Sie sind auf Seite 1von 12

PROJECT NAME : MY TOWN PHASE 1 DUBAI

LOCATION: MAKATI CITY


DATE: MAY 17 2017

BILL OF QUANTITIES

ITEM DESCRIPTION UNIT

DIVISION- Air Conditioning and Ventilating

Equipments:

Installation of Air Conditioning Equipment


WINDOW TYPE
WC/1, 1HP, 230/1/60 unit/s

Installation of Fans and Blower


TOILET EXHAUST FAN
TEF/1, 85CMH, 0.05KW, 220/1/60 unit/s

EXHAUST FAN
EF/2, 550CMH,0.06KW,220/1/60 unit/s

Sub Total: Equipment

Supply and Installation of Mechanical Ventilation System

Duct Ancillaries:
Fire Damper
150 x 150 pcs

Exhaust Air Louver


150 x 150 pcs

Back draft Damper


100 mm pcs

Vent Cap
100 mm pcs

Sub Total: Mechanical Ventilation


Testing and Commissioning

Allow Cost for Testing and Commissioning lot

Sub Total: Testing and Commissioning

Sundries

150 mm PVC PIPE (CEILING DUCT) pcs


100 mm PVC PIPE (CEILING DUCT) pcs
100 mm ELBOW90 pcs

Hangers and Supports lot

Sub Total: Sundries

Total: Air conditioning and Ventilation


UNIT RATES
QTY TOTAL AMOUNT
MATERIALS LABOR

24 12,500.00 3,750.00 16,250.00 390,000.00

25 4,750.00 1,425.00 6,175.00 154,375.00

1 6,875.00 2,062.50 8,937.50 8,937.50

553,312.50

26 1,875.00 562.50 2,437.50 63,375.00

4 3,125.00 937.50 4,062.50 16,250.00

20 820.31 246.09 1,066.41 21,328.13

20 2,929.69 878.91 3,808.59 76,171.88

177,125.00
1 30,690.00 9,207.00 39,897.00 39,897.00

39,897.00

2 1,147.50 344.25 1,491.75 2,983.50


17 535.50 160.65 696.15 11,834.55
3 57.38 17.21 74.59 223.76

1 62,500.00 18,750.00 81,250.00 81,250.00

96,291.81

906,523.31
Project Name: MY TOWN PHASE 1 DUBAI
Location: MAKATI CITY
Date: MAY 17 2017

BILL OF QUANTITIES

ITEM DESCRIPTION UNIT

Division: Plumbing

Supply and Installation of Water Waste/ Sewer Piping System

Polyvinly chloride (PVC) Pipes and Fittings


200mm diameter pcs
150mm diameter pcs
100mm diameter pcs
75mm diameter pcs
50mm diameter pcs

Fittings
Wye/Wye Reducer
200mm diameter pcs
200mm x 150mm diameter pc
200mm x 100mm diameter pc
150mm diameter pcs
150mm x 100mm diameter pcs
100mm diameter pcs
75mm diameter pcs

Coupling
200mm diameter pcs
150mm diameter pcs
100mm diameter pcs
75mm diameter pcs
50mm diameter pcs

ELBOW45
200mm diameter pcs
150mm diameter pcs
100mm diameter pcs
75mm diameter pcs

ELBOW90
75mm diameter pcs
50mm diameter pcs

TEE
75mm diameter pcs
50mm diameter pcs

Drains and Cleanouts

Ceiling Cleanout
100mm diameter pcs

Floor Cleanout
200mm diameter pcs
150mm diameter pcs
100mm diameter pcs
75mm diameter pcs

End Cap
200mm diameter pcs
150mm diameter pcs
100mm diameter pcs
75mm diameter pc
50mm diameter pc

Floor Drain
200mm diameter pcs
150mm diameter pcs

TEE
200mm x 150mm diameter pcs
100mm x 75mm diameter pcs

P-TRAP
100mm diameter pcs

Wye
200mm diameter pcs
100mm diameter pcs

Shower Drain
100mm diameter pcs

Roof Drain
75mm diameter pcs
Trench Drain
100mm diameter pc
75mm diameter pcs

Sub Total: Water Waste/Sewer Piping System

Installation of Plumbing Fixtures


Water Closet set
Lavatory set
Urinal set
Shower Set set

Sub Total: Plumbing Fixtures

Testing and Commissiong

Allow Cost for Testing and Commissiong lot

Sub Total: Testing and Commissioning

Sundries

Plumbing Fixtures (Fittings)


Water Closet
PVC
100mm diameter pcs
50mm diameter pcs

ELBOW90
50mm diameter pcs

WYE
100mm diameter pcs

ELBOW45
100mm diameter pcs

TEE
100 x 50mm diameter pcs

LAVATORY
PVC
75mm diameter pcs
P-TRAP
75mm diameter pcs

TEE
100 x 75mm diameter pcs

WYE
100 x 75mm diameter pcs

URINAL
PVC
75mm diameter pcs

TEE
75mm diameter pc
100 x 75mm diameter pc

ELBOW90
75mm diameter pcs

P-TRAP
75mm diameter pcs

PIPE SUPPORT lot

Sub Total: Sundries

Total: Plumbing
UNIT RATES
QTY. TOTAL AMOUNT
MATERIALS LABOR

6 2,052.75 615.83 2,668.58 16,011.45


8 1,147.50 344.25 1,491.75 11,934.00
86 535.50 160.65 696.15 59,868.90
54 469.00 140.70 609.70 32,923.80
17 187.88 56.36 244.24 4,152.04

7 1,061.44 318.43 1,379.87 9,659.08


1 1,699.69 509.91 2,209.59 2,209.59
1 918.00 275.40 1,193.40 1,193.40
5 726.75 218.03 944.78 4,723.88
2 516.38 154.91 671.29 1,342.58
127 91.80 27.54 119.34 15,156.18
2 98.44 29.53 127.97 255.94

6 819.38 245.81 1,065.19 6,391.13


8 286.88 86.06 372.94 2,983.50
86 51.00 15.30 66.30 5,701.80
54 26.81 8.04 34.86 1,882.24
17 12.75 3.83 16.58 281.78

7 573.75 172.13 745.88 5,221.13


5 306.00 91.80 397.80 1,989.00
151 58.60 17.58 76.18 11,503.18
4 36.94 11.08 48.02 192.08
101 45.94 13.78 59.72 6,031.59
22 19.13 5.74 24.86 546.98

55 101.25 30.38 131.63 7,239.38


9 26.78 8.03 34.81 313.27

19 44.95 13.49 58.44 1,110.27

3 1,573.44 472.03 2,045.47 6,136.41


4 502.50 150.75 653.25 2,613.00
36 44.95 13.49 58.44 2,103.66
1 35.73 10.72 46.44 46.44

3 1,867.49 560.25 2,427.73 7,283.20


4 751.24 225.37 976.61 3,906.44
58 89.59 26.88 116.46 6,754.90
1 70.56 21.17 91.73 91.73
1 41.00 12.30 53.30 53.30

2 4,375.00 1,312.50 5,687.50 11,375.00


30 3,201.78 960.53 4,162.31 124,869.23

2 1,425.00 427.50 1,852.50 3,705.00


30 190.00 57.00 247.00 7,410.00

66 191.25 57.38 248.63 16,409.25

2 1,061.44 318.43 1,379.87 2,759.74


30 91.80 27.54 119.34 3,580.20

15 437.94 131.38 569.32 8,539.78

9 1,500.00 450.00 1,950.00 17,550.00


1 3,125.00 937.50 4,062.50 4,062.50
2 2,250.00 675.00 2,925.00 5,850.00

445,917.89

25 1,875.00 562.50 2,437.50 60,937.50


25 1,875.00 562.50 2,437.50 60,937.50
1 1,875.00 562.50 2,437.50 2,437.50
15 1,875.00 562.50 2,437.50 36,562.50

160,875.00

1 25,000.00 7,500.00 32,500.00 32,500.00

32,500.00

7 535.50 160.65 696.15 4,873.05


35 187.88 56.36 244.24 8,548.31

50 19.13 5.74 24.86 1,243.13

25 91.80 27.54 119.34 2,983.50

25 58.60 17.58 76.18 1,904.50

25 84.79 25.44 110.22 2,755.59

29 469.00 140.70 609.70 17,681.30


25 140.63 42.19 182.81 4,570.31

25 190.00 57.00 247.00 6,175.00

25 126.56 37.97 164.53 4,113.28

2 469.00 140.70 609.70 1,219.40

1 101.25 30.38 131.63 131.63


1 190.00 57.00 247.00 247.00

1 45.94 13.78 59.72 59.72

1 140.63 42.19 182.81 182.81

1 62,500.00 18,750 81,250.00 81,250.00

137,938.53

809,731.42