LOOKAHEAD - 3 WEEKS

(NOMBRE DEL PROYECTO)

FRENTE DE TRABAJO (PROJECT): "NOMBRE DEL PROYECTO"

CONTRATISTA (CONTRACTOR): NOMBRE DEL CONTRATIsTA

Residente (Project Lead):


Inicio 1W (Start Date): lunes 6/12/2017
Fecha actual (Today): Friday 14/07/17 La semana se inicia el Lunes (12):
CONTR
OL DE
AVANCE

6/12/2017

6/13/2017

6/14/2017

6/15/2017

6/16/2017

6/17/2017

6/18/2017

6/19/2017
ACTIVIDADES (Activities) LINEA BASE (Base Line) PROGRAMADO (Scheduled) ###
(Advanc
e
Control)

DURACIN (Duraton
RUTA CRITICA

% COMPLETADO
(Critical Path)
ITEM (WBS)

(Complete)
(Days))
TAREA (Task) Start End Start End SEMANA 01

01.01.02 INSTALACIONES PROVISIONALES_x000D_ 27/04/17 23/07/17 27/04/17 23/07/17 88 0%


01.01.02.02 AGUA PARA LA CONSTRUCCION 27/04/17 23/07/17 27/04/17 23/07/17 70
01.01.02.03 DESAGUE PARA LA CONSTRUCCIN_x000D_ 27/04/17 23/07/17 27/04/17 23/07/17 70
01.01.04 OBRAS DE DESMONTAJE Y DEMOLICIN 29/04/17 04/06/17 09/06/17 17/06/17 9 0%
01.01.04.11 DEMOLICIN DE MUROS ALBAILERA PARA REFORZAMIENTO DE AULA SI 29/04/17 26/05/17 12/06/17 15/06/17 4
01.01.04.13 DEMOLICIN DE VEREDA (H=0.10M) EN AULAS 27/05/17 27/05/17 16/06/17 16/06/17 1

01.01.04.15 DEMOLICIN DE CIMIENTOS Y SOBRECIMIENTOS PARA REFORZAMIENTO EN AULAS SI 27/05/17 03/06/17 09/06/17 16/06/17 8
01.01.04.18 DEMOLICIN DE LOSAS DE CASETA DE COMPRESOR 31/05/17 02/06/17 12/06/17 14/06/17 3
01.01.04.19 DEMOLICIN DE CIMIENTO Y SOBRECIMIENTO DE CASETA DE COMPRESOR 03/06/17 04/06/17 15/06/17 16/06/17 2
01.01.04.20 ELIMINACIN DE MATERIAL DE DEMOLICIN_x000D_ 03/06/17 03/06/17 17/06/17 17/06/17 1
01.01.05 OBRAS GENERALES 27/04/17 28/06/17 23/05/17 28/06/17 37 0%
01.01.05.01 CONTROL DE TRAZO Y REPLANTEO DURANTE LA EJECUCION DE LA OBRA 27/04/17 28/06/17 23/05/17 28/06/17 37
01.01.05.02 LIMPIEZA EN OBRA 27/04/17 23/06/17 23/05/17 23/06/17 32
01.01.05.03 APUNTALAMIENTO DE ESTRUCTURAS EXISTENTES 03/05/17 24/05/17 12/06/17 13/06/17 2
01.01.05.04 MANTENIMIENTO DE BANDEJAS EXISTENTE DE ILUMINACION 24/05/17 26/05/17 19/06/17 21/06/17 3
01.01.06 SEGURIDAD Y SALUD 22/04/17 23/05/17 23/05/17 23/06/17 32 0%
01.01.06.02 EQUIPOS DE PROTECCION INDIVIDUAL 22/04/17 23/05/17 23/05/17 23/06/17 32
01.01.06.03 EQUIPOS DE PROTECCION COLECTIVA 22/04/17 23/05/17 23/05/17 23/06/17 32
01.02.01 MOVIMIENTO DE TIERRAS 24/05/17 30/06/17 08/06/17 30/06/17 23 0%
01.02.01.01 EXCAVACIN SIMPLE DE TERRENO PARA REFORZAMIENTO DE MUROS SI 04/06/17 10/06/17 08/06/17 14/06/17 7
01.02.01.03 EXCAVACIN SIMPLE DE TERRENO PARA CASETA DE COMPRESOR 05/06/17 06/06/17 12/06/17 13/06/17 2
01.02.01.04 RELLENO CON MATERIAL PROPIO PARA REFORZAMIENTO DE MUROS 27/06/17 29/06/17 27/06/17 29/06/17 3
01.02.01.05 RELLENO CON MATERIAL PROPIO PARA TALLER DE MANTENIMIENTO 24/05/17 24/05/17 12/06/17 12/06/17 1
01.02.01.06 RELLENO CON MATERIAL PROPIO PARA CASETA DE COMPRESOR 07/06/17 07/06/17 14/06/17 14/06/17 1
01.02.01.07 ELIMINACION DE MATERIAL EXCEDENTE 08/06/17 08/06/17 15/06/17 15/06/17 1
01.02.01.08 NIVELACIN Y APISONADO DE TERRENO PARA REFORZAMIENTO DE MUROS 30/06/17 30/06/17 30/06/17 30/06/17 1
01.02.01.09 NIVELACIN Y APISONADO DE TERRENO P/ TALLER DE MANTENIMIENTO 24/05/17 24/05/17 13/06/17 13/06/17 1
01.02.01.10 NIVELACIN Y APISONADO DE TERRENO PARA CASETA DE COMPRESOR 08/06/17 08/06/17 15/06/17 15/06/17 1
01.02.02.01 SOLADOS 11/06/17 13/06/17 11/06/17 13/06/17 3 0%

01.02.02.01.01 SOLADOS fc=80kg/cm2 PARA ZAPATAS DE REFORZAMIENTO DE MUROS (t=100mm) SI 11/06/17 13/06/17 11/06/17 13/06/17 3

01.02.02.02 CIMIENTO CORRIDO PARA REFORZAMIENTO DE MUROS 25/06/17 26/06/17 25/06/17 26/06/17 2 0%

01.02.02.02.01 CONCRETO HECHO EN OBRA f'c=175 kg/cm+30% P.G (T.max 6") SI 26/06/17 26/06/17 26/06/17 26/06/17 1

01.02.02.02.02 ENCOFRADO Y DESENCOFRADO CORRIENTE SI 25/06/17 25/06/17 25/06/17 25/06/17 1

01.02.02.03 FALSO PISO, CONTRAPISO Y CEMENTO PULIDO PARA AULAS Y TALLER DE ELECTRICIDAD. 30/06/17 03/07/17 30/06/17 03/07/17 4 0%
01.02.02.03.01 FALSO PISO DE 4" CON MEZC.1:6 C:H PARA AULAS (interior y exterior) 30/06/17 30/06/17 30/06/17 30/06/17 1
01.02.02.03.02 CONTRAPISO DE 50 mm PARA INTERIOR DE AULAS 01/07/17 03/07/17 01/07/17 03/07/17 3
01.02.03.01 ZAPATAS PARA REFORZAMIENTO DE MUROS EN AULAS 14/06/17 24/06/17 14/06/17 24/06/17 11 0%
01.02.03.01.01 CONCRETO PREMEZCLADO f'c=210 kg/cm2 SI 22/06/17 24/06/17 22/06/17 24/06/17 3
01.02.03.01.02 ENCOFRADO Y DESENCOFRADO CORRIENTE SI 16/06/17 22/06/17 16/06/17 22/06/17 7
01.02.03.01.03 ACERO DE REFUERZO fy=4200 kg/cm2 GRADO 60 SI 14/06/17 16/06/17 14/06/17 16/06/17 3
01.02.03.02 SOBRECIMIENTO PARA REFORZAMIENTO DE MUROS EN AULAS 27/06/17 29/06/17 27/06/17 29/06/17 3 0%
01.02.03.02.01 CONCRETO HECHO EN OBRAf'c=175 kg/cm SI 29/06/17 29/06/17 29/06/17 29/06/17 1
01.02.03.02.02 ENCOFRADO Y DESENCOFRADO CORRIENTE SI 28/06/17 28/06/17 28/06/17 28/06/17 1
01.02.03.02.03 ACERO DE REFUERZO fy=4200 kg/cm2 GRADO 60 SI 27/06/17 27/06/17 27/06/17 27/06/17 1
01.02.03.06 PEDESTALES DE TALLER DE MANTENIMIENTO 05/06/17 10/06/17 09/06/17 13/06/17 5 0%
01.02.03.06.01 CONCRETO PREMEZCLADO f'c=210 kg/cm2 09/06/17 09/06/17 12/06/17 12/06/17 1
01.02.03.06.02 ENCOFRADO Y DESENCOFRADO CORRIENTE 05/06/17 08/06/17 09/06/17 12/06/17 4
01.02.03.06.04 PERNOS DE ANCLAJE 5/8" Y 3/4" 09/06/17 09/06/17 12/06/17 12/06/17 1
01.02.03.06.05 MORTERO PARA NIVELACIN - Grout (t=40mm) 10/06/17 10/06/17 13/06/17 13/06/17 1
01.02.03.07 VIGAS DE CONEXIN DE TALLER DE MANTENIMIENTO 31/05/17 02/06/17 11/06/17 12/06/17 2 0%
01.02.03.07.01 CONCRETO PREMEZCLADO f'c=210 kg/cm2 02/06/17 02/06/17 12/06/17 12/06/17 1
01.02.03.07.02 ENCOFRADO Y DESENCOFRADO CORRIENTE 31/05/17 01/06/17 11/06/17 08/06/17 2
01.02.03.08 LOSA DE PISO DE TALLER DE MANTENIMIENTO 29/05/17 12/06/17 12/06/17 21/06/17 10 0%
01.02.03.08.02 CONCRETO PREMEZCLADO f'c=210 kg/cm2 01/06/17 06/06/17 15/06/17 20/06/17 6
01.02.03.08.03 ENCOFRADO Y DESENCOFRADO CORRIENTE 29/05/17 30/05/17 13/06/17 14/06/17 2
01.02.03.08.04 ACERO DE REFUERZO fy=4200 kg/cm2 GRADO 60 29/05/17 03/06/17 12/06/17 17/06/17 6
01.02.03.08.05 JUNTA DE DILATACION E= 20 MM 11/06/17 12/06/17 20/06/17 21/06/17 2
01.02.03.08.06 JUNTAS DE CONSTRUCCIN E=10MM 07/06/17 07/06/17 20/06/17 20/06/17 1
01.02.03.09 PEDESTALES PARA POSTES DE FIJACIN DE TUBERA DE AIRE COMPRIMIDO 11/06/17 11/06/17 17/06/17 17/06/17 1 0%
01.02.03.09.03 ACERO DE REFUERZO fy=4200 kg/cm2 GRADO 60 11/06/17 11/06/17 17/06/17 17/06/17 1

01.02.03.10 LOSA EN CASETA DE COMPRESOR 09/06/17 11/06/17 15/06/17 17/06/17 3 0%


01.02.03.10.01 BASE DE RELLENO CONPACTADO CON EQUIPO (t=15 cm) 09/06/17 09/06/17 15/06/17 15/06/17 1
01.02.03.10.02 CONCRETO PREMEZCLADO f'c=210 kg/cm2 11/06/17 11/06/17 17/06/17 17/06/17 1
01.02.03.10.03 ENCOFRADO Y DESENCOFRADO CORRIENTE 10/06/17 10/06/17 16/06/17 16/06/17 1
01.02.03.10.04 ACERO DE REFUERZO fy=4200 kg/cm2 GRADO 60 10/06/17 10/06/17 16/06/17 16/06/17 1
01.02.03.11 BASE B-1 PARA CASETA DE COMPRESOR 13/06/17 15/06/17 19/06/17 21/06/17 3 0%
01.02.03.11.01 BASE DE RELLENO CONPACTADO CON EQUIPO (t=15 cm) 13/06/17 13/06/17 19/06/17 19/06/17 1
01.02.03.11.02 CONCRETO PREMEZCLADO f'c=210 kg/cm2 15/06/17 15/06/17 21/06/17 21/06/17 1
01.02.03.11.03 ENCOFRADO Y DESENCOFRADO CORRIENTE 14/06/17 14/06/17 20/06/17 20/06/17 1
01.02.03.11.04 ACERO DE REFUERZO fy=4200 kg/cm2 GRADO 60 14/06/17 14/06/17 20/06/17 20/06/17 1
01.02.03.11.05 ANCLAJE QUIMICO DE 5/8" 15/06/17 15/06/17 21/06/17 21/06/17 1
01.02.04 ESTRUCTURA METALICA 13/06/17 18/06/17 19/06/17 25/06/17 7 0%

ESTRUCTURA DE ACERO PARA POSTES DE FIJACIN DE TUBERA DE AIRE COMPRIMIDO: ASTM A36-
01.02.04.02 ARENADO AL GRADO COMERCIAL, BASE ALQUIDICA INCLUYE SUMINISTRO, FABRICACIN Y MONTAJE. 13/06/17 16/06/17 20/06/17 23/06/17 4

COBERTURA DE TECHO: PANEL CALAMINON T PREPINTADO (t=0.6mm) PARA CASETA DE


01.02.04.05 COMPRESOR 18/06/17 18/06/17 25/06/17 25/06/17 1

ESTRUCTURA DE ACERO PARA CASETA DE COMPRESOR: ASTM A36- ARENADO AL GRADO


01.02.04.14 COMERCIAL, BASE ALQUIDICA INCLUYE SUMINISTRO, FABRICACIN Y MONTAJE. 16/06/17 17/06/17 19/06/17 20/06/17 2
01.03.01 MUROS Y TABIQUES 30/06/17 05/07/17 30/06/17 05/07/17 6 0%
01.03.01.01 MURO DE LADRILLO DE CABEZA PARA REFORZAMIENTO DE AULAS 30/06/17 05/07/17 30/06/17 05/07/17 6

01.03.05 CARPINTERA METLICA 13/06/17 16/06/17 20/06/17 23/06/17 4 0%


01.03.05.06 BARANDAS H=1.00M PARA ACCESO ENTRE TALLER Y AULAS 13/06/17 16/06/17 20/06/17 23/06/17 4

01.03.08 PINTURAS Y REVESTIMIENTOS 10/06/17 13/06/17 10/06/17 13/06/17 4 0%

SUMINISTRO E INSTALACIN DE NUEVO MANTO ELASTOMRICO SBS SIPLAST PARA TECHO DE


01.03.08.07 AULAS Y TALLER DE ELECTRICIDAD 10/06/17 11/06/17 10/06/17 11/06/17 2

01.03.08.08 IMPERMEABILIZACIN DE REMATE DE BORDES PARA TECHO DE AULAS Y TALLER DE ELECTRICIDAD 12/06/17 13/06/17 12/06/17 13/06/17 2
01.04.01.01 MOVIMIENTO DE TIERRAS 29/05/17 31/05/17 19/06/17 20/06/17 2 0%
01.04.01.01.01 PICADO DE LOSA EXISTENTE 29/05/17 29/05/17 19/06/17 19/06/17 1
01.04.01.01.02 EXCAVACION LOCALIZADA 30/05/17 30/05/17 20/06/17 20/06/17 1
01.04.01.01.03 ELIMINACION DE MATERIAL EXCEDENTE 31/05/17 31/05/17 21/06/17 10/06/17 1
01.04.01.02 OBRAS DE CONCRETO ARMADO 01/06/17 05/06/17 20/06/17 24/06/17 5 0%
01.04.01.02.01 CONCRETO HECHO EN OBRA f'c=175 kg/cm 03/06/17 03/06/17 22/06/17 22/06/17 1
01.04.01.02.02 ACERO DE REFUERZO fy=4200 kg/cm2 GRADO 60 02/06/17 02/06/17 21/06/17 21/06/17 1
01.04.01.02.03 ENCOFRADO Y DESENCOFRADO CARAVISTA 01/06/17 01/06/17 20/06/17 20/06/17 1
01.04.01.02.04 REJILLA METALICA 04/06/17 05/06/17 23/06/17 24/06/17 2
01.04.01.03 SISTEMA DE DRENAJE 29/05/17 30/05/17 20/06/17 21/06/17 2 0%
01.04.01.03.01 PIEDRA DE DRENAJE AL CASCAJO 29/05/17 24/04/17 20/06/17 20/06/17 1
01.04.01.03.02 TUBERIA DE PVC 3" 30/05/17 30/05/17 21/06/17 21/06/17 1
01.04.01.04 SUMIDERO EXISTENTE EN TECHO DE AULAS 1 Y 2 02/06/17 02/06/17 12/06/17 12/06/17 1 0%
01.04.01.04.01 MANTENIMIENTO Y LIMPIEZA DE SUMIDERO 02/06/17 02/06/17 12/06/17 12/06/17 1

01.04.01.05 PRUEBA HIDRULICA 03/06/17 04/06/17 22/06/17 23/06/17 2 0%


01.04.01.05.01 PRUEBA HIDRAULICA Y LIMPIEZA 03/06/17 04/06/17 22/06/17 23/06/17 2

01.04.02.01 MOVIMIENTOS DE TIERRAS PARA ZANJA DE TUBERAS 29/05/17 05/06/17 17/06/17 21/06/17 5 0%
01.04.02.01.01 PICADO DE VEREDA EXISTENTE 29/05/17 29/05/17 17/06/17 17/06/17 1
01.04.02.01.02 EXCAVACION LOCALIZADA 30/05/17 30/05/17 18/06/17 18/06/17 1
01.04.02.01.03 RELLENO COMPACTADO CON MATERIAL PROPIO 03/06/17 03/06/17 19/06/17 19/06/17 1
01.04.02.01.04 RELLENO COMPACTADO CON MATERIAL DE PRESTAMO (arenilla) 04/06/17 04/06/17 20/06/17 20/06/17 1
01.04.02.01.05 ELIMINACION DE MATERIAL EXCEDENTE 05/06/17 05/06/17 21/06/17 21/06/17 1
01.04.02.02 OBRAS DE CONCRETO SIMPLE PARA ZANJA DE TUBERAS 06/06/17 08/06/17 22/06/17 24/06/17 3 0%
01.04.02.02.01 CONCRETO HECHO EN OBRA f'c=175 kg/cm2 (dado de concreto) 06/06/17 06/06/17 22/06/17 22/06/17 1
01.04.02.02.02 CONCRETO PREMEZCLADO f'c=210 kg/cm2 (resane de vereda) 07/06/17 07/06/17 23/06/17 23/06/17 1
01.04.02.02.03 ENCOFRADO Y DESENCOFRADO CARAVISTA(dado de concreto) 08/06/17 08/06/17 24/06/17 24/06/17 1
01.04.02.03 MOVIMIENTOS DE TIERRA PARA BASE SOPORTE DE GCI 09/06/17 10/06/17 14/06/17 15/06/17 2 0%
01.04.02.03.01 EXCAVACION LOCALIZADA 09/06/17 10/06/17 14/06/17 14/06/17 2
01.04.02.03.02 ELIMINACION DE MATERIAL EXCEDENTE 10/06/17 10/06/17 15/06/17 15/06/17 1
01.04.02.04 OBRAS DE CONCRETO ARMADO PARA BASE SOPORTE DE GCI 11/06/17 12/06/17 17/06/17 18/06/17 2 0%
01.04.02.04.01 CONCRETO HECHO EN OBRA f'c=175 kg/cm 12/06/17 12/06/17 18/06/17 18/06/17 1
01.04.02.04.02 ACERO DE REFUERZO fy=4200 kg/cm2 GRADO 60 11/06/17 11/06/17 17/06/17 17/06/17 1
01.04.02.04.03 ENCOFRADO Y DESENCOFRADO CARAVISTA 11/06/17 11/06/17 17/06/17 17/06/17 1
01.04.02.05 ESTRUCTURA METALICA PARA BASE SOPORTE DE GCI 13/06/17 14/06/17 18/06/17 19/06/17 2 0%
01.04.02.05.01 SOPORTE DE ACERO PARA GABINETE CONTRA INCENDIO L-2 1/2"x2 1/2"x3/16" 13/06/17 14/06/17 18/06/17 19/06/17 2

01.04.02.06 EMPALME A TUBERIA EXISTENTE 31/05/17 02/06/17 17/06/17 19/06/17 3 0%


01.04.02.06.01 TEE 4"x4" HDPE 31/05/17 01/06/17 17/06/17 18/06/17 2
01.04.02.06.02 REDUCCION 4"x2 1/2" HDPE 02/06/17 02/06/17 19/06/17 19/06/17 1
01.04.02.07 SUMINISTRO DE TUBERIA 31/05/17 31/05/17 18/06/17 18/06/17 1 0%
01.04.02.07.01 TUBERIA HDPE 2 1/2" 31/05/17 31/05/17 18/06/17 18/06/17 1
01.04.02.07.02 CODO HDPE 2 1/2" 31/05/17 31/05/17 18/06/17 18/06/17 1
01.04.02.07.03 ADAPTADOR HDPE / ACERO 2 1/2" 31/05/17 31/05/17 18/06/17 18/06/17 1
01.04.02.07.04 BRIDA DE ACERO 2 1/2" 31/05/17 31/05/17 18/06/17 18/06/17 1
01.04.02.07.05 TUBERIA SCH40 2 1/2" 31/05/17 31/05/17 18/06/17 18/06/17 1
01.04.02.07.06 TEE RANURADO REDUCTOR 2 1/2" A 1 1/2" 31/05/17 31/05/17 18/06/17 18/06/17 1
01.04.02.07.07 TUBERIA SCH40 1 1/2" 31/05/17 31/05/17 18/06/17 18/06/17 1
01.04.02.07.08 CODO RANURADO DE 1 1/2" 31/05/17 31/05/17 18/06/17 18/06/17 1
01.04.02.08 GABINETE CONTRA INCENDIO 15/06/17 17/06/17 20/06/17 22/06/17 3 0%

GABINETES CONTRA INCENDIO INCLUYE MANGUERA COLAPSABLE DE FIBRA SINTETICA 1.1/2",


01.04.02.08.01 30.00mts. DE LONGITUD 200PSI + PORTAMANGUERAS 15/06/17 15/06/17 20/06/17 20/06/17 1
01.04.02.08.02 VALVULA ANGULAR 1 1/2" CON ACOPLE STORZ EN BRONCE UL/FM 16/06/17 16/06/17 21/06/17 21/06/17 1
01.04.02.08.03 VALVULA ANGULAR 2 1/2" CON ACOPLE STORZ 17/06/17 17/06/17 22/06/17 22/06/17 1
01.04.02.09 PRUEBA HIDRULICA 18/06/17 18/06/17 23/06/17 23/06/17 1 0%
01.04.02.09.01 PRUEBA HIDRAULICA Y LIMPIEZA 18/06/17 18/06/17 23/06/17 23/06/17 1

01.05.02 TABLEROS ELECTRICOS 18/06/17 18/06/17 02/07/17 02/07/17 1 0%


01.05.02.05 TABLERO DE COMPRESORA T-COMP 18/06/17 18/06/17 02/07/17 02/07/17 1

01.05.03 SALIDAS PARA ILUMINACIN 17/06/17 04/07/17 01/07/17 04/07/17 4 0%

01.05.03.02 SALIDA DE CENTRO DE LUZ EN BANDEJA METALICA EXISTENTE PARA AULAS INCLUYE CAJA Y CABLE 01/07/17 04/07/17 01/07/17 04/07/17 4
01.05.03.03 SALIDA DE ILUMINACION EN CUARTO DE COMPRESORA 18/06/17 18/06/17 02/07/17 18/06/17 1

01.05.03.04 SALIDA PARA LAMPARA DE EMERGENCIA EN TALLER INCLUYE DUCTO,CAJA Y CABLE 17/06/17 17/06/17 01/07/17 17/06/17 1

01.05.03.12 SUMINISTRO DE INTERRUPTOR SIMPLE MATIX BTICINO EN CASETA DE COMPRESOR. 18/06/17 18/06/17 02/07/17 18/06/17 1
01.05.04 SALIDAS PARA TOMACORRIENTES Y FUERZA 18/06/17 18/06/17 18/06/17 18/06/17 1 0%

01.05.04.13 TOMACORRIENTE A PRUEBA DE AGUA C/LT MATIX BTICINO EN CUARTO DE COMPRESORA 18/06/17 18/06/17 18/06/17 18/06/17 1

01.05.07 PUESTA A TIERRA 30/05/17 30/05/17 16/06/17 16/06/17 1 0%

01.05.07.01 MANTENIMIENTO DE POZO A TIERRA CON 02 DOSIS DE THOR GELL Y CAMBIO DE CONECTOR. 30/05/17 30/05/17 16/06/17 16/06/17 1

01.05.08 CAJA DE PASE DE 150X150X100MM 05/06/17 05/06/17 17/06/17 17/06/17 1 0%


01.05.08.01 CAJA DE PASE DE 200X200X100MM 05/06/17 05/06/17 17/06/17 17/06/17 1
01.05.08.02 POYO DE 300X250X200MM 05/06/17 05/06/17 17/06/17 17/06/17 1
01.05.08.03 TUBERIA FLEXIBLE METALICA DE 25MM 05/06/17 05/06/17 17/06/17 17/06/17 1
01.05.08.04 SALIDAS PARA DATA (Solo Ducto y Caja) 05/06/17 05/06/17 17/06/17 17/06/17 1
01.05.08.05 SALIDAS PARA DATA EN PARED A 0.40M 05/06/17 05/06/17 17/06/17 17/06/17 1
01.04.02.04 OBRAS DE CONCRETO ARMADO PARA BASE SOPORTE DE GCI 11/06/17 12/06/17 17/06/17 18/06/17 2 0%
01.04.02.04.01 CONCRETO HECHO EN OBRA f'c=175 kg/cm 12/06/17 12/06/17 18/06/17 18/06/17 1
01.04.02.04.02 ACERO DE REFUERZO fy=4200 kg/cm2 GRADO 60 11/06/17 11/06/17 17/06/17 17/06/17 1
01.04.02.04.03 ENCOFRADO Y DESENCOFRADO CARAVISTA 11/06/17 11/06/17 17/06/17 17/06/17 1
01.06.01 SISTEMA DE AIRE COMPRIMIDO 19/06/17 30/06/17 19/06/17 30/06/17 12 0%
01.06.01.03 SUMINISTRO Y MONTAJE DE COMPRESOR NUEVO (AREA-100) 19/06/17 21/06/17 19/06/17 21/06/17 3
01.06.01.04 CONEXIN A PUNTO DE ALIMENTACIN ELCTRICA (AREA-100) 22/06/17 22/06/17 22/06/17 22/06/17 1

01.06.01.05 MONTAJE TUBERA DE ACERO SCH80-3/4" DE COMPRESOR HASTA EMPALME A TUBERA EXISTENTE. 22/06/17 22/06/17 22/06/17 22/06/17 1
01.06.01.06 VALVULA DE BOLA - 3/4" (AREA-100) 22/06/17 22/06/17 22/06/17 22/06/17 1
01.06.01.07 UBICACIN DE TUBERA EXISTENTE EN LOSA PARA EMPALME (AREA-300) 21/06/17 23/06/17 21/06/17 23/06/17 3
01.06.01.08 VALVULA DE BOLA - 3/4" EN EMPALME A TUBERA NUEVA (AREA-400) 23/06/17 23/06/17 23/06/17 23/06/17 1
01.06.01.09 TUBERIA ADOSADA DE ACERO SCH80- 3/4" (AREA-400) 23/06/17 28/06/17 23/06/17 28/06/17 6
01.06.01.10 TUBERIA ADOSADA DE ACERO SCH80- 1/2" (Inc. Salidas para alimentacin) (AREA-400) 28/06/17 30/06/17 28/06/17 30/06/17 3
A
PRIORIDAD
(Priority) ALTA
PROGRAMADO TAREA MEDIA M
(Scheduled) SUB-TAREA BAJA B

AVANCE
(Progress) TAREA Estatus (Status) En Progreso (Progress) P
SUB-TAREA Atrasado (Outdated) O
Ejecutado (Done) D
6/20/2017

6/21/2017

6/22/2017

6/23/2017

6/24/2017

6/25/2017

6/26/2017

6/27/2017

6/28/2017

6/29/2017

6/30/2017

7/1/2017

7/2/2017
RESTRICCIONES (To Do List)

Das Restantes
(Remaining
PRIORIDAD
(Priority)
Fecha de
RESPONSABLE Estatus

Days)
SEMANA 02 SEMANA 03 DESCRIPCION (Notes) Cumplimiento
(Owner) (Status)
(Due Date)

Duracin
70 das
70 das
Duracin
10 das
1 da

8 das

3 das
2 das
1 da
Duracin
45 das
40 das
4 das
3 dias
Duracin
63 das
63 das
Duracin
7 das
2 das
2 das
1 da
1 da
1 da
1 da
1 da
1 da
Duracin

3 das

Duracin

3 das

3 das

Duracin

63 das
63 das
Duracin
1 da
1 da
1 da
Duracin
1 da
1 da
1 da
Duracin
1 da
4 das
1 da
1 da
5 das
1 da
2 das
19 das
6 das
2 das
6 das
2 das
1 da
Duracin
1 da
1 da
4 das
1 da
1 da
1 da
1 da
19 das
4 das
6 das
2 das
6 das
2 das
19 das

4 das

2 das

6 das

Duracin
1 da
1 da
19 das
4 das
2 das
80 das

2 das

2 das

Duracin
1 da
1 da
1 da
5 das
1 da
1 da
1 da
2 das
2 das
1 da
1 da
1 da
1 da

2 das
2 das

Duracin
1 da
1 da
1 da
1 da
1 da
3 das
1 da
1 da
1 da
2 das
1 da
1 da
2 das
1 da
1 da
1 da
2 das
1 da
1 da
Duracin
2 das
1 da
1 da
1 da
1 da
1 da
1 da
1 da
1 da
1 da
1 da
2 das

1 da

1 da
1 da
62 das
4 das

62 das
4 das

62 das

4 das

4 das

4 das

4 das

62 das

4 das

Duracin

1 da

Duracin
1 da
1 da
1 da
1 da
1 da
2 das
1 da
1 da
1 da
Duracin
1 da
1 da

1 da

1 da
1 da
1 da
1 da