HBE-HT PRODUCT APPLICATION PROCEDURE, ITP & PQT Page 1 of 9

FIELD JOINT INSTALLATION PROCEDURE


FOR
HBE-HT LIQUID EPOXY
ITP & PQT

G2NG-K128 PROJECT

ISSUED MAY, 2013


ISSUED BY NASA CHAABANI
Product Data Sheet

HBE-HT
Brush or Spray Applied High Build Epoxy -
High Temperature Applications
For more than 35 years, Canusa-CPS has been
a leading developer and manufacturer of
specialty pipeline coatings for the sealing and
corrosion protection of pipeline joints and other
substrates. Canusa-CPS high performance
products are manufactured to the highest
quality standards and are available in a number
of configurations to accommodate many
specific project applications.

Product Description
HBE-HT is a state-of-the-art, 100% solids, two
component epoxy coating system which has been
specifically formulated as a pipeline coating. Applied
to bare steel, HBE products are used for protection of
pipeline field joint girth welds, valves and fittings, as Technical Data Applications
a holiday repair material on FBE coated pipe or for Coating Description
pipeline coating rehabilitation. Oil & Gas
Phenolic Epoxy
Typical Uses
Conversion to Solids
Protective coating for pipelines in buried or immersed 100% Repair & Rehab
applications. Used as a direct-to-metal corrosion
Theoretical Coverage
resistant coating and as a rehab coating on steel
425 mil-sq. ft./litre Corrosion Coating
pipelines and at girth welds. Also used as damage or
1605 mil-sq. ft./US gallon
holiday repair material for epoxy mainline coatings.
1.0 mm-m/litre
Excellent coating for pipeline valves, fittings, and bends. Girth-Weld Joints
Typical Thickness
Features & Benefits >20 mils (500 microns)
Flashpoint (T.C.C.) Fittings & Bends
High build in a single coat
>120C (250F)
Sets and cures over a broad temperature range
Mixing Ratio (By Volume)
Excellent adhesion to grit blasted steel - an ideal High Temp
3 Parts Base : 1 Part Cure
mainline corrosion coating for pipelines
Superior adhesion to Fusion Bonded Epoxy (FBE)
Typical Cure Schedule Configurations
coatings - ideal coating for joint protection and
repair of FBE coated pipe
for HBE-HT
Spray Application
Can be used for mainline FBE coating repair and 10
Tack-free time in Minutes

300
Dry hard time in Hours

rehabilitation
240
9
Brush Application
Suitable for girth weld protection during directional
8

7
drilling 180 6
Roller Application
Excellent chemical resistance 5

120 4
Outstanding resistance to cathodic disbonding up 3
2-Part Cartridge
to 150C (302F) operating temperatures 60 2

Easily applied with brush, roller or a heated, airless


1

spray system 0 10 20 30 40 50 60 70 80 90 C 0
Sleeve Compatible
50 120 140 175 1120F

Zero VOCs, 100% solids is environmentally Temperature C & F

friendly *Refer also to Canusa technical bulletin Temperature Range


Single pass thickness of 20-40mils (500 - 1000 HBE Cure MTB for additional information.
microns) Up to 150C (302F)

CANUSA-CPS is registered to ISO 9001:2008.


High Build Epoxy - High Temperature Applications
HBE-HT
Typical Product Properties
Test Standard Unit Typical Values
Cured Coating Performance Properties

Hardness ASTM D2240 Shore D > 80


Adhesion
to steel* ASTM D4541 psi > 2500 psi
to FBE (gloss removed) ASTM D4541 psi > 2000 psi
Cathodic Disbondment Rating
28 days @ 23C CSA Z245.20 mm, radius <5
28 days @ 120C CSA Z245.20 mm, radius < 10
28 days @ 150C CSA Z245.20 mm, radius < 10
Impact at 25mils (625 microns)
@ -30C CSA Z245.20 Joules (in-lb) > 1.5 (13.2)
@ 25C CSA Z245.20 Joules (in-lb) > 3.0 (26.5)
Hot Water Immersion
28 days @ 75C CSA Z245.20 1 to 5 1, excellent
28 days @ 120C CSA Z245.20 1 to 5 1, excellent
Water Absorption ASTM D570 % <0.1
Dielectric Strength ASTM D149 Volts/micron (volts/mil) > 16 (400)
Chemical Resistance ASTM D543 various solutions excellent
* (SSPC-SP10; 2-4 mil profile)

Surface Preparation, Clean-up, Storage & Safety


Direct-to-steel: Clean-up, Storage & Safety Clean-up
! Remove all visible deposits of oil, grease and other contaminants by ! For clean-up use xylene, MEK or mixture.
Surface Preparation

solvent washing in accordance with SSPC SP1. Abrasive blast surface to Storage
Near-White (SSPC-SP10; NACE 2; Sa2) or better, with a 2-4 mil blast ! Products must be shipped and stored at temperatures between 5C (40F) and 40C (105F).
profile. DO NOT FREEZE. Shelf life of 3 years when stored as specified.
! All weld splatter must be removed from the surface and rough welds must Safety
be ground smooth prior to coating. ! Material Safety Data Sheet and product labels contain detailed health, hygiene and safety
On cured pipe coating: information. This coating is intended for industrial use by properly trained professional
! Remove gloss on surface by light abrasive blasting or power tool. All applicators.
surfaces to be coated must be completely dry, free of moisture, soil, dust ! Do not apply without adequate air exchange and ventilation in enclosed areas. Use fresh air
and grit at the time the coating is applied. respirator in confined areas. Wear protective clothing when spraying the coating. Breathing fumes
or contact with skin can cause respiratory and other allergic reactions in some people.

Mixing & Application Instructions


! HBE-HT must be applied to clean dry surface only.
! Ambient conditions for successful application include: relative humidity less than 85%; and temperature greater than 3C (5F) above the dew point.
! The acceptable substrate temperature range for application is 10C (50F) to 100C (212F). Applying onto warm substrate greater than 38C (100F) enhances coating adhesion.
! Formulated to mixing ratio of 3 parts Base to one part Cure by volume.
Application Instructions

! If additional coats are required, they shall be applied while the preceding coat is still tacky (no tie coat needed). The maximum over-coating interval shall not exceed two (2) hours at
25C (77F) without roughening the surface. If recoating interval has been exceeded, surface must be blast roughened prior to application of topcoat.
! A minimum of four (4) hours curing above 20C (68F) is required prior to handling. Handling time may be longer at lower temperatures. Backfill only after Shore D hardness
reaches 70.
Brush Grade:
! Apply thoroughly mixed epoxy by brush, roller or trowel. When coating pipe, remove application tools on the upstroke to prevent pulling material down and off the pipe bottom.
! Refer to HBE-HT Brush Grade Installation Guide for detailed information.
Spray Grade:
! HBE-HT Spray Grade shall be applied to the specified Dry Film Thickness (DFT) in a single application using a 3:1 mix-ratio Graco Hydra-Cat two-component spray equipment or
approved equal.
! Pot-life of mixed components in spray hose is less than 1 minute.
! Detailed application instructions and technical support are available from Canusa.

How to Order:
Product Designation Package Contents
HBE-HT-XX Kit-0.5 375mL of HBE-HT Base, 125mL of HBE-HT-XX Cure
Brush Grade

HBE-HT-XX Kit-1.0 750mL of HBE-HT Base, 250mL of HBE-HT-XX Cure Supplied 8 Kits/Box
HBE-HT-XX Kit-1.5 1125mL of HBE-HT Base, 375mL of HBE-HT-XX Cure
HBE Cartridge 400ml 3:1 ratio Cartridge
HBE Application Kit 1 pair of rubber gloves, mixing sticks, application scraper
XX refers to WG- winter grade, RG- regular grade and XG- mid-grade
Spray Grade

HBE-HT-SG Base-19 19 L (5 US Gal) of HBE-HT-Spray Grade Base


HBE-HT-SG Base-200 200 L (52.8 US Gal) of HBE-HT-Spray Grade Base
HBE-HT-SG Cure-19 19 L (5 US Gal) of HBE-HT-Spray Grade Cure
HBE-HT-SG Cure-200 200 L (52.8 US Gal) of HBE-HT-Spray Grade Cure

www.canusacps.com

Canada U.S.A./Latin America Europe/Middle East Asia/Pacific


CANUSA-CPS CANUSA-CPS CANUSA-CPS CANUSA-CPS
a division of SHAWCOR LTD. a division of SHAWCOR INC. a division of Canusa Systems Ltd. a division of SHAWCOR LTD.
25 Bethridge Road 2408 Timberloch Place Unit 3, Sterling Park #05-31, Blk 52, Frontier
Toronto, Ontario Building C-8 Gatwick Road Ubi Avenue 3
M9W 1M7, The Woodlands, Texas Crawley, West Sussex Singapore
Canada 77380, U.S.A. England RH10 9QT 408867
Tel: +1 (416) 743-7111 Tel: +1 (281) 367-8866 Tel: +44 (1293) 541254 Tel: +65-6749-8918
Fax: +1 (416) 743-5927 Fax: +1 (281) 367-4304 Fax: +44 (1293) 541777 Fax: +65-6749-8919
Canusa warrants that the product conforms to its chemical and physical description and is appropriate for the use stated on the installation guide when used in compliance with Canusas written instructions. Since many
installation factors are beyond our control, the user shall determine the suitability of the products for the intended use and assume all risks and liabilities in connection therewith. Canusas liability is stated in the standard
terms and conditions of sale. Canusa makes no other warranty either expressed or implied. All information contained in this installation guide is to be used as a guide and is subject to change without notice. This installation
guide supersedes all previous installation guides on this product. E&OE
Printed on recycled paper. Recyclable. PDS-A4-HBE-HT-rev021
Installation Guide

HBE Brush Grade


High Build Epoxy Coating (HBE-95 or HBE-HT)

Kit Contents (Options 1A, 1B and 1C) Storage Guidelines


1A Standard 1B Complete Field 1C Cartridge Kit 2
Kit Ready Kit To ensure maximum performance, store Canusa
products in a dry, ventilated area. Keep products sealed
Corrosion
Protection
& Sealing

in original packaging until just prior to use. Avoid


& Sealing

exposure to direct sunlight, rain, snow, dust or other


B
Protection
Corrosion

A B adverse environmental elements. Avoid prolonged


storage at temperatures above 40C (104F) or below
Base 5C (40F).
Cure Base

A 3 Safety Guidelines
Cure
Product installation should be done in well-ventilated area
and in accordance with local health and safety regulations.
HBE products are a two part epoxy coatings used for pipeline rehabilitation and protection of pipeline valves, fittings Read the MSDS prior to using the products.
and field joints. HBE is supplied in kits containing pre-measured components of Part A-HBE Cure (small container)
These installation instructions are intended as a guide for
and Part B-HBE Base (large container). The Standard Kit contains the HBE components while the Complete Field standard products. Consult your Canusa representative
Ready Kit also includes a stir stick, scraper and gloves. HBE is also available in a 2-component 3:1 ratio cartridge. for specific projects or unique applications.
All kit styles are supplied with Installation Guides and MSDSs.

Surface Preparation
4 5 6
mm
ck 50
SOLVENT

tba ck+
Cu utba
C
m m+
50

SIS Sa 2
SSPC SP 10

Clean exposed steel and adjacent pipe coating with Ensure that the pipe is at least 3C (5F) above the Wipe clean with a lint-free cloth or air blast the steel
a solvent cleanser that will not leave an oil residue dew point before cleaning. Thoroughly clean the and pipe coating to remove foreign contaminants.
(ie. ethanol, MEK, etc.) to remove the presence of cutback area to near white metal SIS Sa 2 Surface must be clean and dry prior to application of
oil, grease, and other contaminants. (SSPC-SP10) or equivalent. Lightly abrade at least HBE products.
50mm (2") of the line coating on each side of
cutback area.

Options 1A and 1B
HBE Mixture Kits HBE Stirring Kits HBE Application
7 8A 8B 9
mm
A 4 1 ck
tba ck+
50
Minutes Minute Cu utba
+ C
m m+
50

B B B B

Components must be warmed to at least 20C (68F) A. Begin mixing slowly. After initial mix has been Use a brush, roller or trowel to apply HBE to the joint or
prior to mixing. achieved, a spatula or mixing stick should be used to application area to a specified minimum thickness.
Pour Part A-HBE Cure (small container) into Part B- remove any resin from the side of container. Cover at least 50mm (2") of any adjacent pipeline
HBE Base (large container). Scrape walls and lids of B. Mix at such a speed that ensures a uniform mix, coating. Coating should only be applied at
both containers to ensure all product is used. but does not create a vortex in the liquid. At temperatures above 10C (50F) and when the
When mixing, slow the mixer down at the surface of temperatures between 20C (68F) and 40C (105F), ambient temperature is 3C (5F) above the dew point.
the liquid to prevent the introduction of air into the mix for one (1) minute with a drill stirrer or four (4) Refer to Useful Application Information for other
coating. Do not add solvent or other materials to the minutes with a spatula, blending both parts to create application temperature criteria.
mixture. one uniform colour with no streaks. Note: Pipe substrate may be pre-heated to 85-95C
(180-200F) in order to accelerate curing or to cure in
cold conditions.

CANUSA-CPS is registered to ISO 9001:2008. Part No. 99060-119


HBE- Brush Grade High Build Epoxy Coating

Option 1C HBE 3:1 Ratio Cartridge Surface Preparation


10A 10B 11A 11B

Canusa's high build epoxy (HBE) is available in a 400ml 2-component cartridge. Lightly abrade with clean abrasive Wipe clean with a lint-free cloth or air
Typical use is as a holiday repair coating on fusion bonded epoxy (FBE) coated grit/sand paper, approximately 15 mm blast the steel and pipe coating to
pipe or for recently coated rehabilitation projects using HBE-95 or HBE-HT (0.5) around the repair area. remove foreign contaminants.
products. The cartridge (10A) fits into a universal 2-component cartridge Surface must be clean and dry prior to
dispenser that is available from Canusa. application of HBE products.

Dispensing and Mixing Application


12A 12B 13

1 min

The unique formulation allows for small With a clean stir stick mix thoroughly Use clean trowel, stir stick or other
quantities to be dispensed and has a fast cure for at least 1 minute. Alternately for application tool to apply HBE to repair area
time. To dispense, unscrew the cap, remove larger projects, a static mixer nozzle plus abraded perimeter to specified
the two small plugs in the each side of the (available from Canusa) allows for minimum thickness.
cartridge and replace cap. Squeeze the direct application onto pipe.
trigger of the cartridge dispenser (10B) and
dispense a desired amount of material into a
mixing cup. The cartridge dispenser will
automatically dispense the correct ratio of
base and cure.

Useful Application Information


1. The ideal mixing and application temperature is between 20C (68F) and 40C (105F).
2. The workable pot life after mixing is approximately 15 minutes at 20C (70C). Pot life will be extended at lower temperatures and shortened at higher
temperatures. Refer to Canusa-CPS Marketing Technical Bulletin HBE Cure MTB for cure type options.
3. A variation on high build application technique: Build a first coat of 15 - 20 mils (300-500 microns) around entire circumference followed immediately by a
second coat to achieve specified film thickness.

www.canusacps.com

Canada U.S.A./Latin America Europe/Middle East Asia/Pacific


CANUSA-CPS CANUSA-CPS CANUSA-CPS CANUSA-CPS
a division of SHAWCOR LTD. a division of SHAWCOR INC. a division of Canusa Systems Ltd. a division of SHAWCOR LTD.
25 Bethridge Road 2408 Timberloch Place Unit 3, Sterling Park #05-31, Blk 52, Frontier
Toronto, Ontario Building C-8 Gatwick Road Ubi Avenue 3
M9W 1M7, The Woodlands, Texas Crawley, West Sussex Singapore
Canada 77380, U.S.A. England RH10 9QT 408867
Tel: +1 (416) 743-7111 Tel: +1 (281) 367-8866 Tel: +44 (1293) 541254 Tel: +65-6749-8918
Fax: +1 (416) 743-5927 Fax: +1 (281) 367-4304 Fax: +44 (1293) 541777 Fax: +65-6749-8919
Canusa warrants that the product conforms to its chemical and physical description and is appropriate for the use stated on the installation guide when used in compliance with Canusas written
instructions. Since many installation factors are beyond our control, the user shall determine the suitability of the products for the intended use and assume all risks and liabilities in connection therewith.
Canusas liability is stated in the standard terms and conditions of sale. Canusa makes no other warranty either expressed or implied. All information contained in this installation guide is to be used as a
guide and is subject to change without notice. This installation guide supersedes all previous installation guides on this product. E&OE
Printed on recycled paper. Recyclable. A4-IG-HBE-rev018
HBE-HT PRODUCT APPLICATION PROCEDURE, ITP & PQT Page 2 of 9

TABLE OF CONTENTS

1. INTRODUCTION ......................................................................................................... 3
2. REFERENCES ............................................................................................................ 3
3. RECOMMENDED HBE-HT APPLICATION GUIDELINES ......................................... 4
3.1 MATERIAL STORAGE AND SAFETY .............................................................................. 4
3.2 REQUIRED MATERIALS, INSTALLATION EQUIPMENT AND TESTING EQUIPMENT ............... 4
3.3 RECOMMENDED HBE-HT APPLICATION GUIDELINES ................................................... 5
Step 1: Record Ambient Temperature Conditions .................................................... 5
Step 2: Surface Preparation ..................................................................................... 5
Step 3: Initial Joint Pre-Heat .................................................................................... 5
Step 4: Mixing HBE-HT Liquid Epoxy....................................................................... 5
Step 5: HBE-HT Epoxy Application .......................................................................... 6
3.4 REPAIR PROCEDURE FOR HBE-HT LIQUID EPOXY AND FBE MAINLINE ......................... 6
3.4.1 Minor Repair.................................................................................................... 6
3.4.2 Major Repair.................................................................................................... 6
4. SAMPLE INSPECTION TEST PLAN, PQT ................................................................ 7
5. SAMPLE INSPECTION TEST PLAN, PRODUCTION................................................ 8
APPENDIX PRODUCT DATASHEET & INSTALLATION GUIDE .............................. 9
HBE-HT PRODUCT APPLICATION PROCEDURE, ITP & PQT Page 3 of 9

1. Introduction
This document describes the recommended installation procedures for:

HBE-HT High Build Liquid Epoxy,


Major and Minor Repair Procedures.

2. References
This report should be read in conjunction with the following reference documents:

ASTMAmerican Society for Testing and Materials


ASTM D 4285 Standard Test Method for Indicating Oil or Water in Compressed Air
ASTM D 4940 Standard Test Method for Conductimetric Analysis of Water Soluble Ionic
Contamination of Blasting Abrasives
ASTM D 5162 Standard Practice for Discontinuity (Holiday) Testing of Nonconductive Protective
Coating on Metallic Substrates
ASTM D 6677 Standard Test Method for Evaluating Adhesion by Knife
ASTM G 14 Standard Test Method for Impact Resistance of Pipeline Coatings
ASTM G 17 Standard Test Method for Penetration Resistance of Pipeline Coatings (Blunt Rod)
ISOInternational Organization for Standardization
ISO 8501-1 Preparation of Steel Substrates Before Application of Paints and Related Products -
Visual Assessment of Surface Cleanliness - Part 1: Rust Grades and Preparation
Grades of Uncoated Steel Substrates and of Steel Substrates After Overall Removal of
Previous Coatings
ISO 8501-3 Preparation of Steel Substrates Before Application of Paints and Related Products -
Visual Assessment of Surface Cleanliness - Part 3: Preparation Grades of Welds,
Edges and Other Areas With Surface Imperfections
ISO 8502-3 Preparation of Steel Substrates Before Application of Paint and Related Products -
Tests for the Assessment of Surface Cleanliness - Part 3: Assessment of Dust on
Steel Surfaces Prepared for Painting (Pressure- Sensitive Tape Method)
ISO 8502-6 Preparation of Steel Substrates Before Application of Paints and Related Products -
Tests for the Assessment of Surface Cleanliness - Part 6: Extraction of Soluble
Contaminants for Analysis - the Bresle Method
ISO 8502-9 Preparation of Steel Substrates Before Application of Paints and Related Products -
Tests for the Assessment of Surface Cleanliness - Part 9: Field Method for the
Conductometric Determination of Water-Soluble Salts
ISO 8503-4 Preparation of Steel Substrates Before Application of Paints and Related Products -
Surface Roughness Characteristics of Blast-Cleaned Steel Substrates - Part 4: Method
for the Calibration of ISO Surface Profile Comparators and for the Determination of
Surface Profile Stylus Instrument Procedure
ISO 8503-5 Preparation of Steel Substrates Before Application of Paints and Related Products -
Surface Roughness Characteristics of Blast-Cleaned Steel Substrates - Part 5: Replica
Tape Method for the Determination of the Surface Profile
HBE-HT PRODUCT APPLICATION PROCEDURE, ITP & PQT Page 4 of 9

NACENational Association of Corrosion Engineers


NACE RP0105 Standard Recommended Practice Liquid-Epoxy Coatings for External Repair,
Rehabilitation, and Weld Joints on Buried Steel Pipelines
NACE RP0287 Field Measurement of Surface Profile of Abrasive Blast Cleaned Steel Surfaces Using
a Replica Tape
NACE RP0394 Application, Performance, and Quality Control of Plant-Applied, Fusion-Bonded Epoxy
External Pipe Coating
NACE SP0188 Discontinuity (Holiday) Testing of New Protective Coatings on Conductive Substrates
SSPCThe Society for Protective Coatings
SSPC AB 1 Mineral and Slag Abrasives
SSPC AB 3 Newly Manufactured or Re-Manufactured Steel Abrasives
SSPC GUIDE Field Methods for Retrieval and Analysis of Soluble Salts on Steel and Other
15 Nonporous Substrates
SSPC PA 2 Measurement of Dry Coating Thickness with Magnetic Gages
SSPC SP 1 Solvent Cleaning
SSPC SP 10 Near-White Metal Blast Cleaning (NACE NO. 2)

3. Recommended HBE-HT Application Guidelines


3.1 Material Storage and Safety
To ensure maximum performance, store Canusa products in a dry, ventilated area.
Keep products sealed in original cartons and avoid exposure to direct sunlight, rain,
snow, dust or other adverse environmental elements. Avoid prolonged storage at
temperatures above 35C or below 5C Product installation should be done in
accordance with local health and safety regulations.

Product installation should be done in well-ventilated area and in accordance with local
health and safety regulations. Read the MSDS prior to using the products.

3.2 Required Materials, Installation Equipment and Testing Equipment

Materials/Consumables Installation Equipment Field Testing Equipment


HBE-HT Pre-Measured Kits Surface abrasion tools Holiday Detector
HBE Repair Cartridge Epoxy application accessories Dry Film Thickness Gauge
Solvent (MEK, Acetone, Toluene) Wet film thickness gauge Hygrometer
Digital thermometer
Knife, roller, rags
HBE Repair Dispenser
Safety Equipment (gloves, boots,
goggles, etc.)
HBE-HT PRODUCT APPLICATION PROCEDURE, ITP & PQT Page 5 of 9

3.3 Recommended HBE-HT Application Guidelines


Step 1: Record Ambient Temperature Conditions
As a minimum, at the start of each days coating and every four hours thereafter and
during the final 30 minutes of each days coating, the following parameters shall be
measured and recorded:

Dew point temperature


Ambient temperature
Relative humidity
Pipe temperature (randomly, at a minimum of 6 places around circumference)

Note: Pre-heat Temperature (if required) and Pipe Substrate Temperature shall be
measured with a fully calibrated digital thermometer with a thermocouple probe.

Step 2: Surface Preparation


Clean exposed steel and adjacent pipe coating with a solvent cleanser that will not
leave an oil residue (ie. ethanol, MEK, etc.) to remove the presence of oil, grease, and
other contaminants.

Ensure that the pipe is at least 3C above the dew point before cleaning. Thoroughly
clean the cutback area to near white metal SIS Sa 2 (SSPC-SP10) or equivalent
with a surface profile of 60 to 120 microns. Sweep blast/abrade with Emory Paper 75
mm (3") of the line coating on each side of cutback area.

Wipe clean or air blast the steel and coated areas to remove foreign materials. The pipe
surface must be clean and dry prior to application of HBE-HT epoxy.

If the pipe temperature is <3C above the dew point, the field joint may be pre-heated
with propane torch prior to blasting to remove any moisture.

Step 3: Initial Joint Pre-Heat


Using an induction coil or propane torch, pre-heat the cutback and adjacent mainline
coating to temperature of between 40C to 70C prior to the application of the liquid
HBE-HT coating. If using propane torch, one may have to pre-heat before blasting to
avoid flash rusting of the surface.

Step 4: Mixing HBE-HT Liquid Epoxy


Components must be warmed to at least 20C (68F) prior to mixing. Pour Part A- HBE-
HT Cure (small container) into Part B- HBE-HT Base (large container). Scrape walls
and lids of both containers to ensure all product is used. When mixing, slow the mixer
down at the surface of the liquid to prevent the introduction of air into the coating. Do
not add solvent or other materials to the mixture.

Begin mixing slowly. After initial mix has been achieved, a spatula or mixing stick should
be used to remove any resin from the side of container. Mix at such a speed that
ensures a uniform mix, but does not create a vortex in the liquid. At temperatures
HBE-HT PRODUCT APPLICATION PROCEDURE, ITP & PQT Page 6 of 9

between 20C (68F) and 40C (105F), mix for one (1) minute with a drill stirrer or four
(4) minutes with a spatula, blending both parts to create one uniform colour with no
streaks.

Step 5: HBE-HT Epoxy Application


Dispense epoxy across the steel cutback and spread around the circumference of the
pipe using the HD foam rollers to the specified minimum thickness of 700 to 1000
microns on all exposed metal. Cover at least 50 mm of any adjacent pipeline coating.
Coating should only be applied at temperatures above 10C (50F), when the ambient
temperature is 3C (5F) above the dew point, and when the relative humidity is below
85%.

3.4 Repair Procedure for HBE-HT Liquid Epoxy and FBE Mainline
3.4.1 Minor Repair
Canusa-CPS high build epoxy is available in a 400ml 2-component repair cartridge.
The cartridge fits into a universal 2-component cartridge dispenser.

Lightly abrade the damaged area with clean abrasive grit/sand paper, approximately 15
mm (0.5) around the repair area. Wipe clean with a lint-free cloth or air blast the steel
and pipe coating to remove foreign contaminants. Surface must be clean and dry prior
to application of HBE repair product.

To dispense, unscrew the cap, remove the two small plugs in the each side of the
cartridge and replace cap. Squeeze the trigger of the cartridge dispenser and dispense
a desired amount of material into a mixing cup. The cartridge dispenser will
automatically dispense the correct ratio of base and cure.

With a clean stir stick mix thoroughly for at least 1 minute. Use clean trowel, stir stick or
other application tool to apply HBE to repair area plus abraded perimeter to specified
minimum thickness.

To accelerate curing the damaged area pipe may be heated with a propane torch up to
85 to 95C prior to surface preparation and may be gently forced-cured with a propane
torch or hot air tool.

3.4.2 Major Repair


For major repairs (greater than 50 cm2), the damaged area shall be grit blasted to
remove the defect. Apply HBE-HT in accordance with section 3.3.
HBE-HT PRODUCT APPLICATION PROCEDURE, ITP & PQT Page 7 of 9

4. SAMPLE INSPECTION TEST PLAN, PQT


ACCEPTANCE PQT
NO TEST METHOD/EQUIPMENT
CRITERIA FREQUENCY
MATERIALS
Ambient and Steel Pipe substrate surface at
Temperature least 3C higher than dew
1 Environmental Conditions Every 4 hours
Relative Humidity point and temperature
Dew Point greater than 10C
Each 15,000 kg or
SSPC AB 1 or SSPC Conformance with
2 Abrasive manufacturing batch,
AB 3 method
whichever is less.
No visible contamination
3 Compressed Air Quality ASTM D 4285 Before start of PQT
per method
SURFACE PREPARATION
Free of sharp edges,
weld splatter, slivers, Every Joint, 100% of
4 Pre-coating Visual Visual
burns, loose parent surface
coating
ISO 8502-6 or ISO
5 Salt Contamination Test Less than 20 mg/m2 Once per PQT
8502-9
Blast Cleaning Surface ISO 8503-4 or ISO Every Joint, 2 checks per
6 50 to 100 microns
Profile 8503-5 joint
Blast Cleaning Degree of Every Joint, 2 checks per
7 ISO 8502-3 Max Dust Rating 2
Cleanliness joint
Every Joint, 100% of all
8 Blast Cleaning 1SO 8501-1 Sa 2.5
steel surface
EPOXY APPLICATION
Every Joint, 4 locations
9 Application Temperature Contact Thermometer 40 to 70C equally spaced around
circumference
Every Joint, 4 locations
10 Wet Film Thickness WFT Gauge Min. 700 microns equally spaced around
circumference
Coating Application No sagging, pinholes or
11 Visual Every Joint
Surface Visual Check contamination.
INSPECTION & TESTING FIELD
No holidays on test piece,
12 Holiday Detection Test NACE SP0188 Every Joint
4.0 kV/mm
Every Joint, checked in 6
13 Dry Film Thickness SSPC PA2 Min 700 microns locations equally spaced
around circumference
14 Adhesion Test ASTM D6677 Rating of 6-10 1 Joint

15 Hardness Test ASTM D2240 Shore D Hardness 70 1 Joint


HBE-HT PRODUCT APPLICATION PROCEDURE, ITP & PQT Page 8 of 9

5. SAMPLE INSPECTION TEST PLAN, PRODUCTION


ACCEPTANCE PRODUCTION
NO TEST METHOD/EQUIPMENT
CRITERIA FREQUENCY
MATERIALS
Ambient and Steel Pipe substrate surface at
Temperature least 3C higher than dew
1 Environmental Conditions Every 4 hours
Relative Humidity point and temperature
Dew Point greater than 10C
Each 15,000 kg or
SSPC AB 1 or SSPC Conformance with
2 Abrasive manufacturing batch,
AB 3 method
whichever is less.
Before start of each shift
No visible contamination
3 Compressed Air Quality ASTM D 4285 or change in compressed
per method
air source
SURFACE PREPARATION
Free of sharp edges,
weld splatter, slivers, Every Joint, 100% of
4 Pre-coating Visual Visual
burns, loose parent surface
coating
ISO 8502-6 or ISO
5 Salt Contamination Test Less than 20 mg/m2 Start of Production
8502-9
Blast Cleaning Surface ISO 8503-4 or ISO
6 50 to 100 microns Every 6 Hours
Profile 8503-5
Blast Cleaning Degree of
7 ISO 8502-3 Max Dust Rating 2 Every 6 Hours
Cleanliness
Every Joint, 100% of all
8 Blast Cleaning 1SO 8501-1 Sa 2.5
steel surface
EPOXY APPLICATION
Every Joint, 4 locations
9 Application Temperature Contact Thermometer 40 to 70C equally spaced around
circumference
Every Joint, 4 locations
10 Wet Film Thickness WFT Gauge Min 700 microns equally spaced around
circumference
Coating Application No sagging, pinholes or
11 Visual Every Joint
Surface Visual Check contamination.
INSPECTION & TESTING FIELD
No holidays on test piece,
12 Holiday Detection Test NACE SP0188 Every Joint
4.0 kV/mm
HBE-HT PRODUCT APPLICATION PROCEDURE, ITP & PQT Page 9 of 9