Item Procedure

Project information
(20 points)

Project plan
Overall Network (50 points)
Planning Master
Plan
(100 points)
Assignment
interface
(10 points)

Working system
(10 points)

Risk analysis
(10 points)

Area (point, line


and plane)
scenarios division
20 points)

Tender document
traffic model
analysis
(16 points)
RF Nominal
Planning
Verification Tender document
(100 points) capacity
requirement
analysis
(16 points)
Verification
(100 points)

Tender document
coverage
requirement
analysis
(18 points)

Network quality
(KPI) acceptance
methods and
standard analysis
(18 points)
Risk analysis
(12 points)
Cluster definition
(20 points)

Test route
(20 points)

Cluster
Definition&KPI
(100 points)

KPI
60 points)
Network Preplanning CheckList

CheckList

Project background and scale (5 points)


Coverage area and capacity distribution (10 points)
Wireless networking structure (5 points)
Project planning, structure optimization, and list of key posts (10 points)
Project progress plan, key points, and time points (12 points)
Key point plan outpout report (10 points)

HR plan (Assignment based on areas is required for a big project) (10 p

Project tools and vehicle plan (Assignment based on areas is required for a big project)8 points)

Cooperation party, Huawei and customer working interface (10 points)

Routine working system (5 points)


Project management system (5 points)

Project risk analysis (10 points)

Dense urban area division (divide the range and dimension of specific
area, and understand the terrain structure and traffic distribution). (4
points)
Urban area division (divide the range and dimension of specific area,
and understand the terrain structure and traffic distribution). (4 points)
Suburban area division (divide the range and dimension of specific
area, and understand the terrain structure and traffic distribution). (4
points)
Rural area division (divide the range and dimension of specific area,
and understand the terrain structure and traffic distribution). (4 points)
Other service area division (such as major areas, transport artery and
indoors, divide the range and dimension of specific area, and
understand the terrain structure and traffic distribution). (4 points)
Analyze and understand voice service traffic models in different
scenarios. (6 points)
Analyze and understand data service traffic model in different
scenarios(6 points)
Analyze and understand other auxiliary service models in different
scenarios. (4 points)
Analyze and understand the overall capacity requirement analysis of
tender document,and the voice and data service capacity division
requirements in different scenarios. (8 points)

Understand the capacity calculation process and output requirement


of the tender document. (8 points)
Analyze and understand the overall coverage requirement analysis of
tender document and coverage probability requirement in different
scenarios. (9 points)

Understand the coverage calculation process and output requirement of

Analyze the KPI requirement and risk on voice and data services from t

Analyze the technical risk of the project. (12 points)

Project Cluster division and definition principle. (20 points)

Cluster DT route. (20 points)

Cluster route-based DT indexes. (10 points)

DT index test methods (long call, short call and MS location). (10 point

Traffic statistics index and evaluation methods. (20 points)

Traffic statistics index definition formula. (20 points)


ork Preplanning CheckList
Project owner

Evaluation basis Output requirement

Clarify and understand deeply the project


Clarify and understand deeply the project
Clarify and understand deeply the project
Be rational and support the project
Conform to the requirement of project te
Conform to the requirement of project te

Conform to the requirement of project te RNP&O Project Plan Report(Master Plan)


Conform to the requirement of project te

Clarity and conform to the requirement of

Conform to the requirement of project te


Conform to the requirement of project te

Completeness and deepness

Analyis and clarity

Analyis and clarity

Analyis and clarity

Analyis and clarity

Analyis and clarity

Analyis and clarity

Analyis and clarity RF Nominal Planning Verfication Report

Analyis and clarity

Analyis and clarity

Analyis and clarity


Analyis and clarity

Analyis and clarity

Analyis and clarity

Completeness and deepness

Completeness and clarity

Cluster Definition Report


Completeness and clarity

Completeness and clarity

Completeness and clarity


Detail RNP&O Acceptance test standard and
method
Completeness and clarity

Completeness and clarity


Item Procedure

Site selection
(20 points)
CW Test Data processing
(100 points) (50 points)
Verification
(30 points)

MI collection Information collection and


and analysis analysis
(100 points) (100 points)

Survey principle
RF Survey (60 points)
(100 points)

Survey report
(40 points)
Site selection
(30 points)
Interference
measurement
(100 points) Test method
(70 points)

Analysis of drive test and


dialing test for existing
network
(30 points)

Existing
Network Existing network
Evaluation performance analysis
(Swap Project) (40 points)
(100 points)

Analysis of the operation


of the existing network
equipments
(30 points)
Network
Evaluation
(Swap Project)
(100 points)

Analysis of the operation


of the existing network
equipments
(30 points)

Capacity planning
analysis
(20 points)

Coverage planning
analysis
(20 points)

Frequency plannng
analysis
(10 points)

Practical
planning
(100 points)
Parameter planning
analysis
(10 points)
Practical
planning
(100 points)
Parameter planning
analysis
(10 points)

Device and special


requirement analysis
(20 points)

Network emulation and


adjustment
(20 points)
Network Planning CheckList

CheckList Evaluation basis

Principles of site selection and definition of clutter type (10 points) The landform of the selected sit
Actual number of selected sites for each clutter type (10 points) Completeness? Be consistent wi
Original data of model correction (20 points) Availability and completeness
Process of model correction and final results (30 points) Rationality
Verify the corrected model in actual drive test (30 points) Accuracy

Collect the information about key areas, such as business hall, high-
traffic area, government building, commercial area, VIPs residence Completeness
and office, and hospital. (30 points)
Communicated with customers on their expectation, coverage and
Communicate completely.
capacity requirement, and key areas. (30 points)
Investigate existing networks and competitors networks in key areas. (2Completeness
Predict the traffic distribution in coverage areas based on customers r Completeness and rationality
Consider key areas coverage and hotspot coverage during the site
Rationality
selection. (10 points)
Consider rational BTS distribution principle during site selection (10
Rationality
points)
Make good use of original site during the site selection. (10 points) Rationality
Consider the height during site selection. (10 points) Rationality
Consider the blockings (including mircowave blocking) during the site
Rationality
selection (10 points)
Consider the electromagnetism environment during the site selection.
Rationality
(10 points)
Guide the engineering installation and describe the problems that must Guidance and clarity
Represent survey principle. (20 points) Clarity
Site selection. (15 points) Completeness
Sampling ratio. (15 points) Reflect electromagnetism backg
Test time period. (10 points) Rationality
DT and designated test modes (10 points) Rationality
Test bandwidth (10 points) Rationality
Detail the electrical measurement data and test the areas with
Rationality
interference and provide the processing suggestions. (40 points)
Perform drive test and dialing test have been for the total network
(including street); Provide the record and report for detailed Completeness and rationality
information of the drive test and dialing test. (15 points)
Find out the areas with coverage problem, abnormal index, and user
Completeness and rationality
complaint and test the areas. (15 points)
Analyze the traffic statistics has been analyzed in detail according to
customers requirements on KPI or according to the KPI requirements Completeness and rationality
specified in Huawei half-month report. (20 points)
Define traffic statistics formulas used in the existing network. (20
Clarity and correctness
points)
Check the current BTS (installation equipment, antenna feeder
Clarity and correctness
performance, and equipment alarming). (10 points)
Analyze the indexes about carrier power and combiner loss of the
Clarity and correctness
current network. (10 points)
The RNP&RNO parameters of the current network have been
Clarity and correctness
thoroughly checked and analyzed (10 points)
Analyze the overall capacity requirement of tender document in detail. ( Rationality and secnarios-base
Analyze the traffic distribution in different scenarios in detail. (2 points) Consistency
Consider the location area division and paging capacity. (2 points) Deduction based on formula.

Consider the channel configuration strategy (TCH, SDCCH, CCCH


Rationality
configuration mode, and data service channel). (2 points)

Consider the traffic balancing strategy of dual-band network. (2 points) Rationality

Select the BTS type in different secnarios based on capacity requiremenRationality and precaution

Provide the detailed result of capacity planning (including BTS Rationality and precaution
quantity, and TRX quantity in different scenarios. (3 points)

Consider the effect on capacity planning from the technologies (half Rationality
rate, compact reuse, and AMR). (2 points)
Consider future capacity expansion (2 points) Rationality
Understand the coverage probability requirements in different scenarios.Rationality and correctness
Consider the coverage parameters in different scenarios (sucn as the
Rationality
RACH minimum access level). (2 points)
Consider the BTS power requiremets in different scenarios. (3 points) Rationality
Detail the link budgets in different scenarios. (4 points) Rationality
Provide the detailed results of coverage planning (BTS quantity,
carrier quantity, combiner selection, PBU, and TMA in different Rationality
scenarios). (4 points)
Consider future capacity expansion. (3 points) Rationality
Plan the frequency based on the bands provided by the customers. (2
Rationality
points)
Perform the BSIC planning and intra-frequency intra-BSIC check. (1
Rationality
point)
Consider the difference of frequency planning between BCCH and
Rationality
TCH. (1 point)
Whether the frequency reuse modes meet the capacity quality
Rationality and secnarios-base
requirement (1 point)
Select and design the frequency hopping parameters have been
Accuracy and consistency
designed and selected (1 point)
Consider the frequency reuse modes in different scenarios. (2 points) Use CW calibration model
Completeness and reflect the
Whether there are channel numbers reserved for future use (1 point)
future conditions of network
Perform C/I emulation analysis(1 point) Rationality
Perform the engineering parameter planning (including BTS location,
Rationality
antenna azimuth, tilt, and mounted height) (2 points)
Perform the LAC planning and CI planning. (1 point) Rationality and precaution
Perform the adjacent cell planning (1 point)
Plan power control parameters. (1 point)
Plan access parameters. (1 point)
Plan handover parameters. (1 point)
Plan data service performance parameters. (2 points)
Plan other network perforance parameters (including paging, channel
management, cell selection and reselection, and cell attribute
parameters). (1 point)
Formulate the principles of RF planning (including RF engineering
parameters, antenna type, and coverage capacity). (2 points)
Use different BTS devices to implment the optimization networking
(including macro-BTS, micro-BTS, ominidirectional BTS and
directional BTS). (2 points)
Consider the adoptation of different types of antennas to implement
flexible networking (including directional antenna, omnidirectional
antenna, electrically controlled antenna, and antenn with different
gains and electrical tilts). (2 points)
Consider the repeater or micro-BTS for special coverage areas (2
points)
Provide other special solution requirements (including indoor
coverage, high-level building coverage, and metro coverage, tunnel
coverage, and sea surface coverage) (3 points)
Use special technologies (including half rate, IUO, EMLPP, AMR, EFR,
6-cell, Co-BCCH, dual-timeslot,co-antenna feeder, and trunking) (2
points)
The devices support the freuencies provided by customers and
provide sufficient protection bands. (2 points)
Consider the inter-system problems, such as inter-system handover
and roaming. (1 point)
Consider the inter-system mutual interference and antenna-feeder
isolation. (2 points)
Consider the collocation with partners. Because the device
performance and parameter configuration are different, the negotiation
is requried. It helps improve the running quality and user feelings of
overall network (2 points)
Set longitude and latitude of the BTS, antenna data (including antenna
type, antenna gain, antenna height, azimuth angle, and title angle), Accuracy and consistency
feeder loss, and power (3 points)
Propagation model (4 points) Use CW calibration model
Completeness and reflect the
Coverage and C/I emulation (4 points)
future conditions of network
Traffic distribution based on MI information (3 points) Rationality
Layout of the BTS addresses based on MI information (3 points) Rationality
Analysis of emulation result and qualified KPI (3 points) Rationality and precaution
CheckList
Project owner

Output requirement

CW Test Report

MI Collection and analysis Report

Radio survey summary tableEngineering


parameter table

Interference Measurment Report

Existing Network Evaluation ReportBenchmark Report


Existing Network Evaluation ReportBenchmark Report

Network Planning Report; Simulation


Plots;Network parameter design report
Network Planning Report; Simulation
Plots;Network parameter design report
Item Procedure

Antenna installation
quality check (25 points)

Antenna feeder
installation quality check
(25 points)

Site Audit(report
inspection ratio
100%; On field
spot check ratio BTS RF installation
5%) qualitiy check (20 points)

Baseband installation
quality check (15 points)

BSC alarm analysis and


quality check (15 points)

Single site verification (40


points)

Network
Cutover (100
points)

Cutover scheme

DT analysis ( 30 points)

Neighbor cell planning (20


points)

Drive Test (100


points)
Drive Test (100 Coverage parameter
points) adjustment (30 points)

DT optimization report (20


points)

Existing network load


analysis (5 points)

Traffic statistics analysis

BSC alarm analysis (5


points)

Load related parameters


adjustment suggestions (5
points)

Access/Paging
parameters optimization
(10 points)

Handover parameters
check and optimization
KPI Opt. (100 (10 points)
points)
Power control parameters
check and optimization (5
points)

Data service common


optimization parameters
optimization (10 points)
Data service common
optimization parameters
optimization (10 points)

BTS common parameters


check and optimization
(10 points)

Other common
parameters optimization
(10 points)

System performance
optimization (10 points)

Complaints collection (10


points)
Network Optimization CheckList

CheckList Evaluation basis

Antenna is mounted based on planning suggestions (mounted height,


Coverage ratio and report time
azimuth and tilt angle). (15 points)
Installed antenna parameters are consistent with engineering
Coverage ratio and report time
parameters summary. (15 points)
Check the BTS installation quality through RSSI and all the RSSI
Coverage ratio and report time
installation checking indexes are normal. (10 points)
SWR test is conducted for BTS antenna feeder system and the SWR
is normal. Each BTS has SWR testing record and BSC has no SWR Coverage ratio and report time
alarm. (10 points)
BTS antenna feeder connectors are secure. (5 points) Coverage ratio and report time
Check the BTS installation quality through RSSI and all the RSSI
Coverage ratio and report time
installation checking indexes are normal. (6 points)
Execute BTS Rx power tracing command to trace the Rx powers of all
Coverage ratio and report time
the BTSs and BTS Rx power is normal. (6 points)
BSC has no RF components connection alarm. (4 points) Coverage ratio and report time
BTS RF components connection is secure. (4 points) Coverage ratio and report time
BSC has no baseband frame board alarm. (5 points) Coverage ratio and report time
All the BCKM boards work normally and 8 satellites are blocked. (5
Coverage ratio and report time
points)
All the boards operate normally. (5 points) Coverage ratio and report time
No Abis connection or blinking alarm (5 points) Coverage ratio and report time
No board operation alarm. (5 points) Coverage ratio and report time
BSC clock board operates normally. (5 points) Coverage ratio and report time
Check engineering parameters (antenna parameters and snapshoot)
Attached pictures and problem
(8 points)
Check network parameters (SID/NID,PN, neighbor configuration and
Completeness
system parameters) (8 points)
Rx DT and rationality analysis (8 points) Rationality
Rx_Qual DT and rationality analysis (8 points)
Call access, call drop, handoff and voice quality analysis (8 points) Rationality
Assign manpower, vehicle and tools (10 points) Rationality and customer satisf
Specific test plan (20 points) Rationality and completeness
Cooperate with the engineers of product side (10 points) Rationality
Risk analysis and mitigation measures (20 points) Rationality and completeness
Conduct a detailed DT (including streets) for the overall network, and
Completeness and typical anal
output detailed DT record and analysis report. (15 points)
Rx, Tx, Ec/Io and FER of overall network are normal. If some indexes
Completeness and typical anal
in an area are abnormal, output an analysis report. (15 points)
Conduct a systematical neighbor optimization based on actual network
Completeness,timeliness and
topology, DT result and customer complaints. (20 points)
Adjust the antenna parameters of the area with problems and output
the analysis report. After the parameters are adjusted, make a Completeness,timeliness and
comparsion and output an analysis report. (15 points)
Adjust the pilot power coverage parameters of the area with problems
and output the analysis report. After the parameters are adjustment, Completeness,timeliness and
make a comparsion and output the analysis report (15 points)
Update in time all the adjustment parameters to engineering
Completeness and timeliness
parameter summary. (5 points)
Troubleshoot in time the engineering quality problems found during the
Completeness and timeliness
DT. (5 points)
Output DT optimization report. (10 points) Completeness and timeliness
According to the traffic statistics, analyze in details existing network
Systematicness
load distribution and filter the cells with problems. (2 points)

Consider the future netowrk expansion. (2 points) Systematicness

Collect network load related complaints from the customer. (1 point) Systematicness

In the BSC performance statistics, main indexes (access success rate,


call drop rate, congestion rate, handoff success rate and paging Systematicness
success rate) are normal. (3 points)
In the BTS performance statistics, sector indexes of each BTS (access
success rate, call drop rate, congestion rate and handoff success rate) Systematicness
are normal. (3 points)
In the BTS power control statistics, sector indexes
Systematicness
(FER,EbNt,RSSI,and POWR) are normal. (2 points)
In the BTS channel statistics, BTS load is normal. (2 points) Systematicness
No Abis connection or blinking alarm (2 points) Systematicness
No board operation status alarm (2 points) Systematicness
BSC clock board operates normally. (1 point) Systematicness

Adjustment of traffic control parameters is rational (dualband network


strategy, load switch, CRO, CRH, and layer-vevel priority setup) (5 Systematicness
points)
Adjustment of basic paging and access parameters (access grant
reserved blocks, frames coding between the same paging, extended
Systematicness
transmission gaps, maximum retransmission times, random access
error threshold, and paging times) (5 points)
Adjustment of coverage parameters of problematic areas is conducted
(RACH minimum access level and MS minimum received level grade, Systematicness
and so on) (5 points)
Adjustment of basic handover parameters (minimum downlink power
of handover candidate cells, various handover thresholds, handover Systematicness
hysteresis, and handover switch) (5 points)
Adjustment of basic power control parameters (MS maximum transmit
power, downlink/uplink power increment/decrement level threshold,
Systematicness
downlink/uplink power increment/decrement quality threshold, and
power increment/decrement step) (5 points)
Knowing the QoS, throughput, delay, and reliability of data services of
Systematicness
the serving network (2 points)
Knowing the types of data services of the serving network (WAP,
Systematicness
MMS, EMAIL, WWW, and so on) (2 points)
Knowing the major problems of data services of the serving network (2
Systematicness
points)
Cell reselection parameter CRH is proper (1 point)

Dynamic/Static PDCH allocation strategy is proper (1 point)

PCU-related parameters is proper (1 point)

Record the optimimzation parameters (1 point) Systematicness


Adjustment of basic call drop parameters (SACCH multi-frame
number, radio link invalid counter, T200, T3101, and T3109) (10 Systematicness
points)
Adjustment parameters for special function application (half-rate,
concentric circle, AMR, extended cell, 2G-to-3G interoperation) (5
points)
Adjustment of other parameters (T3212, the second generation of
Systematicness
channel, dynamic adjustment of SDCCH) (5 points)
Optimize the abnormal indexes and analyze the causes. (5 points) Systematicness
Output system performance optimization analysis report. (5 points) Systematicness
Collect the complaints and analyze and filter the information. (5 points) Timeliness, systematicness and

Hanndle the complaints one by one and output processing reports. (5


Timeliness, systematicness and
points)
CheckList
Project owner:

Output requirement

Engineering Parameter Table (Update weekly)

Single site verification Report

Cutover Scheme (RNP Part)

Cluster Drive test data & analysis report


Cluster Drive test data & analysis report

Traffic statistics analysis Report;Worst Cell


analysis Report;Alarm analysis Report

CDD Parameter modify analysis report,


CDD Parameter modify analysis report,

Trouble Shooting Technical problem solution


report;Customer complaint record Table; Problem
investigation report
Network Quality Monito

Item Procedure CheckList

Collect and upload the data to Asia-Pacifc data monitoring center as


Data collection required. (10 points)
(20 points)
Feed back the improvement based on results (10 points)
Network Collect complaints and analyze and filter the information.(10 points)
KPI User complaints collection
(30 points) Handle the complaints and provide corresponding reports.
Monitorin (20 points)
g
(100 Reflect the network trend. (12 points)
pionts) Troubleshoot problems list and analysis report (12 points)
Monitoring Summary
Outstanding issues analysis (8 points)
(50 points)
Network risks and expansion suggestions (8 points)
Introduction to Huawei local employee training (10 points)
uality Monitoring CheckList
Project owner:

Evaluation basis Output requirement

Timeliness and Completeness


KPI daily/Weekly performance monitoring Report
Timeliness
Timeliness,systematicness and c Trouble Shooting Technical problem solution
report;Customer complaint record Table; Problem
Timeliness, systematicness and investigation report
Systematicness
Completeness and systematicne
Systematicness Monitoring Summary Report
Systematicness
Systematicness
Othe

Item Procedure CheckList

Progress (15 points)


Weekly Help (15 points)
Report Risks (20 points)
Routine (70 points)
Work Problems and troubshooting suggestions (20 points)
(100
points) Meeting (Customer and internal) meeting minutes (15 points)
minutes
and FAX
Replies to customer in the format of FAX and filed (15 points)
(30 points)
Training Training Training plan (40 poins)
(100 (100 Training methods (40 points)
points) points) Trainee skills analysis (20 points)
Project Project Project summary (40 points)
Summary Summary
Problme analysis and suggestions (30 points)
(100 (100
points) points) Summary of project participants (30 points)
Other CheckList

Evaluation basis

Completeness
Systematicness
Systematicness
Systematicness
Timeliness and

Timeliness and r
Completeness an
Regularity
Completeness an
Completeness an
Completeness an
Completeness an
Other CheckList
Project owner:

Output requirement

Project Weekly Report

Meeting Minute, FAX

Training Report

Project Summary Report