Sie sind auf Seite 1von 11

ONE FLATBUSH AVENUE PROPERTY, LLC.

(C/O SLATE PROPERTY


850 THIRD AVE, SUITE 16-B
NEW YORK, NY 10022
CONTACT PERSON:
PHONE NUMBER: 646-439-4000

DAYNA CEBUS CONSTRUCTION LLC


111 JOHN STREET, SUITE 220
NEW YORK, NY 10038
CONTACT PERSON:
PHONE NUMBER: 212-205-1437

AGILE RISK GROUP INCORPORATED


10 GLENWOOD AVENUE
STATEN ISLAND, NY 10301
CONTACT PERSON: DOMINICK R. DeRUBBIO
PHONE NUMBER: 917-561-6831

SITE SAFETY PLAN


for
1 FLATBUSH AVE
BROOKLYN, NY 11217

TITLE SHEET

REVIEWED BY
Sk Mohammad Ali
Assistant Plan Examiner
BEST Squad

APPROVED
Date: Aug
DATE: 06/30/2016
21, 2015

2D Site Safety Plans

NOTE: THIS PROJECT IS FILED SSP-001.00


IN COMPLIANCE WITH THE
2014 NYC BUILDING CODE.
ONE FLATBUSH AVENUE PROPERTY, LLC.
(C/O SLATE PROPERTY
850 THIRD AVE, SUITE 16-B
NEW YORK, NY 10022
CONTACT PERSON:
PHONE NUMBER: 646-439-4000

DAYNA CEBUS CONSTRUCTION LLC


111 JOHN STREET, SUITE 220
NEW YORK, NY 10038
CONTACT PERSON:
PHONE NUMBER: 212-205-1437

AGILE RISK GROUP INCORPORATED


10 GLENWOOD AVENUE
STATEN ISLAND, NY 10301
CONTACT PERSON: DOMINICK R. DeRUBBIO
PHONE NUMBER: 917-561-6831

SITE SAFETY PLAN


NYC
for
1 FLATBUSH AVE
BROOKLYN, NY 11217

GENERAL INFORMATION
AND NOTES SHEET

REVIEWED BY
Sk Mohammad Ali
Assistant Plan Examiner
BEST Squad

APPROVED AMENDED
Date: Aug
DATE: 06/30/2016
21, 2015

2D Site Safety Plans

SSP-002.01
ONE FLATBUSH AVENUE PROPERTY, LLC.
(C/O SLATE PROPERTY
850 THIRD AVE, SUITE 16-B
NEW YORK, NY 10022
CONTACT PERSON:
PHONE NUMBER: 646-439-4000

DAYNA CEBUS CONSTRUCTION LLC


111 JOHN STREET, SUITE 220
NEW YORK, NY 10038
CONTACT PERSON:
PHONE NUMBER: 212-205-1437

AGILE RISK GROUP INCORPORATED


10 GLENWOOD AVENUE
STATEN ISLAND, NY 10301
CONTACT PERSON: DOMINICK R. DeRUBBIO
PHONE NUMBER: 917-561-6831

SITE SAFETY PLAN


for
1 FLATBUSH AVE
BROOKLYN, NY 11217

SITE PLAN

REVIEWED BY
Sk Mohammad Ali
Assistant Plan Examiner
BEST Squad

APPROVED
Date: Aug
DATE: 06/30/2016
21, 2015

2D Site Safety Plans

SSP-003.00
ONE FLATBUSH AVENUE PROPERTY, LLC.
(C/O SLATE PROPERTY
850 THIRD AVE, SUITE 16-B
NEW YORK, NY 10022
CONTACT PERSON:
PHONE NUMBER: 646-439-4000

DAYNA CEBUS CONSTRUCTION LLC


111 JOHN STREET, SUITE 220
NEW YORK, NY 10038
CONTACT PERSON:
PHONE NUMBER: 212-205-1437

AGILE RISK GROUP INCORPORATED


10 GLENWOOD AVENUE
STATEN ISLAND, NY 10301
CONTACT PERSON: DOMINICK R. DeRUBBIO
PHONE NUMBER: 917-561-6831

SITE SAFETY PLAN


for
1 FLATBUSH AVE
BROOKLYN, NY 11217

SUPERSTRUCTURE
PHASE PLAN, 1st FLOOR

REVIEWED BY
Sk Mohammad Ali
Assistant Plan Examiner
BEST Squad

APPROVED AMENDED
Date: Aug
DATE: 06/30/2016
21, 2015

2D Site Safety Plans

SSP-004.01
ONE FLATBUSH AVENUE PROPERTY, LLC.
(C/O SLATE PROPERTY
850 THIRD AVE, SUITE 16-B
NEW YORK, NY 10022
CONTACT PERSON:
PHONE NUMBER: 646-439-4000

DAYNA CEBUS CONSTRUCTION LLC


111 JOHN STREET, SUITE 220
NEW YORK, NY 10038
CONTACT PERSON:
PHONE NUMBER: 212-205-1437

AGILE RISK GROUP INCORPORATED


10 GLENWOOD AVENUE
STATEN ISLAND, NY 10301
CONTACT PERSON: DOMINICK R. DeRUBBIO
PHONE NUMBER: 917-561-6831

PROPERTY/
BUILDING LINE

(RUNS UNDER SLAB)

SITE SAFETY PLAN


for
1 FLATBUSH AVE
BROOKLYN, NY 11217

SUPERSTRUCTURE
PHASE PLAN, ROOF

REVIEWED BY
Sk Mohammad Ali
Assistant Plan Examiner
BEST Squad

APPROVED
Date: Aug
DATE: 06/30/2016
21, 2015

2D Site Safety Plans

SSP-005.00
ONE FLATBUSH AVENUE PROPERTY, LLC.
(C/O SLATE PROPERTY
850 THIRD AVE, SUITE 16-B
NEW YORK, NY 10022
CONTACT PERSON:
PHONE NUMBER: 646-439-4000

DAYNA CEBUS CONSTRUCTION LLC


111 JOHN STREET, SUITE 220
NEW YORK, NY 10038
CONTACT PERSON:
PHONE NUMBER: 212-205-1437

AGILE RISK GROUP INCORPORATED


10 GLENWOOD AVENUE
STATEN ISLAND, NY 10301
CONTACT PERSON: DOMINICK R. DeRUBBIO
PHONE NUMBER: 917-561-6831

SITE SAFETY PLAN


for
1 FLATBUSH AVE
BROOKLYN, NY 11217

ELEVATIONS
HORIZONTAL NETS

REVIEWED BY
Sk Mohammad Ali
Assistant Plan Examiner
BEST Squad

APPROVED
Date: Aug
DATE: 06/30/2016
21, 2015

2D Site Safety Plans

SSP-006.00
ONE FLATBUSH AVENUE PROPERTY, LLC.
(C/O SLATE PROPERTY
850 THIRD AVE, SUITE 16-B
NEW YORK, NY 10022
CONTACT PERSON:
PHONE NUMBER: 646-439-4000

DAYNA CEBUS CONSTRUCTION LLC


111 JOHN STREET, SUITE 220
NEW YORK, NY 10038
CONTACT PERSON:
PHONE NUMBER: 212-205-1437

AGILE RISK GROUP INCORPORATED


10 GLENWOOD AVENUE
STATEN ISLAND, NY 10301
CONTACT PERSON: DOMINICK R. DeRUBBIO
PHONE NUMBER: 917-561-6831

SITE SAFETY PLAN


for
1 FLATBUSH AVE
BROOKLYN, NY 11217

ELEVATIONS
HORIZONTAL NETS

REVIEWED BY
Sk Mohammad Ali
Assistant Plan Examiner
BEST Squad

APPROVED
Date: Aug
DATE: 06/30/2016
21, 2015

2D Site Safety Plans

SSP-007.00
ONE FLATBUSH AVENUE PROPERTY, LLC.
(C/O SLATE PROPERTY
850 THIRD AVE, SUITE 16-B
NEW YORK, NY 10022
CONTACT PERSON:
PHONE NUMBER: 646-439-4000

DAYNA CEBUS CONSTRUCTION LLC


111 JOHN STREET, SUITE 220
NEW YORK, NY 10038
CONTACT PERSON:
PHONE NUMBER: 212-205-1437

AGILE RISK GROUP INCORPORATED


10 GLENWOOD AVENUE
STATEN ISLAND, NY 10301
CONTACT PERSON: DOMINICK R. DeRUBBIO
PHONE NUMBER: 917-561-6831

SITE SAFETY PLAN


for
1 FLATBUSH AVE
BROOKLYN, NY 11217

ELEVATIONS
HORIZONTAL NETS

REVIEWED BY
Sk Mohammad Ali
Assistant Plan Examiner
BEST Squad

APPROVED
Date: Aug
DATE: 06/30/2016
21, 2015

2D Site Safety Plans

SSP-008.00
ONE FLATBUSH AVENUE PROPERTY, LLC.
(C/O SLATE PROPERTY
850 THIRD AVE, SUITE 16-B
NEW YORK, NY 10022
CONTACT PERSON:
PHONE NUMBER: 646-439-4000

DAYNA CEBUS CONSTRUCTION LLC


111 JOHN STREET, SUITE 220
NEW YORK, NY 10038
CONTACT PERSON:
PHONE NUMBER: 212-205-1437

AGILE RISK GROUP INCORPORATED


10 GLENWOOD AVENUE
STATEN ISLAND, NY 10301
CONTACT PERSON: DOMINICK R. DeRUBBIO
PHONE NUMBER: 917-561-6831

SITE SAFETY PLAN


for
1 FLATBUSH AVE
BROOKLYN, NY 11217

ELEVATIONS
HORIZONTAL NETS

REVIEWED BY
Sk Mohammad Ali
Assistant Plan Examiner
BEST Squad

APPROVED
Date: Aug
DATE: 06/30/2016
21, 2015

2D Site Safety Plans

SSP-009.00
ONE FLATBUSH AVENUE PROPERTY, LLC.
(C/O SLATE PROPERTY
850 THIRD AVE, SUITE 16-B
NEW YORK, NY 10022
CONTACT PERSON:
PHONE NUMBER: 646-439-4000

DAYNA CEBUS CONSTRUCTION LLC


111 JOHN STREET, SUITE 220
NEW YORK, NY 10038
CONTACT PERSON:
PHONE NUMBER: 212-205-1437

AGILE RISK GROUP INCORPORATED


10 GLENWOOD AVENUE
STATEN ISLAND, NY 10301
CONTACT PERSON: DOMINICK R. DeRUBBIO
PHONE NUMBER: 917-561-6831

SITE SAFETY PLAN


for
1 FLATBUSH AVE
BROOKLYN, NY 11217

DETAILS SHEET

REVIEWED BY
Sk Mohammad Ali
Assistant Plan Examiner
BEST Squad

APPROVED
Date: Aug
DATE: 06/30/2016
21, 2015

2D Site Safety Plans


SSP-010.00
ONE FLATBUSH AVENUE PROPERTY, LLC.
(C/O SLATE PROPERTY
All floors, roofs, and working decks shall be cleaned of debris at least daily, and a daily inspection Hot work may be conducted in the following areas: 1. Areas designed for hot work The fire watch shall observe the entire hot work area. Hot work conducted in areas with vertical or
horizontal fire exposures that are not observable by a single individual shall have additional personnel 850 THIRD AVE, SUITE 16-B
made by a competent person to verify such has occurred. If the building is a major building, such operations. 2. Areas authorized for that purpose by the responsible person at the
inspection shall be noted in the site safety log. assigned to ensure that exposed areas are monitored NEW YORK, NY 10022
premises when precautions have been taken in compliance with the requirements of this
Debris that cannot be removed from the site by the end of the shift shall be placed in containers or chapter. A minimum of one portable fire extinguisher complying with the requirements of FC906 and with a CONTACT PERSON:
shall be secured overnight to protect the public and property and shall be removed from the minimum 2-A:20-B:C rating shall be provided and readily accessible within a 30 feet (9144 mm) travel PHONE NUMBER: 646-439-4000
site or placed in containers at the beginning of the next shift. Hot work shall not be conducted in the following areas unless approval has been distance of the location where hot work is performed and where the fire guards are positioned.
obtained from the commissioner: 1. Areas where the sprinkler system is impaired. 2.
Storage of combustible material and other material and equipment that may present a fire hazard shall A fire guard shall be provided for each torch in operation, except that a single fire guard may be DAYNA CEBUS CONSTRUCTION LLC
Areas where there exists the potential of an explosive atmosphere, such as locations
designated to conduct a fire watch for more than one torch operation on the same floor or level if each
comply with the New York City Fire Code. where flammable gases, liquids or vapors are present. 3. Areas with readily ignitable 111 JOHN STREET, SUITE 220
torch operation is not more than 50 feet (15 240 mm) from the fire guard, as measured by the actual
materials, such as storage of large quantities of bulk sulfur, baled paper, cotton, lint,
path of travel, and the field of view of such fire guard encompasses all of the horizontal fire exposures of NEW YORK, NY 10038
Containers containing debris or waste shall be covered at the end of the workday and at any time dust or loose combustible materials. 4. On board marine vessels or watercraft at dock
when full to near the rim. Containers need not be covered when they are not in use or while stored in a such torch operations. CONTACT PERSON:
under construction or repair.
fully enclosed space at the end of the workday. A pre-hot work check shall be conducted by the responsible person prior to work to ensure that all PHONE NUMBER: 212-205-1437
A daily inspection shall be made for construction or demolition debris on all floors and if the building is Hot work program. Whenever hot work is performed in any building or structure, on a equipment is safe and hazards are recognized and protected. A report of the check shall be kept at the
a major building, such inspection shall be noted in the site safety log. building roof or on a building setback, the owner shall ensure that such work is work site during the work and for a minimum of 48 hours after work is completed, and made available for
performed in accordance with this chapter and shall designate a responsible person to inspection by any representative of the department. The pre-hot work check shall be conducted at least
Material and debris susceptible to dislodgment shall not be stored on scaffolds while work is not being ensure compliance. once per day and shall verify the following: AGILE RISK GROUP INCORPORATED
performed.
Hot work program responsible person. The responsible person shall ensure that a permit 1. The hot work equipment is in good working order. 10 GLENWOOD AVENUE
All corridors and exits shall be maintained free from debris. Debris shall not be stored in stairwells. has been obtained from the department when one is required, and ensure that the hot STATEN ISLAND, NY 10301
2. The hot work area is clear of combustibles and flammable solids or that such materials present in the
Leaks and or spills shall be tended to immediately to prevent a slipping hazard. work is performed in compliance with the terms and conditions of the permit. The area are protected in accordance with FC2604.1.1. CONTACT PERSON: DOMINICK R. DeRUBBIO
responsible person shall inspect the hot work site prior to issuing a hot work program
Containers shall be provided for the collection and separation of waste, trash, oily and used rags, and 3. Exposed construction is of noncombustible materials or, if combustible, is protected. PHONE NUMBER: 917-561-6831
authorization and periodically monitor the work as it is being performed to ensure there
other refuse. Containers used for garbage and other oily, flammable, or hazardous wastes, such as
are no fire safety hazards. 4. Openings are protected.
caustics, acids, harmful dusts, etc. shall be equipped with covers. Garbage and other waste shall be
disposed of at frequent and regular intervals. Hot work operations shall be conducted under the general supervision of the responsible 5. Hot work area floors are clear of combustible waste accumulation.
person.
Combustible scrap and debris shall be removed at regular intervals during the course of construction. 6. Fire watch personnel, where required, are assigned.
Safe means shall be provided to facilitate such removal. An authorization for hot work operations shall not be issued unless the individuals
7. Approved actions have been taken to prevent accidental activation of fire extinguishing systems and
conducting such operations are capable of performing such operations safely.
detection equipment in accordance with FC 2604.1.8 and 2604.1.9.
Demonstration of a working knowledge of the provisions of Chapter 26 of the New York
City Fire Code shall constitute acceptable evidence of compliance with this requirement. 8. Portable fire extinguishers and fire hoses (where provided) are operable and available
Torch operations using oxygen and a flammable gas, and any torch operation for 9. All persons performing hot work possess certificates of fitness, where such certificates are required.
All employees shall be required to wear personal protective equipment at all times while torch-applied roofing systems, shall be performed by a certificate of fitness holder. 10. All persons performing hot work requiring a permit possess a site-specific permit or citywide permit,
working within the building and site. PPE shall not be removed until the employee has All persons conducting hot work operations shall be trained in the use of portable fire authorizing such work.
exited the work site at the ground level. All employees are required to wear a hardhat, extinguishers, and shall be capable of extinguishing fires when they are limited in size Devices or attachments mixing air or oxygen with flammable gases prior to consumption, except at the
eye protection, a reflective vest or clothing and work boots. All workers must be trained and spread such that they can readily be extinguished using a portable fire extinguisher. burner or in a standard torch or blow pipe, shall not be allowed unless approved.
in the proper use of PPE prior to working.
The responsible person for the hot work area shall maintain reports in A single container of oxygen and a single container of flammable gas may be installed on a cart without
accordance with FC2604.3.1. the separation of containers required by FC3504.1.3 provided that the containers are connected to
Protective equipment, including personal protective equipment for eyes, face, head and
extremities, protective clothing, respiratory devices, and protective shields and barriers, Visible hazard identification signs shall be provided where required by FC Chapter 27. regulators, equipped with apparatus designed for cutting, welding or other hot work operation, and are
shall be provided, used and maintained in a sanitary and reliable condition wherever it is Where the hot work area is accessible to persons other than the operator of the hot work otherwise ready for use, and are stored, handled and used in compliance with the following
necessary by reason of hazards or processes or environment, chemical hazards, equipment, signs shall be posted in a conspicuous location to warn others before they requirements:
radiological hazards, or mechanical irritants encountered in a manner capable of enter the hot work area. Such signs shall read as follows: CAUTION HOT WORK IN 1. Carts shall be designed and used in accordance with FC2703.10.3.
causing injury or impairment in the function of any part of the body through absorption, PROGRESS STAY CLEAR
2. Container valves shall have a fixed hand wheel, or other approved means by which the flow of gas
inhalation or physical contact. Hot work operations involving cutting or welding shall be conducted at least 35 feet (10 may be immediately shut down during hot work operations.
668 mm) from combustible materials and combustible waste or shall be provided with
Where employees provide their own protective equipment, the employer shall be 3. Container valves shall be closed at the end of each workday and whenever work is discontinued or
appropriate shielding to prevent sparks, slag or heat from igniting exposed combustibles.
responsible to assure its adequacy, including proper maintenance, and sanitation of the cart moved.
All other hot work operations shall be conducted at least 25 feet (7620 mm) from
such equipment. combustible materials and combustible waste or shall be provided with appropriate 4. Container valve outlet connections shall conform to the requirements of CGA V-1.
shielding to prevent sparks, slag or heat from igniting exposed combustibles. 5. Separation of the cart from the hot work operation shall be maintained in accordance with FC2605.5,
Construction areas, ramps, runways, corridors, offices, shops, and storage areas shall be adequately
Openings or cracks in walls, floors, ducts or shafts within 35 feet (10 668 mm) of the hot or fire-resistant shields shall be provided.
illuminated at all times
work area shall be tightly covered to prevent the passage of sparks to adjacent 6. A separation distance of 20 feet (6096 mm) shall be maintained between such carts.
combustible areas, or shielded by metal fire-resistant guards, or provided with curtains
Oxygen containers and oxygen container valves, regulators, hose and other apparatus and fittings shall Each employee on a walking/working surface (horizontal and vertical surface) with an unprotected side
to prevent passage of sparks or slag.
be kept free of oil or grease. Oxygen containers, apparatus and fittings shall not be handled with oily or edge which is 6 feet or more above a lower side shall be protected from falling by the use of guardrail
Combustible waste shall not be allowed to accumulate on floors and other surfaces hands, oily gloves, or greasy tools or equipment. systems, safety net systems, or personal fall arrest systems.
within the hot work area. Hot work areas shall be regularly cleaned and combustible
All employees must comply with codes, standards, regulations and policies set forth by The New York waste removed and disposed of lawfully. Acetylene gas shall not be piped except in approved container manifolds and container manifold Each employee on walking/working surfaces shall be protected from falling through holes more than 6'
City Department of Buildings, The New York City Fire Department, The United States Department of connections, or piped or utilized at a pressure exceeding 15 pounds per square inch gauge (psig) (103 above lower levels, by personal fall arrest systems, covers, or guardrail systems erected around such
Labor and applicable national consensus standards. National Consensus Organizations are inclusive, Areas designed for hot work operations shall have floors with noncombustible surfaces. kPa). Acetylene gas stored in containers shall be dissolved in a suitable solvent. Acetylene gas shall not holes.
but not limited to The National Fire Protection Association (NFPA) and the American National Sprinkler system protection shall not be shut off or impaired while hot work is performed be brought in contact with unalloyed copper, except in a torch.
Standards Institute (ANSI). unless approved by the commissioner. Where hot work is performed close to sprinklers, Oxygen and fuel gas containers shall be located at a distance from the hot work area sufficient to protect Each employee on a walking/working surface shall be protected from tripping in or stepping into or
noncombustible barriers or damp cloth guards shall shield the individual sprinkler heads such containers from heat, sparks, slag, or misdirection of the torch flame. through holes by covers.
The general contractor shall maintain a place of employment which is free from recognized hazards and shall be removed when the work is completed. If the work extends over several
that are causing or are likely to cause death or serious physical harm to employees. days, the shields shall be removed at the end of each workday. The torch valve shall be closed and the gas supply to the torch completely shut off when hot work
operations are discontinued for a period of 1 hour or more. Each employee on a walking/working surface shall be protected from objects falling through holes by
Approved precautionary measures shall be taken to avoid accidental operation of covers.
Stairways at construction sites shall be provided, maintained, and made available for department use in It shall be unlawful to conduct the following hot work operations:
automatic fire detection systems.
accordance with the construction codes, including the Building Code. Stairways providing egress from
A fire watch shall be maintained during hot work operations. The fire watch shall 1. Welding or cutting operations supported by or resting on compressed gas containers. 2. Torch-applied
the building or structure under construction or alteration, and other components of the means of egress, Each employee less than 6 feet above dangerous equipment shall be protected from falling into or onto
continue for a minimum of 30 minutes after the conclusion of the work. The roof system operations on roofs constructed of combustible materials. 3. Use of an acetylene generator
shall be given construction priority. the dangerous equipment by guardrail systems or by equipment guards.
commissioner, or the responsible person implementing a hot work program, may extend for hot work operations.
A copy of this Health and Safety Plan must be maintained at the site at all times. the duration of the fire watch based on the hazards or work being performed. The frame or case of electric hot work machines, except internal-combustion-engine-driven machines, Each employee 6 feet or more above dangerous equipment shall be protected from fall hazards by
shall be grounded. Ground connections shall be mechanically strong and electrically adequate for the guardrail systems, personal fall arrest systems, or safety net systems.
All workers must receive a safety orientation prior to working at the site. Records shall be maintained required current.
on site. Welding current return circuits from the work to the machine shall have proper electrical contact at joints. The top rail of any guardrail system shall be 42 inches, plus or minus 3 inches above the
The electrical contact shall be periodically inspected. walking/working level. When conditions warrant, the height of the top edge may exceed the 45-inch
A fire prevention plan must be in writing, be kept in the workplace, and be made available to employees
for review. However, an employer with 10 or fewer employees may communicate the plan orally to Electrodes shall be removed from the holders when electric arc welding or cutting is discontinued for any height, provided the guardrail system meets all other requirements in 29 CFR 1926.502.
employees. period of 1 hour or more. The holders shall be located to prevent accidental contact and the machines
In the course of construction, once the structure reaches a height of 6 stories above shall be disconnected from the power source. Midrails, screens, mesh, intermediate vertical members, or equivalent intermediate structural members
the adjoining ground level, horizontal safety netting shall be maintained not more than
An emergency action plan must be in writing, kept in the workplace, and available to employees for A switch or circuit breaker shall be provided so that fixed electric welders and control equipment can be shall be installed between the top edge of the guardrail system and the walking/working surface when
2 stories or 30 feet below the stripping operation where reinforced concrete
review. However, an employer with 10 or fewer employees may communicate the plan orally to disconnected from the supply circuit. The disconnect shall be installed in accordance with the Electrical there is no wall or parapet wall at least 21 inches high.
construction is utilized.
employees. Code.
Netting shall follow the placement of concrete as closely as possible but shall not Damaged cable shall be removed from service until properly repaired or replaced. Midrails, when used, shall be installed at a height midway between the top edge of the guardrail system
exceed the following limitations. The horizontal nets shall be jumped in accordance and walking/working level.
with the following schedule;
Electrodes shall be removed from the holders when electric arc welding or cutting is discontinued for any
period of 1 hour or more. The holders shall be located to prevent accidental contact and the machines
Guardrail systems shall be capable of withstanding, without failure, a force of at least 200 pounds
SITE SAFETY PLAN
shall be disconnected from the power source.
Electrodes shall be removed from the holders when electric arc welding or cutting is discontinued for any
applied within 2 inches of the top edge, in any outward or downward direction, at any point along the top
edge.
for
period of 1 hour or more. The holders shall be located to prevent accidental contact and the machines
1. All vertical netting shall comply with the requirements set forth in chapter 33 on the New York City shall be disconnected from the power source.
In addition to daily inspections conducted by the Contractor Safety Supervisor, weekly safety inspections 1 FLATBUSH AVE
building code, 29 CFR 1926. will also be conducted by the Contractor Site Safety Manager. All inspections shall be documented in
2. When in the course of construction the building reaches a height of 4 stories or 40 feet (12 192 mm),
vertical safety netting shall be maintained at each story except at the story at grade, the story
writing and maintained on site. A weekly toolbox talk meeting shall also be given to all site workers. This
meeting shall touch on best practices and guidelines to identify fall exposures and prevent falls in the
BROOKLYN, NY 11217
immediately above the sidewalk shed and the roof level where a parapet is installed. workplace.
3. Vertical safety netting shall consist of a vertical system of nets and their supports that meet
requirements set forth in department rules, vertical safety netting shall be of a fine mesh of a size and All barriers located in the street must be installed as per DOT regulations and manufacturers
All ladders shall be capable of supporting intended loads.
strength sufficient to contain falling tools and materials, wall operning screens, grills or tarpaulins may specifications.
be used in lieu of vertical safety netting, provided that they shall be of such construction and mounting
as to retain debris.
Ladders shall not be tied or fastened together to provide longer sections unless they are specifically
designed for such use.
NOTES SHEET
4. On every story where vertical safety netting is required, it shall extend from the floor to a height of All ladders shall be inspected for defects/damage prior to use.
not less than 60 inches (1524 mm). Vertical safety nets and their components shall also meet the
requirements set forth in rules promulgated by the commissioner. All employees using ladders shall be provided with ladder safety training and proper use prior to
No crane may operate until the site safety plan matches the approved CN, OW "Limited Use" or Master
5. The holder of the work permit and his or her designee shall be responsible for the installation and commencing work.
Riggers operation.
maintenance of all horizontal and vertical netting, and for complying with the requirements of this Ladders shall be used only for the purpose for which they were designed.
section.

REVIEWED BY
Sk Mohammad Ali
Assistant Plan Examiner
BEST Squad

APPROVED
Date: Aug
DATE: 06/30/2016
21, 2015
Horizontal safety netting shall be installed and maintained to comply with all federal,
2D Site Safety Plans
state and local codes, standards, rules and regulations including: CFR 1926. Subpart
M, Article 19 Sections 27-1021, 27-1022 and RS-19-4 of the NYC Building Code, the
manual for site safety program, ANSI Standard for personnel and debris nets, and the
rules and regulations relating to netting as implemented through Local Law 61 of
SSP-011.00
1987.

Das könnte Ihnen auch gefallen