SECTION-II
SCOPE OF WORK
Page 1 of 4
160,000 MTPA Zinc Residue Fuming Project
Page 1 of 3
160,000 MTPA Zinc Residue Fuming Project
2.5.2 In regard to structural works being executed by NFC, all necessary works like
fabrication, sand blasting, painting, erection and final painting shall be considered as
part of NFCs scope of work.
2.8.0 TRAINING
NFC will undertake the training for HZLs staffs in the similar smelter in China (Qujing /
Huize Smelter) and at site on operation and maintenance during start-up of the plant.
After the training HZLs staffs shall have adequate skill to handle the operation and
maintenance work for running the plant.
2.10.0 The vehicles for handling the materials, consumable and other products for plant
operation, like frontend loaders and fork lifts are not in the scope of supply.
Page 2 of 3
160,000 MTPA Zinc Residue Fuming Project
HZL will prepare necessary design input in accordance with NFCs requests, such like,
the concentrate and all other feed material assays, climate conditions, geological
investigation drawings, topographical diagram, seismic information, Indian mandatory
regulations and standards involved in this project and etc. The detailed requirements
for the design input information will be submitted to HZL before kick-off meeting. HZL
shall take the responsibilities for the correctness and accuracy of the design input
information.
HZL will provide the necessary drawings of existing plant for interfacing &
modification. If the drawings are not available, HZL shall provide the engineering
inputs required.
Page 3 of 3