Beruflich Dokumente
Kultur Dokumente
About us
Incorporated on May 16,16 1992
Licensed to distribute natural gas
In 2000 was Licensed to distribute
LPG
Distribute NG and LPG through
pipeline within peninsular
Malaysia
Introduction to Gas Malaysia
Shareholders
Introduction to Gas Malaysia
Regulatory Framework
MINISTRY OF ENERGY, PRIME MINISTER DEPT
GREEN TECHNOLOGY & ECONOMIC PLANNING
WATER UNIT
LPG COMPONENTS &
CHARACTERISTICS
LPG Components
p
OTHERS
0.5%
PROPANE
39 5%
39.5%
BUTANE
60%
LPG Characteristics
Tasteless
Colorless
Originally
O i i ll odorless
d l
Non-toxic
LPG Characteristics
Air
LPG
METHANE
92.2%
NG Characteristics
Tasteless
Colorless
Originally
O i i ll odorless
d l
Non-toxic
NG Characteristics
NG
Air
Description
p LPG NG
Mainly Mainly
Components propane & methane
butane
Specific
p g
gravity
y ((air = 1.0)) 1.92 0.61
COMMERCIAL
2nd STAGE
REGULATOR
PE p
pipe
p
70 psii 100 psii 5 psi 0.5 psi
RESIDENTIAL
BULK TANK
LPG Bulk Tank
LPG Cylinder Manifold
Supply Concept
NG Transmission System
y
JDA
LAWIT
K
Kangar JERNIH
Gurun
BEKOK
Phase 3 RESAK
Tok Arun
SOTONG
DUYONG
Kertih Phase 1
PGU Loop 1
NATUNA
Kuala Lumpur Phase 2
PGU Loop 2
Putrajaya
PENINSULAR KLIA
Segamat
NG Distribution System
1000 psig
District Regulating
Odorizer Station
City Gate Station Station 4 3 psig
4.3 i
Feeder Distribution M
Line Line
PGU
M
260 psig 60 psig
Internal M
Piping
Multiple End-users/
Shopping Complexes
Area Station Internal
Distribution Piping
Line
M
60 psig
0.43 psig
M = METER
Residential
NG Station
CODES AND
STANDARDS
Codes and Standards
N
No Pi i
Piping Section
S ti C d
Codes, St d d and
Standards d Engineering
E i i Practice
P ti
GMB Objective
Obj ti
To ensure supply is
Safe
Stable
St bl
Continuous
GMB Commitment
Key Responsibility
Daily Operations
Pipeline Inspection and surveillance
Facilities maintenance
Third party supervision
GMB Commitment
Key Responsibility
Responsibility continuation
Emergency Response
Call attended:
Supply Interruption
Number
Item Category
of calls
1. Due to system failure/misoperation 12
at GMB's facilities
2
2. Due to third party 50
3. Due to customers 136
T t l
Total 198
Jan Sep 2013
THANK YOU
GMB Responsibility
Call attended:
Gas Leak
Number of
Item Category
calls
1
1. Due to system failure/misoperation at 107
GMB's facilities
2. Due to third party 2
3. Due to customers 56
Total 165
Call attended:
Others
Number of
Item Category
calls
1. Gas release 18
2. Fire 5
3. High Pressure 3
4
4. L
Low Pressure
P 33
5. False alarm 143
6. Others 7
Total 209