ACTION PLAN
Name of Teacher: CORAZON G. BACSAL Name of Project: Beautification and Sanitation Program
School: Calbiga National High School Time Frame: April 2012-May 2014
Location: Barangay Polangi, Calbiga, Samar

Major Phases Activities/Strategies Time Frame Persons Involved Success Indicator Means of Verification
st
I. PRE-PLANNING Conduct 1 2 weeks of April Barangay Folk and 100% accomplished A list of what the
PHASE survey/interview 2012 Officials barangay need
regarding barangay
needs
Reports to the
Barangay Chairman as
a courtesy call
Presents A copy of the action
plans/projects to the plan
Barangay Officials
II. PLANNING PHASE Coordinate with Last 2 weeks of April Barangay Folks and Barangay Assembly A copy of the minutes
barangay folks and 2012 Officials conducted
officials
Conducts a barangay
assembly regarding
plans and projects
III. IMPLEMENTATION Conduct sanitation May 2012 to April Barangay Officials, 100% accomplished Pictorials
PHASE drive throughout the 2014 Folks and Volunteers
barangay (Pintakasi)
Facilitate in the
construction of
uniform front fences.
Manage in the
planting hedges,
flowering plants, and
other on vacant lots.
Monitors the
maintenance of the
projects.
Facilitates in the May 2012 to April Barangay Officials, 100% accomplished Pictorials
conduct of Barangay 2014 Folks and Volunteers
Assembly
Manages in the
rehabilitation fences
and plants
Facilitates in the
construction of
Signboards for the
sanitation and
orderliness of the
barangay
Manages in putting
up signboards
Monitors and
facilitates in the
maintenance of the
project
IV. EVALUATION Evaluates the November to Barangay Officials and 95% success Observation checklist
PHASE importance and December 2013 Project Coordinator
necessity of the
projects and study
V. POST-EVALUATION Recommends another May 2014 Barangay Officials and 95% success Recommendation
PHASE project to be installed Folks, School Head letter
or constructed after and Project
this project Coordinator

Prepared and Submitted by:

CORAZON G. BACSAL
Chairman/Project Coordinator

APPROVED:

MARIA MAGINA L. OCENAR


Barangay Chairman

ANTONIO F. CAVEIRO
Secondary School Principal III

Das könnte Ihnen auch gefallen