Sie sind auf Seite 1von 9

3G NODE B SITE FOLDER

3G NODE B

SITE FOLDER

Site Name:-

Site IMID;-

Address:-

PAGE 1 (9) Anand 98264-70192


3G NODE B SITE FOLDER
SITE NAME Site IMID Town Name -

1 SITE & EQUIPMENT DETAILS


1.1 NODE B SITE LOCATION

SITE NAME
SITE IMID

ADDRESS

CO-ORDINATES
Latitude Longitude Remarks

SITE INFRA DETAILS


Building Ht RTT Tower Ht GBT Tower Ht ID / OD Shelter Type

1.5 CONTACT DETAILS

SITE O&M ENGINEER


MOBILE :

MAIL ID :
1.2 Cabinet Type

INDOOR INDOOR OUTDOOR DBS


Model No. RBS6201 RBS6202 RBS6101 RBS 6601
Mounting Type NA NA NA
No. Of Cabinets NA NA NA 1 Nos
No. Of Carriers NA NA NA 11 Nos
2G Hardware (No. Of
NA NA NA
RUG / RUS)
Config of 2G Hardware NA NA NA

1.3 Site Configuration


Sector 1 Sector 2 Sector 3 Sector 4
No. Of Carriers 3G 11 Nos 11 Nos 11 Nos N/A
No. Of Carriers 2G 1 Nos 1 Nos 1 Nos N/A

Frequency Band Used: 900 MHz 1800 MHz 2100 Mhz

PAGE 2 (9) Anand 98264-70192


3G NODE B SITE FOLDER
SITE NAME Site IMID Town Name -

1.4 Equipment Serial Numbers -


1 2 3 4 5 6
DUW NA NA NA NA NA
RUW / RRUW NA NA NA
DUG NA NA NA NA NA NA
RUG NA NA NA NA NA NA
RUS NA NA NA NA NA NA

2 ANTENNA & FEEDER SYSTEM


2.1 Antenna and Feeder System Configuration

Sector
Antenna Sector 1 Sector 2 Sector 3
4
Antennae Type
*3G Antennae, Multi-Port (4-Port)
Multi-Port 6-Port)

Antennae Make Andrew Andrew Andrew

Antennae Serial No.

Antennae Height

Antennae Azimuth

2G Mechanical Down Tilt

2G Electrical Down Tilt

3G Mechanical Down Tilt

3G Electrical Down Tilt

External Jumper (m.)

Internal Jumper (m.) NA NA NA

Grounding Kits Installed N/A NA NA

Weather Proofing Done Done Done


Installed

Additinal Remark
Feeder Type OFC OFC OFC
*OFC or RF Feeder

RF Feeder Type NA NA NA

Feeder / OFC Length Mtr. Mtr. Mtr.

Clamping of Feeder / OFC Yes Yes Yes

PAGE 3 (9) Anand 98264-70192


3G NODE B SITE FOLDER
SITE NAME Site IMID Town Name -

2.2.1 Measurements ChecklistNOT APPLICABLE IN THIS PHASE

Sector SECTOR 1 Remarks


900 GSM 1800 GSM 2100 3G
MEASUREMENT TxRx RxD TxRx RxD TxRx RxD
VSWR NA NA NA NA NA NA
Return loss with NA NA NA NA NA NA
Feeder Terminated
Distance to Fault (DTF) NA NA NA NA NA NA

Sector SECTOR 2 Remarks


900 GSM 1800 GSM 2100 3G
MEASUREMENT TxRx RxD TxRx RxD TxRx RxD
VSWR NA NA NA NA NA NA
Return loss with NA NA NA NA NA NA
Feeder Terminated
Distance to Fault (DTF) NA NA NA NA NA NA

Sector SECTOR 3 Remarks


900 GSM 1800 GSM 2100 3G
MEASUREMENT TxRx RxD TxRx RxD TxRx RxD
VSWR NA NA NA NA NA NA
Return loss with NA NA NA NA NA NA
Feeder Terminated
Distance to Fault (DTF) NA NA NA NA NA NA

Local Tests
Test OK Not OK Comments
VSWR 1.4
Distance to Fault (including connectors and cables)
<1.05
Antenna visual checking

Note the maximum value of each measurement to the appropriate box

PAGE 4 (9) Anand 98264-70192


3G NODE B SITE FOLDER
SITE NAME Site IMID Town Name -

3 POWER SYSTEM INFORMATION


3.1 General Information

ITEM DETAILS
Power Plant Make
Number of Rectifier modules
DG Condition
Number of 24 V DC Battery
Number of -48 V DC Battery

AC Power supply
Permanent By Generator
Both operational

4. NODE BTRANSMISSION DETAILS

4.1 TRANSMISSION UNIT


CHECK THE TRANSMISSION UNIT MODEL USED:CLICK WHICH CARD & INTERFACE USED

MINILINK E MMU 2C MMU 2D

Interface: ATM IP

2 E1 3 E1 4 E1 . Mbps

MUX MINILINK LTU NEC

5 NODE BINSTALLATION &COMMISSIONING REPORT


5.1 Installation Inspection
CHECKED
ITEM

Node B Installation
Power cable termination and labeling at Node B
Feeder cable termination and labeling at Node B
Grounding of Node B
RRU Installation
RRU Power Cable Lying & termination
Grounding of RRU
Power Distribution Box Installation & Weather proofing
Antenna Installation
Feeder / OFC Installation (Feeder Clamp Incl)
Weather proofing Installation
Jumper Installation
Feeder / OFC Labeling and termination
Tx Cable Routing
General appearance of the site

PAGE 5 (9) Anand 98264-70192


3G NODE B SITE FOLDER
SITE NAME Site IMID Town Name -

5.2 DC Supply Voltages


Measure the voltage of each DC supply at the connector on top of each Node B & RRU - observe correct
polarity!
NODE B Measured Voltage - V DC
RRU Measured Voltage - V DC
MCB FOR NODE B / DUW Amp
MCB FOR RRUW Amp

5.3 Power-up & Functional Test


CHECKED

Power UP GREEN LEDof Node B

Power UP GREEN LED of RRU

Fan Unit of Node B / DUW

Grounding Of Node B

5.4 Internal Alarm Inspection


List any other PERMITTED Active Alarms::NOT APPLICABLE IN THIS PHASE
Active Alarms
Active Alarm Criticality Alarm Description
Present

5.8 External Alarm Inspection All Alarm Checked - - NOT APPLICABLE IN THIS PHASE
Alarm
S. Alarm Alarm Tested Remarks
ALARM DESCRIPTION
N. No Status Polarity

1 Rectifier fail Critical HIGH

2 DGLLOP Minor HIGH

3 Mains fail Critical HIGH

4 AC Off Critical HIGH

5 Low Battery Critical HIGH

6 DG On load Critical HIGH

7 DG Fail to start Critical HIGH

8 Smoke Critical HIGH

9 Low fuel Critical HIGH

10 High temperature Critical HIGH

PAGE 6 (9) Anand 98264-70192


3G NODE B SITE FOLDER
SITE NAME Site IMID Town Name -

5.9 Finishing Checklist


CHECKED
Item DESCRIPTION

1 EQUIPMENT FINISHING
1.1 All cables and connectors restored to normal position for Node B operation
1.2 All connectors properly tightened
1.3 Sector & cable labels had been affixed
1.4 Node B Reset and ready for connection to RNC
1.5 Site cleaned and tidy

SITE PHOTOGRAPHS (OPTIONAL)(Soft Copy Only)


Node B Installation from Front door open Indoor Cable Routing
Node B / DUW Earthing Indoor Labeling
All RRUW Installation and Earthing Outdoor Cable Routing
All Antennae Installation Outdoor Labeling
All RRUW / Ant RF Weather Proofing Conduit on OFC on Horizontal Routing
Junction Box PDU Installation & Weather Proofing Front View of TX Rack
Sealing of Roxtec used for 3G Other Imp Snap

Notes on Node B Commissioning:

CARRIED OUT BY:

Representative Name (Date) Sing.

I&C Team Lead Mr.

O&M Mr.

Project Mr.

PAGE 7 (9) Anand 98264-70192


3G NODE B SITE FOLDER
SITE NAME Site IMID Town Name -

CERTIFICATE OF COMPLETION FOR


NODE B
INSTALLATION, COMMISSIONING &INTEGRATION
SITE NAME

SITE IMID

TOWN NAME

SITE ADDRESS

COMPLETE/OK COMMENTS/
STAGE DEFICIENCY
(INITIALS)
PREPARATIONS INSTALLATION OK
Cabinet Installation OK
Tx Interface Cabling OK
Node B Unit Installation & settings OK
Finishing of the installation OK

COMPLETE/OK COMMENTS/
STAGE DEFICIENCY
(INITIALS)
Equipment Installation OK
Equipment Commissioning OK

Active Alarm Status OK


Final CV after IuB & OnM Status OK
Equipment Commissioning OK
All RRUs Working OK

COMPLETE/OK COMMENTS/
STAGE DEFICIENCY
(INITIALS)
PREPERATIONS INTEGRATION OK
Login of Node B thru OSS OK
Voice Test Call OK
Vedio Test Call OK
Data Test Call OK
Test Calls OK

Representative Date Sing.


Name

I&C Team Lead Mr.

O&M Mr.

Project Mr.

PAGE 8 (9) Anand 98264-70192


3G NODE B SITE FOLDER
SITE NAME Site IMID Town Name -

SITE ACCEPTANCE CERTIFICATE


This is to certify that the said equipment has been accepted
VENDOR NAME

SITE NAME

SITE IMID

SITE ADDRESS

NODE B TYPE
OUTDOOR RBS 6101Floor
INDOOR RBS 6201Floor
INDOOR RBS 6202Stacking Floor Tx Rack
RBS TYPE RBS
Mount
Other Information

Representative (Date) Sing.


Name

I&C Team Lead Mr.

O&M Mr.

Project Mr.

PAGE 9 (9) Anand 98264-70192

Das könnte Ihnen auch gefallen