BH - 07 Sta: - (at mid point) Ground Water Level = -1.70 m. Titik Bor: BH - 07
Elev. of ground surface = 0.000 m. Hard Layer (Bearing Sratum) 49
0.00 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1.00 -1.00 1 5C 4.00 5.50 5.50 5.50 0.38 0.85 0.85 1.52 0.18 0.24 0.24 0.31 0.56 1.09 1.09 1.83
2.00 -2.00 1 7C 5.50 7.60 7.60 7.60 0.52 1.18 1.18 2.10 0.44 0.57 0.57 0.75 0.96 1.74 1.74 2.85
3.00 -3.00 1 10 C 7.60 7.60 9.00 9.00 0.71 1.18 1.40 2.48 0.81 1.04 1.04 1.38 1.52 2.22 2.43 3.86
4.00 -4.00 1 16 S 10.80 10.80 10.29 10.29 6.93 11.45 10.91 19.39 1.39 1.79 1.79 2.39 8.32 13.24 12.70 21.78
5.00 -5.00 1 16 S 13.40 13.40 13.14 11.50 8.59 14.21 13.94 21.68 1.98 2.54 2.54 3.39 10.57 16.75 16.48 25.07
6.00 -6.00 1 18 S 16.00 16.00 15.57 14.25 10.26 16.96 16.51 26.86 3.30 4.24 4.24 5.65 13.56 21.21 20.75 32.52
7.00 -7.00 1 20 S 18.40 18.40 18.00 16.63 11.80 19.51 19.09 31.34 4.76 6.13 6.13 8.17 16.57 25.64 25.21 39.51
8.00 -8.00 1 22 S 20.00 20.00 20.29 19.00 12.83 21.21 21.51 35.81 6.38 8.20 8.20 10.93 19.21 29.41 29.71 46.75
9.00 -9.00 1 24 S 22.00 22.00 21.57 20.88 14.11 23.33 22.87 39.35 8.14 10.46 10.46 13.95 22.25 33.79 33.33 53.30
10.00 -10.00 1 26 S 23.36 23.36 22.82 21.97 14.99 24.77 24.20 41.41 10.04 12.91 12.91 17.22 25.03 37.68 37.11 58.62
11.00 -11.00 1 25 S 6.69 6.69 6.34 6.17 4.29 7.09 6.73 11.63 11.88 15.27 15.27 20.36 16.17 22.36 22.00 31.99
12.00 -12.00 1 25 S 6.51 6.51 6.08 6.00 4.18 6.90 6.45 11.31 13.71 17.62 17.62 23.50 17.88 24.53 24.07 34.81
13.00 -13.00 1 20 S 5.96 5.96 5.94 5.94 3.82 6.32 6.30 11.19 15.17 19.51 19.51 26.01 19.00 25.83 25.81 37.21
14.00 -14.00 1 15 S 5.58 5.58 5.88 5.94 3.58 5.91 6.24 11.20 16.27 20.92 20.92 27.90 19.85 26.84 27.16 39.10
15.00 -15.00 1 20 S 5.47 5.47 5.71 5.85 3.51 5.80 6.05 11.02 17.74 22.81 22.81 30.41 21.25 28.60 28.86 41.43
16.00 -16.00 1 24 S 5.31 5.31 5.57 5.69 3.40 5.63 5.91 10.73 19.50 25.07 25.07 33.43 22.90 30.70 30.98 44.15
17.00 -17.00 1 23 S 5.41 5.41 5.52 5.63 3.47 5.73 5.85 10.61 21.18 27.24 27.24 36.32 24.65 32.97 33.09 46.93
18.00 -18.00 1 23 S 5.86 5.86 5.79 5.70 3.76 6.21 6.13 10.74 22.87 29.41 29.41 39.21 26.63 35.62 35.54 49.95
19.00 -19.00 1 25 S 6.25 6.25 6.23 5.92 4.01 6.62 6.60 11.16 24.70 31.76 31.76 42.35 28.71 38.39 38.36 53.51
Carrying Capacity for Driven Pile Foundation.
based on SPT results.
JASA KONSULTAN SURVEY GEOTEKNIK PEKERJAAN PENYELIDIKAN TANAH RELOKASI PEMBANGUNAN TERMINAL BAHAN BAKAR MINYAK TEGAL
BH - 07 Sta: - (at mid point) Ground Water Level = -1.70 m. Titik Bor: BH - 07
Elev. of ground surface = 0.000 m. Hard Layer (Bearing Sratum) 49
20.00 -20.00 1 29 S 6.43 6.43 6.48 6.29 4.12 6.82 6.87 11.86 26.83 34.49 34.49 45.99 30.95 41.31 41.36 57.85
21.00 -21.00 1 29 S 6.65 6.65 6.58 6.50 4.27 7.05 6.98 12.25 28.96 37.23 37.23 49.64 33.22 44.28 44.21 61.89
22.00 -22.00 1 29 C 6.87 6.87 6.72 6.58 1.29 2.13 2.08 3.63 31.08 39.96 39.96 53.28 32.37 42.09 42.04 56.91
23.00 -23.00 1 29 C 6.99 6.99 6.89 6.72 1.31 2.17 2.14 3.70 33.21 42.69 42.69 56.93 34.52 44.86 44.83 60.63
24.00 -24.00 1 29 C 6.96 6.96 7.32 7.15 1.31 2.16 2.27 3.94 35.33 45.43 45.43 60.57 36.64 47.59 47.70 64.51
25.00 -25.00 1 30 C 7.40 7.40 7.61 7.51 1.39 2.29 2.36 4.14 37.53 48.25 48.25 64.34 38.92 50.55 50.61 68.48
26.00 -26.00 1 40 C 7.82 7.82 7.91 7.77 1.47 2.43 2.45 4.28 40.46 52.02 52.02 69.37 41.93 54.45 54.48 73.65
27.00 -27.00 1 40 C 8.28 8.28 8.34 8.13 1.55 2.57 2.59 4.48 43.40 55.79 55.79 74.39 44.95 58.36 58.38 78.88
28.00 -28.00 1 41 C 8.90 8.90 8.86 8.57 1.67 2.76 2.75 4.73 46.40 59.66 59.66 79.55 48.07 62.42 62.41 84.27
29.00 -29.00 1 45 C 9.60 9.60 9.12 8.75 1.80 2.98 2.83 4.82 49.70 63.90 63.90 85.20 51.50 66.88 66.73 90.02
30.00 -30.00 1 48 C 9.64 9.64 9.48 9.01 1.81 2.99 2.94 4.97 53.22 68.42 68.42 91.23 55.03 71.41 71.36 96.20