Sie sind auf Seite 1von 1

Owner : PT PLN PERSERO

Project : CPP MUARA KARANG (400 500 MW)


Contract No. : XXXXX
Doc. No.
CLARIFICATION ITB DOCUMENT Prepared by RJ
Checked by BY
Approved by HMD
SUBJECT : Clarification of Bid Document Dated 6 AUG 2017

Main Contractors Reply


No. Item Bidder Clarifications

Function of Floating Deck with seal.

1. Commonly floating deck is to store petroleum


products with high volatility. Meanwhile water
is not volatile fluid. And not vaporize under
design condition.
2. Minimize the loss of the stored liquid product
inside the tank due to evaporation by
eliminate the free space above the stored
1. SDA-B654-R2 Section 3.3
liquid. Demin water is not vaporize at atm
pressure in conjuction with design
temperature.
3. Minimize the fire hazard by decreasing the
volatile gases inside the tank. Meanwhile
water vapor cannot trigger fire hazard.

With above tehnical justification Bidder justify that


floating deck not required.

1 of 1