Beruflich Dokumente
Kultur Dokumente
2 Strainer
Material Critical Chemical/Physical One per Approved drg Approved drg Fouondary - - -
Heat SPX080516/ IBR Form SPX080516/ IBR Form Certificate or
IIIC & Form IIIA IIIC & Form IIIA Certificate
GIRS
3 Safety Valve Size & Set Pr. Critical Verification of 100% As per Appd. Data As per Appd. Data TC - - - N/A
Documents Sheet / Drawing Sheet / Drawing
4 Stop Valve Size & Details Critical Verification of 100% -do- -do- TC - - -
Documents
6 Pipe / Flanges / Nut & Material Critical Chemical / Physical 1/heat -do- -do- GIRS 3 - 2
Bolts Analysis
7 Material Inspection Material Critical Chemical/Physical 100% Approved Drawing Approved Drawing Report 3/2 - 2 AS PER IBR
Analysis Spec.
8 Track Weld Set Up Dimensions Major Dimentional 100% Approved Drawing Approved Drawing SIR 3/2 2 2 AS PER IBR
9 PRS Piping Welding Weld Soundness Major Hydraulic Test 1.5 100% As per Drawing As per Drawing SIR 2 2 2/1 AS PER IBR *BY-PASS HYDRO
times Max. Working SHALL BE SHOWN SEPARETLY.
Pr.
10 PRS Assembly Dimensions Major Dimentional 100% Approved Drawing Approved Drawing SIR 2 2 2/1 AS PER IBR
" #$%&! '()*!*!
$
+, ,"-#
!