PRASAR BHARATI

OFFICE OF THE DEPUTY DIRECTOR GENERAL(E)


HIGH POWER TRANSMITTER; ALL INDIA RADIO
KINGSWAY; MALL ROAD, DELHI-09.

No. HPTK-11(06)(02)/2014-15/
To
The Additional Director General(E)(NZ) Dated 01-11-2014
Kind Attn: Deputy Director General(AVM)
All India Radio & Doordarshan
Jamnagar House,Shahjahan Road
New Delhi-110011

SUB: Monthly report on the working of 10Kw FM IGNOU


TRANSMITTER for the Month of Oct 2014

Sir,

Find enclosed herewith the above cited subject report for your kind
perusal and further action please.

Yours faithfully

(N K Prasad)
Deputy Director General(E)

Copy to:1. The General Manager,AIR Resources(Kind Attn: Shri


A.K.Taneja) DG AIR Akashwani Bhavan, Parliament
Street,
New Delhi-110011.
2. Director EMPC(By name: Shri K. Ravikant) IGNOU Gyanvani
Maidan Garhi, New Delhi-110068

1
MONTHLY REPORT ON THE WORKING OF 10 KW FM TRANSMITTER
OF IGNOU GYAN VANI CHANNEL FOR THE MONTH OF Oct 2014
PART A

Monthly Report of IGNOU Transmitter for the Month of Oct 2014

Name Transmission Power Diesel


Total Break Down due to (if any)
Tr. Hours Consumption usage
of Station Transmission
Power of Tr. Remarks
Hrs during
(KW) Power Total
From To month Hours Lts. Gear Other
KW Supply B/D

IGNOU
Gyanvani
02
Txr 28 DG
Hrs 12
10kw Nil Nil Nil Nil Nil Nil testing.
Approx 00 Lts
At
Mnts
Pitampura

2
PART B
STATION NAME : IGNOU GYANVANI Transmitter
CITING : FM Pitampura
TRANSMITTER TYPE :

Make & Type BE FM 10 S

Date of Commissioning March 2003

Frequency 105.6 MHz

Actual Power Transmitted 05KW

Total monthly consumption of electricity by 4000 Units (from 21/09/14 to 20/10/14)


IGNOU Transmitter

Status of DG set and A/Cs DG Working OK, Two Window AC


faulty

General routine maintenance of the transmitter Done regularly

Scheduled program hours Monthly Progressive

Hours of Programme Nil 2196 Hrs

Testing hours Nil 45:45 Hrs

Total Hours of working Nil 2241:45 Hrs

Frequency Deviation, if any, reported by any


Nil
agency

Working of interlock O.K.

INTERRUPTION

Monthly Progressive

Gear Nil Nil

Power supply Nil 22 Mts

Other causes Nil Nil

Total (Hrs. ) Nil 21Mts

Total (%) Nil 0.0166%

Remarks: Nil
3
LOW POWER OPERATION (HOURS), IF ANY:- Nil

Exciter Make and Type Fxi 60

Exciter in circuit 1 Nos

Deviation (KHz) 75 KHz

Audio Level (dBm) 0 dBm

Power (W) 24 W

POWER AMPLIFIER

Module FORWARD POWER REFLECTED PANEL METER READING


Nos. (W) POWER
(W)

1 Module out - 05KW

2 265 1

3 316 1

4 339 0

5 394 1

6 335 0

7 316 1

8 290 0

9 Module out

10 371 0

11 369 0

12 346 0

13 324 0

14 316 0

15 311 0

16 112 0

IPA 371 0
4
TRANSMITTER POWER :

TRANSMITTER FORWARD REFLECTED REJECT DEHYDRATION Tx. HALL


POWER POWER LOAD PRESSURE TEMP.
(KW) (KW) (Kg/cm2 )

BE FM 10 S 05 KW 36 W - 5.8psi 25

AUTOMATIC VOLTAGE REGULATOR:

MAKE AND TYPE Sterco

CAPACITY 60 KVA

WORKING CONDITION OK

INPUT VOLTAGE OUTPUT VOLTAGE


(Volts) (Volts)

VR VY VB VR VY VB

245 242 240 218 215 218

DIESEL GENERATOR:

Make and Type Capacity Working Hours used


condition

Kirloskar 70 KVA OK 02 Hours 00 mts

COMBINER/DIPLEXER:

Make and Type Capacity Working condition

R.F.S. Pvt Ltd 25 KW O.K.

DUMMY LOAD:

Make and Type Capacity Working condition

5
Bird Electronic 15 KW OK

A/C UNITS:

Split Window
Number of Units 5 3

Make and Type Voltas 1.Amtrex(1)


2.Carrier(1)
3.Fedders Lloyd(1)

Capacity 2 Tons 1.5 Tons

Working condition OK 1 ok
2 Faulty

ANTENNA SYSTEMS:

Make and Type

Whether on CTI Antenna


i) CTI antenna
ii) AIR antenna or
III) IGNOU antenna

Mounting Height of the antenna 210 meters Approx

Working condition OK

FAILURE OF MAJOR COMPONENTS : Three Power Amplifier and One power


supply module faulty .

AVAILABILITY OF SPARES : a. Power Supply module 1Nos Faulty


b. Power Amplifier 1Nos Faulty
c. Front Panel PCR 1Nos
d. Assy PCB Optically coupled
Relay Tyco Electronics
Potter &Brumfield T90 series 1Nos
e. Self starter Autolek 1Nos Faulty
f. Pallets Two Nos

SPARES RECEIVED DURING THE MONTH : Two power supply module marked
Channai recd from Techno Media after repair.

6
IMPORTANT WORK DONE : Two old Voltas split ACs replaced
By new Hitachi split ACs.

ANY OTHER POINT : Isolation transformer was by


passed as its yellow phase was showing short.
Energy mtr reading is 4000 units because reading is taken from 20/09/14 to 20/10/14
THE DETAILS OF INTERRUPTION CAUSED FROM IGNOU STUDIO: Nil

BREAK DOWN DETAILS

Month Interruption Cause Duration


caused (in Mins). Date From to