Sie sind auf Seite 1von 2

Comments Summary for document

BN-MLS-21-PTSC-307302 Rev. 02
Date of comments : Aug. 25 2014
Comments performed / validated by: FLYNN James
Return Code is 2 - Accepted with comments

Document is expected to be re-issued with status: AFC ~ Accepted for Construction

There are 4 annotations following


process drawings
Applicable for all
drawing quality.
AFC with better
to be re-issued in
GENERAL NOTE :
21 VZ 2802 21 FA 2802 21 PR 2803 21 VZ 2803 21 FA 2803 21 TC 2801 21 FA 2801 21 PM 2804 21 VZ 3601 21 PA 3601 A/B 21 FS 3601
CLOSED DRAIN DRUM CLOSED DRAIN DRUM OPEN DRAIN PUMP OPEN DRAIN DRUM DISPOSAL TUBE DISPOSAL TUBE DISPOSAL TUBE PUMP VENT K.O DRUM OFFLOADING PUMPS FLARE/VENT PACKAGE
OPEN DRAIN DRUM
DIMENSION : 1.5m (ID) x 5.3m (L) FLAME ARRESTOR DIMENSION : 1.2m (I.D.) x 3.5m (H) INNER TUBE : 0.6M (I.D.) x 5.6m (H) FLAME ARRESTOR DIMENSION : 2.45m (I.D.) x 9.3m (L) (2 x 50%) NOTE 7
FLAME ARRESTOR
OUTER TUBE : 1m (I.D.) x 21m (H) (FUTURE)
02
02
21 PR 3601 A/B/C

FUEL GAS DISTRIBUTION


PRODUCTION MANIFOLD

BN-MLS-21-PTSC-307207

BN-MLS-21-PTSC-307207

BN-MLS-21-PTSC-307301
FUEL GAS SCRUBBER

FUEL GAS SCRUBBER


SYSTEM BLOWDOWN
PIG LAUNCHER PSV

PSVs / BLOWDOWN

OPERATION DRAIN
CASING ANNULUS

CASING ANNULUS
FLOWLINES PSVs

TEST MANIFOLD
LIQUID RECOVERY PUMP

10000# WELLS

15000# WELLS
EXPORT LINE
21 FS 3601

FILTERS PSV
BLOWDOWN

BLOWDOWN

BLOWDOWN

AND FILTER
FUEL GAS
(3 x 50%) FROM
FROM

FROM

FROM

FROM

FROM

FROM

FROM

FROM

FROM

FROM
---

---

---

---

---

---

---

---
NOTE 1 FUEL GAS SYSTEM

LC
BN-MLS-21-PTSC-307301
02
NOTES :
NOTE 8,9 PCV NOTE 5
1. LIQUID RECOVERY PUMP IS USED AS CLOSED DRAIN TRANSFER PUMP IN CLOSED DRAIN
PROPANE / NITROGEN
BOTTLES AUTOMATIC / MODE.
MANUAL
HIGH ENERGY 2. HAND SWITCH IS PROVIDED TO SELECT OFFLOADING PUMP TO EMPTY THE VENT K.O DRUM
COLD VENT HEADER NC
--- IGNITION SYSTEM DURING OFFLOADING OPERATION IN FUTURE.
FROM 3. SELECTOR SWITCH PROVIDED TO SELECT MANUALLY EITHER VENT K.O DRUM OR CLOSED

PRESSURIZATION PUMPS

BN-MLS-21-PTSC-307201
CORROSION INHIBITOR

DISPOSAL TUBE PUMP

METHANOL INJECTION
FUEL GAS SYSTEM DRAIN DRUM TO BE DRAINED BY LIQUID RECOVER PUMP.
BIOCIDE INJECTION

LIQUID RECOVERY

TEST MANIFOLD
4. SELECTOR SWITCH PROVIDED TO SELECT EITHER LIQUID RECOVERY PUMP OR
WHCP PUMPS

60
OPEN DRAIN

NC
OFFLOADING PUMP TO DRAIN K.O. DRUM LIQUID.

TUBING
BN-MLS-21-PTSC-307301

PUMPS
FROM

FROM

FROM

FROM

FROM

FROM

FROM

FROM

FROM
PUMP

PUMP

PUMP

PUMP

02
---

---

---

---

---

---

---

---

OPERATION DRAIN
5. NO FLARING DURING NORMAL OPERATION.
NOTE 8,9
6. THE PRESSURE AND TEMPERATURE ARE BASED ON EMERGENCY RELEASE OF FULL FLOW
PROPANE / NITROGEN
02 FROM CO2 SNUFFING CONDITION.
BOTTLES FQI
SYSTEM 7. OFFLOADING IS ONLY REQUIRED FOR SENSITIVE WELLS IN FUTURE. OFFLOADING PUMP
NC
--- NC IS USED AFTER OFFLOADING FLUID IN WELL TUBING.
PUMP MIN. FLOW ---
8. PROPANE BOTTLES CONNECTION IS USED FOR BACK UP FOR PILOT GAS TO FLARE AND
02 PURGING DURING OFFLOADING OPERATION.
WELL OFFLOADING LINE HS HS
NOTE 2,4 9. NITROGEN IS USED FOR EXTINGUISHING FLAME.
NC
NOTE 3 10. DELETED.
PUMPS EXHAUST HEADER 11. TWO LIQUID RECOVERY PUMPS TO BE IN SERVICE AND ONE IN STANDBY.
02
02 02 12. LIQUID RECOVERY PUMPS A/B/C OPERATION CAN BE IN AUTO OR MANUAL MODE.
LIC LY LY
02
9
FUEL GAS SCRUBBER

CHEMICAL INJECTION
UPSTREAM OF MPFM
OFFLOADING PUMPS

HOLDS:
PRODUCTION / TEST

NOTE 6 NOTE 11 NOTE 11 NOTE 11


SYSTEM DRAINS
PIG LAUNCHER

DISTRIBUTION

AND FILTERS
WHCP / HPU

HS HS HS
CCVT SKIDS
71
MANIFOLD

FUEL GAS

1. DELETED.
21 VZ 3601
FROM

FROM

FROM

FROM

FROM

FROM

FROM

FROM

FROM
---

---

---

---

---

---

---

---

---

LC
02
LY 101 FCV
02 FIC
NOTE 12 38-87
SDV
SDV 42.6
15
02
LP CLOSED DRAIN HEADER XV
02
02
HP CLOSED DRAIN HEADER 21 PA 3601 A LEGEND :
21 FA 2802 101
VENT AT SAFE
DM 101 FCV
GAS FLOWRATE, MMSm/d STREAM REFERENCE NUMBER
MEZZANINE DECK SUB-HEADER

LOCATION FIC
CELLAR DECK SUB-HEADER

02
UPPER DECK SUB-HEADER
MEZZANINE DECK

38-87
CELLAR DECK

TO
UPPER DECK

WELLHEAD FLOWLINES
FINNED TUBE COOLER

42.6 DUTY / HYDRAULIC POWER, kw


DRIP PANS

DRIP PANS

DRIP PANS

EXPORT LINE OPERATING PRESSURE, barg


FROM

FROM

FROM

LIC 15
---

---

---

FUTURE EQUIPMENT OPERATING TEMPERATURE, C


DRAINS

BN-MLS-21-PTSC-307201
FROM

FROM
---

---

ATM 02 LIQUID FLOWRATE, m/hr

21 VZ 2802 92
21 PA 3601 B
DM
101
02
OPEN DRAIN HEADER 24-92
5.1
0.7
1.8
REFERENCE DRAWINGS :
02
21 FA 2801 02
1. P&ID SYMBOLS AND LEGENDS No. BN-MLS-21-PTSC-307401 TO 307410.
AMB LO
VENT AT SAFE 0.03
LOCATION
1 02
21 FA 2803 21 PR 3601 A
LO VENT AT SAFE
LOCATION DJ
21 PM 2804 101

02
DJ 24-92
5.1
1.8 02 TO
ATM EXPORT LINE

LO
21 VZ 2803 AMB BN-MLS-21-PTSC-307201

21 PR 3601 B
02

FROM RAIN COLLECTION 02


DJ 101
FROM DECKS 02
24-92
5.1
---
1.8 02
02
0.2
FROM LO
OFFLOADING PUMPS
DRIP PAN AMB

---
0.005 21 PR 3601 C WELLHEAD PLATFORM MLJ-3
1
02
VENT AND DRAINS SYSTEM
DJ
LO UTILITY FLOW DIAGRAM
Electronic Filename
21 PR 2803 Doc Type : UFD System : 28 Discipline : PRO

BN-MLS-21-PTSC-307302 REV : 02
21 TC 2801
DJ
Format : A1

Das könnte Ihnen auch gefallen