Subcontractor shall submit an ITP which chronologically lists all relevant aspects covering the full scope
1.5 Performance
Subcontractor shall designate a competent representative familiar with all phases of fabrication and
administration to which Contractor may communicate at all times.
with related requirements (but not limited to) inspections, acceptance criteria, responsibilities and
Subcontractor shall employ only skilled and qualified craftsmen to perform all aspects of the work
including NDT and inspection.
verifying documents. For each relevant activity Subcontractor shall incorporate the kind of verification by
construction manager) experienced in structural steelwork.
allocating Hold, Witness, Monitoring or Review points for approval by Contractor and if applicable, the
Subcontractor shall designate during the work, at all times, competent supervision (e.g. foreman,
adhered to. Where the requirements of either the codes, standards, specifications, governmental laws or
the Certifying Authorities are more stringent than the requirements of this specification, the Subcontractor
shall adhere to these and inform Contractor accordingly.
1.7 Quality Management
The Subcontractor shall maintain an effective program for quality assurance and quality control, planned
with all manufacturing functions necessary to meet the requirements of the contract. The requirements
shall be met by the establishment and implementation of procedures which shall ensure that acceptable
product is delivered to Contractor. The program shall ensure that quality requirements are determined
prior to commencement of manufacture and subsequently satisfied throughout the phase of production
and delivery.
Subcontractor quality systems and quality control procedures shall be in accordance with ISO 9001 or an
approved equivalent and shall be submitted for the review and approval of Contractor