AcceleratedSAP (ASAP) is SAP's standard implementation methodology. It contains the Roadmap, a step-by-step
guide that incorporates experience from many years of implementing R/3. Along with that, AcceleratedSAP contains
a multitude of tools, accelerators and useful information to assist all team members in implementing R/3. Quality
checks are incorporated at the end of each phase to easily monitor deliverables and critical success factors. ASAP is
delivered as a PC-based package, so that - if required - an implementation project can begin prior to having an R/3
System installed.
AcceleratedSAP (ASAP): A comprehensive solution for the introduction of the R/3 System in your enterprise. ASAP
and most of its tools can be used independently of an R/3 installation.
Useful Links
Accelerated SAP:
http://www.sapfans.com/sapfans/asap/be_02_e.htm
Phase 1 : Project preparation
http://www.sapfans.com/sapfans/asap/be_03_e.htm
Phase 2 : Business Blueprint
http://www.sapfans.com/sapfans/asap/be_04_e.htm
Phase 3: Realization
http://www.sapfans.com/sapfans/asap/be_05_e.htm
Phase 4 : Final Preparation
http://www.sapfans.com/sapfans/asap/be_06_e.htm
Phase 5 : Go Live and Support
http://www.sapfans.com/sapfans/asap/be_07_e.htm
http://en.wikipedia.org/wiki/SAP_Implementation
http://www.sapfans.com/sapfans/asap/be_01_e.htm
http://www.sap-basis-abap.com/sapgeneral/what-is-asap.htm
hi,
The ASAP methodology is recommended by SAP for implementation planning and system implementation. It has the following
phases.
Project Preparation - The primary focus of Phase 1 is getting the project started, identifying team members and developing a
high-level plan.
Business Blueprint - The primary focus of Phase 2 is to understand the business goals of the company and to determine the
business requirements needed to support those goals.
Realization - The purpose of this phase is to implement all the business and process requirements based on the Business
Blueprint. You customize the system step by step in two work packages, Baseline and Final configuration.
Final Preparation - The purpose of this phase is to complete testing, end-user training, system management and cut over
activities. Critical open issues are resolved. Upon the successful completion of this phase, you will be ready to run your
business in your productive R/3 system.
Go Live and Support - Transition from a project oriented, pre-productive environment to a successful and live productive
operation.
Def:The Accelarated SAP is the implementation solution provided by SAPwhich integrates several components that works in
conjunction to support the rapid and efficient implementation of the PROJECT.
1.Project Preparation
2.Business Blue Print
3.Realization
4.Final Preparation
5.Go-Live and Support.
1F ->A1-REQUIREMENTS OR EXPECTATIONS
A2-GENERAL EXPLANATIONS
A3-SPECIAL ORGANIZATIONAL CONSIDERATIONS
A4-CHANGES TO EXISTING ORGANIZATION
A5-DESCRIPTION OF IMPROVEMENTS
1G-TECHNICAL REQUIREMENTS
1H-KICK-OFF MEETING
3E1.SOLUTION INFORMATION
3E2.OBJECT INFORMATION
3E3.REVISION HISTORY....WE HAVE 12 STEPS HERE .....
4.FINAL PREPARATION
WE HAVE 4 STEPS.....
4A.UPLOADING THE STIMULATED DATA
4B.INTEGRATION TESTING
4C.CUTOVER ACTIVITIES
4D.PRE GO-LIVE END USER TRAINING
CHAN