Sie sind auf Seite 1von 6

The drawing, design and details given on this format are the property of ENGINEERS INDIA LIMITED .

They are merely loaned on the borrower's express agreement that they will not be reproduced, copied, exhibited or
used, except in the limited way permitted by a written consent given by thw lender to the borrower for the intended ude. EIL-1641-531- Revision 3 . A4 210 X 297.

COMPLETION DATES REVISION DATES


Purpose Status Scheduled/ Data
DRAWING / TITLE Issued Issued Issued Issued Rev 0 Rev 1 Rev 2 % Weighted Progress
(Use Code** Anticipated/ Receipt
DOCUMENT NO For For For For Complete Value Eq.
Code)* Actual Rev 3 Rev 4 Rev 5
Coordination/ Purchase/ Construction
Engineering
Comments Tender Final Issue Rev 6 Rev 7 Rev 8
GENERAL
A307-IV-16-46-DS-3003 FRACTIONATOR OVERHEAD Sch 05/03/2013 02/07/2013 22/10/2013 15/10/2013 100 0.49 0.49
E E 15/08/2013 05/12/2013
CONDENSER IV-E-203 A-P Ant
11/04/2013 18/04/2013 18/04/2013
Act
A307-IV-16-46-DS-3004 SETTING PLAN Sch 05/03/2013 01/07/2013 21/10/2013 26/02/2014 100 0.49 0.49
E E 02/09/2013 23/12/2013
Ant
22/03/2013 07/05/2013 07/05/2013
Act
A307-IV-16-46-DS-3005 HLPS VAPOR AIR COOLER Sch 05/03/2013 29/06/2013 19/10/2013 10/10/2013 21/11/2013 100 0.49 0.49
E E 01/09/2013 22/12/2013
IV-E-105 A/B Ant
11/04/2013 08/05/2013 08/05/2013
Act
A307-IV-16-46-DS-3017 DIESEL PRODUCT AIR Sch 05/03/2013 29/06/2013 19/10/2013 15/10/2013 100 0.49 0.49
E E 12/08/2013 02/12/2013
COOLER IV-E-217 A-D Ant
15/03/2013 18/04/2013 18/04/2013
Act
A307-IV-16-46-DS-3101 FEED SURGE DRUM Sch 24/01/2013 24/01/2013 12/07/2013 15/11/2013 12/05/2014 19/05/2014 100 0.22 0.22
E R 08/05/2013 24/10/2013
IV-V-101 Ant
19/02/2013 08/05/2013 08/05/2013 15/11/2013 19/05/2014
Act
A307-IV-16-46-DS-3104 HOT HP SEPARATOR Sch 24/01/2013 24/01/2013 12/07/2013 31/10/2013 100 0.22 0.22
E R 27/04/2013 13/10/2013
IV-V-104 Ant
19/02/2013 27/04/2013 27/04/2013 31/10/2013 17/07/2014
Act
A307-IV-16-46-DS-3105 COLD HP SEPARATOR Sch 23/01/2013 23/01/2013 11/07/2013 01/11/2013 100 0.22 0.22
E R 25/05/2013 10/11/2013
IV-V-105 Ant
19/02/2013 25/05/2013 25/05/2013 01/11/2013 01/11/2013
Act
A307-IV-16-46-DS-3106 HOT LP SEPARATOR Sch 22/01/2013 22/01/2013 10/07/2013 31/10/2013 19/05/2014 100 0.22 0.22
E R 27/04/2013 13/10/2013
IV-V-106 Ant
19/02/2013 27/04/2013 27/04/2013 31/10/2013 19/05/2014
Act
A307-IV-16-46-DS-3107 HOT LP SEPARATOR Sch 10/01/2013 10/01/2013 28/06/2013 28/10/2013 19/05/2014 12/06/2014 100 0.22 0.22
E R 08/05/2013 24/10/2013
IV-V-107 Ant
19/02/2013 08/05/2013 08/05/2013 28/10/2013 12/06/2014
Act
A307-IV-16-46-DS-3109 HP AMINE ABSORBER IV-V-10 Sch 03/01/2013 10/01/2013 29/08/2013 03/10/2013 10/02/2014 04/04/2014 100 0.59 0.59
E R 22/03/2013 08/11/2013
8/109 SHEET 1 Ant
19/02/2013 15/03/2013 15/03/2013 03/10/2013 04/04/2014
Act
A307-IV-16-46-DS-3110 RECYCLE GAS COMP. KO DRUM Sch 10/01/2013 10/01/2013 28/06/2013 13/09/2013 30/06/2014 100 0.22 0.22
E R 17/04/2013 03/10/2013
IV-V-110 Ant
04/03/2013 17/04/2013 17/04/2013 13/09/2013 13/09/2013
Act

* Use Code A-Design G-TBA Released M-Tender Specification issued S-issued for comments
** Total for this page 3.87 3.87
B-Design of tanks/spheres(with MTO Requirement)
H-PR Issued N-Package Specification issued
A-Stat./Cl. Appr.
Status C-Design of tanks/spheres(without MTO Requirement) Total upto previous pag 0.00 0.00
C- Construction I-Nozzle Orientation issued O-MTO & MR for plates issued
Code D-Drafting
P- Purchase, V-Void J-Vendor Drawing Reviewed in Code -2 With Holds
P-Const.DWG/agreed variations issued Distribution Total 3.87 3.87
E-Drawing Issued K-Vendor Drawing Reviewed in Code -2 WithoutQ-Design
Holds review complete
S- Study, E- Engg. Planning
T- tendering F-MR Issued L-Vendor Drawing Reviewed in Code -1 R-Revision of Drawings
Project: INTEGRATED REFINERY EXPANSION PROJECT(A307)
Status Engg Planning DRAWING/ DOCUMENT SCHEDULE (I)
ENGINEERS INDIA LIMITED
By Unit: VGO HYDROTREATER UNIT (VGO-HDT)(IV)
A307-IV-16-46-SH-01
NEW DELHI Updated Client: M/S BPCL, KOCHI
On 16/10/2014 05/02/2014 Div: ENGINEERING(16) Dept: STATIC EQUIPMENT(46)
Status As On: 20/11/2014 14:36:40
Sheet 1 of 6
The drawing, design and details given on this format are the property of ENGINEERS INDIA LIMITED . They are merely loaned on the borrower's express agreement that they will not be reproduced, copied, exhibited or
used, except in the limited way permitted by a written consent given by thw lender to the borrower for the intended ude. EIL-1641-531- Revision 3 . A4 210 X 297.

COMPLETION DATES REVISION DATES


Purpose Status Scheduled/ Data
DRAWING / TITLE Issued Issued Issued Issued Rev 0 Rev 1 Rev 2 % Weighted Progress
(Use Code** Anticipated/ Receipt
DOCUMENT NO For For For For Complete Value Eq.
Code)* Actual Rev 3 Rev 4 Rev 5
Coordination/ Purchase/ Construction
Engineering
Comments Tender Final Issue Rev 6 Rev 7 Rev 8

A307-IV-16-46-DS-3111 MAKEUP GAS COM. 1ST STAGE Sch 10/01/2013 10/01/2013 28/06/2013 09/12/2013 30/05/2014 100 0.22 0.22
E R 04/04/2013 20/09/2013
SUCTION KO DRUM IV-V-111 Ant
04/03/2013 04/04/2013 04/04/2013 09/12/2013 30/05/2014
Act
A307-IV-16-46-DS-3112 MAKEUP GAS COM. 2NDSTAGE Sch 10/01/2013 10/01/2013 28/06/2013 01/11/2013 17/01/2014 30/05/2014 100 0.22 0.22
E R 26/09/2013
SUCTION KO DRUM IV-V-112 Ant
18/03/2013 04/04/2013 10/04/2013 01/11/2013 30/05/2014
Act
A307-IV-16-46-DS-3113 MAKEUP GAS COM. 3RDSTAGE Sch 08/01/2013 08/01/2013 26/06/2013 06/11/2013 17/01/2014 30/05/2014 100 0.22 0.22
E R
SUCTION KO DRUM IV-V-113 Ant
05/04/2013 11/04/2013 06/11/2013 30/05/2014
Act
A307-IV-16-46-DS-3114 DMDS INJECTION DRUM Sch 08/01/2013 08/01/2013 26/06/2013 23/06/2014 100 0.21 0.21
E R 11/04/2013 27/09/2013
IV-V-114 Ant
11/03/2013 11/04/2013 11/04/2013 11/04/2013 11/04/2013
Act
A307-IV-16-46-DS-3115 LEAN AMINE HEATER COND. Sch 08/01/2013 08/01/2013 26/06/2013 19/11/2013 30/06/2014 100 0.22 0.22
E R 02/05/2013 18/10/2013
IV-V-115 Ant
15/04/2013 02/05/2013 02/05/2013 19/11/2013 19/11/2013
Act
A307-IV-16-46-DS-3116 SOUR WATER FLASH DRUM Sch 08/01/2013 08/01/2013 26/06/2013 09/12/2013 03/03/2014 100 0.22 0.22
E R 04/04/2013 20/09/2013
IV-V-116 Ant
04/03/2013 04/04/2013 04/04/2013 12/09/2013 03/03/2014
Act
A307-IV-16-46-DS-3117 HEATERS FUEL GAS KO DRUM Sch 08/01/2013 08/01/2013 26/06/2013 09/12/2013 03/03/2014 17/07/2014 100 0.22 0.22
E R 10/04/2013 26/09/2013
IV-V-117 Ant
08/04/2013 10/04/2013 10/04/2013 09/12/2013 03/03/2014
Act
A307-IV-16-46-DS-3201 FRACTIONATOR Sch 14/12/2012 24/12/2012 13/08/2013 29/10/2013 100 0.37 0.37
E R 15/02/2013 05/10/2013
IV-V-201 Ant
30/01/2013 05/02/2013 05/02/2013 29/10/2013 17/07/2014
Act
A307-IV-16-46-DS-3202 DIESEL SIDE STRIPPER Sch 10/12/2012 17/12/2012 09/08/2013 11/10/2013 10/02/2014 100 0.37 0.37
E R
IV-V-202 Ant
28/01/2013 05/03/2013 11/10/2013 10/02/2014
Act
A307-IV-16-46-DS-3203 FRACTIONATOR OH DRUM Sch 08/01/2013 08/01/2013 26/06/2013 09/12/2013 03/03/2014 100 0.22 0.22
E R 12/04/2013 28/09/2013
IV-V-203 Ant
04/03/2013 12/04/2013 12/04/2013 09/12/2013 03/03/2014
Act
A307-IV-16-46-DS-3204 FRAC OFFGAS COMP. SUCTION Sch 03/01/2013 03/01/2013 21/06/2013 09/12/2013 17/06/2014 100 0.22 0.22
E R 04/04/2013 20/09/2013
KO DRUM IV-V-204 Ant
05/03/2013 04/04/2013 04/04/2013 09/12/2013 17/06/2014
Act

* Use Code A-Design G-TBA Released M-Tender Specification issued S-issued for comments
** Total for this page 2.71 2.71
B-Design of tanks/spheres(with MTO Requirement)
H-PR Issued N-Package Specification issued
A-Stat./Cl. Appr.
Status C-Design of tanks/spheres(without MTO Requirement) Total upto previous pag 3.87 3.87
C- Construction I-Nozzle Orientation issued O-MTO & MR for plates issued
Code D-Drafting
P- Purchase, V-Void J-Vendor Drawing Reviewed in Code -2 With Holds
P-Const.DWG/agreed variations issued Distribution Total 6.58 6.58
E-Drawing Issued K-Vendor Drawing Reviewed in Code -2 WithoutQ-Design
Holds review complete
S- Study, E- Engg. Planning
T- tendering F-MR Issued L-Vendor Drawing Reviewed in Code -1 R-Revision of Drawings
Project: INTEGRATED REFINERY EXPANSION PROJECT(A307)
Status Engg Planning DRAWING/ DOCUMENT SCHEDULE (I)
ENGINEERS INDIA LIMITED
By Unit: VGO HYDROTREATER UNIT (VGO-HDT)(IV)
A307-IV-16-46-SH-01
NEW DELHI Updated Client: M/S BPCL, KOCHI
On 16/10/2014 05/02/2014 Div: ENGINEERING(16) Dept: STATIC EQUIPMENT(46)
Status As On: 20/11/2014 14:36:40
Sheet 2 of 6
The drawing, design and details given on this format are the property of ENGINEERS INDIA LIMITED . They are merely loaned on the borrower's express agreement that they will not be reproduced, copied, exhibited or
used, except in the limited way permitted by a written consent given by thw lender to the borrower for the intended ude. EIL-1641-531- Revision 3 . A4 210 X 297.

COMPLETION DATES REVISION DATES


Purpose Status Scheduled/ Data
DRAWING / TITLE Issued Issued Issued Issued Rev 0 Rev 1 Rev 2 % Weighted Progress
(Use Code** Anticipated/ Receipt
DOCUMENT NO For For For For Complete Value Eq.
Code)* Actual Rev 3 Rev 4 Rev 5
Coordination/ Purchase/ Construction
Engineering
Comments Tender Final Issue Rev 6 Rev 7 Rev 8

A307-IV-16-46-DS-3206 RECONTACT DRUM Sch 03/01/2013 03/01/2013 21/06/2013 09/12/2013 12/06/2014 100 0.22 0.22
E R 27/04/2013 13/10/2013
IV-V-206 Ant
05/03/2013 27/04/2013 27/04/2013 09/12/2013 12/06/2014
Act
A307-IV-16-46-DS-3207 ABSORBER/STRIPPER Sch 01/01/2013 08/01/2013 27/08/2013 21/10/2013 07/02/2014 30/06/2014 100 0.74 0.74
E R 14/03/2013 31/10/2013
IV-V-207/208 Ant
04/02/2013 07/03/2013 07/03/2013 21/10/2013 17/06/2014
Act
A307-IV-16-46-DS-3209 STABILIZER Sch 29/12/2012 05/01/2013 24/08/2013 21/10/2013 23/11/2013 30/06/2014 100 0.37 0.37
E R 19/03/2013 05/11/2013
IV-V-209 Ant
04/02/2013 12/03/2013 12/03/2013 21/10/2013 30/06/2014
Act
A307-IV-16-46-DS-3210 STABILIZER OH DRUM Sch 03/01/2013 03/01/2013 21/06/2013 09/12/2013 03/03/2014 100 0.22 0.22
E R 27/04/2013 13/10/2013
IV-V-210 Ant
05/03/2013 27/04/2013 27/04/2013 09/12/2013 03/03/2014
Act
A307-IV-16-46-DS-3212 STRIPPER WATER DRAW-OFF Sch 03/01/2013 03/01/2013 21/06/2013 19/11/2013 03/03/2014 100 0.22 0.22
E R 15/04/2013 01/10/2013
DRUM IV-V-212 Ant
15/04/2013 15/04/2013 15/04/2013 19/11/2013 03/03/2014
Act
A307-IV-16-46-DS-3301 LEAN AMINE SURGE DRUM Sch 03/01/2013 03/01/2013 21/06/2013 01/11/2013 30/06/2014 100 0.22 0.22
E R 17/04/2013 03/10/2013
IV-V-301 Ant
05/03/2013 17/04/2013 17/04/2013 01/11/2013 17/06/2014
Act
A307-IV-16-46-DS-3303 MP AMINE ABSORBER IV-V-30 Sch 27/12/2012 03/01/2013 22/08/2013 09/11/2013 30/01/2014 100 0.57 0.57
E R 25/03/2013 11/11/2013
2/303 Ant
19/02/2013 18/03/2013 18/03/2013 09/11/2013 30/01/2014
Act
A307-IV-16-46-DS-3304 RICH AMINE FLASH Sch 03/01/2013 03/01/2013 21/06/2013 09/12/2013 04/03/2014 100 0.22 0.22
E R 12/04/2013 28/09/2013
DRUM IV-V-304 Ant
05/03/2013 12/04/2013 12/04/2013 09/12/2013 04/03/2014
Act
A307-IV-16-46-DS-3401 WASH WATER SURGE Sch 03/01/2013 03/01/2013 21/06/2013 09/12/2013 04/03/2014 100 0.22 0.22
E R 12/04/2013 28/09/2013
DRUM IV-V-401 Ant
05/03/2013 12/04/2013 12/04/2013 09/12/2013 04/03/2014
Act
A307-IV-16-46-DS-3501 CLOSED BLOW DOWN DRUM Sch 15/01/2013 15/02/2013 15/02/2013 29/10/2013 27/12/2013 30/06/2014 100 0.22 0.22
E R
IV-V-501 Ant
03/04/2013 01/05/2013 01/05/2013 29/10/2013 17/06/2014
Act
A307-IV-16-46-DS-3502 AMINE BLOW DOWN DRUM Sch 16/01/2013 11/02/2013 11/02/2013 29/10/2013 27/12/2013 100 0.22 0.22
E R
IV-V-502 Ant
03/04/2013 01/05/2013 01/05/2013 29/10/2013 17/06/2014
Act

* Use Code A-Design G-TBA Released M-Tender Specification issued S-issued for comments
** Total for this page 3.44 3.44
B-Design of tanks/spheres(with MTO Requirement)
H-PR Issued N-Package Specification issued
A-Stat./Cl. Appr.
Status C-Design of tanks/spheres(without MTO Requirement) Total upto previous pag 6.58 6.58
C- Construction I-Nozzle Orientation issued O-MTO & MR for plates issued
Code D-Drafting
P- Purchase, V-Void J-Vendor Drawing Reviewed in Code -2 With Holds
P-Const.DWG/agreed variations issued Distribution Total 10.02 10.02
E-Drawing Issued K-Vendor Drawing Reviewed in Code -2 WithoutQ-Design
Holds review complete
S- Study, E- Engg. Planning
T- tendering F-MR Issued L-Vendor Drawing Reviewed in Code -1 R-Revision of Drawings
Project: INTEGRATED REFINERY EXPANSION PROJECT(A307)
Status Engg Planning DRAWING/ DOCUMENT SCHEDULE (I)
ENGINEERS INDIA LIMITED
By Unit: VGO HYDROTREATER UNIT (VGO-HDT)(IV)
A307-IV-16-46-SH-01
NEW DELHI Updated Client: M/S BPCL, KOCHI
On 16/10/2014 05/02/2014 Div: ENGINEERING(16) Dept: STATIC EQUIPMENT(46)
Status As On: 20/11/2014 14:36:40
Sheet 3 of 6
The drawing, design and details given on this format are the property of ENGINEERS INDIA LIMITED . They are merely loaned on the borrower's express agreement that they will not be reproduced, copied, exhibited or
used, except in the limited way permitted by a written consent given by thw lender to the borrower for the intended ude. EIL-1641-531- Revision 3 . A4 210 X 297.

COMPLETION DATES REVISION DATES


Purpose Status Scheduled/ Data
DRAWING / TITLE Issued Issued Issued Issued Rev 0 Rev 1 Rev 2 % Weighted Progress
(Use Code** Anticipated/ Receipt
DOCUMENT NO For For For For Complete Value Eq.
Code)* Actual Rev 3 Rev 4 Rev 5
Coordination/ Purchase/ Construction
Engineering
Comments Tender Final Issue Rev 6 Rev 7 Rev 8

A307-IV-16-46-DS-3503 CONDENSATE DRUM Sch 21/01/2013 11/02/2013 11/02/2013 16/10/2013 21/10/2013 18/12/2013 100 0.22 0.22
E R
IV-V-503 Ant
23/04/2013 01/05/2013 01/05/2013 21/10/2013 21/10/2013
Act
A307-IV-16-46-DS-3504 HP FLARE KNOCK OUT DRUM Sch 21/01/2013 12/02/2013 12/02/2013 02/12/2013 31/01/2014 100 0.22 0.22
E R
IV-V-504 Ant
23/04/2013 01/05/2013 01/05/2013 02/12/2013 17/06/2014
Act
A307-IV-16-46-DS-3505 LP FLARE KNOCK OUT DRUM Sch 21/01/2013 12/02/2013 12/02/2013 09/12/2013 03/03/2014 100 0.22 0.22
E R
IV-V-505 Ant
23/04/2013 01/05/2013 01/05/2013 09/12/2013 03/03/2014
Act
A307-IV-16-46-DS-3506 STEAM BLOW DOWN DRUM Sch 15/01/2013 15/02/2013 15/02/2013 09/12/2013 03/03/2014 100 0.22 0.22
E R
IV-V-506 Ant
23/04/2013 01/05/2013 01/05/2013 09/12/2013 03/03/2014
Act
A307-IV-16-46-DS-3508 SEAL FLUSHING OIL DRUM Sch 16/01/2014 11/08/2014 100 0.01 0.01
E R
IV-V-508 Ant
09/01/2014 17/07/2014 11/08/2014
Act
A307-IV-16-46-DS-4101 ENGINEERING DRAWINGS/SETT Sch 05/03/2013 29/06/2013 19/10/2013 28/10/2013 100 0.32 0.32
E E 20/08/2013 10/12/2013
ING PLAN Ant
15/03/2013 26/04/2013 26/04/2013 28/10/2013
Act
A307-IV-16-46-DS-4106 ENGINEERING DRAWINGS/SETT Sch 28/02/2013 21/06/2013 11/10/2013 11/06/2014 100 0.32 0.32
E E 08/08/2013 28/11/2013
ING PLAN Ant
22/03/2013 17/04/2013 17/04/2013
Act
A307-IV-16-46-DS-4201 ENGINEERING DRAWINGS/SETT Sch 16/02/2013 11/05/2013 31/08/2013 28/10/2013 100 0.32 0.32
E E 19/07/2013 08/11/2013
ING PLAN Ant
11/04/2013 26/04/2013 26/04/2013
Act
A307-IV-16-46-DS-4202 ENGINEERING DRAWINGS/SETT Sch 14/02/2013 09/05/2013 29/08/2013 31/08/2013 100 0.32 0.32
E E 23/07/2013 12/11/2013
ING PLAN Ant
11/04/2013 30/04/2013 30/04/2013 31/08/2013
Act
A307-IV-16-46-DS-4204 ENGINEERING DRAWINGS/SETT Sch 14/02/2013 09/05/2013 29/08/2013 24/10/2013 100 0.32 0.32
E E 19/07/2013 08/11/2013
ING PLAN Ant
03/04/2013 26/04/2013 26/04/2013
Act
A307-IV-16-46-DS-4205 DIESEL SIDE STRIPPER Sch 13/02/2013 08/05/2013 28/08/2013 04/09/2013 11/09/2013 100 0.32 0.32
E E 23/07/2013 12/11/2013
REBOLIER IV-E-205 Ant
03/04/2013 30/04/2013 30/04/2013 04/09/2013
Act

* Use Code A-Design G-TBA Released M-Tender Specification issued S-issued for comments
** Total for this page 2.81 2.81
B-Design of tanks/spheres(with MTO Requirement)
H-PR Issued N-Package Specification issued
A-Stat./Cl. Appr.
Status C-Design of tanks/spheres(without MTO Requirement) Total upto previous pag 10.02 10.02
C- Construction I-Nozzle Orientation issued O-MTO & MR for plates issued
Code D-Drafting
P- Purchase, V-Void J-Vendor Drawing Reviewed in Code -2 With Holds
P-Const.DWG/agreed variations issued Distribution Total 12.83 12.83
E-Drawing Issued K-Vendor Drawing Reviewed in Code -2 WithoutQ-Design
Holds review complete
S- Study, E- Engg. Planning
T- tendering F-MR Issued L-Vendor Drawing Reviewed in Code -1 R-Revision of Drawings
Project: INTEGRATED REFINERY EXPANSION PROJECT(A307)
Status Engg Planning DRAWING/ DOCUMENT SCHEDULE (I)
ENGINEERS INDIA LIMITED
By Unit: VGO HYDROTREATER UNIT (VGO-HDT)(IV)
A307-IV-16-46-SH-01
NEW DELHI Updated Client: M/S BPCL, KOCHI
On 16/10/2014 05/02/2014 Div: ENGINEERING(16) Dept: STATIC EQUIPMENT(46)
Status As On: 20/11/2014 14:36:40
Sheet 4 of 6
The drawing, design and details given on this format are the property of ENGINEERS INDIA LIMITED . They are merely loaned on the borrower's express agreement that they will not be reproduced, copied, exhibited or
used, except in the limited way permitted by a written consent given by thw lender to the borrower for the intended ude. EIL-1641-531- Revision 3 . A4 210 X 297.

COMPLETION DATES REVISION DATES


Purpose Status Scheduled/ Data
DRAWING / TITLE Issued Issued Issued Issued Rev 0 Rev 1 Rev 2 % Weighted Progress
(Use Code** Anticipated/ Receipt
DOCUMENT NO For For For For Complete Value Eq.
Code)* Actual Rev 3 Rev 4 Rev 5
Coordination/ Purchase/ Construction
Engineering
Comments Tender Final Issue Rev 6 Rev 7 Rev 8

A307-IV-16-46-DS-4207 ENGINEERING DRAWINGS/SETT Sch 12/02/2013 07/05/2013 27/08/2013 28/10/2013 100 0.32 0.32
E E 10/07/2013 30/10/2013
ING PLAN Ant
03/04/2013 17/04/2013 17/04/2013
Act
A307-IV-16-46-DS-4208 ENGINEERING DRAWINGS/SETT Sch 11/02/2013 07/05/2013 27/08/2013 28/10/2013 100 0.32 0.32
E E 21/07/2013 10/11/2013
ING PLAN Ant
03/04/2013 27/04/2013 27/04/2013
Act
A307-IV-16-46-DS-4210 STABILIZER FEED/BOTTOMS Sch 09/02/2013 07/05/2013 27/08/2013 28/10/2013 100 0.32 0.32
E E 26/07/2013 15/11/2013
EXCHANGER IV-E-210 Ant
26/04/2013 30/04/2013 30/04/2013
Act
A307-IV-16-46-DS-4211 ENGINEERING DRAWINGS/SETT Sch 06/02/2013 07/05/2013 27/08/2013 25/10/2013 100 0.32 0.32
E E 10/07/2013 01/08/2013
ING PLAN Ant
15/03/2013 11/04/2013 11/04/2013
Act
A307-IV-16-46-DS-4212 ENGINEERING DRAWINGS/SETT Sch 05/02/2013 07/05/2013 27/08/2013 25/10/2013 100 0.32 0.32
E E 30/07/2013 19/11/2013
ING PLAN Ant
11/04/2013 30/04/2013 30/04/2013
Act
A307-IV-16-46-DS-4214 NAPHTHA PRODUCT TRIM Sch 04/02/2013 07/05/2013 27/08/2013 100 0.32 0.32
E E 27/07/2013 16/11/2013
COOLER IV-E-214 A/B Ant
22/03/2013 26/04/2013 26/04/2013
Act
A307-IV-16-46-DS-4215 ENGINEERING DRAWINGS/SETT Sch 02/02/2013 07/05/2013 27/08/2013 25/10/2013 11/06/2014 02/07/2014 100 0.32 0.32
E E 26/07/2013 15/11/2013
ING PLAN Ant
22/04/2013 23/04/2013 23/04/2013
Act
A307-IV-16-46-DS-4216 ENGINEERING DRAWINGS/SETT Sch 26/02/2013 22/05/2013 11/09/2013 25/10/2013 29/01/2014 100 0.32 0.32
E E 04/07/2013 24/10/2013
ING PLAN Ant
22/03/2013 10/04/2013 10/04/2013
Act
A307-IV-16-46-DS-4218 DIESEL PRODUCT TRIM Sch 26/02/2013 22/05/2013 11/09/2013 100 0.32 0.32
E E 09/07/2013 05/08/2013
COOLER IV-E-218 Ant
15/03/2013 15/04/2013 15/04/2013
Act
A307-IV-16-46-DS-4219 ENGINEERING DRAWINGS/SETT Sch 26/02/2013 22/05/2013 11/09/2013 26/06/2014 08/07/2014 100 0.32 0.32
E E 23/07/2013 12/11/2013
ING PLAN Ant
29/04/2013 29/04/2013
Act
A307-IV-16-46-DS-4220 FRAC. BOTTOMS/LP STEAM Sch 26/02/2013 22/05/2013 11/09/2013 25/10/2013 13/06/2014 02/07/2014 100 0.32 0.32
E E
GENERATOR IV-E-220 Ant
26/04/2013
Act

* Use Code A-Design G-TBA Released M-Tender Specification issued S-issued for comments
** Total for this page 3.52 3.52
B-Design of tanks/spheres(with MTO Requirement)
H-PR Issued N-Package Specification issued
A-Stat./Cl. Appr.
Status C-Design of tanks/spheres(without MTO Requirement) Total upto previous pag 12.83 12.83
C- Construction I-Nozzle Orientation issued O-MTO & MR for plates issued
Code D-Drafting
P- Purchase, V-Void J-Vendor Drawing Reviewed in Code -2 With Holds
P-Const.DWG/agreed variations issued Distribution Total 16.35 16.35
E-Drawing Issued K-Vendor Drawing Reviewed in Code -2 WithoutQ-Design
Holds review complete
S- Study, E- Engg. Planning
T- tendering F-MR Issued L-Vendor Drawing Reviewed in Code -1 R-Revision of Drawings
Project: INTEGRATED REFINERY EXPANSION PROJECT(A307)
Status Engg Planning DRAWING/ DOCUMENT SCHEDULE (I)
ENGINEERS INDIA LIMITED
By Unit: VGO HYDROTREATER UNIT (VGO-HDT)(IV)
A307-IV-16-46-SH-01
NEW DELHI Updated Client: M/S BPCL, KOCHI
On 16/10/2014 05/02/2014 Div: ENGINEERING(16) Dept: STATIC EQUIPMENT(46)
Status As On: 20/11/2014 14:36:40
Sheet 5 of 6
The drawing, design and details given on this format are the property of ENGINEERS INDIA LIMITED . They are merely loaned on the borrower's express agreement that they will not be reproduced, copied, exhibited or
used, except in the limited way permitted by a written consent given by thw lender to the borrower for the intended ude. EIL-1641-531- Revision 3 . A4 210 X 297.

COMPLETION DATES REVISION DATES


Purpose Status Scheduled/ Data
DRAWING / TITLE Issued Issued Issued Issued Rev 0 Rev 1 Rev 2 % Weighted Progress
(Use Code** Anticipated/ Receipt
DOCUMENT NO For For For For Complete Value Eq.
Code)* Actual Rev 3 Rev 4 Rev 5
Coordination/ Purchase/ Construction
Engineering
Comments Tender Final Issue Rev 6 Rev 7 Rev 8

A307-IV-16-46-DS-4221 FRAC. BOTTOMS TEMPERED Sch 26/02/2013 22/05/2013 11/09/2013 25/10/2013 100 0.32 0.32
E E 16/07/2013 05/11/2013
WATER COOLER IV-E-221 Ant
11/04/2013 22/04/2013 22/04/2013
Act
A307-IV-16-46-DS-4301 LEAN AMINE HEATER Sch 23/02/2013 18/05/2013 07/09/2013 24/10/2013 100 0.32 0.32
E E 18/07/2013 07/11/2013
IV-E-301 Ant
15/04/2013 25/04/2013 25/04/2013
Act
A307-IV-16-46-DS-4302 ENGINEERING DRAWINGS/SETT Sch 23/02/2013 18/05/2013 07/09/2013 25/10/2013 100 0.32 0.32
E E 15/07/2013 04/11/2013
ING PLAN Ant
11/04/2013 22/04/2013 22/04/2013
Act

* Use Code A-Design G-TBA Released M-Tender Specification issued S-issued for comments
** Total for this page 0.96 0.96
B-Design of tanks/spheres(with MTO Requirement)
H-PR Issued N-Package Specification issued
A-Stat./Cl. Appr.
Status C-Design of tanks/spheres(without MTO Requirement) Total upto previous pag 16.35 16.35
C- Construction I-Nozzle Orientation issued O-MTO & MR for plates issued
Code D-Drafting
P- Purchase, V-Void J-Vendor Drawing Reviewed in Code -2 With Holds
P-Const.DWG/agreed variations issued Distribution Total 17.31 17.31
E-Drawing Issued K-Vendor Drawing Reviewed in Code -2 WithoutQ-Design
Holds review complete
S- Study, E- Engg. Planning
F-MR Issued Percentage Progress 100.00
T- tendering L-Vendor Drawing Reviewed in Code -1 R-Revision of Drawings
Project: INTEGRATED REFINERY EXPANSION PROJECT(A307)
Status Engg Planning DRAWING/ DOCUMENT SCHEDULE (I)
ENGINEERS INDIA LIMITED
By Unit: VGO HYDROTREATER UNIT (VGO-HDT)(IV)
A307-IV-16-46-SH-01
NEW DELHI Updated Client: M/S BPCL, KOCHI
On 16/10/2014 05/02/2014 Div: ENGINEERING(16) Dept: STATIC EQUIPMENT(46)
Status As On: 20/11/2014 14:36:40
Sheet 6 of 6

Das könnte Ihnen auch gefallen