2 Earth works
5 Block work
11 HVAC System
Note:
The Lump sum Prices indicated by the contractor as above shall cover the entire scope of works detai
specifications, drawings and contractual documents which form part of the contract, whether or not itemiz
AMOUNT in SAR
contractor as above shall cover the entire scope of works detailed in the tender
l documents which form part of the contract, whether or not itemized above.
Provide, Maintain and take back after project completion contractor Porto
1.02 cabin office for this package and their subcontractors complete with Lot
water supply, drainage connection, electricity etc.
Site facilities for labours including shaded & air-conditioned rest area/meal
1.04 Lot
room and restrooms.
Supply & fix Project signboard for project information and light box for
1.05 Lot
perspective
1.06 Shop drawings & As-Built Drawings for Civil, Arch, MEP items etc., Lot
1.08 Items not listed above but specified elsewhere in contract Lot
Complete Earth work for Pump room foundation including site leveling,
2.01 excavation, backfilling, etc.
3.01 Blinding below raft foundation as per the structural drawings & details. m2
RCC for Raft foundation and all associated works as specified including
3.02 catch basins, embedded sleeves, conduits etc. Locations, sizes and number m
of such provisions to be confirmed during construction.
RCC for all types of service pits, Electrical trenches/Duct Bank between LC-
3.04 m
1 Building to Primary Pump Building
3.05 Other works not listed above but specified elsewhere in contract Lot
RCC for columns and column heads at various levels As per the drawing &
4.01 m
details
4.05 Other works not listed above but specified else where in contract LS
5 Block work
Roof water proofing system with light weight concrete, 4mm water
proofing membrane, 70mm rigid poly foam, 350gm/Sqm Non woven
6.01 Geotextile Fabric layer, 50mm gravel for drainage system & 40mm Loosely m2
laid concrete tiles as finished surface all as per specification & drawings
with 10 years guarantee.
A Doors
Supply and install All doors with door frame, iron monogamies and all
accessories as per drawings, details & specifications
All steel doors are 2 hrs. fire rated & All wooden doors are 1 hr. fire rated.
7.01 Single leaf Steel Door (D03 - 1000 X 2200mm High) Nr.
7.02 Double leaf Steel Door (D04 - 2500 X 3000mm High) Nr.
B Windows
Supply and install All Windows with window frame, iron monogamies
and all accessories as per drawings, details & specifications
7.07 Access panels, steel covers, removable grating, closures for openings Lot
Supply and install steel - CAT Ladder/"Monkey Ladder " with all fixing
7.08 Nr.
accessories as per the drawing & details
7.09 Items not listed above but specified elsewhere in contract Lot
Epoxy floor (Nito-floor FC 150 with Nito Floor Anti-slip grains or equivalent)
8.01 m2
finish -50 mm Thick for Pump area.
Epoxy floor finish over 100mm power floated sealed screed for electrical
8.02 m2
equipment rooms etc. as per drawing & finishing schedule.
Wall Finishes
Supply & apply Emulsion paint over AAC thermalite blocks and fair face
8.03 m2
concrete works as per the drawing & finishing schedule.
Ceiling Finishes
Supply & apply Emulsion paint over fair face concrete surface as per the
8.04 m2
drawing & finishing schedule.
External Finishes
Supply & apply Epoxy paint over 20mm thick plastered walls as per
8.05 m2
drawing & details.
Supply and Install Cold Water Pipe work with associated valves including
9.01 Lot
insulation (as applicable) etc., including Testing & Commissioning.
9.02 Items not listed above but specified elsewhere in contract Lot
Internal process drainage pipes, fittings and accessories of various dia. for
10.01 Lot
building including insulation (as applicable) upto the TIE-IN Point
External process drainage pipes, fittings and accessories of various dia. for
10.02 Lot
plant as per the drawing & details.
Floor traps, gully traps, cleanouts, Man hole, floor drains, funnel drains,
10.03 Catch basins, flanges and covers at various locations as shown on drawing Lot
for drainage.
10.05 Items not listed above but specified elsewhere in contract Lot
11 HVAC System
11.05.03 Supply and Install of a Centralized station for Control and monitoring Lot
Approvals from local authority & client - Fire Protection and Fire alarm &
12.01 Lot
detection system etc.,
Supply and install a Standpipe - Automatic Fire Hose Reel with all relevant
12.02 Lot
piping, all supervised valves etc., as per the layout drawing.
Supply and install a sprinkler fire protection network with all relevant
12.03 piping, all supervised valves, all sprinkler heads, etc., as per the layout Lot
drawing.
Supply and install a Clean Agent Fire Suppression System in All Electrical
Equipment rooms as per layout drawings.
12.04 LS
NOVEC Fire Suppression system in VFD room (Refer layout drawing for
room size).
Supply and install all portable fire extinguishers in accordance with NFPA
12.05 Lot
Standards and as per drawings
12.06 Supply and install Fire Detection & Alarm System with Control panel. Lot
Supply and install all cables with accessories between fire alarm panel and
fire detection devices, Remote fire alarm panel, Alarm valve, Flow
12.07 Lot
switches, Plant Control System, PLC, Clean Agent System and as required
by Drawings, Specifications and Standards.
Items not listed above but specified elsewhere in contract (Bidders should
12.10 Lot
provide details of such items with breakdown)
Indoor lighting / Roof Lighting fixtures including lamps with all required
13.02 Lot
accessories.
All kind of outdoor lighting fixtures including lamps with all required
13.03 Lot
accessories (Note : external light poles & lighting fixtures by others)
Emergency & Exit lighting fixtures with lamps and all required accessories
13.04 Lot
and lighting control devices as per Civil Defense requirements
Indoor / Roof Floor Power sockets with switches, lighting control switches.
13.05 Lot
including all required accessories and control devices.
Welding Socket / Three Phase Industrial type Power sockets with switches,
13.06 Lot
including all required accessories and control devices.
Cabling for all Light fixtures, UPS-SUBDB, all switches, all sockets and
13.07 control devices. Including required conduits/trays/trunking / race ways, Lot
junction boxes, fire stopping material at wall crossings and accessories.
Main Grounding system, including earth pit, earth rods, copper bars, test
clamp and all necessary fixings as applicable and as shown on the
13.12 Lot
preliminary drawings and as specified including integration with DC Plant
Grounding system
Lightning Grid for TES Tanks Lightning protection system with necessary
13.13 accessories as applicable; as shown on the preliminary drawings and as Lot
specified. Including integration with DC Plant lightning Protection System.
Items not listed above but specified elsewhere in contract and/or required
13.16 to complete the work. (The contractor shall provide detailed breakdown Lot
prices to justify the amount mentioned against this item.)
20-Apr-2017
630922
C-2001.3
Unit Rate Amount in SAR
N/A
Included
20-Apr-2017
630922
C-2001.3
Unit Rate Amount in SAR
Included
Included
20-Apr-2017
630922
C-2001.3
Unit Rate Amount in SAR
included
included
Rate Only
20-Apr-2017
630922
C-2001.3
Unit Rate Amount in SAR
Rate Only
included
20-Apr-2017
630922
C-2001.3
Unit Rate Amount in SAR
included
Included
By others
Included
20-Apr-2017
630922
C-2001.3
Unit Rate Amount in SAR
Existing
20-Apr-2017
630922
C-2001.3
Unit Rate Amount in SAR
Included
20-Apr-2017
630922
C-2001.3
Unit Rate Amount in SAR
Included
20-Apr-2017
630922
C-2001.3
Unit Rate Amount in SAR
N/A
(Part of TA
scope under
Consortium
agreement.)
20-Apr-2017
630922
C-2001.3
Unit Rate Amount in SAR
included
1 EARTHWORK
1.12 Backfill using road base material (250mm thick) compacted to 98% MDD m3
3.11 600 x 600 heavy duty manhole cover and frame Nr.
5 FORMWORK
5.03 To columns m2
6 REINFORCEMENT
6.01 Mild steel bar reinforcement supply and installed incl. Wastage kg
7 BLOCK WORK
Autoclaved aerated thermalite block work laid in mortar,
including all ties to concrete and DPC complete as per particular
specification.
7.01 100mm thick wall m2
Sl.No. Prepare,
Descriptionprimer and apply two coats of solvent free rubberized bitumen Unit
8.01 m2
emulsion to horizontal
Prepare and lay one layer of polythene membrane 1000 gauge, with
8.02 m2
laps.
Concrete structure waterproofing using 1.50mm self-adhesive
8.03 m2
membrane with 3mm protection board
Concrete structure waterproofing using 1.50mm self-adhesive
8.04 m2
membrane with 50mm thick protection screed
8.05 Water tank internal water proofing with 4 mm thick GRP Lining m2
8.06 Water tank internal water proofing with 2 mm thick GRP Lining m2
4mm torch applied waterproofing membrane to floor / wall with 3mm
8.07 m2
protection board/plywood/screed, complete with primer
Liquid applied waterproof membrane 1.50mm thick Master seal 180 or
8.08 m2
equivalent
8.09 4mm torch applied waterproofing membrane to floor / wall m2
9 GROUTING
9.01 To underside of base and machinery bed plates not exceeding 0.50m2 (Ep Nr.
9.02 To underside of base and machinery bed plates not exceeding 0.50m2 (non Nr.
10 ANCHOR BOLTS
11.01 Primary steel work in stanchions, beams columns, runway beams & the lik Kg
11.03 Prefabricated mild steel hand railing, ladders and the like including fixings Kg
11.04 Galvanized angle iron for concrete embedment cut to size and shape with Kg
14 ARCHITECTURAL FINISHES
14.01 Non slip ceramic floor tiles (CERYPSA SPAIN) m2
Sl.No. 15mm
Description
thick cement and sand plaster to concrete and block work walls, Unit
14.1 including all angle beads, expanded metal lathe and the like, to receive m2
paint.
14.11 Glazed ceramic wall tiles m2
14.12 15mm thick cement and sand plaster to concrete soffits to receive paint m2
External plaster 15mm -20mm thick cement and sand plaster to concrete
14.16 m2
and block work walls to receive paint.
Prepare, primer, putty and apply one undercoat and 2 top coats of
14.17 m2
washable plastic emulsion paint to plastered walls / ceiling
Prepare, putty as required primer and two coats of Oil paint to plastered
14.18 m2
walls & ceiling
Prepare, primer, putty and apply polyurethane epoxy (texotile) paint over
14.19 m2
plastered wall / ceiling
Prepare, primer, putty and apply acrylic epoxy paint over plastered wall /
14.2 m2
ceiling
14.21 Matt Emulsion Paint on internal concrete and blocks m2
14.22 Exterior stone paint finish over plastered & concrete wall / columns m2
PAVING AND SURFACING
200 x 300 chamfered precast concrete kerb stone with bedding, haunch
14.26 m
and paint
FENCING
Chain link fencing using PVC coated Post, wires, fence and barbed wires,
14.27 m
2.20m high
Chain link fencing using PVC coated Post, wires, fence and barbed wires,
14.28 m
3.00m high
Chain link fencing using concrete Post at every 3.00m, tie beam, wires,
14.29 m
fence and barbed wires, 2.20m high
14.31 Single personnel Access Gate 1.00m wide with post Nr.
14.32 Double Gate 8.0m wide with roller, post and accessories Nr
15.101 Cable Tray 400mm, Hot Dip Gal., Max load =1.5kN meter
15.102 Cable Tray 200mm, Hot Dip Gal., Max load =3.0kN meter
15.103 Cable Tray 600mm, Hot Dip Gal., Max load =3.0kN meter
15.104 Wall Bracket 410mm, Hot Dip Gal., Max load =3.0kN each
15.105 Wall Bracket 510mm, Hot Dip Gal., Max load =3.0kN each
15.106 Wall Bracket 510mm, Hot Dip Gal., Max load =5.5kN each
15.107 Wall Bracket 710mm, Hot Dip Gal., Max load =5.5kN each
15.2 Conductors
Sl.No. Description
15.210 1C 95 sq.mm PVC(G/Y) Unit
meter
15.310 32 amp TPN+E socket outlet with local isolator for Welding Equip. each
Sl.No. Description
15.317 Switch bank with phase barrier Unit
each
15.333 70W metal Halide high bay light fixture with IP-65 No
15.504 Build drainage manhole complete, 1.50m deep with DI cover Nr.
15.505 Build drainage manhole complete, > 1.50m deep with DI cover Nr.
15.506 GI sleeve with puddle flange, 600mm long, 200 mm dia. Nr.
Sl.No. Description
15.507 1" PVC conduit / sleeve pipe and accessories Unit
m
Sl.No. Description
16.214 8" dia. Victaulic Grooved type pipe Unit
meter
16.3 Valves
16.304 100mm dia -OS & Y gate valve-Supervised Type with all accessories each
16.305 150mm dia OS & Y Supervised type gate valve with all accessories each
16.306 50mm dia Non return valve with all accessories each
16.307 100mm dia Non return valve with all accessories each
16.308 200mm dia Non return valve with all accessories each
16.4 Others
16.406 Alarm check Valve- 100mm dia with all accessories each
16.409 Alarm check Valve- 80mm dia with all accessories each
16.410 Flexible coupling (Expansion Bellows)- 100mm dia with all accessories each
16.411 Flexible coupling (Expansion Bellows)- 50mm dia with all accessories each
Sl.No. Description
16.419 Double cabinet Unit
each
Sl.No. Description
16.516 Mimic Panel Unit
each
16.614 Gas Cylinder with all accessories - Type 1-650 LBS without gas each
16.615 Gas Cylinder with all accessories - Type 2-375 LBS without gas each
16.616 Gas Cylinder with all accessories - Type 3-215 LBS without gas each
16.617 Gas Cylinder with all accessories - Type 4-125 LBS without gas each
Sl.No. Description
16.702 11/4" dia.- Threaded type pipe and fittings Unit
meter
Sl.No. Description
17.120 EF - 02 TOILETS Unit
each
17.128 FCU -02 ELE.ROOM, TELECOM ROOM, FIRE PUMP ROOM, AHU ROOM each
Piping - Contractor Should provide separate list of unit prices for the,
Piping, insulation and cladding flanges, Joints, Bends, support materials
17.135
used for this project (But not limited to the follows). The price shall be
included with Labor and complete material for the each Item Unit.
Sl.No. Description
17.149 6" dia. - Pipe Unit
meter
Sl.No. Description
17.181 1" Double Regulating Valve Unit
each
Sl.No. Description
17.209 Open/Close Spring Return Damper Actuator (16NM) Unit
each
Cabling - Contractor Should provide separate list of unit prices for the
17.216 Cabling, Conduits/Trays. The price shall be included with Labor and
complete material for each Item Unit.
18 Drainage System
SCHEDULE OF RATES FOR SUPPLY AND INSTALLATION OF NECESSARY
ITEMS AS AND WHEN REQUIRED; RATES SHALL BE INCLUSIVE TO CATER
OF ALL MATERIAL, WASTAGE, TRANSPORTATION, LABOUR WITH SMALL
TOOLS AND EQUIPMENT, OVERHEAD & MARKUP, ETC.
Sl.No. Description
18.119 3" dia Tee Branch Unit
each
Sl.No. Description
19.107 Air Release Valve Unit
each
19.110 Water Service System pipe - 1" Dia with all fittings meter
19.111 Water Service System pipe - 1 1/4" Dia with all fittings meter
19.112 Water Service System pipe - 1 1/2" Dia with all fittings meter
19.113 Water Service System pipe - 2" Dia with all fittings meter
19.114 Water Service System pipe - 4" Dia with - Underground meter
19.117 Water Service System pipe - 6" Dia with - Underground meter
19.120 Water Service System pipe - 8" Dia with - Underground meter
2.10 Water tanker, with 3000gal water good for construction hr.
PRICING PREAMBLES
ITEM DESCRIPTION
REF.
PRICING PREAMBLES
GENERALLY
1 The Bills of Quantities herein, including all notes and instructions, form an integral part of t
Documents. However, the descriptions contained in the Bills of Quantities for each item are not
complete. The Contractor is referred to the Conditions of Contract and other Documents, Specifi
Drawings as well as relevant Standards and Codes of Practice for further information as no claim
will be considered on account of the Contractor's failure so to do.
2 The Contractor is cautioned to familiarize himself with the full content of other Contract Documen
the Drawings and Specification (or any other information that can be reasonably inferred from a
and all obligations contained in the documents shall be included in the tender prices, even if sp
relating to them are not listed in this Bills of Quantities.
3
The Contractor's unit rates are to be the fully inclusive value of the work described and mus
related work, accessory or consumable materials, incidental labour, supervision, administr
construction equipment, overhead and profit and all costs and expenses which may be required in
completion of the work described together with all costs and expenses in complying with all g
liabilities and obligations set forth or implied in the Drawings, Specification and Conditions of
rates and amounts shall be gross and shall include for main contractor's overheads, profit and
special attendances.
4 Drawings, Specifications and Bills of Quantities and all other Contract documents are compleme
any item is included in any of them, it shall be deemed included in all.
6 The Contractor's bid for the entire work shall provide for supervision of any or all trades that is not
be performed with his own forces. No extra compensation for services as a General Contractor wil
7
The lump sum amount entered by the Contractor in this Bills of Quantities shall constitute the ent
compensation for the work under this Contract in accordance with the Conditions of Contract. The
not be remeasured and will be subject to adjustment only as a result of changes in the scope of w
changes in drawings and/or specifications.
8 The Contractor shall check the quantities contained within the Bills of Quantities and confirms his
thereof by submission of this Tender. Any discrepancy between billed quantities and actual quan
shall not be subject to remeasurement on completion.
PRICING PREAMBLES
ITEM DESCRIPTION
REF.
9 Any error in description or in quantity or in omission of items from the Bills of Quantities shall no
Contract nor release the Contractor from the execution of the whole or any part of the Work
therein according to the Drawings and Specifications or from any of his obligations or liabilitie
Contract. Any error in or omissions from the Bills of Quantities shall not be corrected by a variati
the Engineer.
10 The Contractor shall request written clarification from the Engineer of any point he consid
discrepancy or ambiguity and append the value (if any) to the Bills of Quantities as a Tender adjust
11 The Bills of Quantities shall be used for evaluating progress payments due to the Contractor.
12 The Contractor is required to check the numbers of the pages of the Bills of Quantities and sh
found missing or in duplicate or the figures or writing indistinct, the Contractor must notify the
once and have the matter rectified before the tender is submitted. No liability whatsoever will be
in respect of any claim for errors in the Contractor's tender resulting from failures to comp
foregoing.
13 The Contractor is required to provide with his tender two complete sets of the Bills of Qua
quantified and priced out in waterproof ink with summation sheets properly completed.
Provision has been made for the total of each page to be collected at the end of each bill of
14 Quantities.
15 The Contractor should allow against the items or in the prices for everything contained in th
Quantities which has a monetary value.
16
A rate shall be entered by the Contractor against each item in these Bills of Quantities. Items a
no price or rate is entered will be considered as covered by other prices or rates in the Bills of
Irrespective of whether the Contractor includes a price or rate against an item he shall insert
quantity.
17 Lump sums shall not be given where unit rates are applicable.
18
Unit rates may be used reciprocally in the settlement of accounts unless conflict between them
Contractor is, therefore, to ensure that identical items occurring in separate bills are not priced
rates unless this is his deliberate intention.
19
This Bills of Quantities shall be measured generally in accordance with the Rules of POM (I) (as
defined). In any case in the Bills of Quantities where the method differs then the method expres
accepted and measured in accordance therewith. Notwithstanding the above, the following pricin
are included as an amplification or clarification of the method of measurement required.
20 Items in the Preambles Section of these Bills of Quantities are deemed to qualify and to form p
description of measured work to which they refer including composite descriptions.
21 Amendment shall not be made to the Bills of Quantities without the authority, in writing, of the Eng
PRICING PREAMBLES
ITEM DESCRIPTION
REF.
22
The Contractor shall not use these Bills of Quantities as a construction programme or for the
ordering materials or arranging sub-contracts. The references for these activities shall be th
specification and instruction issued by the Engineer.
FORMAT OF DESCRIPTIONS
m - Metre
m2 - Square Metre
m3 - Cubic Metre
No - Number
Kg - Kilogram
KN - Kilo Newton
DEFINITIONS
A "Prices also to include"; items under this heading fall into two categories:
(i) Those which are deemed to be included in descriptions and, therefore, in prices.
(ii) Those for which the Contractor shall allow for in his prices.
C "Cross Falls", "Cross Slopes", "Cross Weathered" : inclination from the horizontal in more than one p
(ii) All costs in connection with Supervision, Co-ordination and Quality Control of the Work.
(iii) Complying in every respect with the requirements of the specifications and drawings.
(vi) Fitting and/or fixing materials and goods in position : hoisting to any height.
PRICING PREAMBLES
ITEM DESCRIPTION
REF.
E All measurements are net and the rates shall include for all laps, waste, working space and trade
allowances.
(i) Pricing Preambles and Specifications shall apply reciprocally between sections of the w
otherwise described.
(ii) Materials shall be of the quality specified unless otherwise directed by the Engineer.
(iii) All materials shall be transported, handled, stored and fixed in accordance with the printed
or recommendations of their manufacture or suppliers.
(iv) Protection of completed work, all casings and temporary coverings and making good and c
upon completion.
A Building paper, damp proof membrane, quilts and all non-rigid sheet materials shall include cuttin
holes and notching and the extra labour of turning up at edges and the like.
C Holes, mortises, pockets, grooves, chases and the like and items described as "built in" and "c
include making good in its fullest sense and through, around, into, over and up to the items concer
E Where the word "allow" is used, the cost of the items shall be the responsibility of the Contractor.
F The amounts set against any items of profit shall include for all costs in connection with letters of
charges, interest charges and insurance after the materials come under the control of the Contract
G The Contractor shall leave the whole of the works ready for immediate occupation to the satisfa
Engineer including but not limited to the following:
(i) Cleaning and touching up the buildings both inside and out, leaving all surfaces fre
blemishes or splashes.
PRICING PREAMBLES
ITEM DESCRIPTION
REF.
(ii) Easing, oiling and adjusting and making good of finishes to all fittings, doors, windows,
and the like.
(iii) Cleaning and polishing all glass, marble, ceramics, anodized aluminium and sanitary wa
the removal of all protective coverings, paint splashes and the like.
(iv) Replacement of all or any chipped, cracked or broken items mentioned in Item (iii) above.
(vi) Removal of rubbish, debris or excess spoil from the site area and raking over and cleanin
parts of the site area.
Fix Only
H The expression "fix only" used in these Bills of Quantities means that the contractor shall provide t
(i) Fixing as defined in Clause GP7.2 of POM (I).
(ii) All requirements of Pricing Preambles page PM/3 Clauses D and F above
(iv) Giving and marking dimensions and taking responsibility for their accuracy.
(vii) Casing up and protection, including clearing away protection on completion of the works.
(viii) Full cost of replacement of any items which are damaged, broken, lost or stolen after the ac
the items from the supplier or client and until handling over the complete works.
Supply Only
A The expression "supply only" used in these Bills of Quantities means that the Contractor is to
everything as defined in Clause GP4.1 of POM (I) in connection with such items except fixing in pos
Sub-Contractors
B Any sub-contractors which the Contractor proposes to use for the works are subject to the app
Engineer and Employer.
C The Contractor should ascertain from sub-contractors and suppliers before the work is put in han
of positions in which chases, holes, mortises, and the like will be required to be formed or left.
the extra costs of cutting away
362490201.xlsx - Pricing preambles Page 74/ 111
King Khaled International Airport
PRICING PREAMBLES
ITEM The Contractor should ascertain from sub-contractors and suppliers before the work is put in han
DESCRIPTION
REF. of positions in which chases, holes, mortises, and the like will be required to be formed or left.
the extra costs of cutting away
D Any sub-contractor who has not been approved by the Engineer and Employer shall not be used in
with the carrying out of the Works.
E The Contractor shall allow for any additional costs incurred due to sub-contractors working diff
from and extended hours to those worked by the Contractor.
G The Main Contractor shall be responsible for providing, including but not limited to, the following at
(viii) Giving and marking dimensions and taking responsibility for their accuracy.
Sub-Contractors (Cont'd)
A Attendance to be provided by the Sub-Contractor shall include but not limited to the following
(i) All special scaffolding required by him in the execution of his works.
(ii) Taking from stores, distributing, hoisting and placing in position, all items of plant, equ
materials required by him in the execution of his works.
362490201.xlsx - Pricing preambles Page 75/ 111
King Khaled International Airport
PRICING PREAMBLES
ITEM DESCRIPTION
REF. Taking from stores, distributing, hoisting and placing in position, all items of plant, equ
materials required by him in the execution of his works.
(iii) All labour, plant, etc., (other than included in Attendances to be provided by Main Contracto
(iv) Site offices and stores required by him for the execution of his works.
(v) Obtaining security passes for access of work people to the Site.
SECTION ; SITEWORK
EARTHWORKS
Method of Measurement
A The method of measurement and remeasurement will be entirely at the discretion of the E
generally will be as follows:
Where there is no reduced level excavation, other excavations will be measured from na
(i) level.
(ii) In instance where there is excavation to reduce levels, other excavations will be measur
reduced level.
B Should the Contractor be able to use any excavated material arising from the works as general fi
shall be measured as material backfilled in making up levels with a deduction of items for fi
material removed from site.
Prices
C In addition to the provisions of POM (I) Section B8 rates for excavation shall include, but not lim
following:
Excavating by whatever means are necessary including hand excavation in any kind
(i) including rock.
(ii) Over break including filling with mass concrete to the levels required by the Engineer.
(iii) Forming temporary spoil heaps where required and multiple handling.
(v) Trimming or grading ground to produce level surfaces or surfaces to falls or slopes.
Prices
A
The Contractor should ascertain from the Engineer the total number of locations of items to be fo
cast into in-situ and precast concrete including those which are not specifically shown on the dr
cutting away of concrete shall be carried out without the approval of the Engineer. All remedial w
carried out at the Contractor's expense.
362490201.xlsx - Pricing preambles Page 76/ 111
King Khaled International Airport
PRICING PREAMBLES
ITEM
The Contractor should ascertain from the Engineer the total number of locations of items to be fo
DESCRIPTION
cast into in-situ and precast concrete including those which are not specifically shown on the dr
REF.
cutting away of concrete shall be carried out without the approval of the Engineer. All remedial w
carried out at the Contractor's expense.
B The rates for all concrete work shall include, but not limited, for the following:
(iii) Mixing, hoisting and placing and compacting on the surfaces of any material or on f
whatever means necessary.
(vii) Curing and protecting concrete surfaces from harmful weather conditions.
C The rates for plain concrete foundations and concrete blinding shall include, but not limited, for the
D The rates for reinforced concrete shall include for working concrete around reinforcement.
E The rates for bar reinforcement shall include, but not limited, for the following:
PRICING PREAMBLES
ITEM DESCRIPTION
REF.
A The rates for fabric reinforcement shall include, but not limited, for the following:
B The rates for formwork or moulds shall include, but not limited, for the following:
(ii) All cutting and waste including raking curved or circular cutting and cutting and notching a
ducting and fittings.
(iii) Setting up, strutting and supporting at any height above the structure subject to any
imposed by the Engineer.
(v) Carefully coating with shutter oil ensuring that no shutter oil is applied to surfaces of reinfor
(vi) Easing, striking, removing and cleaning and preparing for re-use and removal when no long
(vii) The provision of all props, stays, struts, wedges and bolts.
(x) Rubbing down, filling and making good the surface of concrete after removal of shuttering.
(xi) Cutting or notching shutters or moulds to in-situ or precast concrete around projecting reinf
C The rates for wrought formwork to produce a special finish shall include, but not limited, for the fol
(i) Any necessary rubbing down or fillings allowed by the specification to produce the finish d
the specification.
Cutting out and re-casting unsatisfactory work or work not fulfilling the requirem
(ii) specification.
PRICING PREAMBLES
ITEM DESCRIPTION
REF.
(iii) Carrying out remedial or any other work required by the Engineer as an alternative to
substandard work.
A The rates for precast concrete shall include, but not limited, for the following:
(ii) Forming a fair face in accordance with the specification to all exposed surfaces.
(viii) Sills and copings etc. shall include for plain ends and mitred angles where necessary.
B Reinforcement to Masonry
The contents of this section equally apply to reinforcement included within the Masonry section o
Quantities, unless otherwise stated.
Notwithstanding clauses C3 and C4 the reinforcement and shuttering to insitu concrete works shal
to be included in the relevant concrete item. All the requirements detailed above shall be deemed
the insitu concrete volume rates.
SECTION : MASONRY
Prices
A The rates for block walls shall include, but not limited, for the following:
PRICING PREAMBLES
ITEM DESCRIPTION
REF.
(vii) All labour and materials necessary for closing wall cavities.
Special or concrete filled blocks at angles, openings and intersections, and soffits junction a
(xii) walls.
(xiii) Providing any means necessary to prevent concrete cast on hollow block work or over c
falling into voids or cavities (subject to the approval of the Engineer).
(xvi) All necessary cast in wall ties at junctions between block work and in-situ concrete.
(xvii) All horizontal expanded reinforcement to load bearing block work in accordance with the Sp
All necessary expansion joints, control joints and termination bars as required by t
(xviii) Documents.
B The rates for block walls shall include, but not limited, for the following additional labours:
(i) Cutting or forming chases or grooves for slabs, partitions, staircases, etc.
(ii) Cutting grooves for water bars, flashings and the like and making good and pointing in simi
(iii) Building in or cutting and pinning in and making good ends of lintels, brackets, timbers
holder bats and the like.
(iv) Building in or cutting for and making good around pipes, ducting, fittings and the like.
SECTION : METALWORK
Prices
A The rates for metal work shall include, but not limited, for the following:
PRICING PREAMBLES
ITEM DESCRIPTION
REF.
(i) Allowance for rolling margin.
(iv) Cutting to size and shape and joints in the running length.
(v) Notches, holes, slots, mitres, angles, ends and for all drilling and splay cut ends.
(vii) Fixing with appropriate non-corroding countersunk screws including holes unless otherwise
(viii) Riveted and bolted work shall include rivets, bolts and holes.
(ix) Approved protection to cut ends or holes in galvanized work or other applied finish.
(xi) Metal door frames shall include for assembling, fixing with clamps, filling with mortar
supports and removal of base ties.
(xii) Floor plates, duct coves and the like shall include narrow widths laying in position and f
slots and the like making good.
Definitions
B
"Welding" is deemed to be in accordance with the specification and for the material to which it is
Base plates, ends, caps, cleats, brackets, stiffeners, bolts, etc., have been included in the we
associated steelwork in which they occur.
SECTION : WOODWORK
Generally
C Woodwork shall be deemed to be fixed with non-corroding nails unless otherwise described.
D Screwed woodwork shall be so described according to convention except that grooves, rebates
shall include for splayed grooves, rebates and the like.
E Special millings shall be described according to convention except that grooves, rebates, and t
include for splayed grooves, rebates and the like.
PRICING PREAMBLES
ITEM DESCRIPTION
REF.
Prices
F The rates for woodwork shall include, but not limited, for the following:
G The rates for framed woodwork shall include but not limited, for the following:
H The rates for milled woodwork shall include, but not limited, for the following:
A The rates for woodwork described as "selected" shall include, but not limited, for the following:
(ii) Punching nails and pins below exposed surfaces and filling with an approved coloured fil
the woodwork.
(iii) Where described also as "screwed" the woodwork shall be fixed with screws recessed and
match the woodwork.
B The rates for frames and linings shall include for bedding in specified mortar where required.
PRICING PREAMBLES
ITEM DESCRIPTION
REF.
C The rates for plywood, block board and the like shall include for straight raking curved and circular
all consequent wastage.
D The rates for ironmongery shall include, but not limited, for the following:
(vii) Supplying and labeling at least two keys for each and every lock and handing the Engineer.
E The rates for ironmongery described as "fixed to hardwood" shall include for fixing to plywood, blo
Prices
A The rates for work in this section shall include, but not limited, for the following:
(ii) Straight raking curved and circular cutting and all consequent wastage.
(v) Dressing up and over up stands and around and into gargoyles, vent pipes and the like.
(viii) Testing in accordance with the specification and to the approval of the Engineer.
Finishes
PRICING PREAMBLES
ITEM DESCRIPTION
REF.
Applied finishes described in this section are deemed to be measured as the relevant preamble in
B occur.
Insulation
Generally
A This section shall be read particularly in conjunction with the woodwork and metalwork sections:
B The rates for glazing shall include, but not limited, for the following:
(ii) All straight raking, curved and circular cutting and all consequent wastage.
(iii) Patterned and wired glass shall include aligning adjacent panes.
(v) Glazing fillets shall include clipping to metal unless otherwise stated.
(vi)
Patent glazing shall include accessories and shall be fixed with screws or by the method
the system used, hardwood framing to either be inclusive of the window unless measured
Glazing shall include blocks, setting blocks, locating blocks, distance pieces and the like ac
(vii) fixing.
(viii) Cleaning off protective coatings prior to glazing aluminium windows, screens and doors.
(x) Replacing cracked or broken panes and cleaning on both sides on completion of project.
SECTION : FINISHES
Generally
Prices
PRICING PREAMBLES
ITEM DESCRIPTION
REF.
B Rates for finishes shall include, but not limited, for the following:
(ii) Raking out joints of block work partitions, hacking surfaces of concrete or applying bond
form a key and any necessary dubbing out.
(iii)
All cutting and waste, arises, short lengths, angles, ends, etc., making good or cutting
around pipes conduits trunking pipe brackets and the like and making good up to door
frames skirtings etc., all temporary rules and working around buried pipes cables conduits e
(iv) Angle beads, plaster stops, expanded metal strips, glass fibre scrims, aluminium channels
to all plasterwork around doors, windows at vertical abutments etc., and secure
backgrounds.
(v) All setting out, temporary rules, screeds, templates and supports.
(vii) Dubbing out as necessary to take up tolerances in the structure and cambers in floors and t
C Rates for screeds shall include, but not limited, for the following:-
(i) Finishing with a tamped floated or trowelled surface as required.
(iii) Laying in bays where required including formwork to all edges, reinforcement, joint filler a
as detailed and specified.
D Rates for wall and floor tiles and the like shall include, but not limited for the following:-
(i) Fixing with an approved adhesive.
(vii) Provision of slurry protection or the like including removing same in floor areas subjected t
of labour and materials.
PRICING PREAMBLES
ITEM DESCRIPTION
REF.
A Rates for ceiling finishes shall include, but not limited for the following:-
(ii) False ceiling to include for all hangers, ceiling grid, tiles and insulation layers.
(vi) Cutting and fitting around light fittings, A/C equipment etc.
Generally
B Painting to Structural Steelwork and Metalwork may either be included in this section or within e
to which it occurs and may be measured either as m2 or kg of Steel/Metalwork.
Prices
C The rates for painting and decorating shall include, but not limited, for the following:
(ii) All cleaning and preparatory work to the surface to be painted including rubbing down betw
(iii) Priming shall include for using a primer appropriate to the surface to which it is being applie
(iv) Preparation of manufactured boards and wood products shall include for surface filling.
(vi) Extra preparation on metal trims and the like over that of general surfaces in which they ar
(vii) Unless of a differing specification, work shall be deemed to cover internal or external painti
PRICING PREAMBLES
ITEM DESCRIPTION
REF.
Prices
A The rates of pipe work and gutter work shall include, but not limited, for the following:
(vi) Fixing with approved holder bat or pipe clips cut and pinned, built in or plugged and screwe
B The rates for sanitary fittings and the like shall, unless otherwise described or implied, shall incl
limited, for the following:
(iv) Cleaning off all protective wrappers and leaving ready for use.
(v) Leaving taps and valves greased, clean and in full working order.
(vi)
The Contractor shall include for the supply of manufacturers recommended spares as req
Specification for all mechanical engineering installations and shall submit details of s
provided by him on a separate sheet accompanying his tender submission.
(vii) All rates and amounts shall be gross and shall include for main contractor's overheads
general and special attendances.
(viii) The Contractor shall particularly note any list of approved sub-contractors. No other sub
shall be used for the project.
Prices
PRICING PREAMBLES
ITEM DESCRIPTION
REF.
A The rates in general shall include, but not limited, for the following:
(vii) Cleaning off all protective wrappers and leaving ready for use.
(viii) Leaving all equipment etc., clean and in full working order.
(x) Rates for cable and duct trench excavation shall include for all excavation, bedding,
disposal as required by the Statutory Authority standard specification.
Main Circuits
C Cabling and conduiting shall be described as an item, and be inclusive of all sleeves, joints, etc., a
connect the incoming supply to the Main Distribution Board.
General
D The Contractor shall particularly note any list of approved sub-contractors. No other sub-contrac
used for the project.
E All rates and amounts shall be gross and shall include for main contractor's overheads, profit and
special attendances.
F
The Contractor shall include for the supply of manufacturers recommended spares as requ
Specification for all electrical engineering installations and shall submit details of spares to be prov
on a separate sheet accompanying his tender submission.
G The cable lengths/routes where quantified are measured from point to point on the drawing
required for connections, loops, etc., at equipments, appliances, control gear or the like will be de
included.
PRICING PREAMBLES
ITEM DESCRIPTION
REF.
Generally
A The preceding and following clauses of all sections shall apply equally to relevant items within this
DRAINAGE
Generally
B The preceding clauses of all sections shall apply equally to relevant items within this section.
Drains
C The rates for trench excavation for pipes are to include for deepening/widening the trench as n
enable the barrels of pipes to rest on firm ground and to facilitate jointing.
D The rates for rock excavation in trench excavations are to include for imported selected materia
any excavated material which is unsuitable for backfilling.
The rates for trench excavation shall include for disposal of surplus excavated material as dire
E Engineer.
F The rates for concrete beds and surrounds to pipes are to include for flexible joints and an
formwork where required by the Specification.
G The rates for pipes are to include for all short lengths, joints and couplers as necessary and for a
manholes and the like, and all testing.
H The rates for fittings on pipes are to include for jointing to pipes with all necessary additiona
flanges, etc., and any necessary cutting of pipe work.
Generally
A Provisional and Prime Cost sums are included for use as directed by the Engineer in accordance wi
of the General Conditions of Conditions of Contract for Works of Civil Engineering Construction issu
Federation Internationale Des Ingenieurs-Conseils (FIDIC) Fourth Edition 1987 as amended
B Where the Contractor is required to add for "Profit" a Lump sum figure shall be inserted as indicate
lump sum shall include all profits and for site office, head office and other overheads
C Where the Contractor is required to add for "Attendances" and "Ancillary Work" a Lump sum figure
inserted as indicated. This lump sum shall include the following where work is to be executed by a
Contractor:
(i) Use of temporary roads, pavings, paths, standing and special scaffolding, hoisting/cranage
lighting and water, offices, office facilities and sanitary facilities.
PRICING PREAMBLES
ITEM DESCRIPTION
REF.
(ii) Unloading, distribution, hoisting/lifting and placing in position (if not carried out by the Sub-
(viii) Builder's work in connection such as cutting, forming holes, chases and channels, etc. and m
as described under the relevant trade preambles.
(ix) Opening and maintaining Letters of Credit, pre-payment etc. As applicable or required
(x) Unloading delivered items to site, checking for damage and supplying replacements (if nece
processing of insurance claims as applicable or required.
D It is an express obligation of this Contract that the Main Contractor undertakes to coordinate all ma
relating to engineering, construction, programming and commissioning with all nominated Sub-Con
and Suppliers instructed to carry out work under this Contract. The cost of this coordination should
for in the attendance item above.
E The lump sum values included against Items B and C above shall not be the subject to any change
increase in the value of the Provisional and Prime Cost Sums
F Where a Prime Cost sum is included for the supply only of a material the Contractor shall include in
or prices the stated amount to cover the supply of the specific material mentioned delivered to site
costs for labour, plant, ancillary materials, profits, overheads, attendances and ancillary works as d
above shall be included in the Contractor's rate or price for the Work and shall not be the subject t
change should the amount of the Prime Cost sum vary.
oint he considers to be a
a Tender adjustment.
he Contractor.
m (iii) above.
of the works.
Main Contractor).
aterial or on formwork by
wire and
rfaces of reinforcement.
of shuttering.
projecting reinforcement.
al to which it is to be used.
uded in the weights of the
e following:
g the Engineer.
nd the like.
ork sections:
s and doors.
n of project.
t is being applied.
external painting.
. No other sub-contractors
isting/cranage plant,
uired.