Beruflich Dokumente
Kultur Dokumente
Master data
Sales and distribution
Material master sales view MM01
Flag For Deletion MM16)
Change Material Type (MMAM)
MM17 : mass change
Mass : mass change (object BUS1001)
MM06 : flag for deletion
Customer ( General data, Sales VD01 (create)
data, Company code data) XD01 (create)
FD01 (create)
VD05 ( block)
VD06( flag for deletion)
Customer-material info record VD51
Pricing condition VK11
http://www.guru99.com/how-to-create-one-time-customer-master.html
https://www.scribd.com/doc/169111466/One-Time-Customer-Master-in-SAP#fullscreen&from_embed
https://www.saponlinetutorials.com/how-to-create-customer-account-groups-in-sap/
Transactions
Sales and distribution
Inquiry VA11
Quotation VA21
Sales order VA01
Customer-material info record VD51
delivery VL01N / VL10H
Billing VF01 / VF04
Return
Document type
Inquiry ( IN) (AFN)
Quotation (QT) (AGN)
Sales order (OR) (TAN )
return/ demo
Delivery (LF)
Billing (F2)
Sales documents items
schedule line category
CP MRP and BN No MRP
Account determination
Special stock
Consignment stock
Third party
Subcontractor
Credit/debit memo request and Credit/debit memo
Subsequent credit/debit memo
Prepayment process
Service
Pipeline Handling
Stock transport order ( 5 types)
Returnable Transport Packaging
SAP report
Quickviewer: SQVI
Infoset query:
Define user group: SQ03
Create infoset query and assign it to the user group : SQ02
Create query : SQ01
SAP query : SQ01
Report painter :
Report writer
Sales
Pricing
SD MM
1 Condition table (V/03) Condition table
2 Access Sequence (V/07) Access Sequence
3 Condition Type (V/06) Condition Type
4 Pricing Procedure (V/08) Calculation schema procedure
5 customer pricing procedure Schema group for vendor
6 Update the customer master Update the vendor master (XK02) by Assigning the
(VD02) by Assigning customer schema group
pricing procedure
7 document pricing procedure Schema group for purchase organization
8 Update the document type by Assign Schema group for purchase organization to a
Assign document pricing purchase organization
procedure
9 Pricing determination : assign Pricing determination : assign Schema group for
sales area (sales org- purchase organization - Schema group for vendor -
distribution channel - division ) - Calculation schema procedure
doc pricing procedure
customer pricing procedure -
pricing procedure ( OVKK)
10 Condition record ( VK11) Condition record (MEK2)
Delivery
Billing
Copying Control
Assign: storage condition - shipping point delivery plant - the storage location
Shipping determination
Route determination
Assign : country /departure zone (from the shipping point) # country/destination zone (the
customer master of the Ship-to Party) # shipping conditions (the customer master of the Sold-
to Party) or the sales doc # transportation group (the material master record) # The weight
group (optional and only relevant in the delivery).
If the shipping condition is maintained in the delivery type document, the system use this
parameter. If not the system use the shipping condition from the material master.
Text determination
Output determination
1. Condition table
2. Access Sequence
3. Output condition Type creation ( and assignment to access sequence)
4. Output determination Procedure
5. Assign : Output determination Procedure document type
6. Condition record ( VV11 for Order Confirmation , VV21 for Delivery, VV31 for Invoice )
RLT = Purchasing Processing Time + Planned Delivery Time + Goods Receipt Processing
Time
Purchasing Processing Time: (customizing parameter Tcode: OPPQ) = Time that the
purchasing department requires to convert a purchase requisition into a purchase
order. Calendar used is WORKING DAYS of the PLANT.
Planned Delivery Time (MRP2 View) = Number of calendar days needed to obtain the
material.
Goods Receipt Processing Time (MRP2 View) = Number of workdays required after
receiving the material for inspection and placement into storage. Calendar used is
WORKING DAYS of the PLANT.
There is no point in maintaining the Total replenishment lead time field for materials
procured externally.
The procurement type = E (internally Procured)
RLT = Total Replenishment Leadtime (MRP3 View) , if 0 then In-House Production Time +Goods
Receipt Processing Time
In-house Production Time (MRP2 View) = Specifies the time in workdays needed to
produce the material in-house. Calendar used is WORKING DAYS of the PLANT.
Goods Receipt Processing Time (MRP2 View) = Number of workdays required after
receiving the material for inspection and placement into storage. Calendar used is
WORKING DAYS of the PLANT.
Partner determination
Material determination
Rebates
Product hierarchy
Contract
Scheduling agreement
BOM
Due list
User exit/Badi
Transaction variant