Sie sind auf Seite 1von 5

slope protection pagatpatan, bato cam sur

rsb summary
60 pcs 16mm x 6mRSB 60
120 pcs 10mm x 6mRSB 340
200
concrete 1
beam 0.6 0.9 12.5 6.75 4 27 16200 500
20
27 cu.m gravel 5
14 cu.m sand 5
200 bags cement 3
70
wall 8.6 0.1 12.5 10.75 4 43 25800 35
100
320 bags cement
44 cu.m gravel
22 cu.m sand

rsb
45 pcs 12mm x 6mRSB 4 180
55 pcs 10mm x 6mRSB 4 220

riprap
120 cu.m boulders 30000

const of line canal duran balatan, cam. Sur(abc 300k)


area 0.5 153 2 153 sq.m 12.5 1912.5
vol flr 0.05 153 0.75 5.7375

87.21 cu.m excavation 150 13081.5


2000 pcs chb 4 9 18000
100 pcs 10mm x 6mRSB 142 14200
5 kg tie wire #16 65 325
8 cu.m gravel 400 3200
18 cu.m sand 300 5400
70 bags cement 225 15750 mortar
30 bags cement 225 6750 plaster
60 bags cement 225 13500 floring
90206.5

const of line canal coguit balatan, cam sur(abc 200k) labor


area 0.7 101.5 2 142.1 sq.m 12.5 1776.25 14400
vol flr 0.05 101.5 0.75 3.80625 cu.m 4000
53.28 cu.m excavation 150 7992 8000
1800 pcs chb 4 9 16200
70 pcs 10mm x 6mRSB 142 9940
3 kg tie wire # 16 65 195
6 cu.m gravel 400 2400
14 cu.m sand 300 4200
60 bags cement 225 13500
30 bags cement 225 6750
30 bags cement 225 6750
67927

concreting of road luluwasan, balatan, cam. Sur(abc 250k)


vol 0.15 4 35.9 21.54 cu.m

140 bags portland cement x6.5


18 cu.m gravel x0.85
14 cu.m sand x65

concreting of road cabanbanan,balatan, cam. Sur(abc 300k)


vol 0.15 2 95 28.5 cu.m

185 bags portland cement 230 42550


24 cu.m gravel 400 9600
18 cu.m sand 300 5400
57550

57550

BAAO
concreting of road san jose pugay, baao cam sur(abc 250k)
vol 0.15 1 155 23.25 cu.m

150 bags portland cement


20 cu.m gravel
15 cu.m sand

concreting of road san juan, baao cam sur(abc 300k) dayan


vol 0.15 3 62 27.9 cu.m

180 bags portland cement


24 cu.m gravel
18 cu.m sand

concreting of road sta. teresa baao cam sur(abc 250k)


vol 0.15 2 75.8 22.74 cu.m

150 bags portland cement


20 cu.m gravel
15 cu.m sand

concreting of road iyagan, baao cam sur(abc 250k)


vol 0.15 2 73 21.9 cu.m

150 bags portland cement


18 cu.m gravel
14 cu.m sand

concreting of road cristo rey, baao cam sur(250k)


vol 0.15 2 73 21.9 cu.m

150 bags portland cement


18 cu.m gravel
14 cu.m sand

concreting of road san roque zone 1, baao cam sur(200k) dayan


vol 0.15 4 39.5 23.7 cu.m

160 bags portland cement


20 cu.m gravel
16 cu.m sand

concreting of road del pilar, baao cam sur(200k)


vol 0.15 2 60.4 18.12 cu.m

120 bags portland cement


16 cu.m gravel
12 cu.m sand

concreting of road sagrada zone 6, baao cam sur(300k)


vol 0.15 2.4 78.5 28.26 cu.m

180 bags portland cement


24 cu.m gravel
18 cu.m sand

BULA
construction of spillway lubgan, bula cam sur
pcs 16mm x 6mRSB 328 19680 60 pcs
pcs 10mm x 6mRSB 129 43860 200 pcs
pcs 12mm x 6mrsb 186 37200 100 pcs
roll tie wire 2300 2300 1 roll
bags portland cement 230 115000 50 bags
pcs marine plywood 380 7600 20 pcs
kg cwn 4 55 275 5 kg
kg cwn 3 55 275 5 kg
kg cwn 1 1/2 58 174 3 kg
cu.m gravel 400 28000
cu.m sand 300 10500
cu.m boulders 250 25000
289864
summary
balatan/bato
chb cement boulders gravel sand
pagatpat 0 500 100 70 35 slope protection willy
duran 2000 160 0 8 18 line canal lino
coguit 1800 120 0 6 14 line canal lino
luluwasan 0 140 0 18 14 concreting leo
cabanbana 0 185 0 24 18 concreting leo

baao
san jose p 0 150 0 20 15 concreting leo
san juan 0 180 0 24 18 concreting dayan
sta teresa 0 150 0 20 15 concreting leo
iyagan 0 150 0 18 14 concreting leo
cristo rey 0 150 0 18 14 concreting leo
san roque 0 160 0 20 16 concreting dayan
del pilar 0 120 0 16 12 concreting leo
sagrada 0 180 0 24 18 concreting leo
2345
del pilar water supply

nabua
santiago old water supply

bula
lubgan spillway

iriga
san vicente old water supply