BY: SR TATA Consulting Engineers Limited

DATE: 03-08-2016 CLIENT: TATA STEEL LIMITED


CHD.: JKH
PROJECT: 8 MTPA,TSK,PHASE II,AT KALINGANAGAR ,ODISHA
DATE: 03-08-2016 BU: SMMBU OFFICE: DK DISC.: CV SH.

11b DESIGN OF FOOTING MARKED F6 NODE 24 WITH S

Length of Footing along X axis (B) = 2.85 m


Length of Footing along Z axis (D) = 2.18 m
Depth of footing (d) = 0.5 m
Net SBC = 200 KN/m2
Net SBC for WL or SL case = 250 KN/m2
Gross SBC = 274.7 KN/m2
Gross SBC for WL or SL case = 324.7 KN/m2
Pedestal Size along X axis (B') = 1m
Pedestal Size along Z axis (D') = 1m

B'
D D' X

Area of Footing A=BxD = 6.21 m2


Zx = BxD /6 2
= 2.26 m3
Zz= DxB2/6 = 2.95 m3

Finished floor level = 0m Natural ground level


Bottom of Foundation = -5.65 m
Surcharge load = 50 KN/m2
From STAAD Output
Horizontal Vertical Horizontal Moment
Node L/C Fx kN Fy kN Fz kN Mx kNm
24 101 -26 271.75 4 23.8
102 -22 295.75 18 107.1
103 -25 263.75 6 35.7
104 -10 192.75 5 29.75
105 -15 257.75 2 11.9
106 -20 199.75 1 5.95
107 -24 166.75 -14 -83.3
108 -21 307.75 21 124.95
109 -24 267.75 6 35.7

TATA CONSULTING ENGINEERS LIMITED


BY: SR TATA Consulting Engineers Limited
DATE: 03-08-2016 CLIENT: TATA STEEL LIMITED
CHD.: JKH
PROJECT: 8 MTPA,TSK,PHASE II,AT KALINGANAGAR ,ODISHA
DATE: 03-08-2016 BU: SMMBU OFFICE: DK DISC.: CV SH.

110 -9 243.75 16 95.2


111 -12 211.75 4 23.8
112 3 140.75 3 17.85
113 -2 205.75 0 0
114 -7 147.75 -1 -5.95
115 -11 114.75 -16 -95.2
116 -8 255.75 19 113.05
117 -11 215.75 4 23.8
118 2.2 177.675 14.9 88.655
119 -0.8 145.675 2.9 17.255
120 14.2 74.675 1.9 11.305
121 9.2 139.675 -1.1 -6.545
122 4.2 81.675 -2.1 -12.495
123 0.2 48.675 -17.1 -101.745
124 3.2 189.675 17.9 106.505
125 0.2 149.675 2.9 17.255

Grade of Concrete = 30 N/sq.mm


Grade of Steel = 500 N/sq.mm
Unit weight of dry soil(d) = 18 KN/m3
Submerged weight of soil(s) = 10 KN/m3
Dry unit weight of concrete = 25 KN/m3
Submerged unit weight of concrete = 15 KN/m3
Unit weight of water(w) = 10 KN/m3
Weight of footing (Wfd) = 77.6625 KN
Submerged weight of footing (Wfd) = 46.5975 KN
Weight of Soil (Wsd) = 483.2451 KN
Weight of submerged soil(Wss) = 268.4695 KN

TATA CONSULTING ENGINEERS LIMITED


BY: SR TATA Consulting Engineers Limited
DATE: 03-08-2016 CLIENT: TATA STEEL LIMITED
CHD.: JKH
PROJECT: 8 MTPA,TSK,PHASE II,AT KALINGANAGAR ,ODISHA
DATE: 03-08-2016 BU: SMMBU DK
OFFICE: DISC.: CV SH.

Bearing Pressure Check Under Dry Condition(Surcharge included)


Total Fyd Mx Mz
L/C Mx/Zx Mz/Zz (1)+(2)+(3 (1)+(2)-
KN (1) KN-m (2) KN-m(3) ) (3) (1)-(2)+(3)
101 832.7 23.8 224.7 10.5 76.1 270.70 118.42 249.61
102 856.6576 107.1 205.9 47.4 69.8 305.09 165.56 210.21
103 824.6576 35.7 224.8 15.8 76.2 274.70 122.39 243.07
104 753.6576 29.8 78.5 13.2 26.6 211.08 157.88 184.72
105 818.6576 11.9 107.3 5.3 36.3 223.38 150.70 212.84
106 760.6576 6.0 193.0 2.6 65.4 240.46 109.67 235.19
107 727.6576 -83.3 202.8 -36.9 68.7 198.94 61.50 272.74
108 868.6576 125.0 200.0 55.4 67.8 312.92 177.41 202.21
109 828.6576 35.7 204.8 15.8 69.4 268.59 129.79 236.96
110 804.6576 95.2 95.6 42.2 32.4 254.06 189.31 169.72
111 772.6576 23.8 114.4 10.5 38.8 223.67 146.14 202.58
112 701.6576 17.9 -31.9 7.9 -10.8 160.05 181.63 144.23
113 766.6576 0.0 -3.1 0.0 -1.1 172.35 174.45 172.35
114 708.6576 -6.0 82.7 -2.6 28.0 189.43 133.42 194.70
115 675.6576 -95.2 92.5 -42.2 31.3 147.90 85.25 232.25
116 816.6576 113.1 89.6 50.1 30.4 261.88 201.16 161.72
117 776.6576 23.8 94.5 10.5 32.0 217.55 153.54 196.47
118 738.5826 88.7 -2.7 39.3 -0.9 207.24 209.06 128.69
119 706.5826 17.3 16.2 7.6 5.5 176.85 165.89 161.56
120 635.5826 11.3 -130.1 5.0 -44.1 113.23 201.39 103.21
121 700.5826 -6.5 -101.3 -2.9 -34.3 125.52 194.20 131.32
122 642.5826 -12.5 -15.6 -5.5 -5.3 142.61 153.17 153.68
123 609.5826 -101.7 -5.8 -45.1 -2.0 101.08 105.00 191.22
124 750.5826 106.5 -8.6 47.2 -2.9 215.06 220.92 120.70
125 710.5826 17.3 -3.8 7.6 -1.3 170.73 173.30 155.44
Hence maximum pressure acting at bottom of foundation= 312.92 KN/m2 Load case
Hence minimum pressure acting at bottom of foundation= 61.50 KN/m2

Bearing Pressure Check Under Submerged Condition(Surcharge included)


Total Fys Mx Mz
L/C Mx/Zx Mz/Zz (1)+(2)+(3 (1)+(2)-
KN (1) KN-m (2) KN-m(3) ) (3) (1)-(2)+(3)
101 527.3 23.8 224.7 10.5 76.1 221.56 69.28 200.47
102 551.3 107.1 205.9 47.4 69.8 255.95 116.41 161.06
103 519.3 35.7 224.8 15.8 76.2 225.56 73.24 193.93
104 448.3 29.8 78.5 13.2 26.6 161.94 108.74 135.58
105 513.3 11.9 107.3 5.3 36.3 174.23 101.55 163.69
106 455.3 6.0 193.0 2.6 65.4 191.32 60.52 186.05
107 422.3 -83.3 202.8 -36.9 68.7 149.79 12.35 223.59
108 563.3 125.0 200.0 55.4 67.8 263.77 128.27 153.07

TATA CONSULTING ENGINEERS LIMITED


BY: SR TATA Consulting Engineers Limited
DATE: 03-08-2016 CLIENT: TATA STEEL LIMITED
CHD.: JKH
PROJECT: 8 MTPA,TSK,PHASE II,AT KALINGANAGAR ,ODISHA
DATE: 03-08-2016 BU: SMMBU OFFICE: DK DISC.: CV SH.

109 523.3 35.7 204.8 15.8 69.4 219.44 80.65 187.81


110 499.3 95.2 95.6 42.2 32.4 204.92 140.16 120.57
111 467.3 23.8 114.4 10.5 38.8 174.52 96.99 153.44
112 396.3 17.9 -31.9 7.9 -10.8 110.90 132.49 95.09
113 461.3 0.0 -3.1 0.0 -1.1 123.20 125.30 123.20
114 403.3 -6.0 82.7 -2.6 28.0 140.29 84.27 145.56
115 370.3 -95.2 92.5 -42.2 31.3 98.76 36.10 183.10
116 511.3 113.1 89.6 50.1 30.4 212.74 152.02 112.58
117 471.3 23.8 94.5 10.5 32.0 168.41 104.40 147.32
118 439.2 88.7 -2.7 39.3 -0.9 159.05 160.87 80.50
119 407.2 17.3 16.2 7.6 5.5 128.66 117.71 113.37
120 336.2 11.3 -130.1 5.0 -44.1 65.04 153.20 55.02
121 401.2 -6.5 -101.3 -2.9 -34.3 77.33 146.01 83.13
122 343.2 -12.5 -15.6 -5.5 -5.3 94.42 104.99 105.49
123 310.2 -101.7 -5.8 -45.1 -2.0 52.89 56.82 143.04
124 451.2 106.5 -8.6 47.2 -2.9 166.87 172.73 72.51
125 411.2 17.3 -3.8 7.6 -1.3 122.54 125.11 107.25
Hence maximum pressure acting at bottom of foundation= 263.77 KN/m2
Hence minimum pressure acting at bottom of foundation= 12.35 KN/m2

TATA CONSULTING ENGINEERS LIMITED


Limited JOB NO.: TCE.7685A

SUBJECT:SHED OVER TRACK FDN


AR ,ODISHA DOC. NO.: TCE.7685A-02-00-CVL-009
OF REV. NO.: R1
WITH SURCHARGE LOAD

Natural ground level = -1.5 m

Moment Moment
My kNm Mz kNm
0 224.7
0 205.9
0 224.75
0 78.5
0 107.25
0 193
0 202.8
0 199.95
0 204.8

TATA CONSULTING ENGINEERS LIMITED


Limited JOB NO.: TCE.7685A

SUBJECT: SHED OVER TRACK FDN


AR ,ODISHA DOC. NO.: TCE.7685A-02-00-CVL-009
OF REV. NO.: R1
0 95.55
0 114.4
0 -31.85
0 -3.1
0 82.65
0 92.45
0 89.6
0 94.45
0 -2.69
0 16.16
0 -130.09
0 -101.34
0 -15.59
0 -5.79
0 -8.64
0 -3.79

TATA CONSULTING ENGINEERS LIMITED


Limited JOB NO.: TCE.7685A

SUBJECT: SHED OVER TRACK FDN


AR ,ODISHA DOC. NO.: TCE.7685A-02-00-CVL-009
OF REV. NO.: R1

(1)-(2)-(3) Node
97.34 24
70.67
90.76
131.52
140.15
104.40
135.30
66.71
98.16
104.96
125.05
165.82
174.45
138.69
169.60
101.00
132.46
130.52
150.61
191.37
200.00
164.24
195.15
126.56
158.01
108

(1)-(2)-(3)
48.19
21.52
41.61
82.38
91.01
55.25
86.16
17.56

TATA CONSULTING ENGINEERS LIMITED


Limited JOB NO.: TCE.7685A

SUBJECT: SHED OVER TRACK FDN


AR ,ODISHA DOC. NO.: TCE.7685A-02-00-CVL-009
OF REV. NO.: R1
49.02
55.82
75.91
116.67
125.30
89.55
120.45
51.86
83.31
82.33
102.42
143.18
151.81
116.06
146.96
78.37
109.82

TATA CONSULTING ENGINEERS LIMITED


CONCRETE QUANTITY

RCC

Pedestal length = #REF! m Pedestal width = #REF! m


Pedestal height = #REF! m
Concrete volume of pedestal = #REF! cum

Foundation length = #REF! m Foundation width = #REF! m


Foundation depth = #REF! m
Concrete volume of foundation = #REF! cum

Total RCC volume = #REF! cum

PCC

Volume of PCC bed below foundation = #REF! cum

Total PCC volume = #REF! cum

REINFORCEMENT QUANTITY

Foundation

bottom reinforcement (X-direction):

Dia of bar = ### mm No of bar = #REF! Length of each bar = #REF! m


Total weight of reinforcement #REF! T

bottom reinforcement (Z-direction):

Dia of bar = ### mm No of bar = #REF! Length of each bar = #REF! m


Total weight of reinforcement #REF! T

top reinforcement (X-direction):

Dia of bar = ### mm No of bar = #REF! Length of each bar = #REF! m


Total weight of reinforcement #REF! T

top reinforcement (Z-direction):

Dia of bar = ### mm No of bar = #REF! Length of each bar = #REF! m


Total weight of reinforcement #REF! T
Pedestal

Length of vertical bars = #REF! m


No of pedestal = 1
Dia of bar = 20 mm No of bar = 16 Weight = #REF! T
Dia of bar = 0 mm No of bar = 0 Weight = #REF! T
Dia of bar = 0 mm No of bar = 0 Weight = #REF! T

Vertical Link

Dia of vertical link = 10 mm


Spacing provided = 200 mm No of sets of link = #REF!

No of link per set = 3

Length of link 1 = 1.6 Weight= #REF! T


Length of link 2 = 1.13 Weight= #REF! T
Length of link 3 = Weight= #REF! T
Length of link 4 = Weight= #REF! T
Length of link 5 = Weight= #REF! T

Total Weight = #REF! T

Dia of bar Weight (T)


8 #REF! #REF! + #REF! + #REF! + #REF! + 0
10 #REF! #REF! + #REF! + #REF! + #REF! + 0
12 #REF! #REF! + #REF! + #REF! + #REF! + 0
16 #REF! #REF! + #REF! + #REF! + #REF! + 0
20 #REF! #REF! + #REF! + #REF! + #REF! + #REF!
25 #REF! #REF! + #REF! + #REF! + #REF! + 0
28 #REF! #REF! + #REF! + #REF! + #REF! + 0
32 #REF! #REF! + #REF! + #REF! + #REF! + 0

Total tonnage #REF! T kg/cu.m volume #REF! kg/cu.m


SOLU CORRIDOR 132kV TRANSMISSION LINE
PROJECT

COUNTERFORT RETAINING WALL - ANALYSIS &


DESIGN
FOR 132/33/11 kV TINGLA SUB-STATION

7.0 Calculations
This section describes Loads and Load Combinations used for analysis and design.
Also design calculations for various structural members are covered in this section.

7.10 Primary Loads:

Table below shows loads & load symbols, which list all the basic loads considered
in the analysis
List of Primary Loads
Sr. No Load Symbol Description of Loads
1.0 DL Dead Load Self weight of the structure
Surcharge Load on wall (lateral) & on toe
SR
2.0 slab(vertical)
Dry soil pressure on wall (lateral) & on toe
3.0 SL1IN slab(vertical)
Dry soil pressure on wall (lateral) & on heel
4.0 SL1OUT slab(vertical)
Saturated soil pressure on wall (lateral) & on toe
5.0 SL2IN slab(vertical)
Saturated soil pressure on wall (lateral) & on heel
6.0 SL2OUT slab(vertical)
7.0 WL Wind Load on outside face of wall

7.11 Load Combination:

Each element of the structure will be provided with sufficient strength


to resist the most critical effects resulting from the various combinations of
loads. All those combinations are listed in subsequent pages below:
SOLU CORRIDOR 132kV TRANSMISSION LINE PROJECT

COUNTERFORT RETAINING WALL - ANALYSIS & DESIGN

FOR 132/33/11 kV TINGLA SUB-STATION

FGL
7.20 LOAD CALCULATION NGL
INSIDE
7.21 Dead Load (DL)

Selfweight of Wall is considered in STAAD


using selfweight multiplier "1"
7.22 Surcharge Load (SR)

Surcharge Load on FGL = 20 kN/m2


(applied inside)
Load applied in STAAD
Vertical Pressure on Foundation = 20 kN/m2

Lateral Pressure on Wall applied as pressure on plate multiplied with active EP coef.

7.23 Soil Load (SL)

Unit weight of soil = 18 kN/m3


Unit weight of ground water = 10 kN/m3
Unit weight of submerged soil = 10 kN/m3
Unit weight of saturated soil = 20 kN/m3

Active Earth pressure co-efficient = 0.44 (as per DCD)


Natural ground level is of irregular profile
Depth of soil considered on footing outside = 2.00 m

Elevation of FGL (inside) = (+) 2149.00 m


Bottom of Foundation = (+) 2143.50 m
Thickness of Foundation = 0.50 m

Load applied in STAAD


INSIDE
Vertical Soil Pressure (Dry Condition) on Foundation
= 18*5 = 90 kN/m2
Lateral Soil Pr. (dry) on Wall applied as pressure on plate multiplied with active EP coef.

Vertical Soil Pressure (Wet Condition) on Foundation (water 3m above base)


= 20*3+18*2 = 96 kN/m2
Lateral Soil Pr. (wet) on Wall applied as pressure on plate multiplied with active EP coef.
Uplift water pressure on raft = 10*3 = 30.00 kN/m2
(upto 3m height above base)
OUTSIDE
Vertical Soil Pressure (Dry Condition) on Foundation (considering 2.5m depth)
SOLU CORRIDOR 132kV TRANSMISSION LINE PROJECT

COUNTERFORT RETAINING WALL - ANALYSIS & DESIGN

FOR 132/33/11 kV TINGLA SUB-STATION


= 18*2 = 36 kN/m2
Lateral Soil Pr. (dry) on Wall applied as pressure on plate multiplied with active EP coef.

Vertical Soil Pressure (Wet Condition) on Foundation


= 20*2 = 40 kN/m2
Lateral Soil Pr. (wet) on Wall applied as pressure on plate multiplied with active EP coef.

7.24 Wind Load (WL)

Basic Wind speed, Vb = 47 m/sec


Design Wind Speed at any height, Vz = K1 K2 K3 K4 *Vb m/sec
where, K1 = 1.07 ; K2 = 1.02 Cat-2,CL-B ; K3 = 1.00
K4 = 1.00
Vz = 51.3 m/sec
Design Wind Pressure at any height, Pz = 0.6 x Vz^2 N/m2
= 1.5788 kN/m2
Wind pressure applied on wall in STAAD, Pw = Cf*Pz = 1.89 kN/m2
where, Cf = 1.20
SOLU CORRIDOR 132kV TRANSMISSION LINE PROJECT

COUNTERFORT RETAINING WALL - ANALYSIS & DESIGN

FOR 132/33/11 kV TINGLA SUB-STATION

7.30 STABILITY CHECK

7.31 Check against Overturning (per m)

Geometric Properties:

Top Elevation of Wall = (+) 2149.30


Bottom Elevation of Foundation = (+) 2143.50
Thickness of Wall = 0.3
Thickness of Footing = 0.50
Height of Wall = 5.30
Length of Heel (OA) = 2.35
Length of Toe (BC) = 2.85

Unit weight of soil(for overturning as per DCD) = 12


Unit weight of RCC(for overturning as per DCD) = 16
Unit weight of soil = 18
Unit weight of RCC = 25
Unit weight of ground water = 10
Unit weight of submerged soil = 10
Unit weight of saturated soil = 20
Active Earth pressure co-efficient = 0.44
Height of Soil inside = 5.00
Height of Soil outside = 2.00
Factor of Safety against overturning & sliding = 1.4

Force (kN)
Description Lever arm(m)@ "O" Moment( kN-m) @ "O"
Vertical Lateral
Bottom Slab:
Heel 2.35*0.5*16 0.5/2 18.8*0.25
= 18.8 = 0.25 = 4.70
Toe 2.85*0.5*16 0.5/2 22.8*0.25
= 22.8 = 0.25 = 5.70
Wall 5.8*0.3*16 0.3/2 + 2.35 27.84*2.5
= 27.8 = 2.50 = 69.6
Soil on Toe 2.85*5*12 0.5*18*5^2*0.44 =2.85/2 + 0.3+2.=5/3 171*4.08
(dry) = 171.0 = 99 4.075 1.6667 696.8
0.5*5^2*(10*
Soil on Toe 2.85*5*20 0.44+10) =2.85/2 + 0.3+2.=5/3 285*4.08
SOLU CORRIDOR 132kV TRANSMISSION LINE PROJECT

COUNTERFORT RETAINING WALL - ANALYSIS & DESIGN

FOR 132/33/11 kV TINGLA SUB-STATION


(sat.) = 285.0 = 180 4.075 1.6667 1161.4
Soil on Heel 2.85*2*12 0.5*18*2^2*0.44 =2.35/2 =2/3 68.4*1.18
(dry) = 68.4 = 15.84 1.175 0.67 80.4

0.5*2^2*(10*
Soil on Heel 2.85*2*20 0.44+10) =2.35/2 =2/3 114*1.18
(sat.) = 114.0 = 28.8 1.175 0.6667 134.0
SOLU CORRIDOR 132kV TRANSMISSION LINE PROJECT

COUNTERFORT RETAINING WALL - ANALYSIS & DESIGN

FOR 132/33/11 kV TINGLA SUB-STATION

Total overturning moment = 165.000 kN


(No soil outside) (Dry Condition)

Total restoring moment = 4.7+5.7+69.6+696.83 kN


= 776.83 kN

Factor of Safety against overturning = 776.83/165


= 4.71
> 1.4 SAFE Heel

O A

Total overturning moment = 300.000 kN


(No soil outside) (Wet Condition)

Total restoring moment = 4.7+5.7+69.6+1161.38 kN


= 1241.4 kN

Factor of Safety against overturning = 1241.38/300


= 4.14
> 1.4 SAFE

7.32 Check against Sliding (per m)

Total Sliding force = 99.000 kN


(No soil outside) (Dry Condition)

Total resisting force (vertical) = (2.35*0.5*25)+(2.85*0.5*25)+ (5.8*0.3*25)+ (2.85*5*1


= 365.00 kN

Factor of Safety against sliding = 365/99


= 3.69
> 1.4 SAFE

Total Sliding force = 180.000 kN


(No soil outside) (Wet Condition)

Total resisting force (vertical) = (2.35*0.5*25)+(2.85*0.5*25)+ (5.8*0.3*25)+ (2.85*5*2


= 393.50 kN
SOLU CORRIDOR 132kV TRANSMISSION LINE PROJECT

COUNTERFORT RETAINING WALL - ANALYSIS & DESIGN

FOR 132/33/11 kV TINGLA SUB-STATION


Factor of Safety against sliding = 393.5/180
= 2.19
> 1.4 SAFE

7.33 Check against Uplift due to buoyancy(per m)

Total resisting force (vertical) = (2.35*0.5*25)+(2.85*0.5*25)+ (5.8*0.3*25)+ (2.85*5*2


= 393.50 kN

Total uplift force (upto 3m height above base) = 3*(2.35+0.3+2.85)*10 =


(Weep holes are provided at suitable intervals above NGL and water will not rise above NGL line)

Factor of Safety against buoyancy = 393.5/165


= 2.38
> 1.4 SAFE
2149.30 m
2143.50 m
m
m
m
m
m

kN/m3
kN/m3
kN/m3
kN/m3
kN/m3
kN/m3
kN/m3
(as per DCD)
m
m

Moment( kN-m) @ "O" Remarks

18.8*0.25
Resist.
22.8*0.25
Resist.
27.84*2.5
Resist.
99*1.67 Hz.-Overt.
165 Vert.-Resist.

180*1.67 Hz.-Overt.
300 Vert.-Resist.
15.84*0.67 Hz.-Overt.
10.56 Vert.-Resist.

28.8*0.67 Hz.-Overt.
19.20 Vert.-Resist.
FGL
NGL
INSIDE

Toe

A B C

(2.35*0.5*25)+(2.85*0.5*25)+ (5.8*0.3*25)+ (2.85*5*18)kN

(2.35*0.5*25)+(2.85*0.5*25)+ (5.8*0.3*25)+ (2.85*5*20)kN


(2.35*0.5*25)+(2.85*0.5*25)+ (5.8*0.3*25)+ (2.85*5*20)kN

165 kN
SOLU CORRIDOR 132kV TRANSMISSION LINE PROJECT

COUNTERFORT RETAINING WALL - ANALYSIS & DESIGN

FOR 132/33/11 kV TINGLA SUB-STATION

8.10 Check for maximum bearing pressure


Normal condition
Maximum gross bearing pressure in the base raft = 118
(Node no-316, Load case-1009)
Maximum allowable net bearing capacity (as per DCD CL 5.1.1.3) = 80
Maximum allowable gross bearing capacity =80+2.25x18 = 120.5
>118 kN/m2, Hence OK

8.11 Design of Base slab


Characteristic Strength of Concrete = M 25
Characteristic Strength of Steel = Fe 500
for balance section neutral axis depth, x = 0.46
Clear cover to main r/f = 75
Thickness of Slab D = 500
Effective thickness of Slab d = 500-75-10
= 415
Maximum factored moment in Slab M = 277
L/C = 2008 Plate No = 582
R = M/b*d 2
= 1.61

Depth required, dreq = Err:511


= 288
SAFE

Reinforcement Calculation: (for BM values refer STAAD file)


Item BM R=M/b Plate Load Thickof Ast,req Ast,min
(kNm/m *d2 No case slab (m) (mm2/m) (mm2/m)
)
Maximum sag.
moment in 170.24 0.9885 586 2008 ( 500 990.79 600
trans.(X) direc.
Maximum sag.
moment in 19.25 0.1118 582 2014 ( 500 107.25 600
long.(Y) direc.
Maximum hog.
moment in
120.042 0.697 626 2008 ( 500 688.11 600
trans.(X) direc.

Maximum hog.
moment in 276.991 1.6083 582 2008 ( 500 1669.45 600
long.(Y) direc.
SOLU CORRIDOR 132kV TRANSMISSION LINE PROJECT

COUNTERFORT RETAINING WALL - ANALYSIS & DESIGN

FOR 132/33/11 kV TINGLA SUB-STATION

(* Moments at a particular section has been considered after adding corresponding MXY,
e.g. MX at a particular section=(MX+MXY) at that section, same for MY)
SOLU CORRIDOR 132kV TRANSMISSION LINE PROJECT

COUNTERFORT RETAINING WALL - ANALYSIS & DESIGN

FOR 132/33/11 kV TINGLA SUB-STATION

Raft PL. Orientation Wall PL. Orientation

Maximum shear stress = 0.354 N/mm2


(Plate No-357 , Load case-2008) @ "d" dist from face
Allowable shear stress = 0.52 N/mm2 Sign convention for plate bending
for M 25 & 100As/bd= 0.48
SAFE
8.12 Design of Wall

Clear cover to main r/f = 50


Thickness of Wall D = 300
Effective thickness of Wall d = 300-50-10
= 240
Maximum factored moment in Wall M = 42
L/C = 2008 Plate No = 663
R = M/b*d 2
= 0.73

Depth required, dreq = Err:511


= 112
SAFE
Reinforcement Calculation: (for BM values refer STAAD file @ face)
Item BM R=M/b Plate Load Thickof Ast,req Ast,min
(kNm/m *d2 No case slab (m) (mm2/m) (mm2/m)
)
Maximum sag.
moment in 41.79 0.7256 663 2008 ( 300 414.85 360
trans.(X) direc.

Maximum sag.
moment in 32.07 0.5567 703 2009 ( 300 315.60 360
long.(Y) direc.
Maximum hog.
moment in
trans.(X) direc. 32.62 0.5663 708 2008 ( 300 321.18 360

Maximum hog.
moment in
long.(Y) direc. 16.686 0.2897 706 2008 ( 300 162.10 360
SOLU CORRIDOR 132kV TRANSMISSION LINE PROJECT

COUNTERFORT RETAINING WALL - ANALYSIS & DESIGN

Maximum hog. FOR 132/33/11 kV TINGLA SUB-STATION


moment in
long.(Y) direc. 16.686 0.2897 706 2008 ( 300 162.10 360

Maximum shear stress = 0.316 N/mm2


(Plate No-363 , Load case-2008)
Allowable shear stress = 0.35 N/mm2
for M 25 & 100As/bd= 0.24
SAFE
kN/m2

kN/m2
kN/m2
>118 kN/m2, Hence OK

N/mm2
N/mm2
d
mm
mm
500-75-10 mm
mm
kN-m

mm

Ast,pro (mm2/m)
Check

Dia16 @200 OK
TOP
1005.31 FACE

Dia16 @200 OK
TOP
1005.31 FACE

Dia16 @200 OK
BOTTO
1005.31 M FACE

Dia16 @100 OK
BOTTO
2010.62 M FACE
ponding MXY,
n convention for plate bending

mm
mm
300-50-10 mm
mm
kN-m

mm

Ast,pro (mm2/m)
Check

Dia12 @200 OK
INSIDE
565.49 FACE

Dia12 @200 OK
INSIDE
565.49 FACE

Dia12 @200 OK
OUTSID
565.49 E FACE

Dia12 @200 OK
OUTSID
565.49 E FACE
SOLU CORRIDOR 132kV TRANSMISSION LINE PROJECT

COUNTERFORT RETAINING WALL - ANALYSIS & DESIGN

FOR 132/33/11 kV TINGLA SUB-STATION

8.13 Design of Counterfort


(For East & West side both)
Counterfort is designed in two segments for maximum load
Spacing of counterforts, S = 4
Load Calculation

Soil Pr (dry) Max. Fact.


Depth Moment
Segme (0.5*soil*H2* Soil Pr Water Surch Moment
below for "S"
nt (wet) Pr arge (wet 1
FGL Ka) length
soil+surchr.)

Top of
Raft 5.5 119.79 66.55 151.25 48.4 798.6 3194.4
At 1-1 3.5 48.51 26.95 61.25 30.8 235.2 940.8

Characteristic Strength of Concrete M 25 N/mm2


Characteristic Strength of Steel Fe 500 N/mm2
for balance section neutral axis depth, x = 0.46 d

Clear cover to main r/f = 50


Depth of counterfort D = 2650
Width of counterfort B = 400
Effective depth of counterfort d = 2650-50-10
= 2590
Depth @ 5.5 m
R = M/b*d2 = 1.19
Depth required, dreq = Err:511
= 1546
SAFE

Area of steel required = 3011.8


Min. Area of steel required 0.85*Bd / fy = 1761.2
Provide Dia25 No3 First layer 1472.6
Dia20 No3 Second layer 942.48
Dia20 No3 Third layer 942.48

Total R/f prov = 3358


SAFE
Depth @ 3.5 m

Depth of counterfort D = 1333


SOLU CORRIDOR 132kV TRANSMISSION LINE PROJECT

COUNTERFORT RETAINING WALL - ANALYSIS & DESIGN

FOR 132/33/11 kV TINGLA SUB-STATION


Effective depth of counterfort d = 1333-50-10
= 1273
R = M/b*d2 = 1.45
Area of steel required = 1831.6
Min. Area of steel required 0.85*Bd / fy = 865.64
Provide Dia25 No3 First layer 1472.6
Dia20 No3 Second layer 942.48
Dia0 No3 Third layer 0

Total R/f prov = 2415


SAFE
SOLU CORRIDOR 132kV TRANSMISSION LINE PROJECT

COUNTERFORT RETAINING WALL - ANALYSIS & DESIGN

FOR 132/33/11 kV TINGLA SUB-STATION


Lateral ties in counterforts are governed by separation from wall criteria

Soil Pressure (wet Condition) = 5.5*0.44*10


= 24.2
Water Pressure = 5.5*10
= 55
Surcharge = 20*0.44
= 8.8
Considering bottom 1m height, tension exerted on counterfort by walls (considering submerged case on
= Err:511
= 352

Lateral ties in counterforts will be in direct tension due to this force


Area of steel required 1.5*T/fy = 1056.0
Provide Dia12 Leg 2 @ 200 Spacing required = 214.2
SAFE

Vertical ties in counterforts are governed by separation from heel slab criteria
Vert pressure due to submerged soil,surcharge acting on top of heel slab = 5.5*10+20
= 75
Tension exerted by per meter of heel slab on counterfort = 75*4
= 300
Vertical ties in counterforts will be in direct tension due to this force
Area of steel required 1.5*T/fy = 900.0
Provide Dia12 Leg 2 @ 200 Spacing required = 251.33
SAFE
132kV TRANSMISSION LINE PROJECT

- ANALYSIS & DESIGN

33/11 kV TINGLA SUB-STATION

m
FGL

INSIDE
NGL
1 1

Top of Raf

mm
mm
mm
mm
mm

mm

mm2
mm2
mm2
mm2
mm2

mm2

mm
132kV TRANSMISSION LINE PROJECT

- ANALYSIS & DESIGN

33/11 kV TINGLA SUB-STATION


mm
mm

mm2
mm2
mm2
mm2
mm2

mm2
132kV TRANSMISSION LINE PROJECT

- ANALYSIS & DESIGN

33/11 kV TINGLA SUB-STATION

kN/m2

kN/m2

kN/m2
erted on counterfort by walls (considering submerged case only)

kN/m

mm2
mm

5.5*10+20
kN/m2
kN/m
kN/m

mm2
mm
SOLU CORRIDOR 132kV TRANSMISSION LINE PROJECT

COUNTERFORT RETAINING WALL - ANALYSIS & DESIGN

FOR 132/33/11 kV TINGLA SUB-STATION

UNFACTORED LOAD COMBINATION FOR SERVICEABILITY


Load Sr. Load 1 2 3 4 5 6 7 8
Conditions No. Comb DL SR SL1IN SL1OUT SL2IN SL2OUT WL EQX
Normal (w/o
1 1001 1.00 . 1.00 . . . . .
surchrg)
2 1002 1.00 . . 1.00 . . . .
3 1003 1.00 . . . 1.00 . . .
4 1004 1.00 . . . . 1.00 . .
5 1005 1.00 . 1.00 1.00 . . . .
6 1006 1.00 . . . 1.00 1.00 . .
Normal (with
7 1007 1.00 1.00 1.00 . . . . .
surchrg)
8 1008 1.00 1.00 . 1.00 . . . .
9 1009 1.00 1.00 . . 1.00 . . .
10 1010 1.00 1.00 . . . 1.00 . .
11 1011 1.00 1.00 1.00 1.00 . . . .
12 1012 1.00 1.00 . . 1.00 1.00 . .
Env Wind (w/o
13 1013 1.00 . 1.00 . . . 1.00 .
surchrg)
14 1014 1.00 . . 1.00 . . 1.00 .
15 1015 1.00 . . . 1.00 . 1.00 .
16 1016 1.00 . . . . 1.00 1.00 .
17 1017 1.00 . 1.00 1.00 . . 1.00 .
18 1018 1.00 . . . 1.00 1.00 1.00 .
Env Wind (with
19 1019 1.00 1.00 1.00 . . . 1.00
surchrg)
20 1020 1.00 1.00 . 1.00 . . 1.00
21 1021 1.00 1.00 . . 1.00 . 1.00
22 1022 1.00 1.00 . . . 1.00 1.00
23 1023 1.00 1.00 1.00 1.00 . . 1.00
24 1024 1.00 1.00 . . 1.00 1.00 1.00
Env EQ (w/o
25 1025 1.00 . 1.00 . . . 1.00
surchrg)
26 1026 1.00 . . 1.00 . . 1.00
27 1027 1.00 . . . 1.00 . 1.00
28 1028 1.00 . . . . 1.00 1.00
29 1029 1.00 . 1.00 1.00 . . 1.00
30 1030 1.00 . . . 1.00 1.00 1.00
31 1031 1.00 . 1.00 . . .
SOLU CORRIDOR 132kV TRANSMISSION LINE PROJECT

COUNTERFORT RETAINING WALL - ANALYSIS & DESIGN

FOR 132/33/11 kV TINGLA SUB-STATION

32 1032 1.00 . . 1.00 . .


33 1033 1.00 . . . 1.00 .
34 1034 1.00 . . . . 1.00
35 1035 1.00 . 1.00 1.00 . .
36 1036 1.00 . . . 1.00 1.00
37 1037 1.00 . 1.00 . . . -1.00
38 1038 1.00 . . 1.00 . . -1.00
39 1039 1.00 . . . 1.00 . -1.00
40 1040 1.00 . . . . 1.00 -1.00
41 1041 1.00 . 1.00 1.00 . . -1.00
42 1042 1.00 . . . 1.00 1.00 -1.00
43 1043 1.00 . 1.00 . . .
44 1044 1.00 . . 1.00 . .
45 1045 1.00 . . . 1.00 .
46 1046 1.00 . . . . 1.00
47 1047 1.00 . 1.00 1.00 . .
48 1048 1.00 . . . 1.00 1.00
SOLU CORRIDOR 132kV TRANSMISSION LINE PROJECT

COUNTERFORT RETAINING WALL - ANALYSIS & DESIGN

FOR 132/33/11 kV TINGLA SUB-STATION

Env EQ (with
49 1049 1.00 1.00 1.00 . . . 1.00
surchrg)
50 1050 1.00 1.00 . 1.00 . . 1.00
51 1051 1.00 1.00 . . 1.00 . 1.00
52 1052 1.00 1.00 . . . 1.00 1.00
53 1053 1.00 1.00 1.00 1.00 . . 1.00
54 1054 1.00 1.00 . . 1.00 1.00 1.00
55 1055 1.00 1.00 1.00 . . .
56 1056 1.00 1.00 . 1.00 . .
57 1057 1.00 1.00 . . 1.00 .
58 1058 1.00 1.00 . . . 1.00
59 1059 1.00 1.00 1.00 1.00 . .
60 1060 1.00 1.00 . . 1.00 1.00
61 1061 1.00 1.00 1.00 . . . -1.00
62 1062 1.00 1.00 . 1.00 . . -1.00
63 1063 1.00 1.00 . . 1.00 . -1.00
64 1064 1.00 1.00 . . . 1.00 -1.00
65 1065 1.00 1.00 1.00 1.00 . . -1.00
66 1066 1.00 1.00 . . 1.00 1.00 -1.00
67 1067 1.00 1.00 1.00 . . .
68 1068 1.00 1.00 . 1.00 . .
69 1069 1.00 1.00 . . 1.00 .
70 1070 1.00 1.00 . . . 1.00
71 1071 1.00 1.00 1.00 1.00 . .
72 1072 1.00 1.00 . . 1.00 1.00
CORRIDOR 132kV TRANSMISSION LINE PROJECT

RT RETAINING WALL - ANALYSIS & DESIGN

FOR 132/33/11 kV TINGLA SUB-STATION

OAD COMBINATION FOR SERVICEABILITY


9
EQZ

.
.
.
.
.

.
.
.
.
.

.
.
.
.
.

1.00
CORRIDOR 132kV TRANSMISSION LINE PROJECT

RT RETAINING WALL - ANALYSIS & DESIGN

FOR 132/33/11 kV TINGLA SUB-STATION

1.00
1.00
1.00
1.00
1.00

-1.00
-1.00
-1.00
-1.00
-1.00
-1.00
CORRIDOR 132kV TRANSMISSION LINE PROJECT

RT RETAINING WALL - ANALYSIS & DESIGN

FOR 132/33/11 kV TINGLA SUB-STATION

1.00
1.00
1.00
1.00
1.00
1.00

-1.00
-1.00
-1.00
-1.00
-1.00
-1.00
SOLU CORRIDOR 132kV TRANSMISSION LINE PROJECT

COUNTERFORT RETAINING WALL - ANALYSIS & DESIGN

FOR 132/33/11 kV TINGLA SUB-STATION

FACTORED LOAD COMBINATION FOR RCC DESIGN


Load Sr. Load 1 2 3 4 5 6 7 8 9
Conditions No. Comb DL SR SL1IN SL1OUT SL2IN SL2OUT WL EQX EQZ
Normal (w/o
1 2001 1.50 . 1.50 . . . . . .
surchrg)
2 2002 1.50 . . 1.50 . . . . .
3 2003 1.50 . . . 1.50 . . . .
4 2004 1.50 . . . . 1.50 . . .
5 2005 1.50 . 1.50 1.50 . . . . .
6 2006 1.50 . . . 1.50 1.50 . . .
Normal (with
7 2007 1.50 1.50 1.50 . . . . . .
surchrg)
8 2008 1.50 1.50 . 1.50 . . . . .
9 2009 1.50 1.50 . . 1.50 . . . .
10 2010 1.50 1.50 . . . 1.50 . . .
11 2011 1.50 1.50 1.50 1.50 . . . . .
12 2012 1.50 1.50 . . 1.50 1.50 . . .
Env Wind (w/o
13 2013 1.50 . 1.50 . . . 1.50 . .
surchrg)
14 2014 1.50 . . 1.50 . . 1.50 . .
15 2015 1.50 . . . 1.50 . 1.50 . .
16 2016 1.50 . . . . 1.50 1.50 . .
17 2017 1.50 . 1.50 1.50 . . 1.50 . .
18 2018 1.50 . . . 1.50 1.50 1.50 . .
Env Wind (with
19 2019 1.50 1.50 1.50 . . . 1.50
surchrg)
20 2020 1.50 1.50 . 1.50 . . 1.50
21 2021 1.50 1.50 . . 1.50 . 1.50
22 2022 1.50 1.50 . . . 1.50 1.50
23 2023 1.50 1.50 1.50 1.50 . . 1.50
24 2024 1.50 1.50 . . 1.50 1.50 1.50
Env EQ (w/o
25 2025 1.50 . 1.50 . . . 1.50
surchrg)
26 2026 1.50 . . 1.50 . . 1.50
27 2027 1.50 . . . 1.50 . 1.50
28 2028 1.50 . . . . 1.50 1.50
29 2029 1.50 . 1.50 1.50 . . 1.50
30 2030 1.50 . . . 1.50 1.50 1.50
31 2031 1.50 . 1.50 . . . 1.50
SOLU CORRIDOR 132kV TRANSMISSION LINE PROJECT

COUNTERFORT RETAINING WALL - ANALYSIS & DESIGN

FOR 132/33/11 kV TINGLA SUB-STATION

32 2032 1.50 . . 1.50 . . 1.50


33 2033 1.50 . . . 1.50 . 1.50
34 2034 1.50 . . . . 1.50 1.50
35 2035 1.50 . 1.50 1.50 . . 1.50
36 2036 1.50 . . . 1.50 1.50 1.50
37 2037 1.50 . 1.50 . . . -1.50
38 2038 1.50 . . 1.50 . . -1.50
39 2039 1.50 . . . 1.50 . -1.50
40 2040 1.50 . . . . 1.50 -1.50
41 2041 1.50 . 1.50 1.50 . . -1.50
42 2042 1.50 . . . 1.50 1.50 -1.50
43 2043 1.50 . 1.50 . . . -1.50
44 2044 1.50 . . 1.50 . . -1.50
45 2045 1.50 . . . 1.50 . -1.50
46 2046 1.50 . . . . 1.50 -1.50
47 2047 1.50 . 1.50 1.50 . . -1.50
48 2048 1.50 . . . 1.50 1.50 -1.50
SOLU CORRIDOR 132kV TRANSMISSION LINE PROJECT

COUNTERFORT RETAINING WALL - ANALYSIS & DESIGN

FOR 132/33/11 kV TINGLA SUB-STATION

Env EQ (with
49 2049 1.50 1.50 1.50 . . . 1.50
surchrg)
50 2050 1.50 1.50 . 1.50 . . 1.50
51 2051 1.50 1.50 . . 1.50 . 1.50
52 2052 1.50 1.50 . . . 1.50 1.50
53 2053 1.50 1.50 1.50 1.50 . . 1.50
54 2054 1.50 1.50 . . 1.50 1.50 1.50
55 2055 1.50 1.50 1.50 . . . 1.50
56 2056 1.50 1.50 . 1.50 . . 1.50
57 2057 1.50 1.50 . . 1.50 . 1.50
58 2058 1.50 1.50 . . . 1.50 1.50
59 2059 1.50 1.50 1.50 1.50 . . 1.50
60 2060 1.50 1.50 . . 1.50 1.50 1.50
61 2061 1.50 1.50 1.50 . . . -1.50
62 2062 1.50 1.50 . 1.50 . . -1.50
63 2063 1.50 1.50 . . 1.50 . -1.50
64 2064 1.50 1.50 . . . 1.50 -1.50
65 2065 1.50 1.50 1.50 1.50 . . -1.50
66 2066 1.50 1.50 . . 1.50 1.50 -1.50
67 2067 1.50 1.50 1.50 . . . -1.50
68 2068 1.50 1.50 . 1.50 . . -1.50
69 2069 1.50 1.50 . . 1.50 . -1.50
70 2070 1.50 1.50 . . . 1.50 -1.50
71 2071 1.50 1.50 1.50 1.50 . . -1.50
72 2072 1.50 1.50 . . 1.50 1.50 -1.50
AD COMBINATION FOR RCC DESIGN
Shear Membrane Bending Moment
Plate L/C SQX (local SQY (local SX (local) SY (local) SXY (local Mx kN-m/ My kN-m/
Max Qx 363 2008 (1.50 0.316 0.05 0.025 0.309 0.368 38.787 7.619
Min Qx 662 2008 (1.50 -0.316 0.05 0.025 0.309 -0.368 38.787 7.619
Max Qy 738 2008 (1.50 0.193 0.099 0.016 0.35 0.18 -0.714 -2.56
Min Qy 703 2008 (1.50 -0.011 -0.363 0.198 0.216 -0.05 1.602 31.471
Max Sx 703 2008 (1.50 -0.011 -0.363 0.198 0.216 -0.05 1.602 31.471
Min Sx 712 2009 (1.50 -0.007 0.006 -0.144 0.002 -0.011 -23.463 1.163
Max Sy 360 2008 (1.50 -0.15 -0.076 -0.037 0.964 0.428 4.424 12.067
Min Sy 670 2014 (1.50 -0.01 0.078 -0.037 -0.4 0.038 -1.331 -3.656
Max Sxy 360 2008 (1.50 -0.15 -0.076 -0.037 0.964 0.428 4.424 12.067
Min Sxy 659 2008 (1.50 0.15 -0.076 -0.037 0.964 -0.428 4.424 12.067
Max Mx 663 2008 (1.50 -0.303 0.016 0.027 0.226 -0.352 41.97 9.521
Min Mx 708 2008 (1.50 -0.007 0.031 0.008 0.185 -0.023 -31.623 -9.093
Max My 703 2009 (1.50 -0.011 -0.295 0.191 0.187 -0.044 3.293 32.113
Min My 706 2008 (1.50 -0.005 -0.01 0.061 0.275 -0.033 -28.531 -18.239
Max Mxy 22 2008 (1.50 -0.022 -0.136 0.087 0.461 -0.009 -9.529 -4.809
Min Mxy 726 2008 (1.50 0.022 -0.136 0.087 0.461 0.009 -9.529 -4.809
Mxy kN-m/m
-2.324
2.324
-10.954
-0.337
-0.337
-0.663
-6.409
-1.537
-6.409
6.409
0.178
-0.994
0.047
-1.553
15.952
-15.952
Shear Membrane Bending Moment
Plate L/C SQX (local SQY (local SX (local) SY (local) SXY (local Mx kN-m/ My kN-m/
Max Qx 357 2008 (1.50 0.354 -0.033 0 0 0 -53.876 -1.894
Min Qx 606 2008 (1.50 -0.354 -0.033 0 0 0 -53.876 -1.894
Max Qy 375 2008 (1.50 -0.014 0.312 0 0 0 -33.189 -167.493
Min Qy 583 2014 (1.50 -0.004 -0.128 0 0 0 11.458 56.318
Max Sx 788 2001 (1.50 -0.002 0.007 0 0 0 -0.006 -0.922
Min Sx 788 2001 (1.50 -0.002 0.007 0 0 0 -0.006 -0.922
Max Sy 788 2001 (1.50 -0.002 0.007 0 0 0 -0.006 -0.922
Min Sy 788 2001 (1.50 -0.002 0.007 0 0 0 -0.006 -0.922
Max Sxy 788 2001 (1.50 -0.002 0.007 0 0 0 -0.006 -0.922
Min Sxy 788 2001 (1.50 -0.002 0.007 0 0 0 -0.006 -0.922
Max Mx 586 2008 (1.50 -0.657 0.033 0 0 0 160.831 12.23
Min Mx 626 2008 (1.50 -0.017 -0.041 0 0 0 -119.571 -6.244
Max My 582 2014 (1.50 -0.04 -0.194 0 0 0 17.026 96.876
Min My 582 2008 (1.50 0.125 0.448 0 0 0 -41.693 -266.876
Max Mxy 648 2008 (1.50 0.11 -0.716 0 0 0 -9.063 -131.283
Min Mxy 98 2008 (1.50 -0.11 -0.716 0 0 0 -9.063 -131.283
Mxy kN-m/m
17.406
-17.406
0.317
-0.165
-0.181
-0.181
-0.181
-0.181
-0.181
-0.181
-9.405
0.471
2.226
-10.115
56.218
-56.218
Horizontal Vertical Horizontal Moment
Node L/C Fx kN Fy kN Fz kN Mx kN-m My kN-m Mz kN-m
Max Fx 1 1002 (DL + 65.649 7.326 -5.418 0 7.94 0
Min Fx 110 1002 (DL + -42.712 9.058 18.566 0 -12.898 0
Max Fy 168 1001 (DL + 0 30.741 0 0 0 0
Min Fy 125 1002 (DL + 0 0.367 0 0 0 0
Max Fz 110 1002 (DL + -42.712 9.058 18.566 0 -12.898 0
Min Fz 174 1002 (DL + -42.712 9.058 -18.566 0 12.898 0
Max Mx 1 1001 (DL + 60.505 10.438 -5.515 0 7.397 0
Min Mx 1 1001 (DL + 60.505 10.438 -5.515 0 7.397 0
Max My 175 1002 (DL + 28.837 10.796 -7.215 0 13.022 0
Min My 112 1002 (DL + 28.837 10.796 7.215 0 -13.022 0
Max Mz 1 1001 (DL + 60.505 10.438 -5.515 0 7.397 0
Min Mz 1 1001 (DL + 60.505 10.438 -5.515 0 7.397 0
Plate depth dry Pr water
0 0 0
0.5 0.61 3.96 5
1 1.22 7.92 10
1.5 1.83 11.88 15
2 2.44 15.84 20
2.5 3.06 19.8 0
3 3.67 23.76 5
3.5 4.28 27.72 10
4 4.89 31.68 15
4.5 5.50 35.64 20
5.5 5 6.11 39.6 25
5.5 6.72 43.56 30

H = 5.5
Ydry = 18
Ka = 0.44
Ywet = 20
Ywater = 10

43.56
8.96
17.92
26.88
35.84
19.8
28.76
37.72
46.68
55.64
64.6
73.56

Das könnte Ihnen auch gefallen