Beruflich Dokumente
Kultur Dokumente
PROCEDURE
At a section of straight road
1. The layout of the study area is selected and sketched. The area selected is a
strategic location (safe of enumerator). Obstructed location is avoided.
2. Each enumerator concentrated on each lane and one-direction flow.
3. The volumes of the observed vehicles is recorded and determined using tally
counter according to class of vehicle in every 15 minutes for 1 hour time. The
counter is reset to the zero before resume counting.
RESULT:
Survey Station: Masjid Uniten
Direction: INBOUND
From: Bangi To: Mines
Enumerator: Liew Zhan Hang Date: 21.12.2016
Time: 4.00pm - 5.00pm Weather: Sunny
Table 1:
VEHICLE CLASSIFICATION
Direction
TIME
Movement
Car/Taxi Van/LGV MGV HGV Bus M/Cycle Pedal Others
4.00-
295 15 19 0 1 65 0 0
4.15pm
4.15-
374 19 11 2 0 82 0 0
STRAIGHT 4.30pm
ROAD
SECTION 4.30-
432 12 17 2 1 95 0 0
4.45pm
4.45-
518 17 20 0 1 132 0 0
5.00pm
From Bangi
800 688
559
Traffic Volume
600 488
395
400
200
0
15 30 45 60
Minutes
Survey Station: Masjid Uniten
Direction: OUTBOUND
From: Mines To: Bangi
Enumerator: Lim Yin Joon Date: 21.12.2016
Time: 4.00pm - 5.00pm Weather: Sunny
Table 1:
VEHICLE CLASSIFICATION
Direction
TIME
Movement
Car/Taxi Van/LGV MGV HGV Bus M/Cycle Pedal Others
4.00-
175 8 21 2 1 72 0 0
4.15pm
4.15-
231 20 18 2 0 84 0 0
STRAIGHT 4.30pm
ROAD
SECTION 4.30-
254 11 21 0 0 102 0 0
4.45pm
4.45-
260 15 25 2 1 140 0 0
5.00pm
From Bangi
500 443
388
355
Traffic Volume
400
279
300
200
100
0
15 30 45 60
Minutes
PROPOTIONS of VOLUME BY TYPE of
M/Cycle, 772, 22%
VEHICLES
Other,
Pedal, 0, 0%
Bus, 5, 0%
HGV, 10, 0%
MGV, 152, 4%
1000 947
843
Traffic Volume
800
674
600
400
200
0
15 30 45 60
Minutes
ANALYSIS
From the result we get, cars & taxi own the majority and motorcycle comes
second. We get a total number of 3595 in an hour surveying, 71% is car & taxi, 22% is
motorcycles. Both car & motorcycle already covered 93% of the total vehicle passing
through. The Inbound road have a total of 2130 vehicles passing by. Whereas the Outbound
road have a total of 1465 vehicles. 5pm is the peak hour when every employee get back
from work. The vehicles increase simultaneously when it gets nearer to the peak hour.