Objective
To secure a position in a well-known industry where I could upgrade my job expertise by utilizing my
background knowledge in Continuous process Plant and HSE department experience.

Graduation (B.Sc.) 2016


Islamia University Bahawalpur Pakistan
Marks: Result awaited
Academic
Major: Chemistry
Qualifications
Intermediate (F.Sc) 2013
M.T.B college , Ubaid campus ,Rahim yar khan
Marks: 806/1100 , 73 %
Major: Chemistry

Matriculation 2011
Govt. Pilot secondary school , Rahim yar khan
Marks: 812/1050 , 77%
Major: Science

Apprenticeship 2015
Major Course Fauji Fertilizer Company , Plant 3 , Mirpur Mathelo
Major: Operation trade
Plant : Ammonia

Training Skills Reporting Procedures


CPR / First Aid Ms Office
Fire Fighting Email &Browsing
Other Emergency Response Centrifugal & P.d compressors.
Chlorine Emergency Mgmt Centrifugal & P.d pumps.
Qualification
LOTO Catalyst and its operations
House Keeping Steam turbine and its types.
Behavioral Safety Heat exchangers and its types
HIRADC Furnaces and its types
Confined space emergency rescue Reactors and high pressure equipments
training AC motors.
Control valves types and its Basic Instrumentation
characteristics.

Safety Officer from Jan2016 to till date.


Responsibilities:

Conduct all types of Safety Trainings and live fire practices.


Conduct chlorine emergency Trainings and Drills.
Conduct Fire and ammonia disaster management Trainings and Drills.
Provide technical expertise on safety related matters and also provides all safety
protection during
Inspections of all Safety Equipment. (Weekly/biweekly and monthly quarterly audits as
per schedule)
Maintenance of Safety equipment i.e. filling fire extinguisher and SCBA.
Evaluations of Risk assessment and job safety analysis.
Work Provide and participate emergency response expertise during any emergency at site.
Experience Conduct HSE trainings regarding all topics for HSE culture improvement.

Plant Operator from Dec2013 to Dec2015.


Responsibilities:

Responsible to monitoring and logging process parameters,


Responsible for maintaining plant in smooth operation,
Responsible for emergency handling,
Performed safe start up, shut down, and turn around activities,
Perform Plant related auditing, routine checks,
Responsible for monitoring of work Permits and on-going maintenance activities.
I have also attended plant shutdown and turn around activities.
Handling of chemicals and its dozing for Benfield solution in control rate.
Key technical NATURAL GAS BOOSTER COMPRESSOR
Skills DESULPHURIZER SECTION
REFORMING SECTION
WASTE HEAT BOILER & SUPERHEATER
SHIFT CONVERTER
METHANATOR
YORK COMPRESSION CHILLERS
Fauji Fertilizer Company Ltd ,
Ammonia Plant 3 , Mirpur Mathelo , District Ghotki , Sindh.
FFC is a well reputed company having Ammonia/Urea Complex of Haldor Topsoe Process
with capacity of 1250 MTPD (Ammonia) and successfully obtained the following ISO standards ;
Quality standard (ISO 9001: 2008)
Work experience Environmental standard(ISO 14001:2004)
Occupational health and safety standard (OHSAS 18001:2007)
Details
Our Plant control system is Yokogawa Centum CS-3000 (DCS) Singapore.

Natural Gas Booster Compressors

Two Natural Gas booster compressor of GE NUOVO PIGNONE,


Motor driven PD compressors having power of 1.4 MW and 2.3 MW.
DESULPHARIZER SECTION
Sulphur contents are poisonous for catalysts at ammonia plant thus removed by this unit.
Zinc Oxide is used in Desulphurizer unit. It consists of two reactors filled with 21m3 ZnO
(99.5%) catalyst in two beds.
Operating temperature 410C & pressure is 38 Kg/cm2.
REFORMING SECTION
Production of hydrogen is carried out by steam reforming in primary Reformer and
Nitrogen fixation takes place at secondary reformer.
Both reformers are loaded with NiO catalyst.
The excessive heat in result of burning in primary reformer is utilized in convection zone
for heating many process fluids as per demand to economize the plant processes and
maintain the effluents temperature.
WASTE HEAT BOILER
The Reformer outlet temperature (about 920 C) is utilized for high pressure steam
generation in a high pressure boilers.
For this purpose two boilers are installed which produces about 290 tons/hr. of steam and
maintain the required temperature for shift converters.
A thermos syphon is present for passive circulation of water from steam drum to
exchangers (boilers) and then back to steam drum and level of steam drum is controlled
Work experience by 3 element cascade loop.
Details VERY HIGH PRESSURE STEAM SUPERHEATER
This is a Bottom fired furnace with 09 self-aspiring gas burners where very high pressure
(117 kg/cm2) saturated steam is converted into super-heated steam for utilization in
turbines.
SHIFT CONVERTORS
As CO is poisonous for Ammonia reactor, it is converted into carbon di oxide CO2 gas by
water-gas shift reaction in shift converter reactors.
HTSC consists of iron oxide (Fe3O4) catalyst about 61 m3 in volume.
LTSC consists of CuO based catalyst.
METHANATOR
It converts CO & CO2 into methane coming from CO2 absorber.
It is filled with Ni (30%) based catalyst. Its operating pressure is 27 Kg/cm2 &
temperature is 295-320 C.
YORK COMPRESSION CHILLERS
LCH 230 model two compression York Chillers. Each chiller having two chilling units and
equipped with microprocessor control system.
Three centrifugal circulation pumps for chilled water and two make up pumps which
supplies chilled water to 11 AHUz (air handling units).
Date of Birth July 04, 1995
Personal Data Nationality Pakistani
Marital Status Single
NIC 31303-3589709-1
Passport No LW4137091
Willingness to relocate Yes
General answers Salary Negotiate able
Notice Period 1 Month

Commitment
Safety is ahead of Production