:: Tamil Nadu Transmission Corporation Ltd ::

(A Subsidiary of TNEB Ltd.)

Grid Details Date : 06/09/12 Day : Thursday


Sl. Details Total Lighting Minimum Morning Cons-
No. Capacity Peak Load Peak umption
MW MW MW MW MU
Date 05/09/12 06/09/12 06/09/12 05/09/12
Time Hrs. 18:55 1:50 7:50
Frequency HZ. 49.72 49.77 49.75
1 TNEB
a) Hydro 2223.5 785 489 630 11.079
b) Thermal 2970 2135 2140 2150 51.554
c) Gas 516 151 149 149 3.494
2 Independent Power Plant 1180 480 483 482 11.462
3 Captive Power Plant
(i) CPP 214 84 92 83
(ii) CPP (Others) *574 500 500 500
21.561
Non-Conventional Energy Schemes
(i) (a) Cogen 336.6MW + (b) Bio mass 77.85 MW *749 294 290 297
4 (ii) TNEB wind *17.465
3084 2085 1822 66.187
(iii) Private wind *(6980.110)
5 Central Generatimg Stations
a) Neyveli TS1 (Relief to TNEB) 475 290 340 335 8.235
b) Capacity TNEB Share ** 2481
(i) NTPC (2600) + SIMHADRI (500 ) 754
(ii) Neyveli TS2 (1470) 474
(iii) NeyveliTS1Expansion (420) 226
(iv) Talcher St 2 (2000) 501 1822 1833 1541 46.915
(v) MAPS (440) 330
(vi) KAPS (880) 196

c) OD (+) / UD (-) 73 90 28
6 External Assistance
(i) Eastern region power. 305 30 33 33 0.697
Revised allocation by MOP from
(ii) 55 55 55 1.320
ISGS of SR & NTPC

Purchase thro IEX , PXIL &


(iii) From NVVN,PTC & Shree cement 246 246 318 6.506

Total 10364.5 10029 8826 8423 229.009


7 (i) Load Shedding 1286 510 1994 19.777
(ii) HT Relief & R&C 650 100 300 7.002
All time High Consumption 248.189 MU on 24/07/12
Demand 11283 MW on 26/06/12 18:30 49.81 HZ
Note: * Total Capacity Excluding Private Wind, Cogen & biomass .
** Extra allocation of 75 MW for evening peak Hrs from 26.03.08 onwards.