Engineering:
Introduction to
Pavement Engineering
Balingasag By-Pass Rd
S00553MN K1389 + (-810) K1392 + 443
Butuan City-Cagayan de Oro City-Iligan
City Rd
S00473MN 9 K1281 + (-168) K1301 + 372
S00476MN 9 K1329 + (-1589) K1353 + 903
S00485MN 9 K1355 + (-1103) K1399 + 378
S00486MN 9 K1280 + (-818) K1280 + 554
S00564MN 9 K1302 + (-600) K1327 + 418
Dampil-Lagonglong By-Pass Rd
S00551MN K1381 + (-274) K1381 + 124
Gingoog-Claveria-Villanueva Rd
S00569MN 955 K1316 + (-332) K1342 + 074
Gingoog-Wharf Rd
S00568MN 955
Kinoguitan By-Pass Rd
S00549MN K1361 + (-385) K1361 + 499
Lagonglong By-Pass Rd
S00552MN
Looc-Salay By-Pass Rd
S00494MN
Medina By-Pass Rd
S00547MN K1329 + (-703) K1333 + 845
Talisayan By-Pass Rd
S00482MN K1350 + (-467) K1350 + 908
DEO / Functional Classification / Road Name / Road Condition Rating
No
Number Good Fair Poor Bad Total
Assessment
Primary Roads 49.79 32.26 12.88 20.85 4.19 119.97
Butuan City-Cagayan de Oro City-
1-1 49.79 32.26 12.88 20.85 4.19 119.97
Iligan City Rd
Concrete 37.44 12.17 3.50 9.73 2.09 64.93
Region X
2007 620.44 33.76 242.02 896.22 273.39 1,169.61 0.25 169.07 46.45 215.77 296.83 512.61 1,682.22
2008 620.25 33.76 244.56 898.57 279.98 1,178.55 0.36 170.38 43.91 214.64 322.61 537.25 1,715.80
2009 621.55 36.77 245.32 903.65 294.70 1,198.35 - 167.37 43.14 210.51 308.42 518.93 1,717.28
2010 621.55 48.37 248.89 918.82 376.18 1,294.99 - 155.77 39.58 195.35 407.98 603.32 1,898.32
2011 621.55 52.86 249.76 924.17 399.69 1,323.86 - 151.27 38.71 189.99 384.47 574.46 1,898.32
INCREASE / -
DECREASE (0.19) 2.54 2.35 6.59 8.94 0.11 1.31 (2.55) (1.13) 25.77 24.64 33.58
INCREASE /
DECREASE 1.30 3.01 0.76 5.07 14.73 19.80 (0.36) (3.01) (0.76) (4.13) (14.19) (18.32) 1.48
INCREASE /
DECREASE - 11.60 3.57 15.17 81.48 96.64 - (11.60) (3.57) (15.17)99.56 84.39 181.04
INCREASE /
DECREASE - 4.50 0.86 5.36 23.51 28.87 - (4.50) (0.86) (5.36) (23.51) (28.87) -
Introduction: Road and Bridge Statistics
Primary Roads National
Surface Type / Road Primary Roads Grand
% Secondary % %
Condition N-S % E-W % Other Total Total
% Roads
Asphalt 2,874.725 9.17% 569.780 1.82% 2,602.089 8.30% 6,046.594 19.28% 2,847.267 9.08%
8,893.86
1 28.36%
2,327.25
Good 680.247 2.17% 115.542 0.37% 639.363 2.04% 1,435.151 4.58% 892.099 2.84% 1 7.42%
1,590.79
Fair 538.417 1.72% 63.291 0.20% 454.476 1.45% 1,056.184 3.37% 534.607 1.70% 1 5.07%
3,301.25
Poor 1,054.877 3.36% 263.913 0.84% 905.610 2.89% 2,224.401 7.09% 1,076.859 3.43% 9 10.53%
1,120.27
Bad 429.690 1.37% 66.455 0.21% 353.313 1.13% 849.458 2.71% 270.813 0.86% 1 3.57%
No
Assessmen
t 171.494 0.55% 60.579 0.19% 249.327 0.80% 481.400 1.54% 72.888 0.23% 554.288 1.77%
Paved
Concrete 2,231.332 7.12% 1,763.178 5.62% 4,234.392 13.50% 8,228.902 26.24% 7,711.614 24.59%
15,940.5
15 50.83%
2,597.49
Good 314.094 1.00% 215.004 0.69% 869.784 2.77% 1,398.882 4.46% 1,198.613 3.82% 4 8.28%
4,327.51
Fair 464.793 1.48% 511.951 1.63% 1,229.843 3.92% 2,206.586 7.04% 2,120.932 6.76% 8 13.80%
6,234.32
Poor 933.164 2.98% 614.462 1.96% 1,522.901 4.86% 3,070.527 9.79% 3,163.800 10.09% 7 19.88%
2,135.90
Bad 365.741 1.17% 219.807 0.70% 513.160 1.64% 1,098.708 3.50% 1,037.196 3.31% 5 6.81%
No
Assessmen
t 153.540 0.49% 201.954 0.64% 98.705 0.31% 454.199 1.45% 191.073 0.61% 645.272 2.06%
4,924.74
Good 994.340 3.17% 330.546 1.05% 1,509.146 4.81% 2,834.033 9.04% 2,090.712 6.67% 5 15.70%
5,918.30
Fair 1,003.209 3.20% 575.242 1.83% 1,684.319 5.37% 3,262.770 10.40% 2,655.539 8.47% 9 18.87%
TOTAL 9,535.58
PAVED Poor 1,988.041 6.34% 878.375 2.80% 2,428.511 7.74% 5,294.928 16.88% 4,240.658 13.52% 6 30.41%
LENGTH 3,256.17
Bad 795.432 2.54% 286.262 0.91% 866.473 2.76% 1,948.166 6.21% 1,308.009 4.17% 6 10.38%
No
Assessmen 1,199.56
t 325.034 1.04% 262.533 0.84% 348.033 1.11% 935.600 2.98% 263.960 0.84% 0 3.83%
Paved Total 5,106.057 16.28% 2,332.958 7.44% 6,836.481 21.80% 14,275.496 45.52% 10,558.880 33.67%
24,834.3
76 79.19%
Earth 0.000 0.00% 3.400 0.01% 0.000 0.00% 3.400 0.01% 60.139 0.19% 63.539 0.20%
Fair 0.000 0.00% 0.000 0.00% 0.000 0.00% 0.000 0.00% 5.165 0.02% 5.165 0.02%
Poor 0.000 0.00% 0.000 0.00% 0.000 0.00% 0.000 0.00% 3.192 0.01% 3.192 0.01%
Bad 0.000 0.00% 3.400 0.01% 0.000 0.00% 3.400 0.01% 51.026 0.16% 54.426 0.17%
No
Assessment 0.000 0.00% 0.000 0.00% 0.000 0.00% 0.000 0.00% 0.756 0.00% 0.756 0.00%
Unpaved
Gravel 45.010 0.14% 679.540 2.17% 983.270 3.14% 1,707.820 5.45% 4,753.381 15.16% 6,461.201 20.60%
Good 3.034 0.01% 8.319 0.03% 73.864 0.24% 85.217 0.27% 430.552 1.37% 515.769 1.64%
Fair 19.791 0.06% 244.027 0.78% 548.816 1.75% 812.634 2.59% 1,910.627 6.09% 2,723.261 8.68%
Poor 11.240 0.04% 293.419 0.94% 230.243 0.73% 534.902 1.71% 1,564.403 4.99% 2,099.305 6.69%
Bad 0.000 0.00% 74.513 0.24% 63.838 0.20% 138.351 0.44% 660.836 2.11% 799.187 2.55%
No
Assessment 10.945 0.03% 59.262 0.19% 66.509 0.21% 136.716 0.44% 186.964 0.60% 323.680 1.03%
Good 3.034 0.01% 8.319 0.03% 73.864 0.24% 85.217 0.27% 430.552 1.37% 515.769 1.64%
Fair 19.791 0.06% 244.027 0.78% 548.816 1.75% 812.634 2.59% 1,915.792 6.11% 2,728.426 8.70%
TOTAL Poor 11.240 0.04% 293.419 0.94% 230.243 0.73% 534.902 1.71% 1,567.595 5.00% 2,102.497 6.70%
UNPAVED Bad 0.000 0.00% 77.913 0.25% 63.838 0.20% 141.751 0.45% 711.862 2.27% 853.613 2.72%
LENGTH
No
Assessment 10.945 0.03% 59.262 0.19% 66.509 0.21% 136.716 0.44% 187.720 0.60% 324.436 1.03%
Unpaved Total 45.010 0.14% 682.940 2.18% 983.270 3.14% 1,711.220 5.46% 4,813.520 15.35% 6,524.740 20.81%
Good 997.374 3.18% 338.865 1.08% 1,583.010 5.05% 2,919.250 9.31% 2,521.264 8.04% 5,440.514 17.35%
Fair 1,023.000 3.26% 819.268 2.61% 2,233.135 7.12% 4,075.404 13.00% 4,571.331 14.58% 8,646.735 27.57%
Poor 1,999.281 6.38% 1,171.794 3.74% 2,658.754 8.48% 5,829.830 18.59% 5,808.253 18.52% 11,638.083 37.11%
SUMMARY
Bad 795.432 2.54% 364.175 1.16% 930.311 2.97% 2,089.917 6.66% 2,019.871 6.44% 4,109.788 13.11%
No
Assessment 335.979 1.07% 321.795 1.03% 414.542 1.32% 1,072.316 3.42% 451.680 1.44% 1,523.995 4.86%
Total 5,151.067 16.43% 3,015.898 9.62% 7,819.751 24.94% 15,986.716 50.98% 15,372.400 49.02% 31,359.116 100.00%
Source: http://www.dpwh.gov.ph/infrastructure/infra_stat/2011%20Atlas/1_1a.htm
Long history of the paved highway
Can be traced back as early as the invention of
the wheel
First used as potters wheels by 3500 BC
First domestication of the horse by 4000 BC
Early Evidence of cart usage leaves ruts
Cart ruts in Phrygia
Valley, Turkey
Vehicle tracks
Thus, usage of pavement in roads
Paved Road in Egyptian Oasis
In Summary
Introduced key concepts of pavement engineering
as used in highways and roads
Concerned with Materials, Design and
Maintenance of Roads.
Photo Credits and sources
http://www.esri.com/news/arcnews/fall09arti
cles/fall09gifs/p19p1-lg.jpg
http://www.rappler.com/move-
ph/issues/budget-watch/115202-open-roads-
adopt-important-roads
http://www.dpwh.gov.ph/dpwh/citizens/accre
ditedCSO