Sie sind auf Seite 1von 5

Guangzhou Zhuoyuan Machinery Co.

,Ltd
Add: No.8 Limin Street,Dalong village, Shiji Town, Panyu District,Guangzhou
Tel:86-20-66804352 Fax:86-20-66823620 Email: alex@xd-cinema.com
Website: http://www.xd-cinema.com

QUOTATION FOR 9 SEATS 9D CINEMA ELECTRIC SYSTEM


(CFR LAGOS USD)

To: Shola From: Alex


Email: olusholaaina@yahoo.com Email: alex@xd-cinema.com No.: ZY20150719
Mobile Phone: 00 2348120742825 Phone: 0086 13302300382 Date: 2015/7/19

No. SPECIFIATION & DESCRIPTION ITEM QTY. Related Effect

Inter Theater Equipment

Electric system for 9 persons


L*W*H: 2500 X 1600 X 2020 Vibration, Toss, Translation
moving load: 1000KG. normal Seats electric left and right, Backwards
1 max up and down: 260mm system 1 pitching, Drop up and down
max forward, back,left,right: 300mm (9 seats) leg tickler; ear wind; back
front and back pitch or side roll : 21 push; button poker
degree
turn degree:20 degree.

Flat Soft Metal Screen


, widescreen 169
2 Flat Soft Metal Screen 1
(professinoal suitable for your soom)

2.1 surround audio system Product


Features
3 Professional cinema sound system Audio System 1

Epson 3000 lumens


4 Projector 2
Standard resolution1024768

5 9D Special Double Hanger Of Projector Projector Hanger 1

Three-dimensional projection polarizer Three-dimensional


6 2
(Including frame) projection polarizer

9D glasses
Polarization degree: 97%; Transmission:
7 single 43 ( 1.5)%, parallel to 36 ( 1.5)%, 9D Glasses 50 FOR FREE
orthogonal "2%;
Left eye orthogonal mode: 45

1/5
Snow machine
8 Voltage: 230V/50Hz,Power: 1500w Snow Machine 1 Offer two bottle oil for free
With oil 5L

Bubble Machine
9 Power: 100W Bubble Machine 1 Offer two bottle oil for free
With oil 5L

Strobe Machine
10 Power: 1500W Lightning Machine 1 lighting

Wind Machine
11 Low noise fan,Power: 850W Wind Machine 1 wind

water machine
12 Voltage: 230V/50Hz,Power: 1500w Water spray machine 1 water

Smoke fog Machine


13 1500W Smoke/Fog 1 Offer two bottle oil for free
With oil 5L

14 leg Sweep Leg Sweep 9 Leg Sweep

15 ears blow Ears blow 9 Ears blow

16 vibration on the back of the seat Back push 9 Back vibration

2/5
17 vibration on the seat Butt poker 9 Bottom vibration

18 Frame lamp Fire 1

19 Air compressor, Power:1100W Air compressor 1

Controling Room Equipment

20 Monitor 19 inch LCD Display 1 19"

21 Installation Lines 1 set


Installation Lines

Effects Controller machine


Control thunder streak Simulation ,Water
mist spray simulation, Snowflake
Special Effects
22 simulation, Effects of water supply 1
Controller
system, Effects Bubble System, Effects
system accessories

Control computer for Flat-screen


Host computer with 9D
23 Include 9D Control software 1
control software

control box with 2


24 control box with servo motor 1
servo drivers

Now we provide 70 high


definition movies. After
25 9D movies for flat screen 9D movies 70 shipment, we update 2 new
movies for you during one
year.

Total: $17,300

3/5
Spare parts

solenoid valve for controlling leg


26 solenoid valve 2 $30
sweep, and air blow of seats

27 Supporting axle 2 $40

screw for supporting


28 one supporting axle needs one screw 2 FOR FREE
axle

Motor for seat and back


29 2 $15
vibration

30 oil for snow machine Snow oil 4 $25

31 oil for bubble machine Bubble oil 4 $25

32 oil for smoke machine Smoke oil 4 $25

33 Cabin with size of 6X3X3 meter Cabin 1 $7,200

SHIPPING COST FROM GUANGZHOU TO LAGOS US$2,200.00

TOTAL PRICE FOR 9 SEATS 9D ELECTRIC CINEMA US$27,170.00


1. The above picture is for reference only.
2. The quotation of 9D Cinema is for 9 seats, ELECTRIC system based on CFR Lagos term, without freight and tax.

3.Total 11 Special Effects:


Leg Tickler; Ear wind, Back push, Butt poker ;Water-spray effect; Snow Effects;Bubble Effects; Wind Effects;Lighting Effect; Smog Effect; Fire effect.

4. Offer validity: 30 days.


5. Lead time : within 20 days after the receipt of deposit
6. Payment terms: All by T/T (30% deposit,70% balance before loading container)

4/5
7. Warranty: full one year factory warranty (during the period of warranty customer will get maintanence for free, and we will offer you the damaged
keyparts for free within warranty period excluding projection screen and the lamp of projectors).

8.Packing: All the equipments are packed by seal wood box ready for transportation.

9.Installation (we offer you three options)


A:You can come to our factory in person or send your technicians, we have our professional technicians teaching you how to install and operate 9D and
offering you trainnings.
B:Send you installation instructions, pictures and videos showing you the installation of 9D step by step.
C: We are very experienced in overseas installation by dispatching our technician to your location to complete the installation of 9D. normally we send
one technician and takes 3 to 5 days for installation.But for the fees like visa, round-trip tickets, acommodation of our technician should be taken in
customer's account. And for the installation fee, 80 dollars per day for each technician.
Bank information:
BeneficiaryGuangzhou Zhuoyuan Machinery Co., LTD
Account No.: 7003 6378 6495
BankBank of China GuangDong Branch Guangzhou panyu Sub-Branch
Swift Code: BKCHCNBJ400

5/5

Das könnte Ihnen auch gefallen