Sie sind auf Seite 1von 18

PT.

PERTAMINA EP
ASSET 5 SURFACE FACILITIES

PT. JASA KITA BERSAMA PT. WIJAYA KARYA UTAMA


KAKARYATAMAABERSAMA

CALCULATION SHEET FOR CASTELETED BRIDGE


WITH SPAN OF 23 M

PROJECT : JASA PENGGANTIAN TRUNKLINE


KLAMONO – SORONG TAHAP 1
LENGKAP DENGAN VALVE DAN
FITTING FIELD PAPUA

CLIENT : PT. PERTAMINA EP


ASSET 5 SURFACE FACILITIES

CONTRACTOR : PT. JASA KITA BERSAMA –


PT.WIJAYA KARYA UTAMA

LOCATION : SORONG – PAPUA - INDONESIA

DOCUMENT NO. : PTM- CAL.SS - C – 001

0 Issued for Review 22 Maret 17


APVD BY
REV DESCRIPTION DATE PREPARED CHECKED APVD OWNER
SHEET 2 OF 18

JOB NO. : REV


CALCULATION SHEET FOR CASTELETED BRIDGE WITH 0
DOC. NO.
SPAN OF 23 M PTM-CAL.SS-C-001

22 Maret 17

REVISION HISTORICAL SHEET

Rev No Date Description

DISTRIBUTION ORDER

PT JASA KITA BERSAMA – PT WIJAYA KARYA UTAMA PT PERTAMINA EP


Project Manager Project Manager
Site Manager Deputy Project Manager
Engineering Manager Engineering Manager
Procurement Manager
QA/QC Manager
Adm&Finance Manager
Project Control Manager
Construction Manager
Document Control
SHEET 3 OF 18

JOB NO. : REV


CALCULATION SHEET FOR CASTELETED BRIDGE WITH 0
DOC. NO.
SPAN OF 23 M PTM-CAL.SS-C-001

22 Maret 17

1. GENERAL
1.1 Scope
This calculation covers the analysis and design for Casteleted Bridge at Klamono –
Sorong Papua - Indonesia.
1.2 Language
All Drawing, calculation sheets and documents shall be written in English except
where government authorities demand the local language for their approval. Such
demand shall be observed.
1.3 Unit of Measurement
Unit measurement in design shall be in metric system

2. DEFINITION COMPANY
OWNER
PT PERTAMINA EP
ASSET 5 SURFACE FACILITIES

CONTRACTOR
PT JASA KITA BERSAMA – PT WIJAYA KARYA UTAMA

3. APPLICABLE STANDARD, CODE AND REFERENCES


The Requirement shall be in accordance with the latest editions of the following standards
and codes.
a. ASTM : American Society for Testing and Materials
b. JIS : Japan Industrial Standard
c. AASHTO : American Association of state highway and transprortation officials
d. ACI : Americal Concrete Institute
e. UBC : Uniform Building Code
f. AWS : American Welding Society
g. SNI : Standart Nasional Indonesia
h. Indonesian Local Codes and Regulations
i. Soil Investigation Report
SHEET 4 OF 18

JOB NO. : REV


CALCULATION SHEET FOR CASTELETED BRIDGE WITH 0
DOC. NO.
SPAN OF 23 M PTM-CAL.SS-C-001

22 Maret 17

4. SITE CONDITION
Reference to Design Specification for Civil Work and Building
5. MATERIAL
5.1 General
Materials to meet the requirements of the codes and standard as listed in 5.2 to 5.4
below or equivalent shall be used. As for the materials other than specified below,
locally available materials may be used upon condition that they are suitable for their
specific use to quality and quantity.
5.2 Steel Frame and Bolt-Nut
Steel Frame for structure shall be conform to ASTM A36.
Bolt-Nut for conections joint shall be conform to A325.
5.3 Welding Electrode
AWS D1.1, E70XX electrode or JIS Z3211 D 43 or equivalent.
5.4 Anchor Bolt and Nuts
Anchor bolt and nuts shall conform to ASTM A36 or JIS G3101 grade SS 41 or
equivalent.

6. DESIGN LOAD
The design loads for buildings and another structures shall be as spesified in ASCE 7-05
except as spesified.
6.1 Dead Load (DL)
Dead load means the weight of structure it self, and all material permanently
attached there or supported thereby. Unit weights of major construction materials
shall be as follow:
Dead Load
Reference: SKBI-1.3.53, 1987. UDC: 624.042
Category Dead Load
Reinforced concrete 2400 kg/m3
Concrete 2200 kg/m3
Structural steel 7850 kg/m3
Water 1000 kg/m3

Unit weights other than the above mentioned shall be as per ANSI/ ASCE
7-02 or UBC.
SHEET 5 OF 18

JOB NO. : REV


CALCULATION SHEET FOR CASTELETED BRIDGE WITH 0
DOC. NO.
SPAN OF 23 M PTM-CAL.SS-C-001

22 Maret 17

6.2 Live Load (LL)

Live load means the load not permanently fixed to the structure such as load
caused by personnel, furniture tools, material, etc.

Live load for worker during construction is 60 kg/person

6.3 Wind Load (WL)


Wind load shall be calculated in accordance with “Peraturan Pembebanan
Indonesia Untuk Gedung”, Wind Pressure is 40 kg/m2

6.4 Earthquake Load (EL)


Earthquake load applied for this project shall be calculated in accordance with the
formula as given in SNI – 1726 – 2002 as follows:

C1 I
V  Wt
R
Where :

V : Total lateral force or base shear force


C : Basic seismic coefficient, for seismic zone 4
I : Importance factor
R : Seismic reduction factor
Wt : Total weight of structure
SHEET 6 OF 18

JOB NO. : REV


CALCULATION SHEET FOR CASTELETED BRIDGE WITH 0
DOC. NO.
SPAN OF 23 M PTM-CAL.SS-C-001

22 Maret 17
SHEET 7 OF 18

JOB NO. : REV


CALCULATION SHEET FOR CASTELETED BRIDGE WITH 0
DOC. NO.
SPAN OF 23 M PTM-CAL.SS-C-001

22 Maret 17

6.5 Combination Loads


1. Abbreviation Loads
No Load Case Abbreviation
1 Dead Load DL
2 Live Load LL
3 Wind Load WL
4 Earthquake Load X ELX
5 Earthquake Load Y ELY

2. Loads combinations and coefficient for foundation design.


Permanent Load
1 DL+LL

Temporary Load

2 DL + 0.5LL + WL
3 DL + 0.5LL + ELX
4 DL + 0.5LL + ELY

3. Loads combinations and coefficient for steel structure design.


Load Resistance Factor Design (LRFD)
Permanent Load
1 DL+LL

Temporary Load

2 1.4 DL
3 1.2DL + 1.6LL
4 1.2DL + 0.5LL + 1.6WL
5 1.2DL + 0.5LL + ELX
6 1.2DL + 0.5LL + ELY
SHEET 8 OF 18

JOB NO. : REV


CALCULATION SHEET FOR CASTELETED BRIDGE WITH 0
DOC. NO.
SPAN OF 23 M PTM-CAL.SS-C-001

22 Maret 17

7. DESIGN CONCEPT
7.1 Structural Model
The structural model with SAP2000
SHEET 9 OF 18

JOB NO. : REV


CALCULATION SHEET FOR CASTELETED BRIDGE WITH 0
DOC. NO.
SPAN OF 23 M PTM-CAL.SS-C-001

22 Maret 17

8. LOADING DATA
8.1 Dead Load (DL)

- Weight of carbon steel pipe Ø8" : 42.55 kg/m


Distributed Load on Beam ( - Z direction Point Load) For Span of pipe support is 2 m
DL = Weight of Pipe Ø8" x Span of pipe support
DL = 42.55 x 2
DL = 85.10 kg

- Weight of carbon steel pipe Ø4" : 16.07 kg/m


Distributed Load on Beam ( - Z direction Point Load) For Span of pipe support is 2 m
DL = Weight of Pipe Ø4" x Span of pipe support
DL = 16.07 x 2
DL = 32.14 kg

- Weight of water inside carbon steel pipe Ø8" : 31.4 kg/m


Distributed Load on Beam ( - Z direction Point Load) For Span of pipe support is 2 m
DL = Weight of water inside Pipe Ø8" x Span of pipe support
DL = 31.416 x 2
DL = 62.83 kg

- Weight of water inside carbon steel pipe Ø4" : 7.85 kg/m


Distributed Load on Beam ( - Z direction Point Load) For Span of pipe support is 2 m
DL = Weight of water inside Pipe Ø8" x Span of pipe support
DL = 7.854 x 2
DL = 15.71 kg
SHEET 10 OF 18

JOB NO. : REV


CALCULATION SHEET FOR CASTELETED BRIDGE WITH 0
DOC. NO.
SPAN OF 23 M PTM-CAL.SS-C-001

22 Maret 17

Picture of Dead Load Distribution (Z- direction)

8.2 Live Load (LL)


Live Load on Beam is 60 kg (worker load during construction)
Distributed Load on Beam ( - Z direction Poin Load ) every span of 6 m on beam
LL = 60 kg

Picture of Live Load Distribution (Z- direction)


SHEET 11 OF 18

JOB NO. : REV


CALCULATION SHEET FOR CASTELETED BRIDGE WITH 0
DOC. NO.
SPAN OF 23 M PTM-CAL.SS-C-001

22 Maret 17

8.3 Wind Load (WL)


Wind Pressure : 40 kg/m2
Distributed Load on Left Beam
WL = Wind Pressure x Width of Beam x Wind coeff.
WL = 40 x 0.6 x 1.6
WL = 38.40 kg/m'

Distributed Load on Right Beam


WL = Wind Pressure x Span of Column x Wind coeff.
WL = 40 x 0.6 x 1.2
WL = 28.80 kg/m'

Picture of Wind Load Distribution (Y – direction)


SHEET 12 OF 18

JOB NO. : REV


CALCULATION SHEET FOR CASTELETED BRIDGE WITH 0
DOC. NO.
SPAN OF 23 M PTM-CAL.SS-C-001

22 Maret 17

8.4 Earthquake Load (EL)


Seismic Load, V
V = (C x I/R)*Wt

where :
C = 0.6 (Hard Soil, Zone 4 )
I = 1.5 (Important factor)
R = 8.5 (reduction seismic factor)
Wt = DL, LL (include self weight)

Weight of Steel Beam HC 600.200.8.13 DL = 3168 kg


Weight of Steel Support UNP 125.65.6.8 DL = 348 kg
Weight of Steel Pipe Ø8" DL = 1021 kg
Weight of Steel Pipe Ø4" DL = 386 kg
Weight of water inside Pipe Ø8" DL = 754 kg
Weight of water inside Pipe Ø4" DL = 188 kg
Live Load (worker load during construction) LL = 180 kg
Total weight, Wt = 6046 kg

Earthquake Load (total), V = 640 kg


Earthquake Load is distributed on total joint column with beam.

Distributed load : V
CV =
Ʃ Nodal
640
CV =
22
CV = 29 kg

Distributed load on Nodal (X direction)


EL, X X: 0.7 CV = 20 kg
Y: 0.30 CV = 9 kg

Distributed load on Nodal (Y direction)


EL, Y X: 0.30 CV = 9 kg
Y: 0.7 CV = 20 kg
SHEET 13 OF 18

JOB NO. : REV


CALCULATION SHEET FOR CASTELETED BRIDGE WITH 0
DOC. NO.
SPAN OF 23 M PTM-CAL.SS-C-001

22 Maret 17

Picture of Earthquake Load (X - direction)

Picture of Earthquake Load (Y - direction)


SHEET 14 OF 18

JOB NO. : REV


CALCULATION SHEET FOR CASTELETED BRIDGE WITH 0
DOC. NO.
SPAN OF 23 M PTM-CAL.SS-C-001

22 Maret 17

1. STEEL STRUCTURE DESIGN


1.1 Capacity Stress Ratio of Steel Structure
Steel Design Summary – AISC
Steel design check code is performed by SAP.
Capasity Stress ratio shall not be allowed to exceed 0.95 according to AISC
Maximum of stress condition is given at table as follow :
TABLE: Steel Design 1 - Summary Data - AISC-LRFD93
Frame DesignSect DesignType Ratio RatioType Combo Location ErrMsg
No
Text Text Text Unitless Text Text m Text
1 1 HC 600.200.8.13 Beam 0.04 PMM 1.4DL 2 No Messages
2 2 HC 600.200.8.13 Beam 0.07 PMM 1.4DL 2 No Messages
3 3 HC 600.200.8.13 Beam 0.10 PMM 1.4DL 2 No Messages
4 4 HC 600.200.8.13 Beam 0.11 PMM 1.4DL 2 No Messages
5 5 HC 600.200.8.13 Beam 0.13 PMM 1.4DL 2 No Messages
6 6 HC 600.200.8.13 Beam 0.13 PMM 1.4DL 2 No Messages
7 7 HC 600.200.8.13 Beam 0.13 PMM 1.4DL 0 No Messages
8 8 HC 600.200.8.13 Beam 0.13 PMM 1.4DL 0 No Messages
9 9 HC 600.200.8.13 Beam 0.11 PMM 1.4DL 0 No Messages
10 10 HC 600.200.8.13 Beam 0.10 PMM 1.4DL 0 No Messages
11 11 HC 600.200.8.13 Beam 0.07 PMM 1.4DL 0 No Messages
12 12 HC 600.200.8.13 Beam 0.04 PMM 1.4DL 0 No Messages
13 13 HC 600.200.8.13 Beam 0.04 PMM 1.4DL 2 No Messages
14 14 HC 600.200.8.13 Beam 0.07 PMM 1.4DL 2 No Messages
15 15 HC 600.200.8.13 Beam 0.10 PMM 1.4DL 2 No Messages
16 16 HC 600.200.8.13 Beam 0.11 PMM 1.4DL 2 No Messages
17 17 HC 600.200.8.13 Beam 0.13 PMM 1.4DL 2 No Messages
18 18 HC 600.200.8.13 Beam 0.13 PMM 1.4DL 2 No Messages
19 19 HC 600.200.8.13 Beam 0.13 PMM 1.4DL 0 No Messages
20 20 HC 600.200.8.13 Beam 0.13 PMM 1.4DL 0 No Messages
21 21 HC 600.200.8.13 Beam 0.11 PMM 1.4DL 0 No Messages
22 22 HC 600.200.8.13 Beam 0.10 PMM 1.4DL 0 No Messages
23 23 HC 600.200.8.13 Beam 0.07 PMM 1.4DL 0 No Messages
24 24 HC 600.200.8.13 Beam 0.04 PMM 1.4DL 0 No Messages
25 25 UNP 125.65.6.8 Beam 0.01 Major Shear 1.4DL 0.7 No Messages
26 26 UNP 125.65.6.8 Beam 0.01 PMM 1.4DL 0 No Messages
27 27 UNP 125.65.6.8 Beam 0.01 PMM 1.4DL 0 No Messages
28 28 UNP 125.65.6.8 Beam 0.01 PMM 1.2DL + 1.6LL + 0.5H 0 No Messages
29 29 UNP 125.65.6.8 Beam 0.01 PMM 1.4DL 0 No Messages
30 30 UNP 125.65.6.8 Beam 0.01 PMM 1.4DL 0 No Messages
31 31 UNP 125.65.6.8 Beam 0.01 PMM 1.2DL + 1.6LL + 0.5H 0 No Messages
32 32 UNP 125.65.6.8 Beam 0.01 PMM 1.4DL 0 No Messages
33 33 UNP 125.65.6.8 Beam 0.01 PMM 1.4DL 0 No Messages
34 34 UNP 125.65.6.8 Beam 0.01 PMM 1.2DL + 1.6LL + 0.5H 0 No Messages
35 35 UNP 125.65.6.8 Beam 0.01 PMM 1.4DL 0 No Messages
36 36 UNP 125.65.6.8 Beam 0.01 PMM 1.4DL 0 No Messages
37 37 UNP 125.65.6.8 Beam 0.01 Major Shear 1.4DL 0.7 No Messages
SHEET 15 OF 18

JOB NO. : REV


CALCULATION SHEET FOR CASTELETED BRIDGE WITH 0
DOC. NO.
SPAN OF 23 M PTM-CAL.SS-C-001

22 Maret 17

1.2 Joint Reactions


TABLE: Joint Reactions
Joint OutputCase CaseType F1 F2 F3 M1 M2 M3
No
Text Text Text Kgf Kgf Kgf Kgf-m Kgf-m Kgf-m
1 1 DL + LL Combination 0 0 1121 0 0 0
2 1 DL + 0.5LL + WL Combination 0 28.8 1099 0 0 0
3 1 DL + 0.5LL + ELx Combination -220 0 1099 0 0 0
4 1 DL + 0.5LL +ELy Combination -99 0 1099 0 0 0
5 13 DL + LL Combination 0 0 1121 0 0 0
6 13 DL + 0.5LL + WL Combination 0 0 1099 0 0 0
7 13 DL + 0.5LL + ELx Combination 0 0 1099 0 0 0
8 13 DL + 0.5LL +ELy Combination 0 0 1099 0 0 0
9 14 DL + LL Combination 0 0 1194 0 0 0
10 14 DL + 0.5LL + WL Combination 0 38.4 1172 0 0 0
11 14 DL + 0.5LL + ELx Combination -220 0 1172 0 0 0
12 14 DL + 0.5LL +ELy Combination -99 0 1172 0 0 0
13 26 DL + LL Combination 0 0 1194 0 0 0
14 26 DL + 0.5LL + WL Combination 0 0 1172 0 0 0
15 26 DL + 0.5LL + ELx Combination 0 0 1172 0 0 0
16 26 DL + 0.5LL +ELy Combination 0 0 1172 0 0 0
SHEET 16 OF 18

JOB NO. : REV


CALCULATION SHEET FOR CASTELETED BRIDGE WITH 0
DOC. NO.
SPAN OF 23 M PTM-CAL.SS-C-001

22 Maret 17

1.3 Joint Displacements


TABLE: Joint Displacements
Joint OutputCase CaseType U1 U2 U3 R1 R2 R3
No
Text Text Text m m m Radians Radians Radians
1 1 DL + LL Combination 0 0 0 0 0.004568 0
2 1 DL + 0.5LL + WL Combination 0 0 0 0 0.004452 0
3 1 DL + 0.5LL + ELx Combination 0 0 0 0 0.004452 0
4 1 DL + 0.5LL +ELy Combination 0 0 0 0 0.004452 0
5 2 DL + LL Combination 0 0 -0.00907 0 0.004392 0
6 2 DL + 0.5LL + WL Combination 0 0 -0.00884 0 0.004281 0
7 2 DL + 0.5LL + ELx Combination 2.2E-06 0 -0.00884 0 0.004281 0
8 2 DL + 0.5LL +ELy Combination 9.92E-07 0 -0.00884 0 0.004281 0
9 3 DL + LL Combination 0 0 -0.01746 0 0.003899 0
10 3 DL + 0.5LL + WL Combination 0 0 -0.01701 0 0.003799 0
11 3 DL + 0.5LL + ELx Combination 4.21E-06 0 -0.01701 0 0.003799 0
12 3 DL + 0.5LL +ELy Combination 1.89E-06 0 -0.01701 0 0.003799 0
13 4 DL + LL Combination 0 0 -0.02458 0 0.003148 0
14 4 DL + 0.5LL + WL Combination 0 0 -0.02395 0 0.003068 0
15 4 DL + 0.5LL + ELx Combination 6.01E-06 0 -0.02395 0 0.003068 0
16 4 DL + 0.5LL +ELy Combination 2.71E-06 0 -0.02395 0 0.003068 0
17 5 DL + LL Combination 0 0 -0.02998 0 0.002205 0
18 5 DL + 0.5LL + WL Combination 0 0 -0.02922 0 0.002149 0
19 5 DL + 0.5LL + ELx Combination 7.61E-06 0 -0.02922 0 0.002149 0
20 5 DL + 0.5LL +ELy Combination 3.43E-06 0 -0.02922 0 0.002149 0
21 6 DL + LL Combination 0 0 -0.03335 0 0.001135 0
22 6 DL + 0.5LL + WL Combination 0 0 -0.0325 0 0.001106 0
23 6 DL + 0.5LL + ELx Combination 9.02E-06 0 -0.0325 0 0.001106 0
24 6 DL + 0.5LL +ELy Combination 4.06E-06 0 -0.0325 0 0.001106 0
25 7 DL + LL Combination 0 0 -0.0345 0 -6E-17 0
26 7 DL + 0.5LL + WL Combination 0 0 -0.03362 0 -5.8E-17 0
27 7 DL + 0.5LL + ELx Combination 0.00001 0 -0.03362 0 -5.8E-17 0
28 7 DL + 0.5LL +ELy Combination 4.6E-06 0 -0.03362 0 -5.8E-17 0
29 8 DL + LL Combination 0 0 -0.03335 0 -0.00114 0
30 8 DL + 0.5LL + WL Combination 0 0 -0.0325 0 -0.00111 0
31 8 DL + 0.5LL + ELx Combination 0.000011 0 -0.0325 0 -0.00111 0
32 8 DL + 0.5LL +ELy Combination 5.05E-06 0 -0.0325 0 -0.00111 0
33 9 DL + LL Combination 0 0 -0.02998 0 -0.00221 0
34 9 DL + 0.5LL + WL Combination 0 0 -0.02922 0 -0.00215 0
35 9 DL + 0.5LL + ELx Combination 0.000012 0 -0.02922 0 -0.00215 0
36 9 DL + 0.5LL +ELy Combination 5.41E-06 0 -0.02922 0 -0.00215 0
37 10 DL + LL Combination 0 0 -0.02458 0 -0.00315 0
38 10 DL + 0.5LL + WL Combination 0 0 -0.02395 0 -0.00307 0
39 10 DL + 0.5LL + ELx Combination 0.000013 0 -0.02395 0 -0.00307 0
40 10 DL + 0.5LL +ELy Combination 5.68E-06 0 -0.02395 0 -0.00307 0
SHEET 17 OF 18

JOB NO. : REV


CALCULATION SHEET FOR CASTELETED BRIDGE WITH 0
DOC. NO.
SPAN OF 23 M PTM-CAL.SS-C-001

22 Maret 17

TABLE: Joint Displacements


Joint OutputCase CaseType U1 U2 U3 R1 R2 R3
No
Text Text Text m m m Radians Radians Radians
41 11 DL + LL Combination 0 0 -0.01746 0 -0.0039 0
42 11 DL + 0.5LL + WL Combination 0 0 -0.01701 0 -0.0038 0
43 11 DL + 0.5LL + ELx Combination 0.000013 0 -0.01701 0 -0.0038 0
44 11 DL + 0.5LL +ELy Combination 5.86E-06 0 -0.01701 0 -0.0038 0
45 12 DL + LL Combination 0 0 -0.00907 0 -0.00439 0
46 12 DL + 0.5LL + WL Combination 0 0 -0.00884 0 -0.00428 0
47 12 DL + 0.5LL + ELx Combination 0.000013 0 -0.00884 0 -0.00428 0
48 12 DL + 0.5LL +ELy Combination 5.95E-06 0 -0.00884 0 -0.00428 0
49 13 DL + LL Combination 0 0 0 0 -0.00457 0
50 13 DL + 0.5LL + WL Combination 0 0 0 0 -0.00445 0
51 13 DL + 0.5LL + ELx Combination 0.000013 0 0 0 -0.00445 0
52 13 DL + 0.5LL +ELy Combination 5.95E-06 0 0 0 -0.00445 0
53 14 DL + LL Combination 0 0 0 0 0.004573 0
54 14 DL + 0.5LL + WL Combination 0 0 0 0 0.004458 0
55 14 DL + 0.5LL + ELx Combination 0 0 0 0 0.004458 0
56 14 DL + 0.5LL +ELy Combination 0 0 0 0 0.004458 0
57 15 DL + LL Combination 0 0 -0.00908 0 0.004396 0
58 15 DL + 0.5LL + WL Combination 0 0 -0.00885 0 0.004284 0
59 15 DL + 0.5LL + ELx Combination 2.2E-06 0 -0.00885 0 0.004284 0
60 15 DL + 0.5LL +ELy Combination 9.92E-07 0 -0.00885 0 0.004284 0
61 16 DL + LL Combination 0 0 -0.01747 0 0.0039 0
62 16 DL + 0.5LL + WL Combination 0 0 -0.01703 0 0.0038 0
63 16 DL + 0.5LL + ELx Combination 4.21E-06 0 -0.01703 0 0.0038 0
64 16 DL + 0.5LL +ELy Combination 1.89E-06 0 -0.01703 0 0.0038 0
65 17 DL + LL Combination 0 0 -0.02459 0 0.003148 0
66 17 DL + 0.5LL + WL Combination 0 0 -0.02397 0 0.003067 0
67 17 DL + 0.5LL + ELx Combination 6.01E-06 0 -0.02397 0 0.003067 0
68 17 DL + 0.5LL +ELy Combination 2.71E-06 0 -0.02397 0 0.003067 0
69 18 DL + LL Combination 0 0 -0.03 0 0.002205 0
70 18 DL + 0.5LL + WL Combination 0 0 -0.02923 0 0.002148 0
71 18 DL + 0.5LL + ELx Combination 7.61E-06 0 -0.02923 0 0.002148 0
72 18 DL + 0.5LL +ELy Combination 3.43E-06 0 -0.02923 0 0.002148 0
73 19 DL + LL Combination 0 0 -0.03337 0 0.001135 0
74 19 DL + 0.5LL + WL Combination 0 0 -0.03252 0 0.001106 0
75 19 DL + 0.5LL + ELx Combination 9.02E-06 0 -0.03252 0 0.001106 0
76 19 DL + 0.5LL +ELy Combination 4.06E-06 0 -0.03252 0 0.001106 0
77 20 DL + LL Combination 0 0 -0.03451 0 -6.1E-17 0
78 20 DL + 0.5LL + WL Combination 0 0 -0.03363 0 -6E-17 0
79 20 DL + 0.5LL + ELx Combination 0.00001 0 -0.03363 0 -6E-17 0
80 20 DL + 0.5LL +ELy Combination 4.6E-06 0 -0.03363 0 -6E-17 0
SHEET 18 OF 18

JOB NO. : REV


CALCULATION SHEET FOR CASTELETED BRIDGE WITH 0
DOC. NO.
SPAN OF 23 M PTM-CAL.SS-C-001

22 Maret 17

TABLE: Joint Displacements


Joint OutputCase CaseType U1 U2 U3 R1 R2 R3
No
Text Text Text m m m Radians Radians Radians
81 21 DL + LL Combination 0 0 -0.03337 0 -0.00114 0
82 21 DL + 0.5LL + WL Combination 0 0 -0.03252 0 -0.00111 0
83 21 DL + 0.5LL + ELx Combination 0.000011 0 -0.03252 0 -0.00111 0
84 21 DL + 0.5LL +ELy Combination 5.05E-06 0 -0.03252 0 -0.00111 0
85 22 DL + LL Combination 0 0 -0.03 0 -0.00221 0
86 22 DL + 0.5LL + WL Combination 0 0 -0.02923 0 -0.00215 0
87 22 DL + 0.5LL + ELx Combination 0.000012 0 -0.02923 0 -0.00215 0
88 22 DL + 0.5LL +ELy Combination 5.41E-06 0 -0.02923 0 -0.00215 0
89 23 DL + LL Combination 0 0 -0.02459 0 -0.00315 0
90 23 DL + 0.5LL + WL Combination 0 0 -0.02397 0 -0.00307 0
91 23 DL + 0.5LL + ELx Combination 0.000013 0 -0.02397 0 -0.00307 0
92 23 DL + 0.5LL +ELy Combination 5.68E-06 0 -0.02397 0 -0.00307 0
93 24 DL + LL Combination 0 0 -0.01747 0 -0.0039 0
94 24 DL + 0.5LL + WL Combination 0 0 -0.01703 0 -0.0038 0
95 24 DL + 0.5LL + ELx Combination 0.000013 0 -0.01703 0 -0.0038 0
96 24 DL + 0.5LL +ELy Combination 5.86E-06 0 -0.01703 0 -0.0038 0
97 25 DL + LL Combination 0 0 -0.00908 0 -0.0044 0
98 25 DL + 0.5LL + WL Combination 0 0 -0.00885 0 -0.00428 0
99 25 DL + 0.5LL + ELx Combination 0.000013 0 -0.00885 0 -0.00428 0
100 25 DL + 0.5LL +ELy Combination 5.95E-06 0 -0.00885 0 -0.00428 0
101 26 DL + LL Combination 0 0 0 0 -0.00457 0
102 26 DL + 0.5LL + WL Combination 0 0 0 0 -0.00446 0
103 26 DL + 0.5LL + ELx Combination 0.000013 0 0 0 -0.00446 0
104 26 DL + 0.5LL +ELy Combination 5.95E-06 0 0 0 -0.00446 0

Das könnte Ihnen auch gefallen