Sie sind auf Seite 1von 2

roof and roof framing

qty unit member set total area


truss1
5 pcs 1/4 x 2 angle bar top chord/king post 4 20 pcs 24
3 pcs 1/4 x 2 angle bar bot. chord 4 12 pcs 14.4
3 pcs 3/16 x 1 1/2 angle bar diagonal member 4 12 pcs 14.4
36 pcs c purlins 2 x 4 x 1.5mm 1 36 pcs 86.4
15 pcs fiber cement/hardi sanepa 12mmx12inchx 1 15 pcs
6 gal epoxy primer 139.2
3 gal lacquer thinner
2 pcs baby roller
2 pcs paint brush 2
1000 pcs ticscrew 1 1/2

labor
arae of trusses 88 sq.m 3 mp for 10 days
laying of purlins/roof 121 sq.m 3 mp for 2 days
facia board 33 m mp for 1 day
total no of days 13

cost of labor 11000 to 15000


steel works
20 pcs 1/4 x 2 angle bar top chord/king post
12 pcs 1/4 x 2 angle bar bot. chord add 24 pcs
12 pcs 3/16 x 1 1/2 angle bar diagonal member add 10 pcs
36 pcs c purlins 2 x 4 x 1.5mm
15 pcs fiber cement/hardi sanepa 12mmx12inchx8f
6 gal epoxy primer
3 gal lacquer thinner
2 pcs baby roller
2 pcs paint brush 2
1000 pcs ticscrew 1 1/2

Das könnte Ihnen auch gefallen