Project Spreadsheets to BS 8110 The Concrete Centre

Client BigBucks PLC Made by Date Page


Location Pilecap C10 Rod 24-Jul-17 28
6 Pile Cap
PILECAP DESIGN to BS 8110:2005 Checked Revision Job No
Originated from RCC82.xls v 4.1 on CD 2006 TCC - - P2000

Cap load = 101.2 kN OVERTURNING MOMENTS - kNm characteristic


DEAD IMPOSED WIND
Mx 19.2 5.3 2.1
My 23.4 10.7 5.3
PILE REACTIONS kN
PILE 1 PILE 2 PILE 3 PILE 4 PILE 5 PILE 6
Gk + Qk 141.2 153.8 147.8 160.3 154.3 166.9 .
Gk + Qk +Wk 144.2 157.9 151.8 165.5 159.4 173.0 .
.4Gk + 1.6Qk 204.0 222.2 213.6 231.8 223.2 241.3
Gk + 1.4Wk 112.6 124.0 118.6 129.9 124.5 135.9 .
(Gk+Qk+Wk) 172.2 188.5 181.3 197.6 190.3 206.7

BENDING MOMENTS - kNm


1.4Gk + 1.6Qk Gk + 1.4Wk 1.2(Gk+Qk+Wk)
My v of col 511.5 283.9 432.9
My ^ of col 557.5 312.4 476.5 (including tolerance)
My < of col 400.5 222.3 339.9
My > of col 434.5 243.6 370.6

E-W STEEL BOTTOM TOP N-S STEE BOTTOM TOP


16 16 16 16
M = 434.5 0.0 M = 557.5 0.0 K' = 0.1558
b = 3300 3300 b = 2000 2000 min As = 0.13%
d = 551.0 576.0 d = 567.0 592.0
K = 0.0124 0.0000 K = 0.0248 0.0000
z = 523.5 547.2 z = 538.7 562.4
As = 1909 0 As = 2380 0
Provide 2789 0 Provide 2380 0
No = 14 8 No = 12 5
As prov = 2815 1608 As prov = 2413 1005
fs = 226 8 H16 T2 fs = 329 5 H16 T1
Max clear S = 284.0 Max clear S = 284.0
Min clear S = 25.0 Min clear S = 25.0
Clear S = 227.1 Clear S = 153.1
14 H16 B2 12 H16 B1

BEAM SHEAR Critical section is 112.5 mm from pile centres


EW (NS plane) 12 links
V = 695.3 v = 0.3824 As% = 0.155 .
av = 362.5 1.5d/av = 0.8655 (v - vc)b = 1320.0
No of legs = 8 Spacing = 275 8 Legs H12 @ 275 LINKS
NS (EW plane)
V = 464.6 v = 0.4097 As% = 0.213 .
av = 937.5 vc = 0.4221 (v - vc)b = 800.0
No of legs = 5 Spacing = 300 5 Legs H12 @ 300 LINKS

PUNCHING Column Face No other critical section


V= 1194.4 = 6504 d ave = 559
v= 1.257 v = 0.000 av = 537.5
v max = 4.733 ok 1.5d/av = 0.627 ok