12th July, 2017

QUAOTATION FOR THE CONSTRUCTION OF BILL BOARD & FLEX


REPLACEMENT AT THE CONSTITUENCY OFFICE OF THE SENATE PRESIDENT
FEDERAL REPUBLIC OF NIGERIA MANDATE HALL ILORIN

SPECIFICATION DIMENSION COST PRICE TOTAL

SIDE A
Flex media/Installation 20 x 10 (6m x 3m) N90,000
Iron Maintenance and Painting N20,000 N110,000
SIDE B
Flex media & installation 20 x 10 (6m x 3m) N90,000
Iron Maintenance and Painting N20,000 N110,000
MIDDLE ROOFTOP (WALKWAY)
Flex Media 8.1m x 1.5m 12.1m x 5000(60,500)
Tensioning/installation
Construction of structure with
5.0 mm angle iron 8.1m x 1.5m N105,000
N165,500

INNER COURTYARD (ROOF TOP)


Flex Media 34m x 2.4 m 81.6m x 5000(408,000)
Tensioning/installation
Construction of structure with N292,000
5.0 mm angle iron N700,000

GRAND TOTAL N1,085,000

All branding will be completed within 7 days with 75% advance and 25% payment on completion.

Thank you for your anticipated cooperation