TELKOMSEL

RAN Design & Planning


Guidelines for JPP2015

Radio Network Planning 2014


Capacity Upgrade Key Focus

2G 3G
3G Carrier upgrade
SOW. FOCUS

TRX upgrade
Node B upgrade : CE, HS user, HS
TRX license pooling
code, Power, IUB.
VAMOS activation
CE license pooling
Transport Upgrade
Intermediate link transport upgrade
BSC upgrade
RNC upgrade

Traffic & capacity optimization


High RF & payload utilization cells
(layering, channel reconfiguration)
REFERENCE

High Node B utilization cells


TCH blocking cells after optimization
RAFI, NARU & hot spot event
probability
High utilization transport /
High TBF Cells
bottleneck intermediate link
RAFI, NARU & hot spot event
Additional capacity load in RNC
Additional capacity load in BSC

1
3G Carrier Upgrade
REGULAR 3G Carrier Upgrade Criteria :
Average Total Power Downlink utilization > 70%
Average Power Downlink utilization for R99 > 60%
Average daily payload per Cell Carrier > 5 GB
Average HSDPA user per cell carrier > 25 (in general)
RTWP > -95 dBm (in busy hour)
Average Code Utilization > 70%
(Based on measurement of average BDBH 4 weeks)

HOW TO PRIORITIZING BASED ON CRITERIA


- The above criteria should be triggered in >= 50% cells of NodeB
- Prioritizing based number of criteria triggered as follow :
- 4 5 criteria triggered : Prior1
- 2 3 criteria triggered : Prior2
- 1 criteria triggered : Prior3
3G Upgrade
POWER /PA UPGRADE
High Power Utilization Total Power Utilization > 70% and
Not Overshooting PRACH/MR Samples greater than ISD (Inter Site Distance) < 10% and
Low Coverage RSCP Samples < -95dBm inside ISD (Inter Site Distance) > 20% and
CPICH = 10% of Total PA
CE UPGRADE
HS USER R99 CE DL/UL Utilization > 70% or
Is a trade off between accessibility and user R99 CE DL/UL Congestion > 1%
throughput experience. Increasing number of HS user CE license would be taken from CE
will reduce user throughput experience and reducing Pooling
spectral efficiency BASEBAND UTILIZATION
Already second carrier HSPA PROCESSING SET (Nokia Only)
Non POI Area in order to guarantee user HSDPA/HSUPA PS Utilization > 85% or
throughput Baseband Utilization > 85%
HSDPA user per cell carrier > 85% CNBAP Utilization (Huawei Only)
More than 70% cell carrier already triggered CNBAP Utilization > 90%, upgrade
WBBP or WMPT/UMPT

HSDPA CODES LICENSE Upgrade (Huawei & Ericsson) IUB UPGRADE


HS-PDSCH Codes Utilization > 70% Average IUB ATM/IP Utilization > 60% or
Max IUB ATM/IP Utilization > 90%
CE & TRX Upgrade from LICENSE POOLING
CE & TRX upgrade must be as much as possible using CE & TRX from pooling resources
Site Criteria : Donor Site Criteria :
2G : - TRX Utilization Healthy threshold 60% Low Utilization Site
- TRX HIGH UTIL > 70% Utilization after downgraded (include projection) < 50%
- TRX LOW UTIL < 20% Low Revenue Site
- TRX Availability > 99% Minimum CE after downgraded as described in Site Criteria
- TCH Blocking < 2%
3G : - CE UL/DL Utilization Healthy 60% Acceptor Site Criteria :
- CE HIGH UTIL > 70% - Min CE UPLINK 384 High Utilization Site
- CE LOW UTIL > 20% - Min CE DOWNLINK 256 High Blocking/Congestion

4
CAPABILITY UGPRADE
Capability Upgrade Key Focus

2G 3G
Standard BOQ for BBC 30
SOW. FOCUS

HSDPA 21 Mbps
Feature harmonization to Standard
HSDPA DC 42 Mbps
BOQ NGTINEM
HSUPA 5Mbps
BSC transport over IP (Gb & A)
Iub over IP transport
HW & SW for new NE
RNC transport over IP (IuPS, Iur, IuCS)
Feature harmonization to NGTINEM

Top BBC & PoI


REFERENCE

HW & SW definition in NGTINEM


HW & SW definition in NGTINEM
Standard feature in NGTINEM
Standard feature in NGTINEM
BSC capability
RNC capability
Core pooling plan
Core pooling plan

6
Capability Upgrade for BBC 30

Improving BBC Quality of Experience


BBC-6
BBC-24
HSPA Capability Upgrade for Non BBC 30
HSUPA 2Mbps Criteria :
HSUPA 2 Mbps is mandatory for all 3G NodeB

HSUPA 5Mbps Criteria :


Minimum site 2nd carrier with HSUPA 2 Mbps already activated and
Number of Existing HSUPA user per cell carrier > 10 and
Minimum UE capable HSUPA 5Mbps > 50% of total HS user and
Existing RTWP > -95 dBm (to guarantee that user could have required RF quality to get HSUPA
5Mbps)
HSDPA 21Mbps Criteria
CQI > 26 more than 30% of total CQI samples and
HSPA21Mbps (Cat 14) penetration > 25%
HSDPA 42Mbps Criteria
CQI > 26 more than 30% of total CQI samples and
HSPA21Mbps (Cat 14) penetration > 25% and
UE with DC-HSPA capable (CAT 21 above) > 10%

All related capability upgrade in NON BCC must consider potential additional revenue and
budgetary
TOWARD ALL IP NETWORKS A Over IP, Gb Over IP, IuCS Over IP

BSC
All BSC should be migrated to A and Gb Over IP .
The implementation would be gradually and prioritized based on :
- Covering for BBC6 and BBC24
- Most easiest in term of hardware/software dependencies and available transport
- Highest BSC capacity

RNC
All RNC should be migrated to IuCS and IuPS Over IP .
The implementation would be gradually and prioritized based on :
- Covering for BBC6 and BBC24
- Most easiest in term of hardware/software dependencies and available transport
- Highest RNC capacity
10