Maccaferri solutions for


soil reinforcement works
Thanks to the experience and the technological Soil reinforcement
development of new materials, the soil reinforced Soil reinforcement works are structures for the
structure can be considered as the traditional solution containment or stabilization of slopes and
for reinforcement works. embankments, through traction-resistant reinforcement
Therefore, the numerous applications of these elements that change the mass inner features where
structures demonstrate the validity and the they are inserted.
convenience of these systems: road reinforcement In the case of containment structures, the Soil
works, landfill embankments, noise barriers, river and Reinforcement becomes a technical/structural alternative
rockfall barrier embankments. to reinforced concrete or crib walls.
Maccaferri started its experience in Reinforced Soil As a matter of fact, not only does it have a lower
using double twisted wire mesh with a structure built environmental impact but it is also economically
in Sabah (Malaysia) in 1979; Since then, through competitive. The great flexibility of a Soil Reinforcement
continuous internal technical research and with the structure allows its use even on weak soils, as it is able
cooperation of the most prestigious Research Institutes, to adapt to base settlements with moderate
Maccaferri has now developed a knowledge strong deformations. This type of structure has a great inner
enough to offer the market competitive technical seismic resistance.
solutions able to guarantee durability in time and in In case of slope or embankment stabilization it is
the most difficult situations. possible to minimize the use of granular soil with
The Terramesh system developed by Maccaferri is high geotechnical characteristics by exploiting
formed by pre-assembled units which reduce soils with lower characteristics, gaining
installation time and form the front face and reasonable economic savings; it is always
reinforcement without any discontinuity (without very important to run the stability tests
joints) in order to create a complete system with a by using the actual geotechnical data
wide differentiation both of front face wire mesh of the soil or the one that will be used.
reinforcements, and geogrids.

6-7. Pull-out
test and
direct shear
test on double
twisted wire
3 mesh, ENEL
Hydro,
B e r g a m o - I t a l y.

2
C M Y CM MY CY CMY K

1-2. One of the first


examples of
reinforced soil walls
using gabions with
Soil Reinforced
system along the
road from Sinsuran
to Kota Kinabalu,
Malaysia-Sabah.
5

5. Steel wire and geogrids have proper


p l a s t i c c o a t i n g s t o o p t i m i z e d u r a b i l i t y.

Tests Durability
To provide a correct design the analysis of the materials Durability, resistance, and safety are some of the
behavior fitted in the soil has always been a specific object fundamental elements on which Maccaferri engineers
of study of Maccaferri. Maccaferri went into details in the have concentrated their attention and resources.
study of the behavior of double twisted wire mesh in Durability depends not only on the criteria and the models
compacted granular and cohesive soils (Australian Defence used during the design phase, but also on the technical
Force Academy Camberra, Federal Highway Administration characteristics of the materials used for the work.
USA, ISMES Bergamo, Italy). The selection of materials with appropriate protection
The study of the deformations of different stiffness revetments and the utilization of correct safety
reinforcement (ISMES Bergamo, Italy, Bathurst Canada) parameters in the design activity, make Maccaferri a
has allowed the possibility to develop the combination of leader in the quality standards required by the most
double twisted wire mesh products with high resistance demanding Institutions.
geogrids, thus increasing the range of possible solutions. The Terramesh system is formed by double twisted
Moreover, these tests have given Maccaferri the opportunity wire mesh units made of steel wire protected with a
to obtain appropriate criteria to be used during the design eutectic alloy of zinc and alluminium and rare earths
phase of the work. In addition, the tests have helped to plus an additional plastic coating which can even be
create a new Software (Macstars 2000) which uses the linked to polyester geogrids, polyolefin coated, to
most advanced geotechnical techniques on soils behavior. provide optimum durability up to 120 years as required
by the most strict international requirements.

8. Research into the behavior of


6
Direct smeare box, testing interface soil/mesh double twist wire mesh as
reinforcement Camberra
LOAD U n i v e r s i t y, N e w S o u t h W a l e s -
PISTON
Australia.
700 DOUBLE TWISTD WIRE
NESLI WELDED ON
STEEL PLATT

WELDING
STUCK SAND
8
STEEL
PLATE

200 200 331

C6 45
C5 C4
1

369 400
CLAY

1500

3
C M Y CM MY CY CMY K

9 10

Fr o n t fa c e s :
criteria for the solution choice
Aesthetic fitting in the surrounding environment.

Regreening possibility thus meaning an adequate filter, presence of a vegetal soil


external layer and in cooperation with experts, execution of hydroseeding and a possible
fitting of plant cuttings. In dry climate or where work maintenance is not planned, it
is advisable to use stony front faces.

Structural continuity with the reinforcement.

The industrial production of Terramesh elements, that ensure the choice of materials and
their quality assembly.
Availability of support technical material and technical assistance at the job-site to ensure a
good result in the placement process.

4
C M Y CM MY CY CMY K

TERRAMESH WITH A VERTICAL FACE 11

TERRAMESH WITH A BATTERED FACE 12

G R E E N T E R R A ME S H 13

11. Retaining wall structure in


Te r r a m e s h S 2 3 m h i g h i n m i n e
i n d u s t r y, S u m b a w a - I n d o n e s i a .

12. Retaining wall structure


a l o n g a r o a d i n Te r r a m e s h S ,
Souther Highlands,
Papua New Guinea.

13. Front face of


G r e e n Te r r a m e s h ,
C a s a l e c c h i o d i R e n o ( B O ) - I t a l y.

5
C M Y CM MY CY CMY K

Th e r e i n f o r c e m e n t : s o l u t i o n s
Te r r a m e s h s y s t e m
3.79 6.30

2.40
2.40
10.80

2.40
2.40
1.20

7.00
14 15

16

14-15-16-17. Retaining
work along race track
at Imola carried out by
using soil type
reinforced green
Te r r a m e s h ,
I m o l a - I t a l y.

17

6
C M Y CM MY CY CMY K

18

Te r r a m e s h s y s t e m + G e o g r i d s
18-19. Road
embankment in
Te r r a m e s h S a n d
geogrids,
A l i a n o ( M T ) - I t a l y.

15. 5 0
19

20 20-21. Slope
stabilization in
geogrids, Passignano
( P G ) - I t a l y.

Geogrids
8.80
8.80

21

7
C M Y CM MY CY CMY K


The T erramesh system
Close cooperation with construction has taken into account the
companies has allowed Maccaferri to characteristics of the soil used during
offer products created to reduce the placement.
placement cost and problems on the The results of the tests have
construction site. demonstrated that a grading, varying
I n s t a l l a t i o n o f t h e Te r r a m e s h system can from 0,02mm up to 6 mm (100% passing)
be easily and rapidly executed by is an optimum scale of values for the
unskilled staff after proper training. e m b a n k m e n t . Yo u c a n a l s o u s e g r e a t e r
Compliance with the installation gradations in case a partial safety factor
instructions given by Maccaferri is is inserted in the reinforcement to
fundamental to obtain a solid, lasting prevent possible coatings damage.
and cost-effective structure. In the case of green face, in order to
In addition, they ensure safety on the obtain the maximum effectiveness in the
job site. greening process, it is necessary to
Compaction and preparation of soil is prepare a small layer of vegetal soil in
carried out with traditional equipment the area immediately lying behind the
in accordance with all relevant local external face.
specifications for road construction. An appropriate hydroseeding and fitting
The structural embankment should be of of plant cuttings will have to be
select good quality granular fill, with a considered to ensure the greening
high draining capacity and high angle of process taking into account the local
internal friction. Particularly its climatic situation, the exposure, the
characteristics must remain unaltered in geometry of the project, and the
time. If this is not possible, it is floristic-vegetation characteristics of
necessary to make sure that the design the area.

22 23 24

8
C M Y CM MY CY CMY K

Diaphragm TERRAMESH S GREEN TERRAMESH


Double twisted wire mesh Double twisted wire mesh
1.0
0
Metallic
reinforced Reinforcing
rods metallic rods

0
Variable

.0
.0
Vari

3
2
able
Vari
able
Reinforcing welded Erosion control
wire mesh element

Single factory-made unit, folded Single factory-made unit, folded and ready to place
and ready to place in position. in position, including the revegetation matrix, an
additional welded mesh panel, triangular
reinforcing steel brackets.

Unit in position, opened out along the Unit in position, opened out along the
folded corner. folded corner to the required slope.

Partition panels (diaphragms) Opening and pivoting of the triangular


attached by wiring on a edges. supporting brackets.

Gabion portion filled with stone, and lid


wired down. Geotextile positioned and
Backfilling up to desired level.
backfilling commenced.

Possible Geogrids
Possible Geogrids

Folding of the face upper side. Placement of the next


Placing next unit on top, possible layer of Geogrids.
unit and attacching by stainless steel rings to the
unit below. Possible layer of Geogrids.

9
C M Y CM MY CY CMY K

C a l c u l a t i o n : t h e f u t u r e b u i lt o n
The design choices are the results of quantitative analysis and not only qualitative or subjective ones. This is the reason
why our company has promoted laboratory, on-site and bibliographical researches, which furthered a series of specific
software like MACSTARS for reinforced soil structures. These instruments were conceived as evolving tools i.e. ductile
instruments that can be updated and improved continuously. This deeds, not words philosophy supports a presence
and a willingness which have characterized Maccaferri as a solution provider, (not only a products one), since last
century up to the beginning of the third millennium.

MACSTARS 2000
Maccaferri Stability Analysis of Reinforced soils
T h e M A C S TA R S p ro g r a m w a s d e v e l o p e d t o c h e c k t h e s t a b i l i t y
of reinforced soils, e.g. structures which ensure slope stability
by using reinforcement units able to absorb the tensile
strength. Furthermore this program allows to conduct the
stability checks in absence of reinforcement, using the Limit
Equilibrium Method.
T h e M A C S TA R S p ro g r a m d i s t i n g u i s h e s i t s e l f f o r i t s
f l e x i b i l i t y, b o t h i n e l a b o r a t i n g s p e c i f i c a n d c o m p l e x
solutions, and for the possibility to verify all the design
aspects considering the various materials of reinforcement,
the different national standards, all the possible external
requirements, the various geometries, the different soil
typologies and the possible hydraulic stresses.
The test are carried out referring to the real geometry
of the reinforced soil structures.
In the case of complex slopes (e.g. due to the presence
of several isolated works); it is possible to represent
the whole-slope, taking into account the mutual
interaction of the works.
B e s i d e s i t s f l e x i b i l i t y, t h e m a j o r i n n o v a t i v e a s p e c t
exists in the opportunity to use deformation methods
(with forced or incremental displacement) that allows
a careful analysis of the reinforcement stresses and
a m o r e r e a l i s t i c v e r i f i c a t i o n o f s t a b i l i t y. T h e
displacement method differs from the traditional
one only for the reinforcements simulation period.
In the rigid method, every force is simulated by
another force equal to the minimum value between
tensile strength and pull-out load.
In the displacement method the reinforcement is simulated
through a force which depends on the deformation exerted on
the reinforcement and on its elasticity characteristics.

25

10
C M Y CM MY CY CMY K

t he past t racks

Possible checks Report


(using Janbu or Bishop methods) are: It is possible to issue a
report which summarizes
Surface stability all projects and results
data. The Report is saved
Internal stability
in a Word file.
Global stability
Sliding
Retaining walls
Sinking

26

11
C M Y CM MY CY CMY K

27

28

2 7 - 2 8 . G r e e n Te r r a m e s h s o u n d b a r r i e r i n
u r b a n a r e a , B o l o g n a - I t a l y.

Our experience
2 9 - 3 0 . Te r r a m e s h S s o u n d b a r r i e r t o p r o t e c t
t o u r i s t v i l l a g e f r o m R o m a P i s a r a i l w a y,
S . V i n c e n z o - I t a l y.

29 30
5.00

4.00

12
C M Y CM MY CY CMY K

3 1 , 3 2 . R e t a i n i n g s t r u c t u r e i n G r e e n Te r r a m e s h
t o e x t e n d i n d u s t r i a l b u i l d i n g , A r c e v i a ( A N ) - I t a l y.

31

32

33 34

3 3 - 3 4 . G r e e n Te r r a m e s h r e t a i n i n g
s t r u c t u r e t o e x t e n d t o l l b a r r i e r,
V i l l e s s e ( G O ) - I t a l y.

13
C M Y CM MY CY CMY K

35

36

35-36-37. Road
restructuring using
G r e e n Te r r a m e s h ,
Va l l e d O g n a ( B G ) - I t a l y.

37

3 8 - 3 9 . G r e e n Te r r a m e s h r e t a i n i n g
w a l l , C i v i t a n o v a M a r c h e ( M C ) - I t a l y.

38 39

14
C M Y CM MY CY CMY K

40 41

40-41. Slope
stabilization with
geogrids,
Ta p e i - Ta i w a n .

42. Road embankment


and culvert protection
w i t h Te r r a m e s h S
and gabions,
Picerno/Baragiano
42 ( P Z ) - I t a l y.

43

44

43-44. Green
Te r r a m e s h W a t e r
retaining wall,
Masseria Crisci
( M T ) - I t a l y.

15
C M Y CM MY CY CMY K

45 46

45-46. Retaining wall and hydraulic


w o r k s w i t h G r e e n Te r r a m e s h W a t e r,
U g o v i z z a ( U D ) - I t a l y.

47-48. Road embankment using


g e o g r i d s a n d G r e e n Te r r a m e s h m i x e d
s t r u c t u r e , V i l l a m a s s a r g i a ( C A ) - I t a l y.

47

48

54. Slope stabilization,


Jastrzebiej Gorze-Poland.
16
C M Y CM MY CY CMY K

49 50

51 52

49. Green
Te r r a m e s h
retaining
structure,
B o l o g n a - I t a l y.

50. Retaining wall for


new parking area with
G r e e n Te r r a m e s h ,
A r i c c i a ( R M ) - I t a l y.

52. Retaining wall


s t r u c t u r e w i t h Te r r a m e s h S
51. Retaining structure with
in mine industry ,
Te r r a m e s h S f o r n e w
Sumbawa-Indonesia.
residential area,
Christchurch, -New Zealand.

53

54

17
C M Y CM MY CY CMY K

55

55-56. Green
Te r r a m e s h r e t a i n i n g
structure
in Fori Imperiali
archeological area,
R o m a - I t a l y.

56

60

60-61-62. River bank protection


57
for environmental rearrangement
and the construction of a
c y c l e f o o t s t e p u s i n g Te r r a m e s h ,
C a s a l e c c h i o d i R e n o ( B O ) - I t a l y.

5 7 . Te r r a m e s h S r e t a i n i n g
w a l l , Yo u g D o u g E x p r e s s
Way-South Korea.

18
C M Y CM MY CY CMY K

58

58. Hydraulic protection with


Te r r a m e s h S a n d g a b i o n s ,
V e l l a r i v e r, S u l m o n a ( A Q ) - I t a l y.

59

59. Retaining structure in Sidney


2000 Olympic Site-Australia.

62

61

63. Geogrids retaining structure 64. River bank protection with


for enlargement of a road, G r e e n Te r r a m e s h W a t e r,
A r c o l a ( S P ) - I t a l y. C o g n e ( A O ) - I t a l y.

63 64

19

Das könnte Ihnen auch gefallen