Beruflich Dokumente
Kultur Dokumente
and define for each checking group which objects are included in the availability check for this checking rule.
Check the availability checking rules for each transaction.
Assign other checking rules to the transactions, if necessary.
Check
check the links...
http://help.sap.com/erp2005_ehp_04/helpdata/EN/a5/63380f43a211d189410000e829fbbd/frameset.htm
http://help.sap.com/erp2005_ehp_04/helpdata/EN/a5/63380f43a211d189410000e829fbbd/content.htm
From SD side the path is SPRO-> Sales and distribution ->basic functions ->Availability check and transfer of
requirements.
From MRP point of view, the path is SPRO->Production->Material requirement planning ->Procurement
proposal->Planned orders->Define availability check for components and Carry out collective avaialbility check.
Regards
Go to:
Utsav
2) in materail master in sales gen/plant view we give 01 or 02 required check in the field AV Check
Regards
kumar
or
OPJJ trxn code
Regards
Utsav
Availbility Check
1) From SD precpective AV check will performed for sales order, t-code is OVZ9
Regards
kumar