FRIENDLY PROPERTY

Company/Division: Petron Corporation

Site Name: Lucky 7 Petron Service Station

Region: IV-A

Province: Rizal

Phase:

Survey Date: November 29, 2011

Revision:

SFSR_ Friendly Property


CE-30021-05 Page 1 of 30
Issued On: Sep 30 2011
SFSR_ Friendly Property
CE-30021-05 Page 2 of 30
Issued On: Sep 30 2011
TABLE OF CONTENTS:

A. GENERAL INFORMATION 3

1. PURPOSE OF DOCUMENT...................................................................................................3
2. SITE INFORMATION.............................................................................................................. 4

B. CME SURVEY REPORT 6

3. HEALTH & SAFETY............................................................................................................... 6


4. DESIGN RISKS...................................................................................................................... 7
5. SITE DETAILS ........................................................................................................................8
6. TELECOM EQUIPMENT......................................................................................................13
7. ELECTRICAL ........................................................................................................................14
8. CME SURVEY PHOTOS......................................................................................................15
8.1 General Photos...................................................................................................................... 15
8.2 Photos Per Option................................................................................................................18
Option 1....................................................................................................................................... 18
Option 2....................................................................................................................................... 19
Option 3....................................................................................................................................... 20
9. SKETCH LOCATION PLAN...............................................................................................21
10. SKETCH SITE LAYOUT....................................................................................................22
11. SKETCH PERSPECTIVE..................................................................................................23
12. OBSTRUCTION INFORMATION...........................................................................................24
13. PANORAMIC PHOTOS FROM HIGHEST AVAILABLE POINT ON SITE..............................25

SFSR_ Friendly Property


CE-30021-05 Page 3 of 30
Issued On: Sep 30 2011
Site Feasibility Survey Report
Company/Division: Site Name:
Province: Region:

SFSR_ Friendly Property


CE-30021-05 General Information Page 4 of 30
Issued On: Sep 30 2011
Site Feasibility Survey Report
Company/Division: Site Name:
Province: Region:

1. GENERAL INFORMATION

GENERAL INFORMATION

SFS Date:
CME Contractor:
Contractor Lead Engineer:

1. PURPOSE OF DOCUMENT
Purpose of this Site Feasibility Survey Report is to provide input for radio access network nominal
planning for the utilization of identified Friendly properties by providing technically sound and
feasible site solution proposal for the construction and installation of telecommunication facility
taking into account the limitations and features of the actual property.
Name & Telephone/
Present at TSS Signature
Company e-mail address
Melquiades V.
CME Engineer 09175671412/mvdelmundo@petron.com
Del Mundo jr.
Landlord or Lilia Bellido
Representativ Fernando 651-0455/leanpetron@yahoo.com
e Bellido
Comments:

2. SITE INFORMATION
2.1 Site Position/ Information
SFSR_ Friendly Property
CE-30021-05 General Information Page 5 of 30
Issued On: Sep 30 2011
Site Feasibility Survey Report
Company/Division: Site Name:
Province: Region:

Greenfield or Rooftop
Property Name Lilia Bellido
Lot No
Address National Road Tayuman Binangonan Rizal
City
Municipality Binangonan
Barangay Tayuman
Site Co-Ordinates (Deg., Min., Sec) Latitude Longitude
Site Co-Ordinates (Decimal) Latitude 14.512500 Longitude 121.164000
Altitude at ground level (m)
Building height for RT (m) 6mtrs
Current land / building use Commercial
Building / Property Security Details
360 obstruction plotting
Wind Zone 1, 2, 3 (Tick) 1 (250 kph) 2 (200 kph) 3 (150 kph)
Comments:

Identify direct neighbours and / or adjacent structure together with the heights:

Location Building name / Type of structure approximate height

Left side Vacant Lot

Right side Vacant Lot, ABC Hardware / Concrete Type / 3.5m

Rear KC Resort, Vacant Lot / Steel Type / 4m

Front Residential / Steel with Concrete / 5m

2.2 Property Information and Ownership


Property Name

SFSR_ Friendly Property


CE-30021-05 General Information Page 6 of 30
Issued On: Sep 30 2011
Site Feasibility Survey Report
Company/Division: Site Name:
Province: Region:

Full property address

Company name
Does property have vacant land for a tower? None
Does property have access to roof deck
None
where antennas could be installed?
Does property have existing cell site installed? None
Is the property within 4 km radius from Airport? No
Contact person
Telephone number (mobile phone preferred)
Email address
Comments:

SFSR_ Friendly Property


CE-30021-05 General Information Page 7 of 30
Issued On: Sep 30 2011
Site Feasibility Survey Report
Company/Division: Site Name:
Province: Region:

SFSR_ Friendly Property


CE-30021-05 CME Survey Report Page 8 of 30
Issued On: Sep 30 2011
Site Feasibility Survey Report
Company/Division: Site Name:
Province: Region:

2. CME SURVEY REPORT


CME SURVEY REPORT

3. HEALTH & SAFETY


3.1 Specific risks and hazards associated with this site
Yes No Notes:
a) Petrol station with underground tanks
b) Underground power cables
c) Underground or open sewage system
d) Other buried services
e) Special fencing required
f) Hazardous substances
g) Overhead utilities
h) Asbestos
i) Poorly lit access route (natural/artificial)
j) Vermin/pigeons
k) Ducts/flues/chimneys/vents
l) Unprotected machinery
m) Tripping hazards/slippery surfaces
Note any additional hazards here:

3.2 Temporary Works


Yes No Notes:
a) Temporary traffic arrangements
required to accommodate vehicular traffic
and pedestrians during construction?
b) Temporary arrangements to protect the
workforce/members of the public, e.g.
barriers, or will any be necessary?
Comments:

SFSR_ Friendly Property


CE-30021-05 CME Survey Report Page 9 of 30
Issued On: Sep 30 2011
Site Feasibility Survey Report
Company/Division: Site Name:
Province: Region:

4. DESIGN RISKS
Yes No Notes:
a) Restricted access
b) Cutting existing electrical supplies
c) Demolition/dismantling work
d) Overhead power lines
e) Risk to adjacent properties
f) Area prone to flooding
g) Near to river / lake
h) Area prone to landslide
i) Works adjacent to or above moving
traffic
j) Specified construction materials
Note any additional design risks here:

SFSR_ Friendly Property


CE-30021-05 CME Survey Report Page 10 of 30
Issued On: Sep 30 2011
Site Feasibility Survey Report
Company/Division: Site Name:
Province: Region:

5. SITE DETAILS
5.1 Details for GREENFIELD STRUCTURES Not Applicable
a) Available / Leased Compound
dimensions (m x m)
b) Available / Leased Compound shape Regular Irregular
c) Proposed Model Site / Required Plot
dimensions (m x m)
Yes No Notes:
d) Site sloping?
e) Trees to be removed
f) Flood history
g) Access road required (note length) Length:
h) Obstructions
i.) Temporary traffic arrangements
required to accommodate vehicular traffic
and pedestrians during construction?
j.) Temporary arrangements to protect the
workforce/members of the public, e.g.
barriers, or will any be necessary?
k.) Soil type (Swampy, normal, rocky etc): Normal
Comments:
Option1:
Option2:
Option3:

Earthworks & Ground Conditions


Yes No Notes
a) Soil investigation required Required as default
b) Possibility of piling for tower foundation
c) Water table, depth? m not known
d) Where to store excavated soil?
Comments:
Refer to attached layout of underground tanks and suction lines.
Fencing
Details Required Length (m) Height (m)
a) Type Chain link (default)
Masonry wall
Other
Comments:

SFSR_ Friendly Property


CE-30021-05 CME Survey Report Page 11 of 30
Issued On: Sep 30 2011
Site Feasibility Survey Report
Company/Division: Site Name:
Province: Region:

Proposed/Existing Tower Structure


a) Existing/Proposed Tower Type:
b) Existing/Proposed Tower Height:
c) Maximum RF Antenna Height (Top
of Antenna)
d) Maximum No. of RF Antennas

2G (1.3m)
3G (2.6m)
LTE (2.6m)
e) Maximum MW Antenna Height
f) Maximum No. of MW Antennas and
Diameter
0.30 m
0.60 m
1.20 m
2.4 m
Comments:

SFSR_ Friendly Property


CE-30021-05 CME Survey Report Page 12 of 30
Issued On: Sep 30 2011
Site Feasibility Survey Report
Company/Division: Site Name:
Province: Region:

5.2 Details for Existing Antenna Mounting Structure Not Applicable


a) Tower Type (Bipod, Mast,Guyed
trilon,Wall mount)
b) Tower Height:
c) Maximum elevation of available space for
RF Antenna (Top of Antenna)
d) Maximum No. of RF Antennas can be
installed
2G (1.3m)
3G (2.6m)
LTE (2.6m)
e) Maximum elevation of available space for
MW Antenna
f) Maximum No. of MW Antennas and
Diameter can be installed on the tower
0.30 m
0.60 m
1.20 m
2.4 m
g) As built drawing available? : yes no
Comments:

SFSR_ Friendly Property


CE-30021-05 CME Survey Report Page 13 of 30
Issued On: Sep 30 2011
Site Feasibility Survey Report
Company/Division: Site Name:
Province: Region:

5.3 Details for ROOFTOP STRUCTURES Not Applicable


Structural Analysis Required? yes
Construction (Concrete frame, steel frame etc) Concrete frame
Age of building 12 year
Parapet Walls/ Is there available Space on
Building Wall Existing wall? (yes/no) Elev. (m) none
Maximum No. of RF Antennas can
be installed :

2G (1.3m)
3G (2.6m)
LTE (2.6m)
Maximum No. of MW Antennas
and Diameter can be installed:
0.30 m
0.60 m
1.20 m
2.4 m
Load bearing Column Size (m x m) per floor 0.20m x 0.40m
Structures Beam Size (m x m) per floor 0.20m x 0.70m
Slab thickness (m) per floor
Column Grid (m x m)
Wall Spacing (m) 9m
Parapet Wall (Ht/Thickness)
Material Type (RC/Steel/Masonry)
No. of Floors/Building Height With mezzanine/7m
Height per floor (ceiling to floor) (m) Salesroom(4m)/Lubebay(5m)
As built drawing available? : yes no
Comments

Roof Construction
Condition: Good Moderate Poor Visual faults
SFSR_ Friendly Property
CE-30021-05 CME Survey Report Page 14 of 30
Issued On: Sep 30 2011
Site Feasibility Survey Report
Company/Division: Site Name:
Province: Region:

a) Reinforced concrete
b) Broad slab floor
c) Timber
d) Steel construction with steel plates
e) Columns
f) Beams
g) Ceilings
h) Roof
i) Guttering
j) Drainage
k) Waterproofing
l) Other (please specify)
m) Obstacles or obstructions present
Comments:

Roofing
a)Type of water proofing system Thermoplastic type
Proposed RT Pole Structure
Proposed Type of Antenna Support n/a
Proposed Height of Antenna Support
n/a
Structure
Other operators antenna supports
n/a
present at site
Comments:

6. TELECOM EQUIPMENT
6.1 Equipment Installation
SFSR_ Friendly Property
CE-30021-05 CME Survey Report Page 15 of 30
Issued On: Sep 30 2011
Site Feasibility Survey Report
Company/Division: Site Name:
Province: Region:

a) Cabinet Type Proposed Indoor Outdoor


b) Platform required for Equipment Cabinet & ACPDB/ MCB Yes No
c) Location of Cabinet and area required (include to sketch) 1m. x 1.5m.
d) Other operators installations on site (include to sketch) None
Comments:

SFSR_ Friendly Property


CE-30021-05 CME Survey Report Page 16 of 30
Issued On: Sep 30 2011
Site Feasibility Survey Report
Company/Division: Site Name:
Province: Region:

7. ELECTRICAL
7.1 Power Source
a.) Is commercial power available in the area? Yes No
b.) Capacity of existing power connection MCB (400)
c.) Available spare breakers/capacity

2 CB branch (20amps and 30amps)

d.) Manner of electrical power installation Commercial Sub-meter


Aerial Underground
Single Phase Three Phase
e.) Is generator available? Yes No
e.1) Capacity _______30/36_______ (KVA)
e.2) Possible to connect to existing generator Yes No
f.) Space available for new diesel generator?
Yes No
Indicate in site layout sketch
g.) Installation of new diesel generator allowed? Yes No
Comments:

7. 2 Earthing & Lightning Protection


Yes No Notes:
a) Existing earthing & lightning system
present?

b) Connection to existing earthing & lighting


protection possible?

Comments:

8. CME SURVEY PHOTOS


8.1 General Photos

SFSR_ Friendly Property


CE-30021-05 CME Survey Report Page 17 of 30
Issued On: Sep 30 2011
Site Feasibility Survey Report
Company/Division: Site Name:
Province: Region:

SITE VIEW

In Front of Gate/Building Side View (Right)

Side View (Left) Back View

SFSR_ Friendly Property


CE-30021-05 CME Survey Report Page 18 of 30
Issued On: Sep 30 2011
Site Feasibility Survey Report
Company/Division: Site Name:
Province: Region:

Full View Of Site

Nearest Power Source Existing earthing/lightning protection (N/A)

SFSR_ Friendly Property


CE-30021-05 CME Survey Report Page 19 of 30
Issued On: Sep 30 2011
Site Feasibility Survey Report
Company/Division: Site Name:
Province: Region:

Safety hazards: Primary Line and Vehicular Traffic

Obstacles (overhead cables, etc.)

SFSR_ Friendly Property


CE-30021-05 CME Survey Report Page 20 of 30
Issued On: Sep 30 2011
Site Feasibility Survey Report
Company/Division: Site Name:
Province: Region:

8.2 Photos Per Option


Option 1

Site Access Location of Equipment

Location of Tower / Poles (structure, antenna


placement, etc.) Damage in Existing Structures

Roof Condition Parapet Walls

SFSR_ Friendly Property


CE-30021-05 CME Survey Report Page 21 of 30
Issued On: Sep 30 2011
Site Feasibility Survey Report
Company/Division: Site Name:
Province: Region:

Option 2

Site Access Location of Equipment

Location of Tower / Poles (structure, antenna


placement, etc.) Damage in Existing Structures

Roof Condition Parapet Walls

SFSR_ Friendly Property


CE-30021-05 CME Survey Report Page 22 of 30
Issued On: Sep 30 2011
Site Feasibility Survey Report
Company/Division: Site Name:
Province: Region:

Option 3

Site Access Location of Equipment

Location of Tower / Poles (structure, antenna


placement, etc.) Damage in Existing Structures

Roof Condition Parapet Walls


9. SKETCH LOCATION PLAN (google map printout)

SFSR_ Friendly Property


CE-30021-05 CME Survey Report Page 23 of 30
Issued On: Sep 30 2011
Site Feasibility Survey Report
Company/Division: Site Name:
Province: Region:

SKETCH CHECK LIST:


Dimensions of site Layout of site Access to site Gate position - Proposed tower location Elevations of the road and the plot (Spot
levels) Direction of True North Obstacles ( overhead cables, open sewages or ditches, underground services, coverage, etc )

10. SKETCH SITE LAYOUT (showing underground installations and electrical power
source)

SFSR_ Friendly Property


CE-30021-05 CME Survey Report Page 24 of 30
Issued On: Sep 30 2011
Site Feasibility Survey Report
Company/Division: Site Name:
Province: Region:

SKETCH CHECK LIST:


Dimensions of site Layout of site Access to site Gate position - Proposed tower location Elevations of the road and the plot (Spot
levels) Direction of True North Obstacles ( overhead cables, open sewages or ditches, underground services, coverage, etc )

11. SKETCH PERSPECTIVE

SFSR_ Friendly Property


CE-30021-05 CME Survey Report Page 25 of 30
Issued On: Sep 30 2011
Site Feasibility Survey Report
Company/Division: Site Name:
Province: Region:

0 10 20 30 40
0 5 15 25 35 45

10

15

20

25

30

35

40

45

50

55

SKETCH CHECK LIST:


Dimensions of site Layout of site Access to site Gate position - Proposed tower location Elevations of the road and the plot (Spot
levels) Direction of True North Obstacles ( overhead cables, open sewages or ditches, underground services, coverage, etc )

12. OBSTRUCTION INFORMATION


12.1 360 Degrees at 500m Summary

SFSR_ Friendly Property


CE-30021-05 CME Survey Report Page 26 of 30
Issued On: Sep 30 2011
Site Feasibility Survey Report
Company/Division: Site Name:
Province: Region:

Comments:

SFSR_ Friendly Property


CE-30021-05 CME Survey Report Page 27 of 30
Issued On: Sep 30 2011
Site Feasibility Survey Report
Company/Division: Site Name:
Province: Region:

13. PANORAMIC PHOTOS FROM HIGHEST AVAILABLE POINT ON SITE


13.1 Panoramic View (0-330 degrees)

0 30

60 90

Based on obstruction chart, provide obstruction information in every photo (if any).

SFSR_ Friendly Property


CE-30021-05 CME Survey Report Page 28 of 30
Issued On: Sep 30 2011
Site Feasibility Survey Report
Company/Division: Site Name:
Province: Region:

120 150

180 210

Based on obstruction chart, provide obstruction information in every photo (if any).

SFSR_ Friendly Property


CE-30021-05 CME Survey Report Page 29 of 30
Issued On: Sep 30 2011
Site Feasibility Survey Report
Company/Division: Site Name:
Province: Region:

240 270

300 330

Comments:

Based on obstruction chart, provide obstruction information in every photo (if any).

SFSR_ Friendly Property


CE-30021-05 CME Survey Report Page 30 of 30
Issued On: Sep 30 2011

Das könnte Ihnen auch gefallen