Sie sind auf Seite 1von 38

PT.

International Nickel Indonesia Mines & Exploration

PT. INTERNATIONAL NICKEL INDONESIA


LATERITE GEOLOGICAL BLOCK MODELING
AND RESOURCE ESTIMATION

Mineral Resources & Mineral Reserves Group PT.INCO, August 2010


Presentation Outlines
PT. International Nickel Indonesia Mines & Exploration

1. Regional & Local Geology


2. Introduction: Block Modeling & Resource Estimation
3. Data Validation and Geological Validation
4. Geological Domaining and EDA
5. Wireframing, Sample Selection and Compositing
6. Variography
7. Estimation Parameters
8. Block Model Check
9. Volume Variance Correction
10. Ore definition
11. Resource Classification
Regional & Local Geology
PT. International Nickel Indonesia Mines & Exploration

Jakarta Makassar

peridotites that have been


serpentinised to varying
degrees.

In Sorowako and Petea


the rocks are dominantly
harzburgite and lherzolite
with lesser dunite and rare
pyroxenite.
Regional & Local Geology
PT. International Nickel Indonesia Mines & Exploration

Geomorphology

Matano Lake

Petea

Sorowako

Towuti Lake
Regional & Local Geology
PT. International Nickel Indonesia Mines & Exploration

West Type Deposit - Profile


Regional & Local Geology
PT. International Nickel Indonesia Mines & Exploration

West Type Deposit Bedrock Pinnacle


Regional & Local Geology
PT. International Nickel Indonesia Mines & Exploration

East Type Deposit - Profile


Regional & Local Geology
PT. International Nickel Indonesia Mines & Exploration

Ore Type Classification


CLASS PARAMETERS WEST BLOCK ORE TYPES EAST BLOCK & PETEA ORE TYPES
Main ore types -1 Type-1 -1 Type-2 -1 Type-3 -1 Hi Olivine -1 Lo Olivine -6 -18

Ultramafic rock Generally harzburgite with some dunite Generally lherzolite at Sorowako East Block; generally harzburgite at Petea.

Level of serpentinisation Nil <5% Low 5-10% Low 10-15% Low 10-15% Medium 15-25% High 30-60% V.High >60%

Magnetic susceptibility Very low Generally low Very high

SiO2/MgO ratio 2.2 2.6 1.8 2.0 1.6 1.8 1.4 1.6
Iron content High: 20-24% High: 20-24% Low: 15-18%
Optimum screen size -1 -1 -1 -6 -18
Screen rec. ROM to DKP 25-30% 35% 35% 50% 60%

Alternate screen size No alternate size available No alternate size -6 -18 Entire ROM

Screen recovery at alternate size No alternate size available No alternate size 50% 60% 67%

Hardness of boulders Extremely hard Very hard Medium hard Medium hard Soft Soft

Fracture density Very low Medium Medium Medium High Very high Very high

Difficulty of mining High Medium(+) Medium(-) Low Low Low Low

Saprolite thickness (auger) <1.5m 1.54.5 m >4.5m Note used for classifying East Block ore types

Olivine content in the benf. ore Medium Medium Medium Low Low Low Low

Olivine content in the rocky frc. High High Low Low Low

OB thickness Medium Generally high except at Petea


Ore thickness High Medium
PT. International Nickel Indonesia Mines & Exploration

Geological Block Modeling


and
Resource Estimation
PT.INCO Strategic Mineral Resources &
Mineral Reserves
PT. International Nickel Indonesia Mines & Exploration

PTI Strategic Planning

Exploration

PTI MRMR

Public Reporting
Project Development Mine Planning / Design Expansion Projects
(Stock Exchanges)

LOM
Introduction
PT. International Nickel Indonesia Mines & Exploration

The following slides summarized the geological block modeling and


resources estimation activity at PT International Nickel
Indonesia. Improvement and development are conducted
continuously based on:

1. The yearly MRMR readiness assessment and review


2. An external audit findings and recommendations; AMEC (2005,
2007, 2008) and Golder (2010)
3. Continuous studies to support the operation and to improve
resources estimation best practices.
PT.INCO Block Models
PT. International Nickel Indonesia Mines & Exploration

PT. INCO Block Models


80

70 Block model production


block model week manpower
60 increases as the
exploration, drilling
Frequency

50

40
activities, and project
30
69 development increase in
20
all PTI concession area.
40
29 33 35
21 23 24 25 6 6
10 20
3 14 3 12 3 3
0
2004 2005 2006 2007 2008 2009

Year

Notes: Block Modeling duration increases as


2004-2005 Sorowako Project Area (SPA)
there are improvements in best practice
2006 SPA and Bahodopi
2007 SPA, Bahodopi, and Pomalaa
protocols and raising of major and trace
2008 SPA, Bahodopi, Pomalaa, SOA, and SCD elements
Introduction
PT. International Nickel Indonesia Mines & Exploration

Key Factors:

1. The quality of the interpretation (geological domaining) and


subsequent modelling is predicated by a thorough validation of
the drill hole data with emphasis on chemistry.

2. The quality of the geologic interpretations/wire frames will


reflect on the quality of the block model and any conclusions
derived from it.

3. There is no sophisticated geostatistic technique to correct for


a poor interpretation. Be rigorous in validating the resultant
models as mistakes are easy to make but at times hard to
detect.
PT.INCO Resource Estimation General Flow
PT. International Nickel Indonesia Mines & Exploration

Exploration Project
(geological interpretation, mapping, sampling, drilling, logging)

Sample House
Lab. Process & Technology
(sample preparation, acquire assays data, sample QAQC)

Geo-Evaluation & Validation


(acquire drill hole data, geological domains & validation)

3D Modeling & Estimation


(peer review & technical report)

Reconciliation

Pit Designing & Planning

Reporting & Classification


(Mineral Resources and Mineral Reserves)
PT. INCO Block Modeling General Flow
PT. International Nickel Indonesia Mines & Exploration

Geo-Evaluation &
Data Validation

No
Data Preparation Assays & Collars Create Drillhole

Yes Geological Domaining &


Wireframing
Exploratory data analysis

Block Model Prototype Sample Selection & Compositing

Unfold Composite Samples

Variography and
Estimation Parameters

Fatal Flaw
Parameters: Cut-off Grade,
Ore and Waste Thickness Grade Estimation (OK) Grade Estimation (NN)

Ore Definition Ni Volume Variance Correction

Output: Final Block Model with Grade and Product


Technical Report
& Peer Review
Validation
Prepare Block Model to Vulcan format
Automatic Check
Visual Check
Output: Block Model Ready to be Imported to Vulcan Check using tool
Drill hole Database & Data Validation
PT. International Nickel Indonesia Mines & Exploration

HQ3 ~ 2.406
Input: Assays Input: Collars
-1" FRAC -6" FRAC TOT FRAC
REC1 REC6 RECTOT
Create Assays Data Definition Create Collars Data Definition
DW1 DW6 DWTOT
NI1 NI6 NITOT
Verification

Read Assays Read Collars


CO1 CO6 COTOT
FE1 FE6 FETOT
SIO21 SIO26 SIO2TOT Set Grades value < 0.001 to blanks

MGO1 MGO6 MGOTOT


CR1 CR6 CRTOT
Output: Assays.dm Output: Collars.dm
AL1 AL6 ALTOT
MN1 MN6 MNTOT
CA1 CA6 CATOT
H2O1 H2O6 H2OTOT Statistics Create Drill holes Database Visual
Check

Univariate Statistics of Assays Output: Drill holes Database (Holes.dm);


Drill Holes summary; Drill Holes Errors
Geo Validation
PT. International Nickel Indonesia Mines & Exploration

Topography

Fe-MgO
- geological error.
- collars error against topography.
Geological Domain & EDA
PT. International Nickel Indonesia Mines & Exploration

What do we look for?


- Does volume properly isolate the
domain being evaluated?
- Is it consistent with the geological
control rule?

Only related sample should be used


and dont want to mix population
Geological Domain & EDA
PT. International Nickel Indonesia Mines & Exploration

What do we look for: Outliers, trends, mixed population, bias of any sort & systematic
Why it is important: Garbage in Garbage out
Geological Domain & EDA
PT. International Nickel Indonesia Mines & Exploration

indication of misclassification
Geological Model
PT. International Nickel Indonesia Mines & Exploration

- topography as top of limonite


- topography as reference for underlying layers
Wireframing Use GPR (Development)
PT. International Nickel Indonesia Mines & Exploration
Drillhole only for Wireframing
GPR testing at Songko, January 2010
Limonite

Saprolite

Bedrock

GPR testing at Songko Quary, January 2010


slagc
Drillhole & GPR for Wireframing
Bloulder

Soft material
Sample Composite
PT. International Nickel Indonesia Mines & Exploration

Parameters: composite length,


Drill holes Database minimum gap, maximum gap,
minimum composite length

Capture samples in layer limonite, saprolite and bedrock

Limonite samples Saprolite samples Bedrock samples

Sample regularization

Composite Drill holes samples

Composited Limonite Composited Saprolite Composited Bedrock Check compositing


Unfolding
PT. International Nickel Indonesia Mines & Exploration

Unfolding illustrations

Transforms a set of
Cartesian Coordinate
System into Unfolded
Coordinate System [UCS] as
Truncated defined by a stratified
geological unit.

Unfold make a spatial


correlation in a proportional
space and geometry.
Proportional
Variography
PT. International Nickel Indonesia Mines & Exploration

What do we look for?


- Quality of the experimental variograms
- Sill vs sample variance
- Appropriate model(s) used
- Appropriate Ranges

Why is it important?
- Variogram is foundation of geostatistics
- Used as a critical input to Kriging
- Used to determine weights in estimation
- Process is Data driven

- 11 elements of experimental variogram in each layer.


- Variogram map to evaluate degree of anisotropy.
- Zonal anisotropy treatment .
Estimation Parameters
PT. International Nickel Indonesia Mines & Exploration

Estimation parameter Search strategy

Search ellipsoid

The search strategy should


be honored the drillhole
spacing
Block Model Check
PT. International Nickel Indonesia Mines & Exploration

What do we look for:


- Does the model honor the sample data?
- Does the model honor the search ranges?
- Do all the blocks have been estimated?

Why is it important:
- Verify that the estimation parameters were appropriate?
- Verify that the correct data was used?
Block Model Check
PT. International Nickel Indonesia Mines & Exploration

Nave QQ Plot

Parallel Modeling: Regardless of


Global Descriptive Statistics the method, the global mean should
still be the same.
Block Model Check
PT. International Nickel Indonesia Mines & Exploration

NN Model
Visual Inspection Plan View

Plan view visual inspection.


Compare the grade distribution
in NN and OK model. Make
sure the estimation run
correctly

OK Model
Block Model Check
PT. International Nickel Indonesia Mines & Exploration

Visual Inspection Section View


Compare the grade distribution in NN and OK model. Make sure the estimation run correctly.

NN Model

OK Model
Volume Variance Correction
PT. International Nickel Indonesia Mines & Exploration

Regression methods such as Kriging may result in an over-smoothing or under-smoothing of


the grade variability producing a block grade distribution with a variance that is lower or higher
than expected. This expected variance can be calculated using Kriges relationship which
states that the dispersion variance for the samples within the deposit is the sum of the
dispersion variance of samples within the blocks and the dispersion variance of the blocks
within the deposit

To capture the variability within short range (distance), the close space drilling is needed. Also
regarding the SMU, the variability within the sort range is needed as the references for the variance
inside the SMU.
Volume Variance Correction
PT. International Nickel Indonesia Mines & Exploration

volume variance
calculation

Limonite NN Saprolite NN
OK OK
COR COR
Block Model Ore Definition
PT. International Nickel Indonesia Mines & Exploration
Estimated
Block Model

Parameters:
Cut-off Grade (cog),
Create Simulated Drill holes Minimum Ore Thickness,
Maximum Waste Thickness

Composite Simulated Drill holes in zone LIMONITE and SAPROLITE


Using ORE and WASTE criteria

Assign ORE and WASTE products to composite using cog

Merge with original simulated Drill holes

Reclassify WASTE above ORE became OB and


WASTE below ORE became BZ

Assign BZ product to all bedrock composite

PRODUCT
Create Block Model Product
Block Model
Block Model Transfer
PT. International Nickel Indonesia Mines & Exploration

Datamine Block Model


The block model ready for external peer
review by:
- Long-term plan mine engineer
- Grade control geologist
Block Model converted to Vulcan

If there is no serious findings, the block


model approved by MRMR geologist,
Mine engineers and Grade Control
Peer review MRMR, LTP, GC geologist as valid block model.
Resource Classification
PT. International Nickel Indonesia Mines & Exploration

Current resource classification criteria:

+/-15% on tonnes and grade on a quarterly basis for measured, on


an annual basis for indicated and on a global basis for inferred (90%
level of confidence)

PTI criteria: 25 or 50m for measured, 100m for indicated

Measured Indicated Inferred


Drill spacing (m) 25 or 50 100 200
Sampling type Core drill Core drill Core and/or Auger drill

Other improvement in resource classification:

Geostatistical drilling
Steep slope denser drilling
PT.INCO Mineral Resources & Mineral Reserves
PT. International Nickel Indonesia Mines & Exploration

Mineral Reserves
PTI Mineral Reserves
100 Proven Probable
90
80
70

DKP (Mt)
60
Mineral Resources 50

PTI Mineral Resources 40

600 30
Measured Indicated Inferred 20
500 10
0
400
2001 2002 2003 2004 2005 2006 2007 2008 2009
DKP (Mt)

300
MRMR (year)

200

100

0
2001 2002 2003 2004 2005 2006 2007 2008 2009

MRMR (year)
PT. International Nickel Indonesia Mines & Exploration

THANK YOU

Das könnte Ihnen auch gefallen