Descrio Geral | General Description

Os lanadores e receptores de PIG Tormene Americana so de The Tormene Americana scraper launchers and receivers are of simple
simples operao, projeto provado e de estrutura slida. operation, proved design and structural solidity.
Os mesmos so projetados para uma ampla de faixa de presses de They are designed for a wide range of operation pressure ranks,
operao, seguindo as normas internacionais como ASME, API ou following the regulation of international codes such as ASME, API or
outras aplicveis segundo especificaes particulares. others applicable according to particular specifications.
Todos os lanadores e recebedores possuem tampas de abertura All launchers and receivers have quick opening closures, which
rpida, que asseguram um curto tempo de operao de abertura ou guarantee a very short opening and closing operation time even in wide
fechamento. Em grandes dimetros pode ser operados por uma s diameters, being able to be operated by one person without using
pessoa sem utilizao de ferramentas especiais. special tools.
Tambm so oferecidos sob encomenda, os detectores de Passing detectors, valves, relief valves, pressure gauges, by-pass, etc.
passagem, vlvulas, vlvulas de alivio, manmetros, by-pass, etc. are also provided on request.
Nossos lanadores e recebedores so projetados para a utilizao de Our launchers and receivers are designed for the use of mechanical and
PIG mecnicos, inteligentes e/ou esferas de limpeza ou impulso. intelligent PIG and/or cleansing or impulse spheres.
Fornecemos sistema porttil (skid) ou sobre bases metlicas para They are provided with oil skid or on metallic basis for cement basis.
bases de concreto.
Sequncia de operao para Lanadores e Receptores de PIGs | Operation Sequence for PIGS Launchers and Receivers.

A seqncia de operao descrita a seguir informativa de uso geral. No The operation sequence described below is informative for general use. It is not
est direcionada e muito menos dever ser utilizada para treinamento de directed and will not be used for the training of system workers.
operadores de sistemas

Lanadores: Launchers:

Condio de operao: Operation conditions:


O canho est pressurizado e carregado completamente com gs. As vlvulas The trap is pressurized and completely loaded with gas. A, B and C valves are
A, B e C esto abertas. A vlvula D est fechada. opened. D valve is closed.

Pressure Gauge
Vent
Vent Valve
D Mainline trap valve PIG-SIG

Tampa | Closure flow


A

B Mainline bypass valve


C Trap kicker valve

1. Fechar as vlvulas A e C 1. Close A and C valve.

2. Abrir a vlvula D para despressurizar o canho at a presso atmosfrica. 2. Open B valve to vent the launch trap at atmospheric pressure.

3. Quando o canho est completamente despressurizado (0 bar) com a 3. When the trap is completely vented (0 barg) with D valve still opened, open
vlvula D ainda aberta, abrir a tampa de abertura rpida e inserir o PIG, the quick opening closure and insert the PIG tool, tightening it in the reduction
ajustando na reduo anterior a vlvula ao primeiro corpo da ferramenta. previous to A valve with the first cup of the tool.

4. Fechar e travar a tampa de abertura rpida. Drenar o ar dentro da tampa 4. Close and secure the quick opening closure. Drain the air inside the trap
atravs da vlvula D abrindo completamente a vlvula C. Quando o lanador through D valve, opening completely C valve. When the scavenging is done,
estiver completamente purgado, fechar a vlvula D para permitir uma close D valve to allow pressure equalization, then close C valve.
equalizao de presso, ento se fecha a vlvula C.

5. Abrir a vlvula A, e aps a vlvula C. O PIG est em condies de ser 5. Open A valve, then C valve. The PIG is ready to be launched.
lanado.

6. Fechar parcialmente a vlvula B. A vazo de gs aumentar atravs da 6. Close partially B valve. This will increase the gas flowrate through C valve and
vlvula C e atrs do corpo do PIG. Continuar fechando a vlvula B at que o behind the PIG body. Continue closing B valve till the tool goes out of the trap
PIG introduzido at o duto verificar o sinal do detector "PIG-SIG". inserting itself into the pipe current indicated by the gauge signal "PIG-SIG".

7. Quando o PIG lanado do canho e seguir na tubulao, abrir totalmente 7. When the PIG is launched from the trap and comes into the pipe, open
a vlvula B. completely B valve.
Recebedores: Receivers:

Condies de operao: Operation conditions:


o canho est vazio em presso atmosfrica. As Vlvulas B, D e E esto the trap is empty at atmospheric pressure. B, D and E valves are opened; A and
abertas; as vlvulas A e C esto fechadas. A tampa de abertura rpida est C valves are closed. The quick opening closure is closed and secured.
fechada e travada.

Pressure Gauge Vlvula Vent


Vent Valve
Mainline trap valve PIG-SIG D

flow Tampa | Closure


A
E Drain Valve
Trap kicker valve C
Mainline bypass valve B

1. Despressurizar o canho, fechar a vlvula E e abrir lentamente a vlvula C 1. Drain the trap, close E valve and open slowly C valve.

2. Depois de despressurizado, comear a equalizar a presso na tampa 2. Once it is drained, start equalizing the pressure in the trap closing D valve
fechando a vlvula D com a vlvula C aberta. with the C valve opened.

3. Com a vlvula C aberta, abrir a vlvula A. O canho est agora em 3. With C valve still opened, open A valve. The trap is now ready to receive the
condies de receber o PIG. PIG.

4. Quando o PIG chegar, esta se prender entre a vlvula A e ao T de entrada 4. When the tool arrives, this will stop between A valve and the entrance T piece
do canho. of the trap.

5. Fechar a vlvula B parcialmente. Forando o PIG a entrar na tampa 5. Close partially B valve. This will force the PIG to introduce itself into the trap
incrementando o fluxo de gs atravs da vlvula C. increasing the gas flow through C valve.

6. Depois que o PIG estiver no canho, indicado pelo sinal do "PIG-SIG", abrir 6. Once the PIG is in the trap, shown by the signal of the "PIG-SIG", open B
a vlvula B e fechar as vlvulas A e C. valve and close A and C valves.

7. Abrir as vlvulas D e E, e despressurizar o canho at a presso atmosfrica. 7. Open D and E valves and vent the trap until atmospheric pressure.

8. Depois que o canho estiver despressurizado (0 barg) e drenado com as 8. Once the trap is vented (0 barg) and drained with D and E valves opened,
vlvulas D e E abertas, abrir a tampa de fechamento rpido e tirar o PIG. open the quick opening closure and remove the PIG.

9. Fechar e travar a tampa de abertura rpida. 9. Close and secure the quick opening closure.
Sequncia de operao para Lanadores e Receptores de ESFERAS | Operation Sequence of SPHERES Launchers and Receivers.

Lanadores: Launchers:

Condies de operao: o canho est pressurizado e carregado Operation conditions: the trap is pressurized and completely loaded with gas. A
completamente de gs. Vlvulas A e B esto abertas, vlvula C est fechada. and B valves are opened, C valve is closed.

Pressure Gauge
Vlvula Vent
Vent Valve C
Launch pins
No. 1 & No. 2
PIG-SIG
Mainline trap valve

Tampa | Closure PIG-SIG


A flow

B
Pressure equalization valve

1. Vlvulas A e B fechadas. 1. A and B valves closed.

2. Abrir lentamente a vlvula C para despressurizar a tampa at a presso 2. Open slowly C valve to vent the trap at atmospheric pressure.
atmosfrica.

3. Com a vlvula C ainda aberta (0 bar), abrir a tampa de abertura rpida. 3. With the C valve still opened (0 barg), open the quick opening closure.

4. Baixar o pino lanador N 1 e levantar o N 2. 4. Put down the launch pin N 1 and raise N 2.

5. Carregar as esferas, baixar o pino lanador N 2. 5. Load the spheres, put down the launch pin N 2.

6. Fechar e travar a tampa de abertura rpida. 6. Close and secure the quick opening closure.

7. Com a vlvula Vent C ainda aberta, abrir lentamente a vlvula B para retirar 7. With the C venting valve still opened, open slowly B valve to drain the air
o ar obstrudo no canho. occluded in the trap.

8. Depois de retirar completamente o ar, fechar a vlvula C e comear a 8. After draining completely, close C valve and start equalizing the pressure.
regular a presso. Abrir a vlvula A da tubulao principal. Open the A valve of the main pipe.

9. Para lanar uma esfera, levantar o pino lanador N 1, ento a esfera 9. To launch a sphere, raise the launch pin N 1, so the sphere will roll through A
rodar atravs de a vlvula A do T at a reduo. Neste ponto a esfera ser valve and the T piece until the reduction. At this point, the sphere will be
recebida no fluxo da tubulao e o lanamento se completa. O indicador PIG- received in the pipe flow and the launching is complete. The PIG-SIG gauge will
SIG sinalizar quando o lanamento for concludo. show the finished launching.

10. Para preparar o segundo lanamento, baixar o pino lanador N 1 e 10. To prepare the second launching, put down the launch pin N 1 and raise N
levantar o N 2. Todas as esferas avanam at fazer o pino N. 1 levantar. 2. All the spheres will move forwards until they reach pin N 1.

11. Baixar o pino lanador N 2 e a segunda esfera estar pronta para seu 11. Put down the launch pin N 2 and the second sphere will be ready to be
lanamento quando o pino lanador N 1 est levantado. launched when the launch pin N 1 is raised.

12. Continuar os passos 10 e 11 em seqncia at que todas as esferas 12. Continue steps 10 and 11 in sequence until all the spheres are launched.
sejam lanadas.
Tormene Americana do Brasil

Recebedores: Receivers:

Condies de operao: o canho est vazio e em presso atmosfrica. Operation conditions: the trap is empty and at atmospheric pressure. A and B
Vlvulas A e B fechadas. Vlvula C est aberta. A tampa de abertura rpida valves are closed. C valve is opened. The quick opening closure is closed and
est fechada e travada secured.

Vlvula Vent
PIG-SIG Vent Valve Pressure Gauge
No. 1 C
Mainline trap valve PIG-SIG
flow No. 2

Equalization line Tampa | Closure

B
Pressure equalization valve

1. Para purgar o canho, abrir a vlvula B lentamente, ventando atravs da 1. To drain the trap, open B valve slowly, venting through C valve.
vlvula C;

2. Depois de purgado, fechar a vlvula C para regular a presso; 2. Once drained, close C valve to equalize the pressure.

3. Abrir a vlvula A. O canho esta disponvel para receber as esferas. 3. Open A valve. The trap is ready to receive the spheres.

4. As esferas entram no corpo do recebedor atravs da vlvula A da tubulao 4. The spheres will go into the receiver body through the A valve of the main
principal. Os indicadores de sinal 1 e 2 verificam a chegada das esferas. pipe. The signal gauges 1 and 2 will verify the arrival of the spheres.

5. Depois de que as totalidades das esferas esto dentro do receptor, fechar a 5. Once all the spheres are inside the receiver, close A valve.
vlvula A.

6. Fechar a vlvula B. Despressurizar o canho abrindo a vlvula C para atmosfera. 6. Close B valve. Vent the trap opening C valve to the atmosphere.

7. Com a vlvula Vent C aberta, abrir a tampa de abertura rpida, para que as 7. With the vent C valve opened, open the quick opening closure, so the spheres
esferas rodem para fora da mesma at a bandeja. will roll out of it until the tray or cradle.

8. Fechar e travar a tampa de abertura. 8. Close and secure the quick opening closure.
Lanadores e Receptores de PIGs - Reviso. 1 (agosto 2006)

TORMENE AMERICANA DO BRASIL EQUIPAMENTOS PARA GS NATURAL LTDA.


Rua3HVTXHLUD %RQVXFHVVR, Rio de Janeiro,5-%UDVLO&(3
Tel +55 21 2510-6155
www.tormenebrasil.com.br

Das könnte Ihnen auch gefallen