There are different types of labours that are required for the construction:
Skilled labours
Semi-skilled labours
Unskilled labours
All these types of labours have different skills and different salaries.
Their optimum use in every work in construction is essential to
minimize the construction cost.
The table below shows the recommended labour requirement for various
civil engineering/building/construction works:
S.
Description of work Unit Labour Recommende
No.
Labour
0.50
Concrete : Bhisti
0.10
Mixing by machine (mixer) at
4) M3
banker, cement concrete (with Mixer
0.07
20mm graded coarse aggregate) operator
0.07
Mixer
0.10
mason
1.63
Labour
0.70
5) Mixer mixed cement concrete M3 bhisti
0.07
mixer
operator
0.07
mixer 0.07
vibrator
mason
0.17
0.07
vibrator
mason
0.24
Labour
2.50
bhisti
Reinforced cement concrete in situ in 0.90
7) suspended floors/roofs excluding M3
mixer
form work, and reinforcement. 0.07
operator
0.07
mixer
0.07
vibrator
Mortars:
Mixing by hand, cement mortar of Labour 0.75
8) any mix/proportions (Labour M3
required will be approximately same Bhisti 0.07
for different mix proportions.)
mason 0.08
Labour 0.10
Plastering and pointing:
a) 15mm thick cement plaster to bhisti 0.10
ceiling including mixing of mortar.
mason 0.06
b) 15mm thick cement plaster on M2
13) brick walls (exterior) including M2 Labour 0.10
mixing of mortar M2
bhisti 0.10
c) Tuck pointing to random rubble
masonry in cement mortar including mason 0.10
mixing mortar.
Labour 0.15
bhisti 0.10