Sie sind auf Seite 1von 1

NOTE:

4.50 M. SPACING OF FLOOR BEAM SHALL BE


RECKONED CENTER TO CENTER OF THE FLOOR BEAM
4.50
0.15 0.15 0.15 0.15 0.15

0.25 0.25 0.25 0.25 0.25


2.00

16mm MAIN BARS


SPCD. @ 0.15 M. O.C.

ONE-WAY SLAB 2 DETAIL 12mm TEMPERATURE BARS SPCD. @ 0.25 M. O.C.


SCALE: 1:30 METERS
0.25 0.25

6-20mm RSB 10mm RSB STIRRUPS SPCD. @ 4-0.50 M.,


3-0.10 M.,2-0.15 M., ALONG L/4.
0.50

0.50
10mm RSB STIRRUPS SPCD. @ 4-0.50 M., REST @ 0.175 ALONG L/2
3-0.10 M., 2-0.15 M., ALONG L/4.
REST @ 0.175 ALONG L/2
8-20mm RSB
AT SUPPORT AT MID SPAN
6.00
1.00 2.00 1.00 2.00
L/4 L/2 L/4

0.30
12mm STIFFINER BAR

GIRDER BEAM DETAIL


SCALE: 1:20 METERS

PROJECT TITLE PREPARED BY: RECOMMENDING APPROVAL: APPROVED BY: SHEET NO.
REPUBLIC OF THE PHILIPPINES
PROVINCE OF SURIGAO DEL NORTE
MUNICIPALITY OF CLAVER
IMPROVEMENT OF TAGANITO GYM S
BARANGAY TAGANITO
LOCATION: BARANGAY TAGANITO, CLAVER, SURIGAO DEL NORTE
PANFILO P. OCHAVEZ, C.E.
CIVIL ENGINEER
RANDY S. GABELIGNO
KAGAWAD ON INFRA
RENE D. GIJAPON
BARANGAY CAPTAIN