Sie sind auf Seite 1von 18

REPORTON

STRUCTURALANALYSIS
IWOBOWTHRUSTER



Rev. Description Date Prepared Review

Issuedfor:APPROVAL
Client: Project:
GRANDWELD 35MCRANEWORKBOAT

Doc# DocumentTitle: Prepared VEENA



CFZC137008602 REPORTONSTRUCTURALANALYSIS Review1 NITESH
IWOBOWTHRUSTER

Size Sheet Date Review2 SUBHRA


Scale

NTS A4 1of18 09112013

PO Box : 9243
Bldg Z, Suite - 40. SAIF Zone ,
Sharjah , United Arab Emirates.
E-mail : uae@cybermarine.net
Website : www.cybermarine.net


GRANDWELD

INDEX
1.0 EXECUTIVE SUMMARY 3
2.0 RULES AND REFERENCE 3
3.0 CONCEPT NOTE 3
4.0 MODEL DESCRIPTION 4
4.1 COORDINATE SYSTEM 4
4.2 BOUNDARY CONDITION 5
5.0 MODEL PROPERTIES 6
5.1 LOAD DESCRIPTION 8
6.0 ACCEPTANCE CRITERIA 11
7.0 RESULT 11
8.0 CONCLUSION 12
9.0 APPENDIX A- STRESS PLOTS AND DEFLECTION 13

CybermarineFZC. Page2of18

GRANDWELD

1.0 EXECUTIVE SUMMARY


The owner intends to check the strength of structure IWO bow thruster to be installed
between frame no. 0 to frame no. 4 of vessel named 35m Crane Work Boat.
Cybermarine has been asked to carry out the structural analysis of the structure iwo bow
thruster.

Accordingly a structural analysis has been carried out. It has been found that structure
can withstand the Induced loads.

2.0 RULES AND REFERENCE


LR Rules.

American Institute of Steel Construction (AISC), 9th edition

3.0 CONCEPT NOTE


This document contains the Structural Analysis of the supporting structure IWO bow
thruster of Vessel named 35m Crane Work Boat.

The objective of the analysis is to verify that structure can withstand the induced loads.

Analysis of the structure had been carried out by the Structural Analysis Software; Genie
5.0-15

CybermarineFZC. Page3of18

GRANDWELD

4.0 MODEL DESCRIPTION


The structure is modeled as Combination of 2D Finite elements and space frames.

3D MODEL

Main Dck

4500mm
Off CL

CL

Fr#0

Fr#4

4.1 COORDINATE SYSTEM

+X STBD Side
+Y Forward
+Z Upwards

CybermarineFZC. Page4of18

GRANDWELD

4.2 BOUNDARY CONDITION

Fx=Fy=Fixed
Fz=Mx=My=Mz=Free

CybermarineFZC. Page5of18

GRANDWELD

5.0 MODEL PROPERTIES:-

MODEL THICKNESS:-

Unit: m

Unit: m

CybermarineFZC. Page6of18

GRANDWELD

BEAM PROPERTIES:-

MATERIAL:-

CybermarineFZC. Page7of18

GRANDWELD

5.1 LOAD DESCRIPTION

Loads considered in the analysis are as follows:

STRUCTURE SELF WEIGHT

Acceleration m/s2
Roll Pitch g + Heave
0 0 -9.81

STEERING TORQUE (29000 N-m)

Fz=29000 N-m

CybermarineFZC. Page8of18

GRANDWELD

LOAD CONDITION: THRUST LOAD

Rb = 376000 N

Ra=546000 N

Note : Loads are taken from the Thruster arrangement drawing.

CybermarineFZC. Page9of18

GRANDWELD

BOUYANT FORCE (30165.75 N/m^2)

30165.75 N/m^2

CybermarineFZC. Page10of18

GRANDWELD

6.0 ACCEPTANCE CRITERIA

The allowable stress according to LR rules is as follows:

Static condition:

Yield Stress FOS Allowable Von Mises Stress


Material
t/cm2 (x108 N/m2)
(x108 N/m2)
Mild Steel 2.4 (2.35) 1.43 2.11

Yield Stress FOS Allowable Beam Stress


Material
t/cm2 (x108 N/m2)
(x108 N/m2)
Mild Steel 2.4 (2.35) 1.25 1.88

7.0 RESULT
Summary of Von mises stress:

Yield Stress FOS Allowable Von Mises Stress Induced Von Mises
Material
t/cm2 (x108 N/m2) Stresses(x10^8 N/m^2)
(x108 N/m2)
1.88
Mild Steel 2.4 (2.35) 1.43 2.11

Summary of Beam stress:

Yield Stress FOS Allowable Beam Stress Induced Beam Stresses


Material
t/cm2 (x108 N/m2) (x10^8 N/m^2)
(x108 N/m2)
1.1
Mild Steel 2.4 (2.35) 1.25 1.88

CybermarineFZC. Page11of18

GRANDWELD

8.0 CONCLUSION

The stresses in the structure IWO bow thruster are well within the permissible stresses.

CybermarineFZC. Page12of18

GRANDWELD

9.0 APPENDIX A- STRESS PLOTS AND DEFLECTION


STRESS PLOTS
Von Mises Stresses- Lower Layer

CybermarineFZC. Page13of18

GRANDWELD

Von Mises Stresses- Upper Layer

CybermarineFZC. Page14of18

GRANDWELD

CybermarineFZC. Page15of18

GRANDWELD

CybermarineFZC. Page16of18

GRANDWELD

CybermarineFZC. Page17of18

GRANDWELD

DEFLECTION

CybermarineFZC. Page18of18

Das könnte Ihnen auch gefallen