Beruflich Dokumente
Kultur Dokumente
Description
These feeds are designed for installation in shielded Foam absorber material on certain feeds
standard types of parabolic antennas. The feed is is for RF performance.
designed for positive metal-to-metal contact between
the feed and the reflector, therefore no separate ground DO NOT REMOVE
wire is required. The mounting hardware includes either THIS MATERIAL.
standard or thin-head bolts and requires the use of 13 and
17mm wrenches.
Reflector Reflector
Feed
Mounting Ring
Feed without vertex ring Feed with vertex ring Feed with vertex ring and vertex ring shim
Figure 2. Feed Mounting Variations
Andrew Solutions www.commscope.com\andrew
Visit our Web site at www.commscope.com\andrew or contact your local Andrew Solutions representative for more information. For Rohs Inquiries;
Customer Service 24 hours 2008 CommScope, Inc. All rights reserved. CommScope Inc
U.S.A., Canada, Mexico: 1-800-255-1479 Andrew Solutions is a trademark of CommScope. All trademarks identified by or are registered trademarks or trade-
or 1-888-235-5732 Corke Abbey, Bray Co,
marks, respectively, of CommScope. This document is for planning purposes only and is not intended to modify or supplement
U.K.: 0800 250055 any specifications or warranties relating to Andrew Solutions products or services. Dublin, Ireland
Other Europe: +44 592 782 612 Attn: Legal Department
Notice: Andrew disclaims any liability or responsibility for the results of improper or unsafe installation, inspection, maintenance, or removal practices.
Aviso: Andrews no acepta ninguna obligacion ni responsabilidad como resultado de practicas incorrectas o peligrosas de instalacion, inspecci6n, mantenimiento o retire.
Avis : Andrew decline toute responsabilite pour les consequences de procedures d'installation, d'inspection, d'entretien ou de retrait incorrectes ou dangereuses.
Hinweis: Andrew lehnt jede Haftung Oder Verantwortung fur Schaden ab, die aufgrund unsachgemaBer Installation, Uberprufung, Wartung Oder Demontage auftreten.
Atencao: A Andrew abdica do direito de toda responsabilidade pelos resultados de praticas inadequadas e sem seguranca de instalacao, inspecao, manutengao ou remocao.
Awertenza: Andrew declina eventual! responsabilita denvanti dell'esecuzione di procedure di installazione, ispezione, manutenzione e smontaggio improprie o poco sicure.
Installation Instructions
Feeds Bulletin 37870 page 2 of 7
M8 hardware
Torque to 18.7Nm 5%. RF spring
Feed hub gasket
M10 hardware
(standard or thin head) Vertex Ring
Torque to 38Nm 5%. (if required)
Vertex Ring Shim
(if required)
Notes:
Feed hub diameter is 8 in (205mm)
Feed is always front mounted on new installations Figure 4. Feed Hub Assembly Details
Vertex ring with or without vertex ring shim is front mounted
Mounting ring is rear mounted
Retaining ring is factory installed in mounting ring
Hub locking clamps are captivated to feed hub
RF spring gasket fits into groove in mounting ring
Feed hub
Polarisation arrow
Waveguide
bend
Waveguide
bend
A.1. Remove Old Feed. Loosen the hub locking B. Replacement of Old Style Feed with
clamps, slide them toward the centre of the hub and Feed of Improved Hub Design
finger tighten the nuts. Carefully push the feed hub Replacement feeds are furnished with a mounting ring,
slightly forward and slightly downward so that the guy wires and mounting hardware. Also included with
spring tension of the guy wires holds the hub in place these parts, some feeds will require either a vertex
against the front surface of the mounting ring. ring or a vertex ring and vertex ring shim which
optimizes performance.
Carefully remove the hub retaining ring from the inside
of the mounting ring. Do not discard this ring as it will be Installation of the new vertex rings/vertex ring shim's,
reused. Push the feed hub slightly forward and allow it however,must be done from the front side of the antenna
as given for a new feed installation - the old feed mounting
to pass through the mounting ring. Disconnect the guy ring and vertex ring shim(s) must be removed.
wires to the front surface of the reflector so that they
can be easily reached for reattachment. If no vertex rings/vertex ring shims are required, most
replacement feeds can be installed from the rear of
A.2. Feed Replacement (Improved Hub Design) Do the antenna (see General Note). Attach the mounting
not remove flange covers until you are ready to connect ring as given in Step 1 for new feed installation. Then
the feed to the feed lines. The flanges must remain complete the installation as given in step A.2.
clean and dry.
Attach the guy wires to the anchor ring of the new feed
and guide the feed through the mounting ring. Push the
feed hub forward and slightly downward so that the
spring tension of the guy wires holds the hub in place
against the front surface of the mounting ring.