IDR 700,000,000.00
IDR 600,000,000.00
IDR 500,000,000.00
IDR 400,000,000.00
COST
IDR 300,000,000.00
IDR 200,000,000.00
IDR 100,000,000.00
IDR -
H=10 m H = 20 m H=
WALL HEIGHT
ar m Penghematan biaya dengan Paramesh System
Concrete Wall Paramesh / Natural Paramesh / Concrete Wall
IDR USD Slope
IDR 155,468,800.00 USD 11,105 8% 44%
IDR 224,908,800.00 USD 16,065 20% 34%
IDR 352,908,800.00 USD 25,208 31% 29%
IDR 592,908,800.00 USD 42,351 40% 43%
Paramesh
Natural Slope
Concrete Wall
H = 30 m H= 40 m
LL HEIGHT
USD to IDR
14000
Influence factor
3.8
H=30m type unit
terramesh system 2.9x3x0.5 8 units
terramesh system 2.9x3x1 13 units
green terramesh 2.9x3x0.7(60) 20 units
paralink 300 300 kN/m 516 m2
terramesh system instalation 2.9x3x0.5 11.6 m2
terramesh system instalation 2.9x3x1 37.7 m2
green terramesh system instalation 2.9x3x0.7(60) 40.02 m2
rock filling for Terramesh 17 m3
backfilling installation and compaction 1000 m3
foundation excavation and levelling 27 m3
pipe (supply and installation) 8.1 m
stone for drainage (supply and installation) 37.41 m3
geotextile (supply and installation) 300 g/m2 326.83 m2
collecting pit installation 1 m
USD to IDR
14000
compacted soil 11.4 USD/m3 Influence factor
3.8
gravel for drainage 7.1 USD/m3
PVC pipe 5.0 USD/m
geotextile 1.5 USD/m2