S.N Description of activity Actual Risk potential for Recommendation for
status prioritization of improvement
Ok/Not follow-up action
Ok/NA (High-A, Medium-
B, Low-C)
EXCAVATION
1 Are all underground & above ground utilities
identified and adequate protection in placed
before excavation (isolation)
2 Is the soil piled at least 1.5 meter away from
the edge of the excavation.
3 Are excavation collapse prevented by sloping,
shoring, benching as appropriate.
Is inspection of excavation made by an
experienced supervisor/engineer
- Before start of work
- As needed throughout the shift
- After rainstorms or any other hazard-
increasing occurrence and the
protection against slides and cave-ins.
4 Arrangement of illumination at construction site
is available (if required)
6 Is adequate ladder/ramp available for
access/egress of person in the pit. (Ladder
shall protrude 1m above the level of landing)
7 Is there any object liable to fall in the
excavation
8 Is everyone wears safety helmet & safety
shoes at site.
9 Are all temporary electrical connections routed
through ELCB/RCCB.
10 Ensure lying of temporary cables used for
operation of machines during construction
should not cause any danger for electrocution
for workmen.
11 After excavation all excavated pits adequately
barricaded and warning signs displayed.
Other Observations:
Risk Potential prioritization High-A: Immediate corrective action needs to be taken, Medium-B:
Action needs to be taken within a two days, Low-C: Action needs to be taken within a week
AL Sharif Group & GENERAL HEALTH & SAFETY CHECKLIST
KEC
INTERNATIONAL
LTD.
S.N Description of activity Actual Risk potential for Recommendation for
status prioritization of improvement
Ok/Not follow-up action
Ok/NA (High-A, Medium-
B, Low-C)
Other Observations:
Risk Potential prioritization High-A: Immediate corrective action needs to be taken, Medium-B:
Action needs to be taken within a two days, Low-C: Action needs to be taken within a week
AL Sharif Group & GENERAL HEALTH & SAFETY CHECKLIST
KEC
INTERNATIONAL
LTD.
S.N Description of activity Actual Risk potential for Recommendation for
status prioritization of improvement
Ok/Not follow-up action
Ok/NA (High-A, Medium-
B, Low-C)
Risk Potential prioritization High-A: Immediate corrective action needs to be taken, Medium-B:
Action needs to be taken within a two days, Low-C: Action needs to be taken within a week
AL Sharif Group & GENERAL HEALTH & SAFETY CHECKLIST
KEC
INTERNATIONAL
LTD.
S.N Description of activity Actual Risk potential for Recommendation for
status prioritization of improvement
Ok/Not follow-up action
Ok/NA (High-A, Medium-
B, Low-C)
TOWER ERECTION
Risk Potential prioritization High-A: Immediate corrective action needs to be taken, Medium-B:
Action needs to be taken within a two days, Low-C: Action needs to be taken within a week
AL Sharif Group & GENERAL HEALTH & SAFETY CHECKLIST
KEC
INTERNATIONAL
LTD.
S.N Description of activity Actual Risk potential for Recommendation for
status prioritization of improvement
Ok/Not follow-up action
Ok/NA (High-A, Medium-
B, Low-C)
taken up.
Other Observations:
Risk Potential prioritization High-A: Immediate corrective action needs to be taken, Medium-B:
Action needs to be taken within a two days, Low-C: Action needs to be taken within a week
AL Sharif Group & GENERAL HEALTH & SAFETY CHECKLIST
KEC
INTERNATIONAL
LTD.
S.N Description of activity Actual Risk potential for Recommendation for
status prioritization of improvement
Ok/Not follow-up action
Ok/NA (High-A, Medium-
B, Low-C)
CONDUCTOR STRINGING
Risk Potential prioritization High-A: Immediate corrective action needs to be taken, Medium-B:
Action needs to be taken within a two days, Low-C: Action needs to be taken within a week
AL Sharif Group & GENERAL HEALTH & SAFETY CHECKLIST
KEC
INTERNATIONAL
LTD.
S.N Description of activity Actual Risk potential for Recommendation for
status prioritization of improvement
Ok/Not follow-up action
Ok/NA (High-A, Medium-
B, Low-C)
Other Observations:
Risk Potential prioritization High-A: Immediate corrective action needs to be taken, Medium-B:
Action needs to be taken within a two days, Low-C: Action needs to be taken within a week
AL Sharif Group & GENERAL HEALTH & SAFETY CHECKLIST
KEC
INTERNATIONAL
LTD.
S.N Description of activity Actual Risk potential for Recommendation for
status prioritization of improvement
Ok/Not follow-up action
Ok/NA (High-A, Medium-
B, Low-C)
Risk Potential prioritization High-A: Immediate corrective action needs to be taken, Medium-B: