DOOR SCHEDULE
700
1500
700 775
1650
775
KLEC - PARCEL B
STRUCTURAL STRUCTURAL STRUCTURAL
450
LINTEL LEVEL EQ 300 EQ EQ 300 EQ LINTEL LEVEL EQ 300 EQ EQ 300 EQ LINTEL LEVEL TAJUK PROJEK
STRUCTURAL STRUCTURAL STRUCTURAL STRUCTURAL STRUCTURAL FIRE RATED DOOR STRUCTURAL FIRE RATED DOOR
600 600 600 600 900 900
LINTEL LEVEL LINTEL LEVEL LINTEL LEVEL LINTEL LEVEL LINTEL LEVEL
CLOSER REFER TO
IRONMONGERY LINTEL LEVEL CLOSER REFER TO
IRONMONGERY
SCHEDULE SCHEDULE
CADANGAN PEMBANGUNAN BERCAMPUR YANG TERDIRI DARIPADA:-
300MM x 300MM x 300MM x 300MM x
3MM THK. CLEAR 3MM THK. CLEAR
FLOAT GLASS FLOAT GLASS
VIEWING PANEL VIEWING PANEL
1) PARCEL A YANG MENGANDUNGI:-
300
300
10MM SHADOW GAP 10MM SHADOW GAP 10MM SHADOW GAP 10MM SHADOW GAP 10MM SHADOW GAP 10MM SHADOW GAP 10MM SHADOW GAP 10MM SHADOW GAP 10MM SHADOW GAP
2100
50MM x 150MM METAL DOOR FRAME IN SELECTED 50MM x 150MM METAL DOOR FRAME IN SELECTED 50MM x 150MM METAL DOOR FRAME IN SELECTED FINISH TO MATCH 50MM x 150MM METAL DOOR FRAME IN SELECTED FINISH TO MATCH
LEVEL grain
LETAK KERETA 7 TINGKAT DAN RUANG LETAK KERETA BAWAH TANAH
2400
2400
2400
SPRAY PAINT FINISH ( MATTE SURFACE ) SPRAY PAINT FINISH ( MATTE SURFACE ) SPRAY PAINT FINISH ( MATTE SURFACE ) H.W. FLUSH DOOR WITH LOCKSET REFER TO SPRAY PAINT FINISH ( MATTE SURFACE ) LOCKSET REFER TO
LOCKSET REFER TO LOCKSET REFER TO DOOR PANEL DOOR PANEL LOCKSET REFER TO
H.W. FLUSH DOOR WITH PT-3 PAINT FINISH IRONMONGERY IRONMONGERY
IRONMONGERY IRONMONGERY IRONMONGERY
2100
PT-3 PAINT FINISH PT8 PT7 TS1b SCHEDULE SCHEDULE
1 TINGKAT
SCHEDULE SCHEDULE STAINLESS STEEL STAINLESS STEEL STAINLESS STEEL SCHEDULE STAINLESS STEEL
2400
2400
2400
2400
STAINLESS STEEL TIMBER DOOR IN SELECTED TIMBER DOOR IN SELECTED TIMBER DOOR IN SELECTED
LOCKSET REFER TO LOCKSET REFER TO LOCKSET REFER TO HINGES REFER TO HINGES REFER TO LOCKSET REFER TO HINGES REFER TO HINGES REFER TO
HINGES REFER TO SPRAY PAINT FINISH SPRAY PAINT FINISH VENEER FINISH STAINLESS STEEL
IRONMONGERY IRONMONGERY IRONMONGERY IRONMONGERY IRONMONGERY IRONMONGERY IRONMONGERY IRONMONGERY
1550
1550
IRONMONGERY
ii. 1 BLOK PANGSAPURI SERVIS B - 42 TINGKAT DI ATAS PODIUM RUANG
SCHEDULE SCHEDULE SCHEDULE SCHEDULE SCHEDULE SCHEDULE HINGES REFER TO SCHEDULE SCHEDULE
SCHEDULE STAINLESS STEEL STAINLESS STEEL STAINLESS STEEL IRONMONGERY
HINGES REFER TO HINGES REFER TO HINGES REFER TO SOLID TIMBER DOOR SCHEDULE SOLID TIMBER DOOR
1000
INSIDE INSIDE
INSIDE
i. 1 BLOK PANGSAPURI SERVIS (326 UNIT) DAN HOTEL (252 UNIT) -
600 INSIDE INSIDE INSIDE INSIDE
40 TINGKAT
600 600 600 900
ii. 1 BLOK PEJABAT A - 32 TINGKAT
900
iii. 1 BLOK PEJABAT B - 42 TINGKAT
450
OUTSIDE 1500 1650 DI ATAS PODIUM RUANG LETAK KERETA 7 TINGKAT DAN RUANG LETAK KERETA
PLAN
OUTSIDE 2 TINGKAT DI ATAS RUANG LETAK KERETA BAWAH TANAH 3 TINGKAT
OUTSIDE OUTSIDE
PLAN
OUTSIDE OUTSIDE
PLAN PLAN
OUTSIDE OUTSIDE OUTSIDE PLAN PLAN
PLAN PLAN PLAN 3) PARCEL C YANG MENGANDUNGI:-
i. 1 BLOK RUANG PERNIAGAAN 4 TINGKAT DI ATAS RUANG
SINGLE LEAF SERVICE PANEL TIMBER DOOR IN SPRAY PAINT SINGLE LEAF FLUSHED TIMBER DOOR IN SPRAY PAINT SINGLE LEAF FLUSHED TIMBER DOOR IN TIMBER VENEER FINISH SINGLELEAF,
DOUBLE LEAFDOUBLE
FLUSHED TIMBER
SWING, DOORFRAME
METAL IN TIMBER VENEER
SOLID FINISH
TIMBER DOUBLELEAF,
DOUBLE LEAFDOUBLE
SERVICESWING,
PANELMETAL
TIMBERFRAME
DOOR SOLID
IN SPRAY PAINT
TIMBER DOUBLE LEAF, DOUBLE SWING, METAL FRAME SOLID TIMBER SINGLE LEAF SOLID TIMBER SERVICE DOOR IN SELECTED SPRAY
SINGLE LEAF METAL FRAME TIMBER FLUSH DOOR, SINGLE LEAF METAL FRAME TIMBER FLUSH DOOR, LETAK KERETA BAWAH TANAH 3 TINGKAT
FINISH ON BOTH SIDES AND METAL FRAME IN SELECTED FINISH ON BOTH SIDES AND METAL FRAME IN SELECTED ON BOTH SIDES AND METAL FRAME IN SELECTED SPRAY ON BOTH
DOOR, SIDES AND
IN PAINTED METAL
FINISH WITHFRAME
FIXED IN SELECTED
GLASS SPRAY
VIEWING PANEL AND FINISH
DOOR, IN ON BOTH SIDES
PAINTED FINISHAND
WITHMETAL
FIXEDFRAME
GLASS IN SELECTED
VIEWING PANEL AND DOOR, IN PAINTED FINISH WITH FIXED GLASS VIEWING PANEL AND PAINT FINISH ON BOTH SIDES AND METAL FRAME IN SELECTED
DOOR TYPE / D IN PAINTED FINISH D SPRAY PAINT FINISH D SPRAY PAINT FINISH D PAINT FINISH D IN PAINTED FINISH D PAINT FINISH
STAINLESS STEEL KICK PLATE
D SPRAY PAINT
STAINLESS FINISH
STEEL KICK PLATE
D STAINLESS STEEL KICK PLATE
D SPRAY PAINT FINISH ii. 1 BLOK PEJABAT A - 41 TINGKAT
SPECIFICATION 1 WIDTH 600 mm
1a-1y WIDTH 600 mm
1a-2y WIDTH 600 mm
1a-3y WIDTH 600 mm 3 WIDTH 900 mm 4b WIDTH 1500 mm
7a-1y WIDTH 900 mm 8b WIDTH 1650 mm 13a WIDTH 450 mm iii. 1 BLOK PEJABAT B - 18 TINGKAT
HEIGHT 2100 mm HEIGHT 2400 mm HEIGHT 2400 mm HEIGHT 2400 mm HEIGHT 2100 mm HEIGHT 2400 mm HEIGHT 2400 mm HEIGHT 2400 mm HEIGHT 2400 mm
iv. 1 BLOK PEJABAT C - 17 TINGKAT
v. 1 BLOK PEJABAT D - 16 TINGKAT
FLOOR LEVEL ROOM / AREA / LOCATION QTY FLOOR LEVEL ROOM / AREA / LOCATION QTY FLOOR LEVEL ROOM / AREA / LOCATION QTY FLOOR LEVEL ROOM / AREA / LOCATION QTY FLOOR LEVEL ROOM / AREA / LOCATION QTY FLOOR LEVEL ROOM / AREA / LOCATION QTY FLOOR LEVEL ROOM / AREA / LOCATION QTY FLOOR LEVEL ROOM / AREA / LOCATION QTY FLOOR LEVEL ROOM / AREA / LOCATION QTY FLOOR LEVEL
LEVEL vi. 1 BLOK PEJABAT E - 31 TINGKAT
LEVEL BASEMENT 3 ELV 1 LEVEL BASEMENT 3 LEVEL BASEMENT 3 LEVEL BASEMENT 3 LEVEL BASEMENT 3 LEVEL BASEMENT 3 LEVEL BASEMENT 3 LEVEL BASEMENT 3 LEVEL BASEMENT 3 LEVEL BASEMENT 3
LEVEL BASEMENT 2 ELV 1 LEVEL BASEMENT 2 LEVEL BASEMENT 2 LEVEL BASEMENT 2 LEVEL BASEMENT 2 LEVEL BASEMENT 2 LEVEL BASEMENT 2 LEVEL BASEMENT 2 LEVEL BASEMENT 2 LEVEL BASEMENT 2 DI ATAS PODIUM RUANG PERNIAGAAN - 4 TINGKAT DAN RUANG LETAK KERETA 2
LEVEL BASEMENT 1 ELV 1 LEVEL BASEMENT 1 LEVEL BASEMENT 1 LEVEL BASEMENT 1 LEVEL BASEMENT 1 LEVEL BASEMENT 1 LEVEL BASEMENT 1 LEVEL BASEMENT 1 LEVEL BASEMENT 1 LEVEL BASEMENT 1
TINGKAT DI ATAS RUANG LETAK KERETA BAWAH TANAH 3 TINGKAT
LEVEL GROUND ELV 1 LEVEL GROUND LEVEL GROUND ELV 1 LEVEL GROUND LEVEL GROUND LEVEL GROUND F&B STORAGE (H) 1 LEVEL GROUND 1 LEVEL GROUND POULTRY PREP, BAKERY & PASTRY (H) 2 LEVEL GROUND LEVEL GROUND
LEVEL MEZZANINE ELV 1 LEVEL MEZZANINE LEVEL MEZZANINE LEVEL MEZZANINE LEVEL MEZZANINE LEVEL MEZZANINE LEVEL MEZZANINE LEVEL MEZZANINE LEVEL MEZZANINE LEVEL MEZZANINE
LEVEL UPPER GROUND ELV 1 LEVEL UPPER GROUND ELV 1 LEVEL UPPER GROUND LEVEL UPPER GROUND 1 LEVEL UPPER GROUND LEVEL UPPER GROUND LEVEL UPPER GROUND LEVEL UPPER GROUND LEVEL UPPER GROUND LEVEL UPPER GROUND 4) PARCEL D YANG MENGANDUNGI :-
PARKING LEVEL 1 ELV 1 PARKING LEVEL 1 PARKING LEVEL 1 PARKING LEVEL 1 PARKING LEVEL 1 PARKING LEVEL 1 PARKING LEVEL 1 PARKING LEVEL 1 PARKING LEVEL 1 PARKING LEVEL 1 i. 1 BLOK MASJID 2 TINGKAT
PARKING LEVEL 2 ELV 1 PARKING LEVEL 2 PARKING LEVEL 2 PARKING LEVEL 2 PARKING LEVEL 2 PARKING LEVEL 2 PARKING LEVEL 2 PARKING LEVEL 2 PARKING LEVEL 2 PARKING LEVEL 2 II. PLAZA
PARKING LEVEL 3 ELV 1 PARKING LEVEL 3 PARKING LEVEL 3 PARKING LEVEL 3 PARKING LEVEL 3 PARKING LEVEL 3 PARKING LEVEL 3 PARKING LEVEL 3 PARKING LEVEL 3 PARKING LEVEL 3
DI ATAS PODIUM RUANG LETAK KERETA 5 TINGKAT DAN RUANG LETAK KERETA
PARKING LEVEL 4 ELV 1 PARKING LEVEL 4 PARKING LEVEL 4 PARKING LEVEL 4 PARKING LEVEL 4 PARKING LEVEL 4 PARKING LEVEL 4 PARKING LEVEL 4 PARKING LEVEL 4 PARKING LEVEL 4
PARKING LEVEL 5 ELV 1 PARKING LEVEL 5 PARKING LEVEL 5 PARKING LEVEL 5 PARKING LEVEL 5 PARKING LEVEL 5 PARKING LEVEL 5 PARKING LEVEL 5 PARKING LEVEL 5 PARKING LEVEL 5
BAWAH TANAH 2 TINGKAT
PARKING LEVEL 6 ELV 1 PARKING LEVEL 6 PARKING LEVEL 6 PARKING LEVEL 6 PARKING LEVEL 6 PARKING LEVEL 6 PARKING LEVEL 6 PARKING LEVEL 6 PARKING LEVEL 6 PARKING LEVEL 6
PARKING LEVEL 7 ELV 1 PARKING LEVEL 7 PARKING LEVEL 7 PARKING LEVEL 7 PARKING LEVEL 7 PARKING LEVEL 7 PARKING LEVEL 7 PARKING LEVEL 7 PARKING LEVEL 7 PARKING LEVEL 7 DI ATAS LOT-LOT 5, 29, 30, 16, 215, 42, 20001, 20002, 20003, 20012 & 20013
PODIUM DECK ELV 1 PODIUM DECK PODIUM DECK PODIUM DECK ELV 1 PODIUM DECK PODIUM DECK 1 PODIUM DECK HR 1 PODIUM DECK PODIUM DECK PODIUM DECK
DAN PT-PT 27 & 72 MERUPAKAN TANAH KERAJAAN DI ATAS SEKSYEN 95A & 98,
LEVEL 2 ELV 2 LEVEL 2 LEVEL 2 LEVEL 2 LEVEL 2 M&E RISER ROOM 1 LEVEL 2 LEVEL 2 LEVEL 2 LEVEL 2 LEVEL 2
LEVEL 3 ELV 2 LEVEL 3 LEVEL 3 LEVEL 3 LEVEL 3 M&E RISER ROOM 1 LEVEL 3 LEVEL 3 LEVEL 3 LEVEL 3 LEVEL 3
KAMPUNG HAJI ABDULLAH HUKUM ,
LEVEL 4 ELV 2 LEVEL 4 LEVEL 4 LEVEL 4 LEVEL 4 M&E RISER ROOM 1 LEVEL 4 LEVEL 4 LEVEL 4 LEVEL 4 SHAFT 12 LEVEL 4 JALAN BANGSAR, WILAYAH PERSEKUTUAN, KUALA LUMPUR.
LEVEL 5 ELV 2 LEVEL 5 LEVEL 5 LEVEL 5 LEVEL 5 M&E RISER ROOM 1 LEVEL 5 LEVEL 5 LEVEL 5 LEVEL 5 SHAFT 12 LEVEL 5
LEVEL 6 ELV 2 LEVEL 6 LEVEL 6 LEVEL 6 LEVEL 6 M&E RISER ROOM 1 LEVEL 6 LEVEL 6 LEVEL 6 LEVEL 6 SHAFT 12 LEVEL 6
UNTUK:-
LEVEL 7 ELV 2 LEVEL 7 LEVEL 7 LEVEL 7 LEVEL 7 M&E RISER ROOM 1 LEVEL 7 LEVEL 7 LEVEL 7 LEVEL 7 SHAFT 12 LEVEL 7
PROJEK USAHASAMA DI ANTARA DEWAN BANDARAYA KUALA LUMPUR DAN KL
LEVEL 8 ELV 2 LEVEL 8 LEVEL 8 LEVEL 8 LEVEL 8 M&E RISER ROOM 1 LEVEL 8 LEVEL 8 LEVEL 8 LEVEL 8 SHAFT 12 LEVEL 8
LEVEL 9 ELV 2 LEVEL 9 LEVEL 9 LEVEL 9 LEVEL 9 M&E RISER ROOM 1 LEVEL 9 LEVEL 9 LEVEL 9 LEVEL 9 SHAFT 12 LEVEL 9 ECO CITY SDN. BHD.
LEVEL 10 ELV 2 LEVEL 10 LEVEL 10 LEVEL 10 LEVEL 10 M&E RISER ROOM 1 LEVEL 10 LEVEL 10 LEVEL 10 LEVEL 10 SHAFT 12 LEVEL 10
TAJUK CADANGAN
LEVEL 11 ELV 2 LEVEL 11 LEVEL 11 LEVEL 11 LEVEL 11 M&E RISER ROOM 1 LEVEL 11 LEVEL 11 LEVEL 11 LEVEL 11 SHAFT 12 LEVEL 11
LEVEL 12 ELV 2 LEVEL 12 LEVEL 12 LEVEL 12 LEVEL 12 M&E RISER ROOM 1 LEVEL 12 LEVEL 12 LEVEL 12 LEVEL 12 SHAFT 12 LEVEL 12 CADANGAN PINDAAN KEPADA PELAN BANGUNAN YANG TELAH DILULUSKAN
LEVEL 13 ELV 2 LEVEL 13 LEVEL 13 LEVEL 13 LEVEL 13 M&E RISER ROOM 1 LEVEL 13 LEVEL 13 LEVEL 13 LEVEL 13 SHAFT 12 LEVEL 13 BERTARIKH 16 MAC 2015 (NO RUJUKAN BP S1 OSC 2014 1720) KEPADA
LEVEL 14 ELV 2 LEVEL 14 LEVEL 14 LEVEL 14 LEVEL 14 M&E RISER ROOM 1 LEVEL 14 LEVEL 14 LEVEL 14 LEVEL 14 SHAFT 12 LEVEL 14
CADANGAN PEMBANGUNAN BERCAMPUR YANG TERDIRI DARIPADA:-
LEVEL 15 ELV 2 LEVEL 15 LEVEL 15 LEVEL 15 LEVEL 15 M&E RISER ROOM 1 LEVEL 15 LEVEL 15 LEVEL 15 LEVEL 15 SHAFT 12 LEVEL 15
LEVEL 16 ELV 2 LEVEL 16 LEVEL 16 LEVEL 16 LEVEL 16 M&E RISER ROOM 1 LEVEL 16 LEVEL 16 LEVEL 16 LEVEL 16 SHAFT 12 LEVEL 16
LEVEL 17 ELV 2 LEVEL 17 LEVEL 17 LEVEL 17 LEVEL 17 M&E RISER ROOM 1 LEVEL 17 LEVEL 17 LEVEL 17 LEVEL 17 SHAFT 12 LEVEL 17 1) PARCEL B YANG MENGANDUNGI:-
LEVEL 18 ELV 2 LEVEL 18 LEVEL 18 LEVEL 18 LEVEL 18 M&E RISER ROOM 1 LEVEL 18 LEVEL 18 LEVEL 18 LEVEL 18 SHAFT 12 LEVEL 18 1 BLOK PANGSAPURI SERVIS (326 UNIT) DAN HOTEL (252 UNIT) - 40
LEVEL 19 ELV 2 LEVEL 19 LEVEL 19 LEVEL 19 LEVEL 19 M&E RISER ROOM 1 LEVEL 19 LEVEL 19 LEVEL 19 LEVEL 19 12 LEVEL 19
SHAFT TINGKAT
LEVEL 20 ELV 2 LEVEL 20 LEVEL 20 LEVEL 20 LEVEL 20 M&E RISER ROOM 1 LEVEL 20 LEVEL 20 LEVEL 20 LEVEL 20 SHAFT 12 LEVEL 20
SHAFT DI ATAS PODIUM RUANG LETAK KERETA 7 TINGKAT DAN RUANG LETAK KERETA
LEVEL 21 ELV 2 LEVEL 21 LEVEL 21 LEVEL 21 LEVEL 21 M&E RISER ROOM 1 LEVEL 21 LEVEL 21 LEVEL 21 LEVEL 21 12 LEVEL 21
LEVEL 22 ELV 2 LEVEL 22 LEVEL 22 LEVEL 22 LEVEL 22 M&E RISER ROOM, SPRINKLER BREAK TANK 2 3 LEVEL 22 LEVEL 22 LEVEL 22 LEVEL 22 LEVEL 22 2 TINGKAT DI ATAS RUANG LETAK KERETA BAWAH TANAH 3 TINGKAT
LEVEL 23 LEVEL 23 LEVEL 23 LEVEL 23 LEVEL 23 LEVEL 23 LEVEL 23 LEVEL 23 LEVEL 23 LEVEL 23
LEVEL 24 ELV 1 LEVEL 24 LEVEL 24 LEVEL 24 LEVEL 24 M&E RISER ROOM 1 LEVEL 24 LEVEL 24 LEVEL 24 LEVEL 24 LEVEL 24
DI ATAS LOT-LOT 5, 29, 30, 16, 215, 42, 20001, 20002, 20003, 20012 & 20013
LEVEL 25 ELV 1 LEVEL 25 LEVEL 25 LEVEL 25 LEVEL 25 M&E RISER ROOM 1 LEVEL 25 LEVEL 25 LEVEL 25 LEVEL 25 LEVEL 25
DAN PT-PT 27 & 72 MERUPAKAN TANAH KERAJAAN DI ATAS SEKSYEN 95A & 98,
LEVEL 26 ELV 1 LEVEL 26 LEVEL 26 LEVEL 26 LEVEL 26 M&E RISER ROOM 1 LEVEL 26 LEVEL 26 LEVEL 26 LEVEL 26 LEVEL 26
LEVEL 27 ELV 1 LEVEL 27 LEVEL 27 LEVEL 27 LEVEL 27 M&E RISER ROOM 1 LEVEL 27 LEVEL 27 LEVEL 27 LEVEL 27 LEVEL 27 KAMPUNG HAJI ABDULLAH HUKUM, JALAN BANGSAR, WILAYAH PERSEKUTUAN,
LEVEL 28 ELV 1 LEVEL 28 LEVEL 28 LEVEL 28 LEVEL 28 M&E RISER ROOM 1 LEVEL 28 LEVEL 28 LEVEL 28 LEVEL 28 LEVEL 28 KUALA LUMPUR.
LEVEL 29 ELV 1 LEVEL 29 LEVEL 29 LEVEL 29 LEVEL 29 M&E RISER ROOM 1 LEVEL 29 LEVEL 29 LEVEL 29 LEVEL 29 LEVEL 29
LEVEL 30 ELV 1 LEVEL 30 LEVEL 30 LEVEL 30 LEVEL 30 M&E RISER ROOM 1 LEVEL 30 LEVEL 30 LEVEL 30 LEVEL 30 LEVEL 30
UNTUK:-
LEVEL 31 ELV 1 LEVEL 31 LEVEL 31 LEVEL 31 LEVEL 31 M&E RISER ROOM 1 LEVEL 31 LEVEL 31 LEVEL 31 LEVEL 31 LEVEL 31
LEVEL 32 ELV 1 LEVEL 32 LEVEL 32 LEVEL 32 LEVEL 32 M&E RISER ROOM 1 LEVEL 32 LEVEL 32 LEVEL 32 LEVEL 32 LEVEL 32
PROJEK USAHASAMA DI ANTARA DEWAN BANDARAYA KUALA LUMPUR DAN KL
LEVEL 33 ELV 1 LEVEL 33 LEVEL 33 LEVEL 33 LEVEL 33 M&E RISER ROOM 1 LEVEL 33 LEVEL 33 LEVEL 33 LEVEL 33 LEVEL 33 ECO CITY SDN. BHD.
LEVEL 34 ELV 1 LEVEL 34 LEVEL 34 LEVEL 34 LEVEL 34 M&E RISER ROOM 1 LEVEL 34 LEVEL 34 LEVEL 34 LEVEL 34 LEVEL 34
LEVEL 35 ELV 1 LEVEL 35 LEVEL 35 LEVEL 35 LEVEL 35 M&E RISER ROOM 1 LEVEL 35 LEVEL 35 LEVEL 35 LEVEL 35 LEVEL 35
WEST
LEVEL 36 ELV 1 LEVEL 36 LEVEL 36 LEVEL 36 LEVEL 36 M&E RISER ROOM 1 LEVEL 36 LEVEL 36 LEVEL 36 LEVEL 36 LEVEL 36 ELEVATION Q
LEVEL 37 ELV 1 LEVEL 37 LEVEL 37 LEVEL 37 LEVEL 37 M&E RISER ROOM 1 LEVEL 37 LEVEL 37 LEVEL 37 LEVEL 37 LEVEL 37 N
A
LEVEL 38 ELV 1 LEVEL 38 LEVEL 38 LEVEL 38 LEVEL 38 M&E RISER ROOM 1 LEVEL 38 LEVEL 38 LEVEL 38 LEVEL 38 LEVEL 38 LRT
PANGSAPURI
KEY
B
PLATFORM
SERVIS C
PANGSAPURI
LEVEL 39 ELV 1 LEVEL 39 LEVEL 39 LEVEL 39 LEVEL 39 M&E RISER ROOM 1 LEVEL 39 LEVEL 39 LEVEL 39 LEVEL 39 LEVEL 39 SERVIS & HOTEL
SOUTH
A
NORTH PLAN
LEVEL 40 LEVEL 40 LEVEL 40 LEVEL 40 LEVEL 40 LEVEL 40 LEVEL 40 LEVEL 40 LEVEL 40 LEVEL 40 ELEVATION B ELEVATION
PEJABAT
LEVEL 41 LEVEL 41 LEVEL 41 LEVEL 41 LEVEL 41 LEVEL 41 LEVEL 41 LEVEL 41 LEVEL 41 LEVEL 41 PANGSAPURI PEJABAT B PEJABAT
SERVIS A A A
PEJABAT
LEVEL 42 LEVEL 42 LEVEL 42 LEVEL 42 LEVEL 42 LEVEL 42 LEVEL 42 LEVEL 42 LEVEL 42 LEVEL 42 PANGSAPURI
SERVIS B
B
PEJABAT
C
IRONMONGERY SET TOTAL 72 SET TOTAL 1 SET TOTAL 1 SET TOTAL 1 SET TOTAL 39 SET TOTAL 1 SET TOTAL 1 SET TOTAL 2 SET TOTAL 216 SET PEJABAT
D
NOTES : COMPLETED DOOR DONE BY OTHER CONTRACT. NOTES : COMPLETED DOOR DONE BY OTHER CONTRACT. NOTES : COMPLETED DOOR DONE BY OTHER CONTRACT. NOTES : COMPLETED DOOR DONE BY OTHER CONTRACT. PEJABAT
PARCEL B
PARCEL A
B
EAST
C
PARCEL
PARCEL
ELEVATION
DOOR SCHEDULE MASJID
PLAZA
WARISAN
RC L C
STRUCTURAL STRUCTURAL STRUCTURAL STRUCTURAL STRUCTURAL STRUCTURAL 1150
D
PA C E
EL
R
800 800 800 800 1200
PA
LINTEL LEVEL LINTEL LEVEL LINTEL LEVEL LINTEL LEVEL LINTEL LEVEL LINTEL LEVEL EQ 300 EQ
STRUCTURAL STRUCTURAL FIRE RATED DOOR STRUCTURAL
800 800 600
LINTEL LEVEL LINTEL LEVEL CLOSER REFER TO
IRONMONGERY LINTEL LEVEL LAND OWNER
SCHEDULE
300MM x 300MM x FIRE RATED DOOR
3MM THK. CLEAR CLOSER REFER TO
10MM SHADOW GAP 10MM SHADOW GAP 10MM SHADOW GAP 10MM SHADOW GAP FLOAT GLASS
VIEWING PANEL
IRONMONGERY
SCHEDULE
DEWAN BANDARAYA KUALA LUMPUR
10MM SHADOW GAP
10MM SHADOW GAP Tingkat 25, Menara Dewan Bandaraya Kuala Lumpur,
300
10MM SHADOW GAP 10MM SHADOW GAP 10MM SHADOW GAP
PT15
50MM x 150MM METAL DOOR FRAME IN SELECTED
PT15
50MM x 150MM METAL DOOR FRAME IN SELECTED
PT16
50MM x 150MM METAL DOOR FRAME IN SELECTED
PT15
50MM x 150MM METAL DOOR FRAME IN SELECTED
1 HOUR FIRE RATED
TIMBER SOLID DOOR
Jalan Raja Laut,
grain 50MM x 150MM
50MM x 150 MM SPRAY PAINT FINISH ( MATTE SURFACE ) SPRAY PAINT FINISH ( MATTE SURFACE ) SPRAY PAINT FINISH ( MATTE SURFACE ) SPRAY PAINT FINISH ( MATTE SURFACE ) WITH PT-3 PAINT METAL DOOR FRAME 50350 Kuala Lumpur
LOCKSET METAL DOOR FRAME
PT7 PT15
50MM x 150MM METAL DOOR FRAME IN SELECTED
TS1b PT15
50MM x 150MM METAL DOOR FRAME IN SELECTED
PT8 PT7 FINISH TO MANUF'S
DETAIL
WITH PT-3 PAINT
TIMBER DOOR IN SELECTED TIMBER DOOR IN SELECTED TIMBER DOOR IN SELECTED TIMBER DOOR IN SELECTED FINISH TO MATCH
LEVEL grain
2400
2400
2400
2400
2400
2400
H.W. FLUSH DOOR WITH SPRAY PAINT FINISH SPRAY PAINT FINISH ( MATTE SURFACE ) VENEER FINISH SPRAY PAINT FINISH ( MATTE SURFACE ) SPRAY PAINT FINISH SPRAY PAINT FINISH LOCKSET REFER TO LOCKSET REFER TO DOOR PANEL
LOCKSET REFER TO LOCKSET REFER TO LOCKSET REFER TO LOCKSET REFER TO LOCKSET REFER TO
IRONMONGERY PT-3 PAINT FINISH IRONMONGERY IRONMONGERY IRONMONGERY IRONMONGERY
IRONMONGERY 50MM x 150MM IRONMONGERY
OWNER
2100
SCHEDULE METAL DOOR FRAME SCHEDULE
SCHEDULE STAINLESS STEEL SCHEDULE STAINLESS STEEL SCHEDULE STAINLESS STEEL SCHEDULE STAINLESS STEEL SCHEDULE STAINLESS STEEL STAINLESS STEEL
2400
2400
WITH PT-3 PAINT
HINGES REFER TO HINGES REFER TO LOCKSET REFER TO HINGES REFER TO LOCKSET REFER TO HINGES REFER TO HINGES REFER TO HINGES REFER TO
IRONMONGERY IRONMONGERY IRONMONGERY IRONMONGERY IRONMONGERY IRONMONGERY IRONMONGERY
FINISH TO MATCH
IRONMONGERY KL ECO CITY SDN BHD
1550
DOOR PANEL
SCHEDULE SCHEDULE SCHEDULE STAINLESS STEEL SCHEDULE SCHEDULE STAINLESS STEEL SCHEDULE SCHEDULE SCHEDULE
HINGES REFER TO
IRONMONGERY
HINGES REFER TO
IRONMONGERY
2 HOUR FIRE RATED Setia International Centre
TIMBER SOLID DOOR
1000
ELEVATION ELEVATION
GDP ARCHITECTS SDN BHD
45-21,Plaza Level Block C
Plaza Damansara, 45 Medan Setia Satu
Bukit Damansara,50490 Kuala Lumpur
Tel: 03-2093 5700 Fax: 03-2093 5711
INSIDE INSIDE INSIDE INSIDE INSIDE INSIDE
INSIDE
INSIDE
INSIDE
Company No. : 232661-A
CIVIL & STRUCTURE ENGINEER
600
TY Lin International SDN BHD
1200 Civil & Structural Engineers
No.61 - 2, Jalan SS 23/15,
800 800 800 800 800 800 1150 47400 Petaling Jaya, Selangor Darul Ehsan
OUTSIDE
Tel: 03-7804 3313 Fax: 03-7803 5313
PLAN
Company No. : 63617-H
OUTSIDE
OUTSIDE OUTSIDE OUTSIDE OUTSIDE OUTSIDE OUTSIDE
PLAN
OUTSIDE
MECHANICAL, ELECTRICAL & PLUMBING ENGINEER
PLAN PLAN PLAN PLAN PLAN PLAN PLAN
J Roger Preston (M) SDN BHD
(Mechanical, Electrical, Plumbing)
H-4, Excella Business Park,
TIMBER SERVICE DOOR IN SELECTED SPRAY SINGLE LEAF SERVICE PANEL TIMBER DOOR IN SPRAY PAINT SINGLE
SINGLE LEAF
LEAF SERVICE
SERVICE PANEL
PANEL TIMBER
TIMBER DOOR
DOOR IN
IN SPRAY
SPRAY PAINT
PAINT SINGLE LEAF SERVICE PANEL TIMBER DOOR IN TIMBER VENEER SINGLE
SINGLE LEAF
LEAF SERVICE
SERVICE PANEL
PANEL TIMBER
TIMBER DOOR
DOOR IN
IN TIMBER
TIMBER VENEER
VENEER SINGLE LEAF SERVICE PANEL TIMBER DOOR IN SPRAY PAINT SINGLE LEAF TIMBER FLUSHED DOOR IN SPRAY PAINT SINGLE LEAF, DOUBLE SWING, METAL FRAME SOLID TIMBER DOOR, Jalan Ampang Putra, Taman Ampang Hilir
OTH SIDES AND METAL FRAME IN SELECTED SINGLE LEAF METAL FRAME TIMBER SERVICE PANEL DOOR, ON BOTH SIDES AND METAL FRAME IN SELECTED SPRAY PAINT FINISH
ON BOTHONSIDES
BOTH AND
SIDES AND METAL
METAL FRAME FRAME IN SELECTED
IN SELECTED SPRAY PAINT FINISH ON BOTH SIDES AND METAL FRAME IN SELECTED FINISH
FINISH ON
ON BOTH
BOTH SIDES
SIDES AND
AND METAL
METAL FRAME
FRAME IN
IN SELECTED
SELECTED FINISH ON BOTH SIDES AND METAL FRAME IN SELECTED FINISH ON BOTH SIDES AND METAL FRAME IN SELECTED IN PAINTED FINISH WITH FIXED GLASS VIEWING PANEL AND BOMBA APPROVED 2-HOUR FIRE RATED SINGLE LEAF 55100 Kuala Lumpur
H DOOR TYPE / D IN PAINTED FINISH D FINISH D SPRAY
FINISH PAINT FINISH D SPRAY PAINT FINISH D SPRAY
SPRAY PAINT
PAINT FINISH
FINISH D SPRAY PAINT FINISH D SPRAY PAINT FINISH D STAINLESS STEEL KICK PLATE
FD METAL FRAME SOLID TIMBER DOOR, IN PAINTED FINISH Tel: 03-4270 4663 Fax: 03-4270 5663
SPECIFICATION 14a WIDTH 800 mm 14a-1 WIDTH 800 mm
14a-1y WIDTH 800 mm 14a-2 WIDTH 800 mm
14a-2y WIDTH 800 mm 14a-3 WIDTH 800 mm 16a-1 WIDTH 1200 mm 17b WIDTH 1150 mm 1 WIDTH 600 mm QUANTITY SURVEYOR
HEIGHT 2400 mm HEIGHT 2400 mm HEIGHT 2400 mm HEIGHT 2400 mm HEIGHT 2400 mm HEIGHT 2400 mm HEIGHT 2400 mm HEIGHT 2400 mm HEIGHT 2100 mm JUBM SDN BHD
Level 5, Menara TSR,
12 Jalan PJU 7/3, Mutiara Damansara,
QTY FLOOR LEVEL ROOM / AREA / LOCATION QTY FLOOR LEVEL ROOM / AREA / LOCATION QTY FLOOR LEVEL ROOM / AREA / LOCATION QTY FLOOR LEVEL ROOM / AREA / LOCATION QTY FLOOR LEVEL ROOM / AREA / LOCATION QTY FLOOR LEVEL ROOM / AREA / LOCATION QTY FLOOR LEVEL ROOM / AREA / LOCATION QTY FLOOR LEVEL ROOM / AREA / LOCATION QTY FLOOR LEVEL ROOM / AREA / LOCATION QTY FLOOR LEVEL
LEVEL 47810 Petaling Jaya, Selangor Darul Ehsan
LEVEL BASEMENT 3 LEVEL BASEMENT 3 LEVEL BASEMENT 3 LEVEL BASEMENT 3 LEVEL BASEMENT 3 LEVEL BASEMENT 3 LEVEL BASEMENT 3 LEVEL BASEMENT 3 LEVEL BASEMENT 3 ELEC, UTILITY, CW 3 LEVEL BASEMENT 3 Tel: 03-6156 9000 Fax: 03-6157 8660
LEVEL BASEMENT 2 LEVEL BASEMENT 2 LEVEL BASEMENT 2 LEVEL BASEMENT 2 LEVEL BASEMENT 2 LEVEL BASEMENT 2 LEVEL BASEMENT 2 LEVEL BASEMENT 2 LEVEL BASEMENT 2 ELEC, UTILITY, CW 3 LEVEL BASEMENT 2 Company No. : 27638-X
LEVEL BASEMENT 1 LEVEL BASEMENT 1 LEVEL BASEMENT 1 LEVEL BASEMENT 1 LEVEL BASEMENT 1 LEVEL BASEMENT 1 LEVEL BASEMENT 1 LEVEL BASEMENT 1 LEVEL BASEMENT 1 ELEC, UTILITY, CW 3 LEVEL BASEMENT 1 LANDSCAPE CONSULTANT
LEVEL GROUND LEVEL GROUND LEVEL GROUND HR 2 LEVEL GROUND 2 LEVEL GROUND LEVEL GROUND LEVEL GROUND LEVEL GROUND VEGIE & FRUIT PREP, SEAFOOD PREP 2 LEVEL GROUND ELEC, UTILITY, CW 3 LEVEL GROUND
PENTAGO SDN BHD
LEVEL MEZZANINE LEVEL MEZZANINE LEVEL MEZZANINE LEVEL MEZZANINE LEVEL MEZZANINE LEVEL MEZZANINE LEVEL MEZZANINE LEVEL MEZZANINE LEVEL MEZZANINE ELEC, REFUSE, CW 3 LEVEL MEZZANINE
No. 58-60, Jalan Rotan,
LEVEL UPPER GROUND LEVEL UPPER GROUND LEVEL UPPER GROUND HR 2 LEVEL UPPER GROUND 2 LEVEL UPPER GROUND HR 2 LEVEL UPPER GROUND LEVEL UPPER GROUND LEVEL UPPER GROUND LEVEL UPPER GROUND ELEC, REFUSE, CW 3 LEVEL UPPER GROUND Kampung Attap,
PARKING LEVEL 1 PARKING LEVEL 1 PARKING LEVEL 1 PARKING LEVEL 1 PARKING LEVEL 1 PARKING LEVEL 1 PARKING LEVEL 1 PARKING LEVEL 1 PARKING LEVEL 1 ELEC, CW 2 PARKING LEVEL 1 50460 Kuala Lumpur
Tel: 03-2276 6488 Fax: 03-2276 4828
PARKING LEVEL 2 PARKING LEVEL 2 PARKING LEVEL 2 PARKING LEVEL 2 PARKING LEVEL 2 PARKING LEVEL 2 PARKING LEVEL 2 PARKING LEVEL 2 PARKING LEVEL 2 ELEC, CW 2 PARKING LEVEL 2
PARKING LEVEL 3 PARKING LEVEL 3 PARKING LEVEL 3 PARKING LEVEL 3 PARKING LEVEL 3 PARKING LEVEL 3 PARKING LEVEL 3 PARKING LEVEL 3 PARKING LEVEL 3 ELEC, CW 2 PARKING LEVEL 3 FACADE CONSULTANT
PARKING LEVEL 4 PARKING LEVEL 4 PARKING LEVEL 4 PARKING LEVEL 4 PARKING LEVEL 4 PARKING LEVEL 4 PARKING LEVEL 4 PARKING LEVEL 4 PARKING LEVEL 4 ELEC, CW 2 PARKING LEVEL 4
PARKING LEVEL 5 PARKING LEVEL 5 PARKING LEVEL 5 PARKING LEVEL 5 PARKING LEVEL 5 PARKING LEVEL 5 PARKING LEVEL 5 PARKING LEVEL 5 PARKING LEVEL 5 ELEC, CW 2 PARKING LEVEL 5
MEINHARDT FACADE TECHNOLOGY
Suite 17-02, Level 17,
PARKING LEVEL 6 PARKING LEVEL 6 PARKING LEVEL 6 PARKING LEVEL 6 PARKING LEVEL 6 PARKING LEVEL 6 PARKING LEVEL 6 PARKING LEVEL 6 PARKING LEVEL 6 ELEC, CW 2 PARKING LEVEL 6
Amoda, 22 Jalan Imbi,
PARKING LEVEL 7 PARKING LEVEL 7 PARKING LEVEL 7 PARKING LEVEL 7 PARKING LEVEL 7 PARKING LEVEL 7 PARKING LEVEL 7 PARKING LEVEL 7 PARKING LEVEL 7 ELEC, CW 2 PARKING LEVEL 7 55100 Kuala Lumpur
PODIUM DECK PODIUM DECK 1 PODIUM DECK PODIUM DECK PODIUM DECK HR 3 PODIUM DECK PODIUM DECK PODIUM DECK PODIUM DECK ELEC, CW 2 PODIUM DECK Tel: 03-2710 9488 Fax: 03-2710 2990
LEVEL 2 LEVEL 2 HR 2 LEVEL 2 2 LEVEL 2 HR 2 LEVEL 2 2 LEVEL 2 LEVEL 2 MALE & FEMALE SURAU 2 LEVEL 2 LEVEL 2 ELEC, CW, TEL 5 LEVEL 2
INTERIOR DESIGNER
LEVEL 3 HR 1 LEVEL 3 HR 2 LEVEL 3 2 LEVEL 3 HR 1 LEVEL 3 1 LEVEL 3 LEVEL 3 LEVEL 3 LEVEL 3 ELEC, CW, TEL 5 LEVEL 3
12 LEVEL 4 LEVEL 4 HR 2 LEVEL 4 2 LEVEL 4 LEVEL 4 LEVEL 4 HR 2 LEVEL 4 LEVEL 4 LEVEL 4 ELEC, REFUSE, CW, TEL 6 LEVEL 4
Blu Water Studio SDN BHD
E-2-1, Block E, Second Floor,
12 LEVEL 5 LEVEL 5 HR 2 LEVEL 5 2 LEVEL 5 LEVEL 5 LEVEL 5 HR 2 LEVEL 5 LEVEL 5 LEVEL 5 ELEC, REFUSE, CW, TEL 6 LEVEL 5 Megan Avenue 1,
12 LEVEL 6 LEVEL 6 HR 2 LEVEL 6 2 LEVEL 6 LEVEL 6 LEVEL 6 HR 2 LEVEL 6 LEVEL 6 LEVEL 6 ELEC, REFUSE, CW, TEL 6 LEVEL 6 189 Jalan Tun Razak,
50400 Kuala Lumpur, Malaysia
12 LEVEL 7 LEVEL 7 HR 2 LEVEL 7 2 LEVEL 7 LEVEL 7 LEVEL 7 HR 2 LEVEL 7 LEVEL 7 LEVEL 7 ELEC, REFUSE, CW, TEL 6 LEVEL 7
Tel: 03-2163 4689 Fax: 03-2163 4686
12 LEVEL 8 LEVEL 8 HR 2 LEVEL 8 2 LEVEL 8 LEVEL 8 LEVEL 8 HR 2 LEVEL 8 LEVEL 8 LEVEL 8 ELEC, REFUSE, CW, TEL 6 LEVEL 8
Tandatangan Arkitek
12 LEVEL 9 LEVEL 9 HR 2 LEVEL 9 2 LEVEL 9 LEVEL 9 LEVEL 9 HR 2 LEVEL 9 LEVEL 9 LEVEL 9 ELEC, REFUSE, CW, TEL 6 LEVEL 9
12 LEVEL 10 LEVEL 10 HR 2 LEVEL 10 2 LEVEL 10 LEVEL 10 LEVEL 10 HR 2 LEVEL 10 LEVEL 10 LEVEL 10 ELEC, REFUSE, CW, TEL 6 LEVEL 10
12 LEVEL 11 LEVEL 11 HR 2 LEVEL 11 2 LEVEL 11 LEVEL 11 LEVEL 11 HR 2 LEVEL 11 LEVEL 11 LEVEL 11 ELEC, REFUSE, CW, TEL 6 LEVEL 11
12 LEVEL 12 LEVEL 12 HR 2 LEVEL 12 2 LEVEL 12 LEVEL 12 LEVEL 12 HR 2 LEVEL 12 LEVEL 12 LEVEL 12 ELEC, REFUSE, CW, TEL 6 LEVEL 12
12 LEVEL 13 LEVEL 13 HR 2 LEVEL 13 2 LEVEL 13 LEVEL 13 LEVEL 13 HR 2 LEVEL 13 LEVEL 13 LEVEL 13 ELEC, REFUSE, CW, TEL 6 LEVEL 13
LEVEL 14 LEVEL 14 LEVEL 14 LEVEL 14 LEVEL 14 LEVEL 14 LEVEL 14 LEVEL 14 LEVEL 14 LEVEL 14
12 HR 2 2 HR 2 ELEC, REFUSE, CW, TEL 6 SYED SOBRI SYED ISMAIL
12 LEVEL 15 LEVEL 15 HR 2 LEVEL 15 2 LEVEL 15 LEVEL 15 LEVEL 15 HR 2 LEVEL 15 LEVEL 15 LEVEL 15 ELEC, REFUSE, CW, TEL 6 LEVEL 15
AA Dip. APAM
12 LEVEL 16 LEVEL 16 HR 2 LEVEL 16 2 LEVEL 16 LEVEL 16 LEVEL 16 HR 2 LEVEL 16 LEVEL 16 LEVEL 16 ELEC, REFUSE, CW, TEL 6 LEVEL 16
12 HR 2 2 HR 2 ELEC, REFUSE, CW, TEL 6
A / S 47
LEVEL 17 LEVEL 17 LEVEL 17 LEVEL 17 LEVEL 17 LEVEL 17 LEVEL 17 LEVEL 17 LEVEL 17 LEVEL 17
12 LEVEL 18 LEVEL 18 HR 2 LEVEL 18 2 LEVEL 18 LEVEL 18 LEVEL 18 HR 2 LEVEL 18 LEVEL 18 LEVEL 18 ELEC, REFUSE, CW, TEL 6 LEVEL 18 "Saya memperakui bahawa detail-detail dalam pelan-pelan ini adalah menurut
kehendak-kehendak Undang-Undang Kecil Bangunan (Wilayah Persekutuan Kuala Lumpur)
12 LEVEL 19 LEVEL 19 HR 2 LEVEL 19 2 LEVEL 19 LEVEL 19 LEVEL 19 HR 2 LEVEL 19 LEVEL 19 LEVEL 19 ELEC, REFUSE, CW, TEL 6 LEVEL 19
1985 dan saya setuju terima tanggungjawab penuh dengan sewajarnya."
12 LEVEL 20 LEVEL 20 HR 2 LEVEL 20 2 LEVEL 20 LEVEL 20 LEVEL 20 HR 2 LEVEL 20 LEVEL 20 LEVEL 20 ELEC, REFUSE, CW, TEL 6 LEVEL 20
12 LEVEL 21 LEVEL 21 HR 2 LEVEL 21 2 LEVEL 21 LEVEL 21 LEVEL 21 HR 2 LEVEL 21 LEVEL 21 LEVEL 21 ELEC, REFUSE, CW, TEL 6 LEVEL 21
HOTEL & SERVICED RESIDENCE
LEVEL 22 HR 2 LEVEL 22 HR 2 LEVEL 22 2 LEVEL 22 LEVEL 22 LEVEL 22 LEVEL 22 LEVEL 22 LEVEL 22 ELEC, REFUSE, CW, TEL 6 LEVEL 22
LEVEL 23 LEVEL 23 LEVEL 23 LEVEL 23 LEVEL 23 LEVEL 23 LEVEL 23 LEVEL 23 LEVEL 23 LEVEL 23 Tajuk Lukisan
LEVEL 24 LEVEL 24 HR 4 LEVEL 24 4 LEVEL 24 LEVEL 24 LEVEL 24 LEVEL 24 LEVEL 24 LEVEL 24 ELEC, REFUSE, CW, TEL 4 LEVEL 24
LEVEL 25 LEVEL 25 HR 4 LEVEL 25 4 LEVEL 25 LEVEL 25 LEVEL 25 LEVEL 25 LEVEL 25 LEVEL 25 ELEC, REFUSE, CW, TEL 4 LEVEL 25 DOOR SCHEDULE
LEVEL 26 LEVEL 26 HR 4 LEVEL 26 4 LEVEL 26 LEVEL 26 LEVEL 26 LEVEL 26 LEVEL 26 LEVEL 26 ELEC, REFUSE, CW, TEL 4 LEVEL 26 DOOR SCHEDULE 01
LEVEL 27 LEVEL 27 HR 4 LEVEL 27 4 LEVEL 27 LEVEL 27 LEVEL 27 LEVEL 27 LEVEL 27 LEVEL 27 ELEC, REFUSE, CW, TEL 4 LEVEL 27
LEVEL 28 LEVEL 28 HR 4 LEVEL 28 4 LEVEL 28 LEVEL 28 LEVEL 28 LEVEL 28 LEVEL 28 LEVEL 28 ELEC, REFUSE, CW, TEL 4 LEVEL 28
LEVEL 29 LEVEL 29 HR 4 LEVEL 29 4 LEVEL 29 LEVEL 29 LEVEL 29 LEVEL 29 LEVEL 29 LEVEL 29 ELEC, REFUSE, CW, TEL 4 LEVEL 29
LEVEL 30 LEVEL 30 HR 4 LEVEL 30 4 LEVEL 30 LEVEL 30 LEVEL 30 LEVEL 30 LEVEL 30 LEVEL 30 ELEC, REFUSE, CW, TEL 4 LEVEL 30
Pindaan Tarikh Nota
LEVEL 31 LEVEL 31 HR 4 LEVEL 31 4 LEVEL 31 LEVEL 31 LEVEL 31 LEVEL 31 LEVEL 31 LEVEL 31 ELEC, REFUSE, CW, TEL 4 LEVEL 31
LEVEL 32 LEVEL 32 HR 4 LEVEL 32 4 LEVEL 32 LEVEL 32 LEVEL 32 LEVEL 32 LEVEL 32 LEVEL 32 ELEC, REFUSE, CW, TEL 4 LEVEL 32 - - -
LEVEL 33 LEVEL 33 HR 4 LEVEL 33 4 LEVEL 33 LEVEL 33 LEVEL 33 LEVEL 33 LEVEL 33 LEVEL 33 ELEC, REFUSE, CW, TEL 4 LEVEL 33
LEVEL 34 LEVEL 34 HR 4 LEVEL 34 4 LEVEL 34 LEVEL 34 LEVEL 34 LEVEL 34 LEVEL 34 LEVEL 34 ELEC, REFUSE, CW, TEL 4 LEVEL 34
LEVEL 35 LEVEL 35 HR 4 LEVEL 35 4 LEVEL 35 LEVEL 35 LEVEL 35 LEVEL 35 LEVEL 35 LEVEL 35 ELEC, REFUSE, CW, TEL 4 LEVEL 35
LEVEL 36 LEVEL 36 HR 4 LEVEL 36 4 LEVEL 36 LEVEL 36 LEVEL 36 LEVEL 36 LEVEL 36 LEVEL 36 ELEC, REFUSE, CW, TEL 4 LEVEL 36
LEVEL 37 LEVEL 37 HR 4 LEVEL 37 4 LEVEL 37 LEVEL 37 LEVEL 37 LEVEL 37 LEVEL 37 LEVEL 37 ELEC, REFUSE, CW, TEL 4 LEVEL 37
CONSTRUCTION
LEVEL 38 LEVEL 38 HR 4 LEVEL 38 4 LEVEL 38 LEVEL 38 LEVEL 38 LEVEL 38 LEVEL 38 LEVEL 38 ELEC, REFUSE, CW, TEL 4 LEVEL 38 HOTEL & SERVICED RESIDENCE AND BALANCE OF WORKS TO BASEMENT AND PODIUM
LEVEL 39 HR 2 LEVEL 39 HR 2 LEVEL 39 2 LEVEL 39 LEVEL 39 LEVEL 39 LEVEL 39 LEVEL 39 LEVEL 39 ELEC, REFUSE, CW, TEL 4 LEVEL 39
Scale 1:50 Date FEBRUARY 2017
LEVEL 40 HR 2 LEVEL 40 LEVEL 40 LEVEL 40 LEVEL 40 LEVEL 40 LEVEL 40 LEVEL 40 LEVEL 40 ELEC, ELV, CW, TEL 4 LEVEL 40
LEVEL 41 LEVEL 41 LEVEL 41 LEVEL 41 LEVEL 41 LEVEL 41 LEVEL 41 LEVEL 41 LEVEL 41 LEVEL 41
Drawn by ASILA Check by SAR & AB
LEVEL 42 LEVEL 42 LEVEL 42 LEVEL 42 LEVEL 42 LEVEL 42 LEVEL 42 LEVEL 42 LEVEL 42 LEVEL 42
2400
2400
2400
LOCKSET REFER TO grain TO MATCH PT9 SPRAY PAINT FINISH ( MATTE SURFACE ) LOCKSET REFER TO LOCKSET REFER TO grain LOCKSET REFER TO LOCKSET REFER TO grain SPRAY PAINT FINISH ( MATTE SURFACE ) LOCKSET REFER TO
DOOR PANEL DOOR PANEL
IRONMONGERY IRONMONGERY IRONMONGERY IRONMONGERY IRONMONGERY IRONMONGERY
2100
2100
2100
SCHEDULE SCHEDULE SCHEDULE SCHEDULE SCHEDULE SCHEDULE
STAINLESS STEEL STAINLESS STEEL STAINLESS STEEL STAINLESS STEEL STAINLESS STEEL STAINLESS STEEL
1 TINGKAT
2400
2400
2400
LOCKSET REFER TO LOCKSET REFER TO LOCKSET REFER TO
HINGES REFER TO HINGES REFER TO HINGES REFER TO HINGES REFER TO HINGES REFER TO HINGES REFER TO
IRONMONGERY IRONMONGERY IRONMONGERY
IRONMONGERY IRONMONGERY IRONMONGERY IRONMONGERY IRONMONGERY IRONMONGERY
SCHEDULE
ii. 1 BLOK PANGSAPURI SERVIS B - 42 TINGKAT DI ATAS PODIUM RUANG
SCHEDULE SCHEDULE STAINLESS STEEL SCHEDULE STAINLESS STEEL SCHEDULE SCHEDULE SCHEDULE SCHEDULE STAINLESS STEEL SCHEDULE
HINGES REFER TO HINGES REFER TO HINGES REFER TO
1 HOUR FIRE RATED 1 HOUR FIRE RATED
L8 IRONMONGERY IRONMONGERY TS1b TS1a IRONMONGERY PT7
TIMBER SOLID DOOR TIMBER SOLID DOOR
1000
LEVEL
2-HOUR FIRE RATED DOOR IN SELECTED
SPRAY PAINT FINISH
2-HOUR FIRE RATED DOOR IN SELECTED
VENEER FINISH
1-HOUR FIRE RATED DOOR IN SELECTED
VENEER FINISH
RUANG LETAK KERETA BAWAH TANAH 1 TINGKAT
8MM GAP 8MM GAP 8MM GAP 8MM GAP 8MM GAP 8MM GAP
8MM GAP 8MM GAP iii. 1 BLOK PANGSAPURI SERVIS C - 44 & 50 TINGKAT DI ATAS PODIUM RUANG
100mm KERB LOCATION TO 100mm KERB LOCATION TO 8MM GAP
ELEVATION REFER SLAB SETTING OUT REFER SLAB SETTING OUT ELEVATION ELEVATION ELEVATION ELEVATION ELEVATION
LETAK KERETA 6 TINGKAT DAN RUANG LETAK KERETA 3 TINGKAT DI ATAS
ELEVATION ELEVATION ELEVATION
RUANG LETAK KERETA BAWAH TANAH 1 TINGKAT
600
INSIDE 40 TINGKAT
600 600
ii. 1 BLOK PEJABAT A - 32 TINGKAT
iii. 1 BLOK PEJABAT B - 42 TINGKAT
1000 1000 1000 1000 1000
DI ATAS PODIUM RUANG LETAK KERETA 7 TINGKAT DAN RUANG LETAK KERETA
1000
2 TINGKAT DI ATAS RUANG LETAK KERETA BAWAH TANAH 3 TINGKAT
OUTSIDE OUTSIDE OUTSIDE OUTSIDE OUTSIDE OUTSIDE
LEVEL 37 LEVEL 37 LEVEL 37 4 LEVEL 37 STAIRCASE, FIRE SERVICE LIFT LOBBY (H) 3 LEVEL 37 3 LEVEL 37 LEVEL 37 LEVEL 37 LEVEL 37 STAIRCASE, FIRE SERVICE LIFT LOBBY 3 LEVEL 37 N
A
LEVEL 38 LEVEL 38 LEVEL 38 4 LEVEL 38 STAIRCASE, FIRE SERVICE LIFT LOBBY (H) 3 LEVEL 38 3 LEVEL 38 LEVEL 38 LEVEL 38 LEVEL 38 STAIRCASE, FIRE SERVICE LIFT LOBBY 3 LEVEL 38 LRT
PANGSAPURI
KEY
B
PLATFORM
SERVIS C
PANGSAPURI
LEVEL 39 LEVEL 39 LEVEL 39 4 LEVEL 39 STAIRCASE, FIRE SERVICE LIFT LOBBY (H) 3 LEVEL 39 3 LEVEL 39 STAIRCASE, FIRE SERVICE LIFT LOBBY (SR) 2 LEVEL 39 LEVEL 39 LEVEL 39 FIRE SERVICE LIFT LOBBY 1 LEVEL 39 SERVIS & HOTEL
SOUTH
A
NORTH PLAN
LEVEL 40 ELEC 1 LEVEL 40 LEVEL 40 4 LEVEL 40 STAIRCASE 1 LEVEL 40 1 LEVEL 40 STAIRCASE, FIRE SERVICE LIFT LOBBY (SR) 3 LEVEL 40 LEVEL 40 LEVEL 40 LEVEL 40 ELEVATION B ELEVATION
PEJABAT
LEVEL 41 LEVEL 41 LEVEL 41 LEVEL 41 LEVEL 41 LEVEL 41 STAIRCASE 3 LEVEL 41 LEVEL 41 LEVEL 41 LEVEL 41 PANGSAPURI PEJABAT B PEJABAT
SERVIS A A A
PEJABAT
LEVEL 42 LEVEL 42 LEVEL 42 LEVEL 42 LEVEL 42 LEVEL 42 STAIRCASE 2 LEVEL 42 LEVEL 42 LEVEL 42 LEVEL 42 PANGSAPURI
SERVIS B
B
PEJABAT
C
PARCEL B
PARCEL A
B
EAST
C
PARCEL
PARCEL
ELEVATION
DOOR SCHEDULE MASJID
PLAZA
WARISAN
1500
RC L C
STRUCTURAL STRUCTURAL STRUCTURAL STRUCTURAL 1000 STRUCTURAL 1000 STRUCTURAL STRUCTURAL
D
PA C E
EL
R
1000 1000 1000 1100
PA
LINTEL LEVEL LINTEL LEVEL LINTEL LEVEL LINTEL LEVEL EQ 300 EQ LINTEL LEVEL EQ 300 EQ LINTEL LEVEL LINTEL LEVEL 700 700
STRUCTURAL FIRE RATED DOOR FIRE RATED DOOR FIRE RATED DOOR FIRE RATED DOOR FIRE RATED DOOR FIRE RATED DOOR STRUCTURAL FIRE RATED DOOR
1000 900
LINTEL LEVEL CLOSER REFER TO
IRONMONGERY
CLOSER REFER TO
IRONMONGERY
CLOSER REFER TO
IRONMONGERY
CLOSER REFER TO
IRONMONGERY
CLOSER REFER TO
IRONMONGERY
CLOSER REFER TO
IRONMONGERY LINTEL LEVEL
CLOSER REFER TO
IRONMONGERY
LAND OWNER
FIRE RATED DOOR SCHEDULE SCHEDULE SCHEDULE SCHEDULE SCHEDULE SCHEDULE SCHEDULE
CLOSER REFER TO 300MM x 300MM x FIRE RATED DOOR
IRONMONGERY 3MM THK. CLEAR CLOSER REFER TO
SCHEDULE
PT7
FLOAT GLASS
VIEWING PANEL
300MM x 300MM x
3MM THK. CLEAR
IRONMONGERY
SCHEDULE
DEWAN BANDARAYA KUALA LUMPUR
1-HOUR FIRE RATED DOOR IN SELECTED FLOAT GLASS
SPRAY PAINT FINISH 10MM SHADOW GAP VIEWING PANEL 10MM SHADOW GAP 10MM SHADOW GAP 10MM SHADOW GAP Tingkat 25, Menara Dewan Bandaraya Kuala Lumpur,
300
300
10MM SHADOW GAP 10MM SHADOW GAP 10MM SHADOW GAP 10MM SHADOW GAP
1 HOUR FIRE RATED Jalan Raja Laut,
PT15 PT16 PT15 TIMBER SOLID DOOR PT15 PT14 50MM x 150MM 50MM x 150MM
10MM SHADOW GAP
50MM x 150MM METAL DOOR FRAME IN SELECTED 50MM x 150MM METAL DOOR FRAME IN SELECTED 50MM x 175MM METAL DOOR FRAME IN SELECTED WITH PT-3 PAINT 50MM x 150MM METAL DOOR FRAME IN SELECTED METAL DOOR FRAME METAL DOOR FRAME 50350 Kuala Lumpur
PT15 LOCKSET
50MM x 150MM METAL DOOR FRAME IN SELECTED
PT15
50MM x 150MM METAL DOOR FRAME IN SELECTED
SPRAY PAINT FINISH ( MATTE SURFACE ) SPRAY PAINT FINISH ( MATTE SURFACE ) SPRAY PAINT FINISH ( MATTE SURFACE ) FINISH TO MANUF'S SPRAY PAINT FINISH ( MATTE SURFACE )
50MM x 150MM METAL DOOR FRAME IN SELECTED
SPRAY PAINT FINISH ( MATTE SURFACE ) WITH PT-3 PAINT WITH PT-3 PAINT
DETAIL FINISH TO MATCH FINISH TO MATCH
LEVEL
2400
2400
2400
2400
2400
2400
2400
SPRAY PAINT FINISH ( MATTE SURFACE ) SPRAY PAINT FINISH ( MATTE SURFACE ) LOCKSET REFER TO LOCKSET REFER TO LOCKSET REFER TO grain LOCKSET REFER TO LOCKSET REFER TO LOCKSET REFER TO grain LOCKSET REFER TO DOOR PANEL LOCKSET REFER TO DOOR PANEL
IRONMONGERY IRONMONGERY IRONMONGERY IRONMONGERY 50MM x 150MM IRONMONGERY
PT7
IRONMONGERY IRONMONGERY IRONMONGERY
OWNER
2100
SCHEDULE SCHEDULE SCHEDULE SCHEDULE METAL DOOR FRAME SCHEDULE SCHEDULE SCHEDULE SCHEDULE
STAINLESS STEEL STAINLESS STEEL STAINLESS STEEL 1-HOUR FIRE RATED DOOR IN SELECTED STAINLESS STEEL STAINLESS STEEL STAINLESS STEEL
2400
1550
1550
SCHEDULE DOOR PANEL
STAINLESS STEEL SCHEDULE SCHEDULE SCHEDULE SCHEDULE SCHEDULE SCHEDULE
HINGES REFER TO
IRONMONGERY PT8 TS1a TS1a 1 HOUR FIRE RATED 1 HOUR FIRE RATED Setia International Centre
TIMBER SOLID DOOR TIMBER SOLID DOOR
1000
ELEVATION
GDP ARCHITECTS SDN BHD
45-21,Plaza Level Block C
Plaza Damansara, 45 Medan Setia Satu
Bukit Damansara,50490 Kuala Lumpur
Tel: 03-2093 5700 Fax: 03-2093 5711
INSIDE INSIDE INSIDE INSIDE INSIDE INSIDE INSIDE INSIDE
Company No. : 232661-A
CIVIL & STRUCTURE ENGINEER
INSIDE
DOOR SCHEDULE
1500 1500 700
1500
700 1800
1800
1800 1800
KLEC - PARCEL B
STRUCTURAL STRUCTURAL STRUCTURAL STRUCTURAL STRUCTURAL 850 850 STRUCTURAL STRUCTURAL
LINTEL LEVEL 700 700 LINTEL LEVEL 700 700 LINTEL LEVEL EQ 300 EQ EQ 300 EQ LINTEL LEVEL 850 850 LINTEL LEVEL LINTEL LEVEL 850 850 LINTEL LEVEL 850 850 1800 TAJUK PROJEK
FIRE RATED DOOR FIRE RATED DOOR FIRE RATED DOOR FIRE RATED DOOR
EQ 300 EQ EQ 300 EQ FIRE RATED DOOR STRUCTURAL 1800 FIRE RATED DOOR FIRE RATED DOOR STRUCTURAL
CLOSER REFER TO
IRONMONGERY
CLOSER REFER TO
IRONMONGERY
CLOSER REFER TO
IRONMONGERY
CLOSER REFER TO
IRONMONGERY
CLOSER REFER TO
IRONMONGERY LINTEL LEVEL 850 850
CLOSER REFER TO
IRONMONGERY
CLOSER REFER TO
IRONMONGERY LINTEL LEVEL 850 850
SCHEDULE SCHEDULE SCHEDULE SCHEDULE SCHEDULE
FIRE RATED DOOR
SCHEDULE SCHEDULE FIRE RATED DOOR
CLOSER REFER TO
CADANGAN PEMBANGUNAN BERCAMPUR YANG TERDIRI DARIPADA:-
300MM x 300MM x 300MM x 300MM x CLOSER REFER TO IRONMONGERY
3MM THK. CLEAR 3MM THK. CLEAR IRONMONGERY SCHEDULE
TS1b PT7 PT7
FLOAT GLASS FLOAT GLASS SCHEDULE
2-HOUR FIRE RATED DOOR IN SELECTED 2-HOUR FIRE RATED DOOR IN SELECTED 2-HOUR FIRE RATED DOOR IN SELECTED
VIEWING PANEL VIEWING PANEL
1) PARCEL A YANG MENGANDUNGI:-
VENEER FINISH SPRAY PAINT FINISH SPRAY PAINT FINISH
300
300
10MM SHADOW GAP 10MM SHADOW GAP 10MM SHADOW GAP 10MM SHADOW GAP 10MM SHADOW GAP 10MM SHADOW GAP 10MM SHADOW GAP 10MM SHADOW GAP
10MM SHADOW GAP
50MM x 150MM 50MM x 150MM 50MM x 150MM 50MM x 150MM PT15 50MM x 150MM
i. 1 BLOK PANGSAPURI SERVIS A - 48 & 56 TINGKAT DI ATAS PODIUM RUANG
PT15 PT15 PT15
50MM x 175MM METAL DOOR FRAME IN SELECTED METAL DOOR FRAME METAL DOOR FRAME METAL DOOR FRAME METAL DOOR FRAME 50MMMETAL DOOR FRAME 50MM x 150MM METAL DOOR FRAME IN SELECTED
LOCKSET SPRAY PAINT FINISH ( MATTE SURFACE )
50MM x 175MM METAL DOOR FRAME IN SELECTED
SPRAY PAINT FINISH ( MATTE SURFACE ) WITH PT-3 PAINT WITH PT-3 PAINT WITH PT-3 PAINT WITH PT-3 PAINT SPRAY
x 175MM
WITH PT-3
PAINT
METAL DOOR FRAME IN SELECTED
PAINT( MATTE SURFACE )
FINISH
PT15
SPRAY PAINT FINISH ( MATTE SURFACE )
50MM x 150MM METAL DOOR FRAME IN SELECTED
PT15
50MM x 150MM METAL DOOR FRAME IN SELECTED
FINISH TO MATCH FINISH TO MATCH FINISH TO MATCH FINISH TO MATCH FINISH TO MATCH
LEVEL LETAK KERETA 7 TINGKAT DAN RUANG LETAK KERETA BAWAH TANAH
2400
2400
2400
2400
2400
2400
2400
LOCKSET REFER TO grain grain LOCKSET REFER TO grain grain LOCKSET REFER TO LOCKSET REFER TO LOCKSET REFER TO LOCKSET REFER TO LOCKSET REFER TO LOCKSET REFER TO SPRAY PAINT FINISH ( MATTE SURFACE ) SPRAY PAINT FINISH ( MATTE SURFACE )
DOOR PANEL DOOR PANEL DOOR PANEL DOOR PANEL DOOR PANEL
IRONMONGERY IRONMONGERY IRONMONGERY IRONMONGERY IRONMONGERY IRONMONGERY IRONMONGERY IRONMONGERY
2100
SCHEDULE SCHEDULE SCHEDULE SCHEDULE SCHEDULE SCHEDULE SCHEDULE SCHEDULE
STAINLESS STEEL STAINLESS STEEL STAINLESS STEEL STAINLESS STEEL STAINLESS STEEL STAINLESS STEEL STAINLESS STEEL STAINLESS STEEL
1 TINGKAT
2400
LOCKSET REFER TO
HINGES REFER TO HINGES REFER TO HINGES REFER TO HINGES REFER TO HINGES REFER TO HINGES REFER TO HINGES REFER TO HINGES REFER TO
IRONMONGERY
IRONMONGERY IRONMONGERY IRONMONGERY IRONMONGERY IRONMONGERY IRONMONGERY IRONMONGERY IRONMONGERY
1550
1550
SCHEDULE
SCHEDULE SCHEDULE SCHEDULE
1 HOUR FIRE RATED
SCHEDULE
MT1
KICKPLATE IN BOTH SIDES
MT1
KICKPLATE IN BOTH SIDES
WITH PT-3 PAINT WITH PT-3 PAINT WITH PT-3 PAINT WITH PT-3 PAINT WITH PT-3 PAINT
SCHEDULE
LETAK KERETA 5 TINGKAT DAN RUANG LETAK KERETA 3 TINGKAT DI ATAS
FINISHED FLR. FINISH TO MANUF'S
DETAIL
FINISH TO MANUF'S
DETAIL
FINISH TO MANUF'S
DETAIL
FINISH TO MANUF'S
DETAIL
FINISH TO MANUF'S
DETAIL
PT7
LEVEL 37 LEVEL 37 LEVEL 37 LEVEL 37 LEVEL 37 LEVEL 37 LEVEL 37 LEVEL 37 FIRE SERVICE LIFT LOBBY(H/SR) 2 LEVEL 37 LEVEL 37 N
A
LEVEL 38 LEVEL 38 LEVEL 38 LEVEL 38 LEVEL 38 LEVEL 38 LEVEL 38 LEVEL 38 FIRE SERVICE LIFT LOBBY(H/SR) 2 LEVEL 38 LEVEL 38 LRT
PANGSAPURI
KEY
B
PLATFORM
SERVIS C
PANGSAPURI
LEVEL 39 LEVEL 39 LEVEL 39 LEVEL 39 LEVEL 39 LEVEL 39 LEVEL 39 FIRE SERVICE LIFT LOBBY, PUMP ROOM 3 LEVEL 39 FIRE SERVICE LIFT LOBBY(H) 1 LEVEL 39 LEVEL 39 SERVIS & HOTEL
SOUTH
A
NORTH PLAN
LEVEL 40 LEVEL 40 LEVEL 40 LEVEL 40 LEVEL 40 LEVEL 40 LEVEL 40 FIRE SERVICE LIFT LOBBY 1 LEVEL 40 LEVEL 40 LEVEL 40 ELEVATION B ELEVATION
PEJABAT
LEVEL 41 LEVEL 41 LEVEL 41 LEVEL 41 LEVEL 41 LEVEL 41 LEVEL 41 LEVEL 41 LEVEL 41 LEVEL 41 PANGSAPURI PEJABAT B PEJABAT
SERVIS A A A
PEJABAT
LEVEL 42 LEVEL 42 LEVEL 42 LEVEL 42 LEVEL 42 LEVEL 42 LEVEL 42 LEVEL 42 LEVEL 42 LEVEL 42 PANGSAPURI
SERVIS B
B
PEJABAT
C
IRONMONGERY 1 SET TOTAL 2 SET TOTAL 81 SET TOTAL 1 SET TOTAL 1 SET TOTAL 2 SET TOTAL 9 SET TOTAL 14
1 SET TOTAL 59
5 SET TOTAL 2 SET PEJABAT
D
NOTES : COMPLETED DOOR DONE BY OTHER CONTRACT. STRUCTURAL PEJABAT
PARCEL B
PARCEL A
B
EAST
C
LINTEL LEVEL
PARCEL
PARCEL
ELEVATION
DOOR SCHEDULE FIRE RATED DOOR
MASJID
RC L C
STRUCTURAL STRUCTURAL STRUCTURAL STRUCTURAL SCHEDULE
STRUCTURAL STRUCTURAL STRUCTURAL
D
PA C E
850 850 850 850
EL
R
1200
PA
LINTEL LEVEL 850 850 1800 LINTEL LEVEL 850 850 LINTEL LEVEL 850 850 LINTEL LEVEL 850 850 LINTEL LEVEL LINTEL LEVEL LINTEL LEVEL
FIRE RATED DOOR
STRUCTURAL FIRE RATED DOOR FIRE RATED DOOR FIRE RATED DOOR
EQ 300 EQ EQ 300 EQ FIRE RATED DOOR
EQ 300 EQ EQ 300 EQ FIRE RATED DOOR FIRE RATED DOOR
CLOSER REFER TO
IRONMONGERY LINTEL LEVEL 850 850
CLOSER REFER TO
IRONMONGERY
CLOSER REFER TO
IRONMONGERY
CLOSER REFER TO
IRONMONGERY
CLOSER REFER TO
IRONMONGERY
CLOSER REFER TO
IRONMONGERY
CLOSER REFER TO
IRONMONGERY
LAND OWNER
SCHEDULE FIRE RATED DOOR SCHEDULE SCHEDULE SCHEDULE SCHEDULE SCHEDULE SCHEDULE
CLOSER REFER TO FB11
IRONMONGERY 300MM x 300MM x 300MM x 300MM x
DEWAN BANDARAYA KUALA LUMPUR
FLUSH BOLT REFER
SCHEDULE TO IRONMONGERY 3MM THK. CLEAR 3MM THK. CLEAR
TS1b PT7 PT8 TS1a 50MM x 150MM
2-HOUR FIRE RATED DOOR IN SELECTED 2-HOUR FIRE RATED DOOR IN SELECTED 2-HOUR FIRE RATED DOOR IN SELECTED SCHEDULE 2-HOUR FIRE RATED DOOR IN SELECTED FLOAT GLASS FLOAT GLASS
METAL DOOR FRAME VIEWING PANEL VIEWING PANEL
VENEER FINISH SPRAY PAINT FINISH SPRAY PAINT FINISH BOOKMATCH VENEER FINISH WITH PT-3 PAINT Tingkat 25, Menara Dewan Bandaraya Kuala Lumpur,
300
300
10MM SHADOW GAP 10MM SHADOW GAP 10MM SHADOW GAP 10MM SHADOW GAP FINISH TO MATCH 10MM SHADOW GAP 10MM SHADOW GAP 10MM SHADOW GAP
10MM SHADOW GAP DOOR PANEL Jalan Raja Laut,
3000
PT15 PT15 PT15 PT15 PT16 PT15 50MM x 150MM
PT15 PT15 PT14
50MM x 150MM METAL DOOR FRAME IN SELECTED 50MM x 150MM METAL DOOR FRAME IN SELECTED 50MM x 150MM METAL DOOR FRAME IN SELECTED 50MM x 150MM METAL DOOR FRAME IN SELECTED 50MM x 150MM METAL DOOR FRAME IN SELECTED 50MM x 150MM METAL DOOR FRAME IN SELECTED METALx DOOR
50MM 150MM FRAME
METAL DOOR FRAME IN SELECTED 50MM x 150MM METAL DOOR FRAME IN SELECTED 50MM x 150MM METAL DOOR FRAME IN SELECTED 50350 Kuala Lumpur
LOCKSET
SPRAY PAINT FINISH ( MATTE SURFACE )
PT15
SPRAY PAINT FINISH ( MATTE SURFACE )
50MM x 150MM METAL DOOR FRAME IN SELECTED
PT15
SPRAY PAINT FINISH ( MATTE SURFACE )
50MM x 150MM METAL DOOR FRAME IN SELECTED
SPRAY PAINT FINISH ( MATTE SURFACE ) SPRAY PAINT FINISH ( MATTE SURFACE ) SPRAY PAINT FINISH ( MATTE SURFACE ) WITH PT-3
SPRAY PAINT
PAINT FINISH ( MATTE SURFACE ) SPRAY PAINT FINISH ( MATTE SURFACE ) SPRAY PAINT FINISH ( MATTE SURFACE )
FINISH TO MATCH
LEVEL grain grain
2400
2400
2400
2400
2400
2400
2400
LOCKSET REFER TO grain grain SPRAY PAINT FINISH ( MATTE SURFACE ) SPRAY PAINT FINISH ( MATTE SURFACE ) LOCKSET REFER TO LOCKSET REFER TO LOCKSET REFER TO grain grain LOCKSET REFER TO LOCKSET REFER TO DOOR PANEL LOCKSET REFER TO LOCKSET REFER TO
IRONMONGERY
SCHEDULE
IRONMONGERY
SCHEDULE
IRONMONGERY
SCHEDULE
IRONMONGERY
SCHEDULE
IRONMONGERY
SCHEDULE
IRONMONGERY
SCHEDULE
IRONMONGERY
SCHEDULE PT7
IRONMONGERY
SCHEDULE OWNER
STAINLESS STEEL STAINLESS STEEL STAINLESS STEEL STAINLESS STEEL STAINLESS STEEL STAINLESS STEEL 2-HOUR FIRE RATED DOOR IN SELECTED STAINLESS STEEL
2400
LOCKSET REFER TO
HINGES REFER TO HINGES REFER TO HINGES REFER TO HINGES REFER TO HINGES REFER TO HINGES REFER TO HINGES REFER TO
KL ECO CITY SDN BHD
IRONMONGERY SPRAY PAINT FINISH
IRONMONGERY IRONMONGERY IRONMONGERY IRONMONGERY IRONMONGERY IRONMONGERY IRONMONGERY
1550
1550
SCHEDULE
SCHEDULE STAINLESS STEEL SCHEDULE SCHEDULE SCHEDULE SCHEDULE SCHEDULE SCHEDULE
HINGES REFER TO
IRONMONGERY DS12 PULL HANDLE BY ID 2 HOUR FIRE RATED 1 HOUR FIRE RATED
PT6
Setia International Centre
TIMBER SOLID DOOR TIMBER SOLID DOOR
1000
STRIPPING SEAL
SCHEDULE MT1
REFER TO WITH PT-3 PAINT WITH PT-3 PAINT MT1 1-HOUR FIRE RATED DOOR IN SELECTED
SPRAY PAINT FINISH
Lot 215, Pantai Baru,Jalan Bangsar
KICKPLATE IN BOTH SIDES KICKPLATE IN BOTH SIDES
FINISHED FLR. TS1b
IRONMONGERY
SCHEDULE
FINISH TO MANUF'S
DETAIL
FINISH TO MANUF'S
DETAIL 59200 Kuala Lumpur
2-HOUR FIRE RATED DOOR IN SELECTED
LEVEL VENEER FINISH
750MM (H) SS KICK STAINLESS STEEL Tel: 03-2283 2255 Fax: 03-2284 1188
8MM GAP 8MM GAP 8MM GAP 8MM GAP 8MM GAP PLATE 8MM GAP
HINGES REFER TO
IRONMONGERY Company No : 185140-X
SCHEDULE
ELEVATION 8MM GAP
ELEVATION ELEVATION ELEVATION 850 850 ELEVATION
8MM GAP
ELEVATION 8MM GAP ELEVATION ARCHITECT
ELEVATION
1800 GDP ARCHITECTS SDN BHD
45-21,Plaza Level Block C
Plaza Damansara, 45 Medan Setia Satu
Bukit Damansara,50490 Kuala Lumpur
ELEVATION Tel: 03-2093 5700 Fax: 03-2093 5711
INSIDE INSIDE INSIDE INSIDE INSIDE INSIDE
INSIDE
Company No. : 232661-A
INSIDE CIVIL & STRUCTURE ENGINEER
INSIDE
TY Lin International SDN BHD
Civil & Structural Engineers
No.61 - 2, Jalan SS 23/15,
1800 1800 1800 1800 1800 1800 1200 47400 Petaling Jaya, Selangor Darul Ehsan
Tel: 03-7804 3313 Fax: 03-7803 5313
1800
Company No. : 63617-H
OUTSIDE OUTSIDE OUTSIDE OUTSIDE
1800
OUTSIDE OUTSIDE OUTSIDE
MECHANICAL, ELECTRICAL & PLUMBING ENGINEER
PLAN PLAN PLAN PLAN PLAN PLAN PLAN
OUTSIDE
OUTSIDE
J Roger Preston (M) SDN BHD
PLAN
PLAN (Mechanical, Electrical, Plumbing)
H-4, Excella Business Park,
2-HOURS FIRE RATED DOUBLE LEAF SOLID CORE DOOR IN SPRAY 2-HOURS FIRE RATED DOUBLE LEAF SOLID CORE DOOR IN TIMBER 2-HOURS FIRE RATED DOUBLE LEAF SOLID CORE DOOR IN 2-HOURS FIRE RATED DOUBLE LEAF SOLID CORE DOOR IN 2-HOURS FIRE RATED DOUBLE LEAF SOLID CORE DOOR IN TIMBER 2-HOURS
BOMBA FIRE RATED
APPROVED DOUBLE
2-HOUR FIRE LEAF
RATED SOLID CORE
DOUBLE DOOR IN TIMBER
LEAF 2-HOURS
BOMBA FIRE RATED
APPROVED DOUBLE
2-HOUR FIRE LEAF
RATED SOLID CORE
DOUBLE DOOR WITH FIXED
LEAF BOMBA APPROVED 1-HOUR FIRE RATED SINGLE LEAF Jalan Ampang Putra, Taman Ampang Hilir
PAINT
TIMBERFINISH ON FINISH
VENEER BOTH SIDES ANDSIDES
ON BOTH METALAND
FRAME IN SELECTED
METAL FRAME VENEER FINISH ON BOTH SIDES AND METAL FRAME IN SELECTED SPRAY PAINT FINISH ON BOTH SIDES AND METAL FRAME SPRAY PAINT FINISH ON BOTH SIDES AND METAL FRAME VENEER FINISH ON BOTH SIDES AND METAL FRAME IN SELECTED BOMBA APPROVED 2-HOUR FIRE RATED DOUBLE LEAF VENEER
METAL FINISH
FRAME ON BOTH
SOLID SIDES
TIMBER DOORAND
, INMETAL FRAME
PAINTED IN SELECTED
FINISH WITH GLASSFRAME
METAL VIEWING PANEL
SOLID IN SPRAY
TIMBER DOORPAINT FINISH ON
, IN PAINTED BOTH
FINISH SIDES AND
WITH SOLID CORE DOOR WITH METAL FRAME IN SELECTED SPRAY 55100 Kuala Lumpur
DOOR TYPE / FD SPRAY PAINT SPRAY
IN SELECTED FINISH PAINT FINISH FD SPRAY PAINT FINISH FD IN SELECTED SPRAY PAINT FINISH C/W KICKPLATE FD IN SELECTED SPRAY PAINT FINISH C/W KICKPLATE FD SPRAY PAINT FINISH WITH CUSTOMISED DOOR PULL HANDLE FD METAL FRAME SOLID TIMBER DOOR , IN PAINTED FINISH FD SPRAY
FIXED PAINT
GLASS FINISH WITH
VIEWING PANELCUSTOMISED
AND STAINLESSDOOR PULLKICK
STEEL HANDLE
PLATE
FD METAL
FIXED FRAME
GLASS IN SELECTED
VIEWING PANEL SPRAY PAINT FINISH
AND STAINLESS STEELC/W KICKPLATE
KICK PLATE
FD PAINT FINISH ON BOTH SIDES
Tel: 03-4270 4663 Fax: 03-4270 5663
SPECIFICATION 10a-2 WIDTH 1800 mm
10a-2y WIDTH 1800 mm 10a-3 WIDTH 1800 mm 10a-4 WIDTH 1800 mm 10a-5 WIDTH 1800 mm 10b WIDTH 1800 mm 10c WIDTH 1800 mm 10c-1 WIDTH 1800 mm 11a WIDTH 1200 mm QUANTITY SURVEYOR
HEIGHT 2400 mm HEIGHT 2400 mm HEIGHT 2400 mm HEIGHT 2400 mm HEIGHT 2400 mm HEIGHT 3000 mm HEIGHT 2400 mm HEIGHT 2400 mm HEIGHT 2400 mm JUBM SDN BHD
Level 5, Menara TSR,
12 Jalan PJU 7/3, Mutiara Damansara,
QTY FLOOR LEVEL ROOM / AREA / LOCATION QTY FLOOR LEVEL ROOM / AREA / LOCATION QTY FLOOR LEVEL ROOM / AREA / LOCATION QTY FLOOR LEVEL ROOM / AREA / LOCATION QTY FLOOR LEVEL ROOM / AREA / LOCATION QTY FLOOR LEVEL ROOM / AREA / LOCATION QTY FLOOR LEVEL ROOM / AREA / LOCATION QTY FLOOR LEVEL ROOM / AREA / LOCATION QTY FLOOR LEVEL ROOM / AREA / LOCATION QTY FLOOR LEVEL
LEVEL 47810 Petaling Jaya, Selangor Darul Ehsan
LEVEL BASEMENT 3 LEVEL BASEMENT 3 LEVEL BASEMENT 3 LEVEL BASEMENT 3 LEVEL BASEMENT 3 LEVEL BASEMENT 3 LEVEL BASEMENT 3 LEVEL BASEMENT 3 LEVEL BASEMENT 3 LEVEL BASEMENT 3 Tel: 03-6156 9000 Fax: 03-6157 8660
LEVEL BASEMENT 2 LEVEL BASEMENT 2 LEVEL BASEMENT 2 LEVEL BASEMENT 2 LEVEL BASEMENT 2 LEVEL BASEMENT 2 LEVEL BASEMENT 2 LEVEL BASEMENT 2 LEVEL BASEMENT 2 LEVEL BASEMENT 2 Company No. : 27638-X
LEVEL BASEMENT 1 LEVEL BASEMENT 1 LEVEL BASEMENT 1 LEVEL BASEMENT 1 LEVEL BASEMENT 1 LEVEL BASEMENT 1 LEVEL BASEMENT 1 LEVEL BASEMENT 1 LEVEL BASEMENT 1 LEVEL BASEMENT 1 LANDSCAPE CONSULTANT
1 LEVEL GROUND 1 LEVEL GROUND LEVEL GROUND LEVEL GROUND LEVEL GROUND 3 LEVEL GROUND PABX, SSU, TRANSFORMER, MSB, GENSET, MDF 12 LEVEL GROUND BOH CORRIDOR 1 LEVEL GROUND 1 LEVEL GROUND LEVEL GROUND
PENTAGO SDN BHD
1 LEVEL MEZZANINE STAFF LOUNGE 1 LEVEL MEZZANINE 1 LEVEL MEZZANINE LEVEL MEZZANINE LEVEL MEZZANINE 1 LEVEL MEZZANINE LEVEL MEZZANINE LEVEL MEZZANINE LEVEL MEZZANINE LEVEL MEZZANINE
No. 58-60, Jalan Rotan,
2 LEVEL UPPER GROUND 1 LEVEL UPPER GROUND LEVEL UPPER GROUND PREPARATION KITCHEN 1 LEVEL UPPER GROUND LEVEL UPPER GROUND LEVEL UPPER GROUND LEVEL UPPER GROUND LEVEL UPPER GROUND LEVEL UPPER GROUND LEVEL UPPER GROUND Kampung Attap,
PARKING LEVEL 1 PARKING LEVEL 1 PARKING LEVEL 1 PARKING LEVEL 1 PARKING LEVEL 1 2 PARKING LEVEL 1 PARKING LEVEL 1 PARKING LEVEL 1 PARKING LEVEL 1 PARKING LEVEL 1 50460 Kuala Lumpur
Tel: 03-2276 6488 Fax: 03-2276 4828
PARKING LEVEL 2 PARKING LEVEL 2 PARKING LEVEL 2 PARKING LEVEL 2 PARKING LEVEL 2 PARKING LEVEL 2 PARKING LEVEL 2 PARKING LEVEL 2 PARKING LEVEL 2 PARKING LEVEL 2
PARKING LEVEL 3 PARKING LEVEL 3 PARKING LEVEL 3 PARKING LEVEL 3 PARKING LEVEL 3 1 PARKING LEVEL 3 PARKING LEVEL 3 PARKING LEVEL 3 PARKING LEVEL 3 PARKING LEVEL 3 FACADE CONSULTANT
PARKING LEVEL 4 PARKING LEVEL 4 PARKING LEVEL 4 PARKING LEVEL 4 PARKING LEVEL 4 2 PARKING LEVEL 4 PARKING LEVEL 4 PARKING LEVEL 4 PARKING LEVEL 4 PARKING LEVEL 4
PARKING LEVEL 5 PARKING LEVEL 5 PARKING LEVEL 5 PARKING LEVEL 5 PARKING LEVEL 5 PARKING LEVEL 5 PARKING LEVEL 5 PARKING LEVEL 5 PARKING LEVEL 5 PARKING LEVEL 5
MEINHARDT FACADE TECHNOLOGY
Suite 17-02, Level 17,
1 PARKING LEVEL 6 PARKING LEVEL 6 PARKING LEVEL 6 PARKING LEVEL 6 PARKING LEVEL 6 PARKING LEVEL 6 PARKING LEVEL 6 PARKING LEVEL 6 PARKING LEVEL 6 PARKING LEVEL 6
Amoda, 22 Jalan Imbi,
1 PARKING LEVEL 7 PARKING LEVEL 7 PARKING LEVEL 7 PARKING LEVEL 7 PARKING LEVEL 7 1 PARKING LEVEL 7 PARKING LEVEL 7 PARKING LEVEL 7 PARKING LEVEL 7 PARKING LEVEL 7 55100 Kuala Lumpur
PODIUM DECK AHU 1 PODIUM DECK FIRE SERVICE LIFT LOBBY (SR) 1 PODIUM DECK PODIUM DECK PODIUM DECK PODIUM DECK PODIUM DECK PODIUM DECK MAIN KITCHEN 1 PODIUM DECK PODIUM DECK Tel: 03-2710 9488 Fax: 03-2710 2990
3 LEVEL 2 AHU 1 LEVEL 2 1 LEVEL 2 LEVEL 2 LEVEL 2 FUNCTIONAL HALL, BUSINESS LOUNGE 5 LEVEL 2 LEVEL 2 5 LEVEL 2 LEVEL 2 LEVEL 2
INTERIOR DESIGNER
LEVEL 3 FIRE SERVICE LIFT LOBBY (SR) 1 LEVEL 3 1 LEVEL 3 LEVEL 3 LEVEL 3 LEVEL 3 LEVEL 3 LEVEL 3 LEVEL 3 LEVEL 3
1 LEVEL 4 LEVEL 4 LEVEL 4 LEVEL 4 AHU, FIRE SERVICE LIFT LOBBY (H) 2 LEVEL 4 LEVEL 4 LEVEL 4 LEVEL 4 LEVEL 4 UNIT ENTRANCE 6 LEVEL 4
Blu Water Studio SDN BHD
E-2-1, Block E, Second Floor,
1 LEVEL 5 LEVEL 5 LEVEL 5 LEVEL 5 AHU, FIRE SERVICE LIFT LOBBY (H) 2 LEVEL 5 LEVEL 5 LEVEL 5 LEVEL 5 LEVEL 5 UNIT ENTRANCE 6 LEVEL 5 Megan Avenue 1,
1 LEVEL 6 LEVEL 6 LEVEL 6 LEVEL 6 AHU, FIRE SERVICE LIFT LOBBY (H) 2 LEVEL 6 LEVEL 6 LEVEL 6 LEVEL 6 LEVEL 6 UNIT ENTRANCE 6 LEVEL 6 189 Jalan Tun Razak,
50400 Kuala Lumpur, Malaysia
1 LEVEL 7 LEVEL 7 LEVEL 7 LEVEL 7 AHU, FIRE SERVICE LIFT LOBBY (H) 2 LEVEL 7 LEVEL 7 LEVEL 7 LEVEL 7 LEVEL 7 UNIT ENTRANCE 6 LEVEL 7
Tel: 03-2163 4689 Fax: 03-2163 4686
1 LEVEL 8 LEVEL 8 LEVEL 8 LEVEL 8 AHU, FIRE SERVICE LIFT LOBBY (H) 2 LEVEL 8 LEVEL 8 LEVEL 8 LEVEL 8 LEVEL 8 UNIT ENTRANCE 6 LEVEL 8
Tandatangan Arkitek
1 LEVEL 9 LEVEL 9 LEVEL 9 LEVEL 9 AHU, FIRE SERVICE LIFT LOBBY (H) 2 LEVEL 9 LEVEL 9 LEVEL 9 LEVEL 9 LEVEL 9 UNIT ENTRANCE 6 LEVEL 9
1 LEVEL 10 LEVEL 10 LEVEL 10 LEVEL 10 AHU, FIRE SERVICE LIFT LOBBY (H) 2 LEVEL 10 LEVEL 10 LEVEL 10 LEVEL 10 LEVEL 10 UNIT ENTRANCE 6 LEVEL 10
1 LEVEL 11 LEVEL 11 LEVEL 11 LEVEL 11 AHU, FIRE SERVICE LIFT LOBBY (H) 2 LEVEL 11 LEVEL 11 LEVEL 11 LEVEL 11 LEVEL 11 UNIT ENTRANCE 6 LEVEL 11
1 LEVEL 12 LEVEL 12 LEVEL 12 LEVEL 12 AHU, FIRE SERVICE LIFT LOBBY (H) 2 LEVEL 12 LEVEL 12 LEVEL 12 LEVEL 12 LEVEL 12 UNIT ENTRANCE 6 LEVEL 12
1 LEVEL 13 LEVEL 13 LEVEL 13 LEVEL 13 AHU, FIRE SERVICE LIFT LOBBY (H) 2 LEVEL 13 LEVEL 13 LEVEL 13 LEVEL 13 LEVEL 13 UNIT ENTRANCE 6 LEVEL 13
LEVEL 14 LEVEL 14 LEVEL 14 LEVEL 14 LEVEL 14 LEVEL 14 LEVEL 14 LEVEL 14 LEVEL 14 LEVEL 14
1 AHU, FIRE SERVICE LIFT LOBBY (H) 2 UNIT ENTRANCE 6 SYED SOBRI SYED ISMAIL
1 LEVEL 15 LEVEL 15 LEVEL 15 LEVEL 15 AHU, FIRE SERVICE LIFT LOBBY (H) 2 LEVEL 15 LEVEL 15 LEVEL 15 LEVEL 15 LEVEL 15 UNIT ENTRANCE 6 LEVEL 15
AA Dip. APAM
1 LEVEL 16 LEVEL 16 LEVEL 16 LEVEL 16 AHU, FIRE SERVICE LIFT LOBBY (H) 2 LEVEL 16 LEVEL 16 LEVEL 16 LEVEL 16 LEVEL 16 FOYER 8 LEVEL 16
1 AHU, FIRE SERVICE LIFT LOBBY (H) 2 FOYER 8
A / S 47
LEVEL 17 LEVEL 17 LEVEL 17 LEVEL 17 LEVEL 17 LEVEL 17 LEVEL 17 LEVEL 17 LEVEL 17 LEVEL 17
1 LEVEL 18 LEVEL 18 LEVEL 18 LEVEL 18 AHU, FIRE SERVICE LIFT LOBBY (H) 2 LEVEL 18 LEVEL 18 LEVEL 18 LEVEL 18 LEVEL 18 FOYER 8 LEVEL 18 "Saya memperakui bahawa detail-detail dalam pelan-pelan ini adalah menurut
kehendak-kehendak Undang-Undang Kecil Bangunan (Wilayah Persekutuan Kuala Lumpur)
1 LEVEL 19 LEVEL 19 LEVEL 19 LEVEL 19 AHU, FIRE SERVICE LIFT LOBBY (H) 2 LEVEL 19 LEVEL 19 LEVEL 19 LEVEL 19 LEVEL 19 FOYER 8 LEVEL 19
1985 dan saya setuju terima tanggungjawab penuh dengan sewajarnya."
1 LEVEL 20 LEVEL 20 LEVEL 20 LEVEL 20 AHU, FIRE SERVICE LIFT LOBBY (H) 2 LEVEL 20 LEVEL 20 LEVEL 20 LEVEL 20 LEVEL 20 FOYER 8 LEVEL 20
1 LEVEL 21 LEVEL 21 LEVEL 21 LEVEL 21 AHU, FIRE SERVICE LIFT LOBBY (H) 2 LEVEL 21 LEVEL 21 LEVEL 21 LEVEL 21 LEVEL 21 FOYER 8 LEVEL 21
HOTEL & SERVICED RESIDENCE
1 LEVEL 22 LEVEL 22 LEVEL 22 LEVEL 22 LEVEL 22 LEVEL 22 LEVEL 22 LEVEL 22 LEVEL 22 LEVEL 22
LEVEL 23 LEVEL 23 LEVEL 23 LEVEL 23 LEVEL 23 LEVEL 23 LEVEL 23 LEVEL 23 LEVEL 23 LEVEL 23 Tajuk Lukisan
2 LEVEL 24 LEVEL 24 LEVEL 24 LEVEL 24 LEVEL 24 LEVEL 24 LEVEL 24 LEVEL 24 LEVEL 24 FOYER 14 LEVEL 24
2 LEVEL 25 LEVEL 25 LEVEL 25 LEVEL 25 LEVEL 25 LEVEL 25 LEVEL 25 LEVEL 25 LEVEL 25 FOYER 14 LEVEL 25 DOOR SCHEDULE
2 LEVEL 26 LEVEL 26 LEVEL 26 LEVEL 26 LEVEL 26 LEVEL 26 LEVEL 26 LEVEL 26 LEVEL 26 FOYER 14 LEVEL 26 DOOR SCHEDULE 03
2 LEVEL 27 LEVEL 27 LEVEL 27 LEVEL 27 LEVEL 27 LEVEL 27 LEVEL 27 LEVEL 27 LEVEL 27 FOYER 14 LEVEL 27
2 LEVEL 28 LEVEL 28 LEVEL 28 LEVEL 28 LEVEL 28 LEVEL 28 LEVEL 28 LEVEL 28 LEVEL 28 FOYER 14 LEVEL 28
2 LEVEL 29 LEVEL 29 LEVEL 29 LEVEL 29 LEVEL 29 LEVEL 29 LEVEL 29 LEVEL 29 LEVEL 29 FOYER 14 LEVEL 29
2 LEVEL 30 LEVEL 30 LEVEL 30 LEVEL 30 LEVEL 30 LEVEL 30 LEVEL 30 LEVEL 30 LEVEL 30 FOYER 14 LEVEL 30
Pindaan Tarikh Nota
2 LEVEL 31 LEVEL 31 LEVEL 31 LEVEL 31 LEVEL 31 LEVEL 31 LEVEL 31 LEVEL 31 LEVEL 31 FOYER 14 LEVEL 31
2 LEVEL 32 LEVEL 32 LEVEL 32 LEVEL 32 LEVEL 32 LEVEL 32 LEVEL 32 LEVEL 32 LEVEL 32 FOYER 14 LEVEL 32 - - -
2 LEVEL 33 LEVEL 33 LEVEL 33 LEVEL 33 LEVEL 33 LEVEL 33 LEVEL 33 LEVEL 33 LEVEL 33 FOYER 14 LEVEL 33
2 LEVEL 34 LEVEL 34 LEVEL 34 LEVEL 34 LEVEL 34 LEVEL 34 LEVEL 34 LEVEL 34 LEVEL 34 FOYER 12 LEVEL 34
2 LEVEL 35 LEVEL 35 LEVEL 35 LEVEL 35 LEVEL 35 LEVEL 35 LEVEL 35 LEVEL 35 LEVEL 35 FOYER 12 LEVEL 35
2 LEVEL 36 LEVEL 36 LEVEL 36 LEVEL 36 LEVEL 36 LEVEL 36 LEVEL 36 LEVEL 36 LEVEL 36 FOYER 12 LEVEL 36
2 LEVEL 37 LEVEL 37 LEVEL 37 LEVEL 37 LEVEL 37 LEVEL 37 LEVEL 37 LEVEL 37 LEVEL 37 FOYER 12 LEVEL 37
CONSTRUCTION
2 LEVEL 38 LEVEL 38 LEVEL 38 LEVEL 38 LEVEL 38 LEVEL 38 LEVEL 38 LEVEL 38 LEVEL 38 FOYER 12 LEVEL 38 HOTEL & SERVICED RESIDENCE AND BALANCE OF WORKS TO BASEMENT AND PODIUM
1 LEVEL 39 LEVEL 39 LEVEL 39 LEVEL 39 LEVEL 39 3 LEVEL 39 LEVEL 39 LEVEL 39 LEVEL 39 FOYER, PUMP ROOM 10 LEVEL 39
Scale 1:50 Date FEBRUARY 2017
LEVEL 40 LEVEL 40 LEVEL 40 LEVEL 40 LEVEL 40 1 LEVEL 40 LEVEL 40 LEVEL 40 LEVEL 40 LEVEL 40
LEVEL 41 LEVEL 41 LEVEL 41 LEVEL 41 LEVEL 41 LEVEL 41 LEVEL 41 LEVEL 41 LEVEL 41 LEVEL 41
Drawn by ASILA Check by SAR & AB
LEVEL 42 LEVEL 42 LEVEL 42 LEVEL 42 LEVEL 42 LEVEL 42 LEVEL 42 LEVEL 42 LEVEL 42 LEVEL 42
IRONMONGERY 59 SET TOTAL 24 SET TOTAL 14 SET TOTAL 1 SET TOTAL 36 SET TOTAL 14
5 SET TOTAL 12 SET TOTAL 51 SET TOTAL 11 SET TOTAL 330 SET Nombor Lukisan
Revision
Project
Number 2431 Drawing
Status CD
0
KLEC - PARCEL B
DRAWING AND SPECIFICATION DRAWING AND SPECIFICATION
DOOR SCHEDULE
STRUCTURAL 7690
STRUCTURAL 1000 STRUCTURAL STRUCTURAL STRUCTURAL LINTEL LEVEL STRUCTURAL
900 900 900 1000
LINTEL LEVEL 930 LINTEL LEVEL LINTEL LEVEL LINTEL LEVEL STAINLESS STEEL
HINGES REFER TO LINTEL LEVEL TAJUK PROJEK
FIRE RATED DOOR FIRE RATED DOOR FIRE RATED DOOR FIRE RATED DOOR STRUCTURAL IRONMONGERY STRUCTURAL
CLOSER REFER TO CLOSER REFER TO CLOSER REFER TO CLOSER REFER TO 700 SCHEDULE 800
IRONMONGERY IRONMONGERY IRONMONGERY IRONMONGERY LINTEL LEVEL LINTEL LEVEL
SCHEDULE SCHEDULE SCHEDULE SCHEDULE
FIRE RATED DOOR 50MM x 150MM PIVOT HINGE REFER TO
CADANGAN PEMBANGUNAN BERCAMPUR YANG TERDIRI DARIPADA:-
CLOSER REFER TO METAL DOOR FRAME IRONMONGERY SCHEDULE
IRONMONGERY WITH POWDER
TS1b 50MM x 150MM
SCHEDULE COATED FINISH TO
1-HOUR FIRE RATED DOOR IN SELECTED METAL DOOR FRAME
MATCH DOOR PANEL
WITH PT-3 PAINT 50MM x 150MM POWDER COATED
1) PARCEL A YANG MENGANDUNGI:-
VENEER FINISH
10MM SHADOW GAP 10MM SHADOW GAP 10MM SHADOW GAP FINISH ALUMINIUM FRAME
10MM SHADOW GAP 10MM SHADOW GAP
2550
i. 1 BLOK PANGSAPURI SERVIS A - 48 & 56 TINGKAT DI ATAS PODIUM RUANG
PT14 50MM x 150MMPT15 PT15 PT15 50MM x 150MM
METAL DOOR FRAME METAL DOOR FRAME FIXED FIXED
LOCKSET grain
50MM x 150MM METAL DOOR FRAME IN SELECTED
SPRAY PAINT FINISH ( MATTE SURFACE )
50MM x 150MM METAL DOOR FRAME IN SELECTED
WITH PT-3 PAINT
SPRAY PAINT FINISH ( MATTE SURFACE )
50MM x 150MM METAL DOOR FRAME IN SELECTED
SPRAY PAINT FINISH ( MATTE SURFACE )
50MM x 175MM METAL DOOR FRAME IN SELECTED
SPRAY PAINT FINISH ( MATTE SURFACE ) WITH PT-3 PAINT 50MM THK. PVC
FINISH TO MATCH FINISH TO MATCH
LETAK KERETA 7 TINGKAT DAN RUANG LETAK KERETA BAWAH TANAH
DOOR PANEL
LEVEL
2400
2400
2400
2400
2400
LOCKSET REFER TO LOCKSET REFER TO DOOR PANEL LOCKSET REFER TO grain LOCKSET REFER TO LOCKSET REFER TO DOOR PANEL LOCKSET REFER TO
IRONMONGERY IRONMONGERY IRONMONGERY IRONMONGERY IRONMONGERY IRONMONGERY
2100
2100
SCHEDULE SCHEDULE SCHEDULE SCHEDULE SCHEDULE SCHEDULE PULL HANDLE REFER TO
STAINLESS STEEL
HINGES REFER TO
STAINLESS STEEL
HINGES REFER TO
STAINLESS STEEL
HINGES REFER TO
STAINLESS STEEL
HINGES REFER TO
STAINLESS STEEL
HINGES REFER TO IRONMONGERY SCHEDULE 1 TINGKAT
IRONMONGERY IRONMONGERY IRONMONGERY IRONMONGERY IRONMONGERY
SCHEDULE SCHEDULE
LEVEL 8MM GAP 8MM GAP 8MM GAP RUANG LETAK KERETA BAWAH TANAH 1 TINGKAT
8MM GAP 8MM GAP 8MM GAP 8MM GAP 8MM GAP
OUTSIDE
OUTSIDE INSIDE
3) PARCEL C YANG MENGANDUNGI:-
PLAN
i. 1 BLOK RUANG PERNIAGAAN 4 TINGKAT DI ATAS RUANG
BOMBA APPROVED 1-HOUR FIRE RATED SINGLE LEAF CONNECTING 2-HOURS FIRE RATED DOUBLE LEAF SOLID CORE DOOR WITH FIXED 1-HOUR FIRE RATED SINGLE LEAF SOLID CORE DOOR IN TIMBER 1-HOUR FIRE RATED SINGLE LEAF SOLID CORE DOOR IN
BOMBAVIEWING
APPROVED 1-HOUR FIRE RATED DOUBLE PANEL METAL FRAME FOLDABLE DOOR, IN POWDER LETAK KERETA BAWAH TANAH 3 TINGKAT
GLASS PANEL IN SPRAY PAINT SINGLE LEAF
FINISH ON BOTH SIDES AND VENEER FINISH ON BOTH SIDES AND METAL FRAME IN SELECTED SPRAY PAINT FINISH ON BOTH SIDES AND METAL FRAME IN BOMBA APPROVED 2-HOUR FIRE RATED SINGLE LEAF EIGHT PANEL ALUMINIUM FRAME GLASS FOLDABLE DOOR WITH 10MM THK TEMPERED GLASS SINGLE-LEAF POWDER-COATED ALUMN FRAME GLASS
DOOR TYPE / FD SOLID CORE DOOR IN SELECTED VENEER FINISH ON BOTH SIDES
AND METAL FRAME IN SELECTED SPRAY PAINT FINISH
FD METAL FRAME
METAL FRAME IN
SOLID TIMBERSPRAY
SELECTED DOOR PAINT
, IN PAINTED
FINISH FINISH
C/W KICKPLATE FD SPRAY PAINT FINISH FD SELECTED SPRAY PAINT FINISH FD METAL FRAME SOLID TIMBER DOOR , IN PAINTED FINISH FL WITH TWO FIXED ALUMINIUM FRAME GLASS PANELS , IN POWDER COATED FINISH FL COATED FINISH GD DOOR WITH 10MM THK TEMPERED GLASS ii. 1 BLOK PEJABAT A - 41 TINGKAT
SPECIFICATION 12a WIDTH 1000 mm 13a WIDTH 900 mm 13a-1 WIDTH 900 mm 13a-2 WIDTH 900 mm 14 WIDTH 700 mm 1 WIDTH 7690 mm 2 WIDTH 800 mm 4a WIDTH 1000 mm iii. 1 BLOK PEJABAT B - 18 TINGKAT
HEIGHT 2400 mm HEIGHT 2400 mm HEIGHT 2400 mm HEIGHT 2400 mm HEIGHT 2100 mm HEIGHT 2550 mm HEIGHT 2100 mm HEIGHT 2400 mm
iv. 1 BLOK PEJABAT C - 17 TINGKAT
v. 1 BLOK PEJABAT D - 16 TINGKAT
QTY FLOOR LEVEL ROOM / AREA / LOCATION QTY FLOOR LEVEL ROOM / AREA / LOCATION QTY FLOOR LEVEL ROOM / AREA / LOCATION QTY FLOOR LEVEL ROOM / AREA / LOCATION QTY FLOOR LEVEL ROOM / AREA / LOCATION QTY FLOOR LEVEL ROOM / AREA / LOCATION QTY FLOOR LEVEL ROOM / AREA / LOCATION QTY FLOOR LEVEL ROOM / AREA / LOCATION QTY
LEVEL vi. 1 BLOK PEJABAT E - 31 TINGKAT
LEVEL BASEMENT 3 LEVEL BASEMENT 3 LEVEL BASEMENT 3 LEVEL BASEMENT 3 LEVEL BASEMENT 3 LEVEL BASEMENT 3 LEVEL BASEMENT 3 LEVEL BASEMENT 3
LEVEL BASEMENT 2 LEVEL BASEMENT 2 LEVEL BASEMENT 2 LEVEL BASEMENT 2 LEVEL BASEMENT 2 LEVEL BASEMENT 2 LEVEL BASEMENT 2 LEVEL BASEMENT 2 DI ATAS PODIUM RUANG PERNIAGAAN - 4 TINGKAT DAN RUANG LETAK KERETA 2
LEVEL BASEMENT 1 LEVEL BASEMENT 1 LEVEL BASEMENT 1 LEVEL BASEMENT 1 LEVEL BASEMENT 1 LEVEL BASEMENT 1 LEVEL BASEMENT 1 LEVEL BASEMENT 1 TINGKAT DI ATAS RUANG LETAK KERETA BAWAH TANAH 3 TINGKAT
LEVEL GROUND LEVEL GROUND CHEF OFFICE (H) 1 LEVEL GROUND LEVEL GROUND 1 LEVEL GROUND LEVEL GROUND LEVEL GROUND LEVEL GROUND
LEVEL MEZZANINE LEVEL MEZZANINE LEVEL MEZZANINE LEVEL MEZZANINE LEVEL MEZZANINE LEVEL MEZZANINE LEVEL MEZZANINE LEVEL MEZZANINE
LEVEL UPPER GROUND LEVEL UPPER GROUND TOILET BAR, FRONT OFFICE TOILETS 4 LEVEL UPPER GROUND TOILET 2 LEVEL UPPER GROUND 4 LEVEL UPPER GROUND LEVEL UPPER GROUND LEVEL UPPER GROUND LEVEL UPPER GROUND 4) PARCEL D YANG MENGANDUNGI :-
PARKING LEVEL 1 PARKING LEVEL 1 PARKING LEVEL 1 PARKING LEVEL 1 PARKING LEVEL 1 PARKING LEVEL 1 PARKING LEVEL 1 PARKING LEVEL 1 i. 1 BLOK MASJID 2 TINGKAT
PARKING LEVEL 2 PARKING LEVEL 2 PARKING LEVEL 2 PARKING LEVEL 2 PARKING LEVEL 2 PARKING LEVEL 2 PARKING LEVEL 2 PARKING LEVEL 2 II. PLAZA
PARKING LEVEL 3 PARKING LEVEL 3 PARKING LEVEL 3 PARKING LEVEL 3 PARKING LEVEL 3 PARKING LEVEL 3 PARKING LEVEL 3 PARKING LEVEL 3
DI ATAS PODIUM RUANG LETAK KERETA 5 TINGKAT DAN RUANG LETAK KERETA
PARKING LEVEL 4 PARKING LEVEL 4 PARKING LEVEL 4 PARKING LEVEL 4 PARKING LEVEL 4 PARKING LEVEL 4 PARKING LEVEL 4 PARKING LEVEL 4
PARKING LEVEL 5 PARKING LEVEL 5 PARKING LEVEL 5 PARKING LEVEL 5 PARKING LEVEL 5 M&E ROOMS 2 PARKING LEVEL 5 PARKING LEVEL 5 PARKING LEVEL 5
BAWAH TANAH 2 TINGKAT
PARKING LEVEL 6 PARKING LEVEL 6 PARKING LEVEL 6 PARKING LEVEL 6 PARKING LEVEL 6 PARKING LEVEL 6 PARKING LEVEL 6 PARKING LEVEL 6
PARKING LEVEL 7 PARKING LEVEL 7 PARKING LEVEL 7 PARKING LEVEL 7 PARKING LEVEL 7 PARKING LEVEL 7 PARKING LEVEL 7 PARKING LEVEL 7 DI ATAS LOT-LOT 5, 29, 30, 16, 215, 42, 20001, 20002, 20003, 20012 & 20013
PODIUM DECK PODIUM DECK 1 PODIUM DECK PODIUM DECK JANITOR 1 PODIUM DECK PODIUM DECK PODIUM DECK PODIUM DECK HERBS GARDEN 1
DAN PT-PT 27 & 72 MERUPAKAN TANAH KERAJAAN DI ATAS SEKSYEN 95A & 98,
LEVEL 2 LEVEL 2 LEVEL 2 LEVEL 2 LEVEL 2 LEVEL 2 LEVEL 2 3 LEVEL 2
LEVEL 3 LEVEL 3 LEVEL 3 LEVEL 3 LEVEL 3 LEVEL 3 LEVEL 3 LEVEL 3
KAMPUNG HAJI ABDULLAH HUKUM ,
6 LEVEL 4 HOTEL UNIT 4 LEVEL 4 LEVEL 4 LEVEL 4 LEVEL 4 LEVEL 4 LEVEL 4 MAID STATION TOILET 1 LEVEL 4 JALAN BANGSAR, WILAYAH PERSEKUTUAN, KUALA LUMPUR.
6 LEVEL 5 HOTEL UNIT 4 LEVEL 5 LEVEL 5 LEVEL 5 LEVEL 5 LEVEL 5 LEVEL 5 MAID STATION TOILET 1 LEVEL 5
6 LEVEL 6 HOTEL UNIT 4 LEVEL 6 LEVEL 6 LEVEL 6 LEVEL 6 LEVEL 6 LEVEL 6 MAID STATION TOILET 1 LEVEL 6
UNTUK:-
6 LEVEL 7 HOTEL UNIT 4 LEVEL 7 LEVEL 7 LEVEL 7 LEVEL 7 LEVEL 7 LEVEL 7 MAID STATION TOILET 1 LEVEL 7
PROJEK USAHASAMA DI ANTARA DEWAN BANDARAYA KUALA LUMPUR DAN KL
6 LEVEL 8 HOTEL UNIT 4 LEVEL 8 LEVEL 8 LEVEL 8 LEVEL 8 LEVEL 8 LEVEL 8 MAID STATION TOILET 1 LEVEL 8
6 LEVEL 9 HOTEL UNIT 4 LEVEL 9 LEVEL 9 LEVEL 9 LEVEL 9 LEVEL 9 LEVEL 9 MAID STATION TOILET 1 LEVEL 9 ECO CITY SDN. BHD.
6 LEVEL 10 HOTEL UNIT 4 LEVEL 10 LEVEL 10 LEVEL 10 LEVEL 10 LEVEL 10 LEVEL 10 MAID STATION TOILET 1 LEVEL 10
TAJUK CADANGAN
6 LEVEL 11 HOTEL UNIT 4 LEVEL 11 LEVEL 11 LEVEL 11 LEVEL 11 LEVEL 11 LEVEL 11 MAID STATION TOILET 1 LEVEL 11
6 LEVEL 12 HOTEL UNIT 4 LEVEL 12 LEVEL 12 LEVEL 12 LEVEL 12 LEVEL 12 LEVEL 12 MAID STATION TOILET 1 LEVEL 12 CADANGAN PINDAAN KEPADA PELAN BANGUNAN YANG TELAH DILULUSKAN
6 LEVEL 13 HOTEL UNIT 4 LEVEL 13 LEVEL 13 LEVEL 13 LEVEL 13 LEVEL 13 LEVEL 13 MAID STATION TOILET 1 LEVEL 13 BERTARIKH 16 MAC 2015 (NO RUJUKAN BP S1 OSC 2014 1720) KEPADA
6 LEVEL 14 HOTEL UNIT 4 LEVEL 14 LEVEL 14 LEVEL 14 LEVEL 14 LEVEL 14 LEVEL 14 MAID STATION TOILET 1 LEVEL 14
CADANGAN PEMBANGUNAN BERCAMPUR YANG TERDIRI DARIPADA:-
6 LEVEL 15 HOTEL UNIT 4 LEVEL 15 LEVEL 15 LEVEL 15 LEVEL 15 LEVEL 15 LEVEL 15 MAID STATION TOILET 1 LEVEL 15
8 LEVEL 16 HOTEL UNIT 4 LEVEL 16 LEVEL 16 LEVEL 16 LEVEL 16 LEVEL 16 LEVEL 16 MAID STATION TOILET 1 LEVEL 16
8 LEVEL 17 HOTEL UNIT 4 LEVEL 17 LEVEL 17 LEVEL 17 LEVEL 17 LEVEL 17 LEVEL 17 MAID STATION TOILET 1 LEVEL 17 1) PARCEL B YANG MENGANDUNGI:-
8 LEVEL 18 HOTEL UNIT 4 LEVEL 18 LEVEL 18 LEVEL 18 LEVEL 18 LEVEL 18 LEVEL 18 MAID STATION TOILET 1 LEVEL 18 1 BLOK PANGSAPURI SERVIS (326 UNIT) DAN HOTEL (252 UNIT) - 40
8 LEVEL 19 HOTEL UNIT 4 LEVEL 19 LEVEL 19 LEVEL 19 LEVEL 19 LEVEL 19 LEVEL 19 MAID STATION TOILET 1 LEVEL 19
TINGKAT
8 LEVEL 20 HOTEL UNIT 4 LEVEL 20 LEVEL 20 LEVEL 20 LEVEL 20 LEVEL 20 LEVEL 20 MAID STATION TOILET 1 LEVEL 20
DI ATAS PODIUM RUANG LETAK KERETA 7 TINGKAT DAN RUANG LETAK KERETA
8 LEVEL 21 HOTEL UNIT 4 LEVEL 21 LEVEL 21 LEVEL 21 LEVEL 21 LEVEL 21 LEVEL 21 MAID STATION TOILET 1 LEVEL 21
LEVEL 22 LEVEL 22 LEVEL 22 LEVEL 22 LEVEL 22 LEVEL 22 LEVEL 22 LEVEL 22 2 TINGKAT DI ATAS RUANG LETAK KERETA BAWAH TANAH 3 TINGKAT
LEVEL 23 LEVEL 23 LEVEL 23 LEVEL 23 LEVEL 23 LEVEL 23 LEVEL 23 LEVEL 23
14 LEVEL 24 LEVEL 24 LEVEL 24 LEVEL 24 LEVEL 24 LEVEL 24 LEVEL 24 LEVEL 24
DI ATAS LOT-LOT 5, 29, 30, 16, 215, 42, 20001, 20002, 20003, 20012 & 20013
14 LEVEL 25 LEVEL 25 LEVEL 25 LEVEL 25 LEVEL 25 LEVEL 25 LEVEL 25 LEVEL 25
DAN PT-PT 27 & 72 MERUPAKAN TANAH KERAJAAN DI ATAS SEKSYEN 95A & 98,
14 LEVEL 26 LEVEL 26 LEVEL 26 LEVEL 26 LEVEL 26 LEVEL 26 LEVEL 26 LEVEL 26
14 LEVEL 27 LEVEL 27 LEVEL 27 LEVEL 27 LEVEL 27 LEVEL 27 LEVEL 27 LEVEL 27 KAMPUNG HAJI ABDULLAH HUKUM, JALAN BANGSAR, WILAYAH PERSEKUTUAN,
14 LEVEL 28 LEVEL 28 LEVEL 28 LEVEL 28 LEVEL 28 LEVEL 28 LEVEL 28 LEVEL 28 KUALA LUMPUR.
14 LEVEL 29 LEVEL 29 LEVEL 29 LEVEL 29 LEVEL 29 LEVEL 29 LEVEL 29 LEVEL 29
14 LEVEL 30 LEVEL 30 LEVEL 30 LEVEL 30 LEVEL 30 LEVEL 30 LEVEL 30 LEVEL 30
UNTUK:-
14 LEVEL 31 LEVEL 31 LEVEL 31 LEVEL 31 LEVEL 31 LEVEL 31 LEVEL 31 LEVEL 31
14 LEVEL 32 LEVEL 32 LEVEL 32 LEVEL 32 LEVEL 32 LEVEL 32 LEVEL 32 LEVEL 32
PROJEK USAHASAMA DI ANTARA DEWAN BANDARAYA KUALA LUMPUR DAN KL
14 LEVEL 33 LEVEL 33 LEVEL 33 LEVEL 33 LEVEL 33 LEVEL 33 LEVEL 33 LEVEL 33 ECO CITY SDN. BHD.
12 LEVEL 34 LEVEL 34 LEVEL 34 LEVEL 34 LEVEL 34 LEVEL 34 LEVEL 34 LEVEL 34
12 LEVEL 35 LEVEL 35 LEVEL 35 LEVEL 35 LEVEL 35 LEVEL 35 LEVEL 35 LEVEL 35
WEST
12 LEVEL 36 LEVEL 36 LEVEL 36 LEVEL 36 LEVEL 36 LEVEL 36 LEVEL 36 LEVEL 36 ELEVATION Q
PEJABAT
LEVEL 41 LEVEL 41 LEVEL 41 LEVEL 41 LEVEL 41 LEVEL 41 LEVEL 41 LEVEL 41 PANGSAPURI PEJABAT B PEJABAT
SERVIS A A A
PEJABAT
LEVEL 42 LEVEL 42 LEVEL 42 LEVEL 42 LEVEL 42 LEVEL 42 LEVEL 42 LEVEL 42 PANGSAPURI
SERVIS B
B
PEJABAT
C
IRONMONGERY 330 SET TOTAL 72 SET TOTAL 15 SET TOTAL 2 SET TOTAL 15 SET TOTAL 2 SET TOTAL 2 SET TOTAL 18
93 SET TOTAL 91 PEJABAT
D
NOTES : DOOR DETAIL TO REFER FACADE CONSULTANT NOTES : DOOR DETAIL TO REFER FACADE CONSULTANT NOTES : DOOR DETAIL TO REFER FACADE CONSULTANT NOTES : DOOR DETAIL TO REFER FACADE CONSULTANT
PEJABAT
DRAWING AND SPECIFICATION DRAWING AND SPECIFICATION DRAWING AND SPECIFICATION DRAWING AND SPECIFICATION
PARCEL B
PARCEL A
B
EAST
C
PARCEL
PARCEL
ELEVATION
DOOR SCHEDULE STRUCTURAL
MASJID
RC L C
STRUCTURAL STRUCTURAL
D
MOTOR DRIVE UNIT TO MANUF'S DETAIL MANUF'S DETAIL
PA C E
EL
R
SHUTTER BOX TO MANUF'S DETAIL
PA
MOTOR DRIVE UNIT TO MOTOR DRIVE UNIT TO
LINTEL LEVEL MANUF'S DETAIL MANUF'S DETAIL MANUF'S DETAIL EQ EQ LINTEL LEVEL 900
EQ 900
EQ
MOTOR DRIVE UNIT TO
MANUF'S DETAIL LAND OWNER
STRUCTURAL STRUCTURAL
LINTEL LEVEL SHUTTER BOX TO
LINTEL LEVEL
50MM x 30MM (THK)
METAL FRAME WITH
50MM x 30MM (THK)
METAL FRAME WITH
DEWAN BANDARAYA KUALA LUMPUR
MANUF'S DETAIL
PT-3 PAINT FINISH PT-3 PAINT FINISH
Tingkat 25, Menara Dewan Bandaraya Kuala Lumpur,
LOCKSET REFER TO 50MM x 30MM (THK)
Jalan Raja Laut,
IRONMONGERY METAL FRAME WITH 50350 Kuala Lumpur
500
LOCKSET
600
RSH-1 RSH-1 RSH-1 PT-3 PAINT FINISH
2700
SCHEDULE
2600
2600
2600
2600
LEVEL 50MM x 150MM 50MM x 150MM 50MM x 150MM
2400
2400
METAL DOOR FRAME LOCKSET REFER TO METAL DOOR FRAME LOCKSET REFER TO METAL DOOR FRAME
RSH-1 RSH-2 WITH PT-3 PAINT IRONMONGERY
SCHEDULE
WITH PT-3 PAINT IRONMONGERY
SCHEDULE
WITH PT-3 PAINT OWNER
FINISH FINISH FINISH
10MM THK. CLEAR TEMPERED 10MM THK. CLEAR TEMPERED 10MM THK. CLEAR TEMPERED
GLASS WITH HEAT SOAKED GLASS WITH HEAT SOAKED GLASS WITH HEAT SOAKED
Setia International Centre
1200
1100
1000
KLEC - PARCEL B
DRAWING AND SPECIFICATION
DOOR SCHEDULE
STRUCTURAL 2700
LINTEL LEVEL STRUCTURAL
600
LINTEL LEVEL TAJUK PROJEK
LOCKSET 50MM x 150 MM i. 1 BLOK PANGSAPURI SERVIS A - 48 & 56 TINGKAT DI ATAS PODIUM RUANG
METAL DOOR FRAME
2600 LETAK KERETA 7 TINGKAT DAN RUANG LETAK KERETA BAWAH TANAH
LEVEL 50MM x 150MM
2400
LOCKSET REFER TO METAL DOOR FRAME LOCKSET REFER TO
H.W. FLUSH DOOR WITH
IRONMONGERY WITH PT-3 PAINT IRONMONGERY
PT-3 PAINT FINISH
SCHEDULE FINISH SCHEDULE
STAINLESS STEEL
HINGES REFER TO
1 TINGKAT
10MM THK. CLEAR TEMPERED IRONMONGERY
GLASS WITH HEAT SOAKED SCHEDULE ii. 1 BLOK PANGSAPURI SERVIS B - 42 TINGKAT DI ATAS PODIUM RUANG
1000
PLAN PLAN
PEJABAT
LEVEL 41 LEVEL 41 LEVEL 41 PANGSAPURI PEJABAT B PEJABAT
SERVIS A A A
PEJABAT
LEVEL 42 LEVEL 42 LEVEL 42 PANGSAPURI
SERVIS B
B
PEJABAT
C
PEJABAT
PARCEL B
PARCEL A
B
EAST
C
PARCEL
PARCEL
ELEVATION
MASJID
PLAZA
WARISAN
RC L C
D
PA C E
EL
R
PA
LAND OWNER
OWNER
KL ECO CITY SDN BHD
Setia International Centre
Lot 215, Pantai Baru,Jalan Bangsar
59200 Kuala Lumpur
Tel: 03-2283 2255 Fax: 03-2284 1188
Company No : 185140-X
ARCHITECT
GDP ARCHITECTS SDN BHD
45-21,Plaza Level Block C
Plaza Damansara, 45 Medan Setia Satu
Bukit Damansara,50490 Kuala Lumpur
Tel: 03-2093 5700 Fax: 03-2093 5711
Company No. : 232661-A
CIVIL & STRUCTURE ENGINEER
TY Lin International SDN BHD
Civil & Structural Engineers
No.61 - 2, Jalan SS 23/15,
47400 Petaling Jaya, Selangor Darul Ehsan
Tel: 03-7804 3313 Fax: 03-7803 5313
Company No. : 63617-H
MECHANICAL, ELECTRICAL & PLUMBING ENGINEER
J Roger Preston (M) SDN BHD
(Mechanical, Electrical, Plumbing)
H-4, Excella Business Park,
Jalan Ampang Putra, Taman Ampang Hilir
55100 Kuala Lumpur
Tel: 03-4270 4663 Fax: 03-4270 5663
QUANTITY SURVEYOR
JUBM SDN BHD
Level 5, Menara TSR,
12 Jalan PJU 7/3, Mutiara Damansara,
47810 Petaling Jaya, Selangor Darul Ehsan
Tel: 03-6156 9000 Fax: 03-6157 8660
Company No. : 27638-X
LANDSCAPE CONSULTANT
FACADE CONSULTANT
INTERIOR DESIGNER
Blu Water Studio SDN BHD
E-2-1, Block E, Second Floor,
Megan Avenue 1,
189 Jalan Tun Razak,
50400 Kuala Lumpur, Malaysia
Tel: 03-2163 4689 Fax: 03-2163 4686
Tandatangan Arkitek
DOOR SCHEDULE
DOOR SCHEDULE 05
- - -
CONSTRUCTION
HOTEL & SERVICED RESIDENCE AND BALANCE OF WORKS TO BASEMENT AND PODIUM
Scale 1:50 Date FEBRUARY 2017
Nombor Lukisan
Revision
Project
Number 2431 Drawing
Status CD
0