Beruflich Dokumente
Kultur Dokumente
SIDE A
Flex media/Installation 20 x 10 (6m x 3m) N90,000
Iron Maintenance and Painting N20,000 N110,000
SIDE B
Flex media & installation 20 x 10 (6m x 3m) N90,000
Iron Maintenance and Painting N20,000 N110,000
MIDDLE ROOFTOP (WALKWAY)
Flex Media 8.1m x 1.5m 12.1m x 5000(60,500)
Tensioning/installation
Construction of structure with
5.0 mm angle iron 8.1m x 1.5m N105,000
N165,500
All branding will be completed within 7 days with 75% advance and 25% payment on completion.
Idris Musa
Brand Manager