LOCATION :
ITEM NO DESCRIPTION QTY UNIT MATERIAL LABOR EQUIPMENT SUBCONTRACT % wt PCF DIRECT COST BID COST
UC COST UC COST UC COST UC COST UC COST UC COST
1.00 Earth Works
1.01 excavation / manual - cum - - 266.67 - - - - - #DIV/0! ### 266.67 - #DIV/0! #DIV/0!
1.02 earthfill / manual - cum - - 160.00 - - - - - #DIV/0! ### 160.00 - #DIV/0! #DIV/0!
1.03 compaction / manual - cum - - 26.67 - #DIV/0! #DIV/0! - - #DIV/0! ### #DIV/0! #DIV/0! #DIV/0! #DIV/0!
2.00 Masonry Works
2.01 below ffl chb 5" - sqm #DIV/0! #DIV/0! 163.64 - - - - - #DIV/0! ### #DIV/0! #DIV/0! #DIV/0! #DIV/0!
2.02 1st ffl to 2nd ffl chb 4" - sqm #DIV/0! #DIV/0! 163.64 - - - - - #DIV/0! ### #DIV/0! #DIV/0! #DIV/0! #DIV/0!
2.03 2nd ffl to rb chb 4 - sqm #DIV/0! #DIV/0! 163.64 - - - - - #DIV/0! ### #DIV/0! #DIV/0! #DIV/0! #DIV/0!
2.05 above rb - sqm #DIV/0! #DIV/0! 163.64 - - - - - #DIV/0! ### #DIV/0! #DIV/0! #DIV/0! #DIV/0!
2.06 partition 4"chb (ground & 2nd flr) - sqm #DIV/0! #DIV/0! 163.64 - - - - - #DIV/0! ### #DIV/0! #DIV/0! #DIV/0! #DIV/0!
3.00 Plastering Works
3.01 ground floor - sqm #DIV/0! #DIV/0! 75.00 - - - - - #DIV/0! ### #DIV/0! #DIV/0! #DIV/0! #DIV/0!
3.02 second floor #VALUE! sqm #VALUE! #VALUE! 75.00 #VALUE! - #VALUE! - #VALUE! #VALUE! ### #VALUE! #VALUE! #VALUE! #VALUE!
3.04 above rb to roof - sqm #DIV/0! #DIV/0! 75.00 - - - - - #DIV/0! ### #DIV/0! #DIV/0! #DIV/0! #DIV/0!
3.05 partition (ground & second flr) #VALUE! sqm #VALUE! #VALUE! 77.78 #VALUE! - #VALUE! - #VALUE! #VALUE! ### #VALUE! #VALUE! #VALUE! #VALUE!
4.00 Concreting Works
4.01 concreting - cum #DIV/0! #DIV/0! 1,450.00 - 250.00 - - - #DIV/0! ### #DIV/0! #DIV/0! #DIV/0! #DIV/0!
5.00 Form Works
5.01 forms - sqm #DIV/0! #DIV/0! 112.50 - - - - - #DIV/0! ### #DIV/0! #DIV/0! #DIV/0! #DIV/0!
6.00 Rebar Works
6.01 structural grade - kg #DIV/0! #DIV/0! 8.50 - - - - - #DIV/0! ### #DIV/0! #DIV/0! #DIV/0! #DIV/0!
7.00 Roofing Works
7.01 s-tile roof - sqm - - - - #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
7.02 r-span roof - sqm #VALUE! #VALUE! 180.00 - - - - - #VALUE! ### #VALUE! #VALUE! #VALUE! #VALUE!
7.03 corrugated gi sheet ga 26 - sqm #N/A #N/A 90.00 - - - - - #N/A #N/A #N/A #N/A #N/A #N/A
7.04 angular & lc purlins - kg #N/A #N/A 19.26 - #DIV/0! #DIV/0! #DIV/0! #DIV/0! #N/A ### #N/A #N/A #N/A #N/A
8.00 Tile Works
8.01 tiles @ kitchen counter - sqm #DIV/0! #DIV/0! 360.00 - - - - - #DIV/0! ### #DIV/0! #DIV/0! #DIV/0! #DIV/0!
8.02 tiles @ grnd flr t & b - sqm #DIV/0! #DIV/0! 360.00 - - - - - #DIV/0! ### #DIV/0! #DIV/0! #DIV/0! #DIV/0!
8.03 tiles @ 2nd flr t & b - sqm #DIV/0! #DIV/0! 360.00 - - - - - #DIV/0! ### #DIV/0! #DIV/0! #DIV/0! #DIV/0!
8.04 tiles @ masters bedroom t& b - sqm #DIV/0! #DIV/0! 360.00 - - - - - #DIV/0! ### #DIV/0! #DIV/0! #DIV/0! #DIV/0!
8.05 kitchen counter - lot #N/A #N/A 1,800.00 - - - - - #N/A #N/A #N/A #N/A #N/A #N/A
8.06 nook (granite slab) - sqm #DIV/0! #DIV/0! 360.00 - - - - - #DIV/0! ### #DIV/0! #DIV/0! #DIV/0! #DIV/0!
8.07 nook counter - lot #N/A #N/A 1,800.00 - - - - - #N/A #N/A #N/A #N/A #N/A #N/A
9.00 Doors, Jambs & Accessories
9.01 2100 x 900 steel door & jamb / manual - unit - 900.00 - - - - - #DIV/0! ### 900.00 - #DIV/0! #DIV/0!
9.02 2100 x 700 steel door & jamb / manual - unit - 900.00 - - - - - #DIV/0! ### 900.00 - #DIV/0! #DIV/0!
9.03 2100 x 800 molded door - unit - 900.00 - - - - - #DIV/0! ### 900.00 - #DIV/0! #DIV/0!
9.04 2100 x 700 sld panel door - unit 7,950.00 - 900.00 - - - - - #DIV/0! ### 8,850.00 - #DIV/0! #DIV/0!
9.05 2100 x 800 molded door - unit 2,700.00 - 900.00 - - - - - #DIV/0! ### 3,600.00 - #DIV/0! #DIV/0!
9.06 2100 x 600 upvc door - unit 1,350.00 - 900.00 - - - - - #DIV/0! ### 2,250.00 - #DIV/0! #DIV/0!
10.00 Windows
10.01 window steel casement - sqft - - 25.71 - - - #DIV/0! #DIV/0! #DIV/0! ### #DIV/0! #DIV/0! #DIV/0! #DIV/0!
10.02 steel grilles - sqft #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! - - #DIV/0! ### #DIV/0! #DIV/0! #DIV/0! #DIV/0!
10.03 sliding glass analok - sqft - - - - - - #DIV/0! #DIV/0! #DIV/0! ### #DIV/0! #DIV/0! #DIV/0! #DIV/0!
10.04 window glass 1/8" smoked - sqft - - - - - - #DIV/0! #DIV/0! #DIV/0! ### #DIV/0! #DIV/0! #DIV/0! #DIV/0!
11.00 Painting Works
11.01 boysen acrytex (firewall) - sqm #DIV/0! #DIV/0! 90.00 - - - - - #DIV/0! ### #DIV/0! #DIV/0! #DIV/0! #DIV/0!
11.02 enamel 0.74 sqm 96.43 71.66 36.00 26.75 - - - - #DIV/0! 1.38 132.43 98.41 182.66 135.74
11.03 latex exterior side #VALUE! sqm #VALUE! #VALUE! 30.00 #VALUE! - #VALUE! - #VALUE! #VALUE! ### #VALUE! #VALUE! #VALUE! #VALUE!
11.04 latex interior side #VALUE! sqm #VALUE! #VALUE! 30.00 #VALUE! - #VALUE! - #VALUE! #VALUE! ### #VALUE! #VALUE! #VALUE! #VALUE!
11.05 boysen acrytex (door) - sqm #DIV/0! #DIV/0! 33.33 - - - - - #DIV/0! ### #DIV/0! #DIV/0! #DIV/0! #DIV/0!
11.06 varnish - sqm #DIV/0! #DIV/0! 150.00 - - - - - #DIV/0! ### #DIV/0! #DIV/0! #DIV/0! #DIV/0!
11.07 roof paint - sqm #DIV/0! #DIV/0! 30.00 - - - - - #DIV/0! ### #DIV/0! #DIV/0! #DIV/0! #DIV/0!
12.00 Plumbing Works
12.01 rough-in ground flr - lot #DIV/0! #DIV/0! 3,600.00 - - - - - #DIV/0! ### #DIV/0! #DIV/0! #DIV/0! #DIV/0!
12.02 rough-in second flr - lot #DIV/0! #DIV/0! 3,600.00 - - - - - #DIV/0! ### #DIV/0! #DIV/0! #DIV/0! #DIV/0!
12.03 water closet & lavatory package (skylark) - set 4,400.00 - #DIV/0! #DIV/0! - - - - #DIV/0! ### #DIV/0! #DIV/0! #DIV/0! #DIV/0!
12.04 water closet & lavatory package (emperor) - set 5,500.00 - #DIV/0! #DIV/0! - - - - #DIV/0! ### #DIV/0! #DIV/0! #DIV/0! #DIV/0!
12.05 kitchen sink double tub - set 2,099.75 - #DIV/0! #DIV/0! - - - - #DIV/0! ### #DIV/0! #DIV/0! #DIV/0! #DIV/0!
12.06 kitchen sink single tub - set 790.00 - #DIV/0! #DIV/0! - - - - #DIV/0! ### #DIV/0! #DIV/0! #DIV/0! #DIV/0!
12.07 bath tub - set #DIV/0! #DIV/0! 900.00 - - - - - #DIV/0! ### #DIV/0! #DIV/0! #DIV/0! #DIV/0!
12.07 septic tank installation & pipes - set #DIV/0! #DIV/0! 900.00 - - - - - #DIV/0! ### #DIV/0! #DIV/0! #DIV/0! #DIV/0!
12.08 catch basin & downspout - unit #DIV/0! #DIV/0! 450.00 - - - - - #DIV/0! ### #DIV/0! #DIV/0! #DIV/0! #DIV/0!
13.00 Ceiling Works
13.01 interior ceiling - sqm - - - - - - #DIV/0! #DIV/0! #DIV/0! ### #DIV/0! #DIV/0! #DIV/0! #DIV/0!
13.02 exterior ceiling - sqm - - - - - - #DIV/0! #DIV/0! #DIV/0! ### #DIV/0! #DIV/0! #DIV/0! #DIV/0!
13.03 cornice - lft #DIV/0! #DIV/0! 12.00 - - - - - #DIV/0! ### #DIV/0! #DIV/0! #DIV/0! #DIV/0!
14.00 Electrical Works
14.01 ground floor - co & sw #DIV/0! #DIV/0! 450.00 - - - - - #DIV/0! ### #DIV/0! #DIV/0! #DIV/0! #DIV/0!
14.02 second floor - co & sw #DIV/0! #DIV/0! 450.00 - - - - - #DIV/0! ### #DIV/0! #DIV/0! #DIV/0! #DIV/0!
15.00 Others
362811142.xls08/10/2017
ITEM NO DESCRIPTION QTY UNIT MATERIAL LABOR EQUIPMENT SUBCONTRACT % wt PCF DIRECT COST BID COST
UC COST UC COST UC COST UC COST UC COST UC COST
15.01 ceramic tiles 12 x 12" - sqm #DIV/0! #DIV/0! 300.00 - - - - - #DIV/0! ### #DIV/0! #DIV/0! #DIV/0! #DIV/0!
15.02 ceramic tiles 12 x 12" (stair) - sqm #DIV/0! #DIV/0! 300.00 - - - - - #DIV/0! ### #DIV/0! #DIV/0! #DIV/0! #DIV/0!
15.03 anti-skid at stair steps - steps #DIV/0! #DIV/0! 35.71 - - - - - #DIV/0! ### #DIV/0! #DIV/0! #DIV/0! #DIV/0!
15.04 ceramic tiles 12 x 12" (balcony, carport & lanai) - sqm #DIV/0! #DIV/0! 300.00 - - - - - #DIV/0! ### #DIV/0! #DIV/0! #DIV/0! #DIV/0!
15.05 ceramic tiles 16 x 16 - sqm #DIV/0! #DIV/0! 300.00 - - - - - #DIV/0! ### #DIV/0! #DIV/0! #DIV/0! #DIV/0!
15.06 granite 16 x 16 - sqm #DIV/0! #DIV/0! 300.00 - - - - - #DIV/0! ### #DIV/0! #DIV/0! #DIV/0! #DIV/0!
15.07 wood parquet ( narra ) 3/8" - sqm - - - - - - #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
15.08 cement topping (2nd flr) - sqm #DIV/0! #DIV/0! 112.50 - #DIV/0! #DIV/0! - - #DIV/0! ### #DIV/0! #DIV/0! #DIV/0! #DIV/0!
15.09 vinyl tiles 12" x 12" - sqm #DIV/0! #DIV/0! 81.82 - - - - - #DIV/0! ### #DIV/0! #DIV/0! #DIV/0! #DIV/0!
15.10 cement topping - sqm #DIV/0! #DIV/0! 112.50 - - - - - #DIV/0! ### #DIV/0! #DIV/0! #DIV/0! #DIV/0!
15.11 concrete steps & landing - steps #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! - - #DIV/0! 1.38 #DIV/0! #DIV/0! #DIV/0! #DIV/0!
15.12 wooden handrails ( 3"x 3" ) - ft #DIV/0! #DIV/0! 20.00 - - - - - #DIV/0! ### #DIV/0! #DIV/0! #DIV/0! #DIV/0!
15.13 steel stair railings - sq ft - - 25.71 - - - #DIV/0! #DIV/0! #DIV/0! ### #DIV/0! #DIV/0! #DIV/0! #DIV/0!
15.14 acu grills (1-unit) 8.00 sq ft 702.04 5,616.31 1,203.93 9,631.44 481.57 3,852.58 - - #DIV/0! 1.38 2,387.54 19,100.32 3,293.16 26,345.27
15.15 stainless railings - sq ft #DIV/0! #DIV/0! 120.00 - 60.00 - #DIV/0! #DIV/0! #DIV/0! ### #DIV/0! #DIV/0! #DIV/0! #DIV/0!
15.16 concrete mouldings - m #DIV/0! #DIV/0! 250.00 - - - - - #DIV/0! ### #DIV/0! #DIV/0! #DIV/0! #DIV/0!
15.17 concrete moldings 4 - m #DIV/0! #DIV/0! 100.00 - - - - - #DIV/0! ### #DIV/0! #DIV/0! #DIV/0! #DIV/0!
15.18 concrete moldings 5 - m #DIV/0! #DIV/0! 100.00 - - - - - #DIV/0! ### #DIV/0! #DIV/0! #DIV/0! #DIV/0!
15.19 wall cladding - sqm #DIV/0! #DIV/0! 300.00 - - - - - #DIV/0! ### #DIV/0! #DIV/0! #DIV/0! #DIV/0!
15.20 pebble ( black with vigan tiles) - sqm #DIV/0! #DIV/0! 225.00 - - - - - #DIV/0! ### #DIV/0! #DIV/0! #DIV/0! #DIV/0!
15.21 pebbles ( black ) - sqm #DIV/0! #DIV/0! 225.00 - - - - - #DIV/0! ### #DIV/0! #DIV/0! #DIV/0! #DIV/0!
15.22 water proofing (balcony & CR) - sqm #DIV/0! #DIV/0! 36.00 - - - - - #DIV/0! ### #DIV/0! #DIV/0! #DIV/0! #DIV/0!
15.23 water proofing & topping (roof deck) - sqm #DIV/0! #DIV/0! 180.00 - - - - - #DIV/0! ### #DIV/0! #DIV/0! #DIV/0! #DIV/0!
15.24 wood trellis - bd ft #DIV/0! #DIV/0! 18.00 - #DIV/0! #DIV/0! - - #DIV/0! ### #DIV/0! #DIV/0! #DIV/0! #DIV/0!
15.25 glass blocks 8" x 8" - sqm #DIV/0! #DIV/0! 333.33 - - - - - #DIV/0! ### #DIV/0! #DIV/0! #DIV/0! #DIV/0!
15.26 tv antena outlet - outlet #DIV/0! #DIV/0! 450.00 - - - - - #DIV/0! ### #DIV/0! #DIV/0! #DIV/0! #DIV/0!
15.27 polycarbonate sheet - sqm #DIV/0! #DIV/0! 600.00 - - - #DIV/0! #DIV/0! #DIV/0! ### #DIV/0! #DIV/0! #DIV/0! #DIV/0!
15.28 adobe 12 x 12 x 4 - sqm #DIV/0! #DIV/0! 300.00 - - - - - #DIV/0! ### #DIV/0! #DIV/0! #DIV/0! #DIV/0!
15.29 brick red 2 x 4 x 8 - sqm #DIV/0! #DIV/0! 300.00 - - - - - #DIV/0! ### #DIV/0! #DIV/0! #DIV/0! #DIV/0!
15.30 door casing 3 x 14 ft - lft #DIV/0! #DIV/0! 12.00 - - - - - #DIV/0! ### #DIV/0! #DIV/0! #DIV/0! #DIV/0!
15.31 gi canopy - sqft #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! - - #DIV/0! ### #DIV/0! #DIV/0! #DIV/0! #DIV/0!
15.32 base board 4 (bb 1- 4b) x 14 ft - sqm #DIV/0! #DIV/0! 12.00 - - - - - #DIV/0! ### #DIV/0! #DIV/0! #DIV/0! #DIV/0!
15.33 decorative fixed capiz - sqft - - 25.71 - - - #DIV/0! #DIV/0! #DIV/0! ### #DIV/0! #DIV/0! #DIV/0! #DIV/0!
15.34 concrete balluster - pc/s #DIV/0! #DIV/0! 90.00 - - - - - #DIV/0! ### #DIV/0! #DIV/0! #DIV/0! #DIV/0!
15.35 king post 4 x 4 - pc/s #DIV/0! #DIV/0! 450.00 - - - - - #DIV/0! ### #DIV/0! #DIV/0! #DIV/0! #DIV/0!
15.36 assorted pebbles - sqm #DIV/0! #DIV/0! 225.00 - - - - - #DIV/0! ### #DIV/0! #DIV/0! #DIV/0! #DIV/0!
15.37 telephone outlet - outlet #DIV/0! #DIV/0! 450.00 - - - - - #DIV/0! ### #DIV/0! #DIV/0! #DIV/0! #DIV/0!
15.38 border - lm #DIV/0! #DIV/0! 36.00 - - - - - #DIV/0! ### #DIV/0! #DIV/0! #DIV/0! #DIV/0!
15.39 bedroom closet - lot #DIV/0! #DIV/0! 2,571.43 - - - - - #DIV/0! ### #DIV/0! #DIV/0! #DIV/0! #DIV/0!
#DIV/0! #DIV/0! #DIV/0! #N/A #DIV/0! #DIV/0! #DIV/0!
ITEM NO DESCRIPTION QTY UNIT MATERIAL LABOR EQUIPMENT SUBCONTRACT PCF DIRECT COST BID COST
UC COST UC COST UC COST UC COST UC COST UC COST
1.00 Earth Works
1.01 EARTHFILL / materials (house) - cum #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
1.02 EARTHFILL / materials (lot) - cum #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
2.00 Doors, Jambs & Accessories (materials)
2.01 2100 x 900 steel door & jamb - unit 4,200.00 - - - - - - - #DIV/0! 4,200.00 - #DIV/0! #DIV/0!
2.02 2100 x 700 steel door & jamb - unit 4,200.00 - - - - - - - #DIV/0! 4,200.00 - #DIV/0! #DIV/0!
2.03 2100 x 800 molded door - unit 1,300.00 - - - - - - - #DIV/0! 1,300.00 - #DIV/0! #DIV/0!
2.04 knobs ( faultless ) - set 520.00 - - - - - - - #DIV/0! 520.00 - #DIV/0! #DIV/0!
2.05 dead bolt - set 320.00 - - - - - - - #DIV/0! 320.00 - #DIV/0! #DIV/0!
2.06 steel door jamb - set 750.00 - - - - - - - #DIV/0! 750.00 - #DIV/0! #DIV/0!
3.00 Plumbing Works (materials)
3.01 septic tank - set 10,400.00 - - #DIV/0! 10,400.00 - #DIV/0! #DIV/0!
TOTAL #DIV/0! - - - #DIV/0! #DIV/0!
Checked by : Approved :
Engr. Agapito C. Caparas Amando M. Buhain
AVP Engineering & Construction President
362811142.xls08/10/2017
PROJECT:
FLOOR AREA:
SUBCON COST
1.00 WINDOWS
steel casement sqft p #VALUE! sqft miscellaneous #VALUE! #VALUE!
glass 1/8 thk (smoked) 0.00 0.00 sqft 0.00 0.00 0.00
TOTAL SUBCON COST #VALUE! #VALUE!
Roofing Tile span (long span) .4mm thick pre-painted APO (Puyat steel Corp.)
Accessories .4mm thick pre-painted APO (Puyat steel Corp.)
Ceiling 4.5 mm thk cement board in metal furring painted w/ boysen Flex boards
wooden cornice 4(CN-4b) living,dining,kit & hallway painted w/ boysen Pateco
wooden cornice 3 (CN-3b) bedrooms,porch & balcony painted w/ boysen Pateco
wooden cornice 2 (CN-2b) CR painted w/ boysen Pateco
Flooring Ground flr 12 x 12 ceramic tiles (polished) with pvc anti skid on Tenzen/Lepanto/Euro tiles
second flr 12 x 12 ceramic tiles (polished) exposed edges Tenzen/Lepanto/Euro tiles
Porch - 12 x 12 ceramic tiles (unpolished) Tenzen/Lepanto/Euro tiles
Balcony - 12 x 12 ceramic tiles (unpolished) Tenzen/Lepanto/Euro tiles
Doors & Jambs Main door - steel door 2.1 x 0.9 m painted w/ boysen Rapid Forming
Service door - steel door 2.1 x 0.7 m painted w/ boysen Rapid Forming
Door at balcony sliding panel door 2-2.1 x 0.7 m painted w/ boysen Sash Factory
Bedroom door molded door 2.1 x 0.8 m painted w/ boysen Pateco
Cr door PVC door 2.1 x 0.6 m pre painted w/ colored glass Poly door
All door jamb steel (except CR & balcony door) painted w/ boysen Rapid Forming
sliding door jamb 2 x 6 wood jamb painted w/ boysen (acrytex) Sash Factory
All door lock set (except CR & sliding door) lever type antique brass Yale L6267 ET US5
Main door entrance set antique brass Yale CBCA 5057 US5
CR door lock set cylindrical type Yale
Water closet (CS4338PBDF) & wash basin with long pedestal (LF368) white HCG Pissarro Package I
w/ faucet (LF3000), soap holder (BA31) & paper holder (BA38)
Water closet (AMB 150DF) & pedestal lavatory (AMK-P03P) white Artes Myer Emperor Package
w/ faucet, soap holder & paper holder (AMPA-E)
Bath tub (1.70 m) with telephone shower acrylic white Royal Tern Penguin
Kitchen Counter Counter top & splash wall - 8x 8 ceramic tiles glazed Tenzen/Lepanto/Euro tiles
Border 3 x 8 ceramic tiles glazed Tenzen/Lepanto/Euro tiles
Kitchen sink double tub stainless ( CBS-3617-327) Distributed by best tank
Kitchen sink double tub stainless ( CBS-3018-331) Distributed by best tank
Kitchen sink faucet chrome plated (JM-9814-231) Distributed by best tank
Kitchen counter cabinet (design F) painted with boysen Pateco
Other Finishes
Prepared by:
MMC
Office Engineer
Checked by:
Miscellaneous
Project -
Floor Area 0.00 sqm
Location -
Buyer 0
ITEM MATERIALS SPECIFICATION FINISHES BRAND
Roofing Tile span (long span) .4mm thick pre-painted APO (Puyat steel Corp.)
Accessories .4mm thick pre-painted APO (Puyat steel Corp.)
Ceiling 4.5 mm thk cement board in metal furring painted w/ boysen Flex boards
with cornice 4(CN-4b) x 14 ft living,dining,kit & hallway painted w/ boysen Pateco
with cornice 3 (CN-3b) x 14 ft bedrooms,porch & balcony painted w/ boysen Pateco
with cornice 2 (CN-2b) x 14 ft CR painted w/ boysen Pateco
Flooring Ground flr 12 x 12 ceramic tiles (polished) with pvc anti skid on Tenzen/Lepanto/Euro tiles
second flr 12 x 12 ceramic tiles (polished) exposed edges Tenzen/Lepanto/Euro tiles
Porch - 12 x 12 ceramic tiles (unpolished) Tenzen/Lepanto/Euro tiles
Balcony - 12 x 12 ceramic tiles (unpolished) Tenzen/Lepanto/Euro tiles
Doors & Jambs Main door - panel door 2.1 x 0.9 m painted w/ boysen (acrytex) Sash Factory
Service door - panel door 2.1 x 0.7 m painted w/ boysen (acrytex) Sash Factory
Door at balcony sliding panel door 2-2.1 x 0.7 m painted w/ boysen (acrytex) Sash Factory
Bedroom door molded door 2.1 x 0.8 m painted w/ boysen (QDE) Pateco
Cr door PVC door 2.1 x 0.6 m pre painted w/ colored glass Poly door
All door jamb steel (except CR & balcony door) painted w/ boysen Rapid Forming
sliding door jamb 2 x 6 wood jamb painted w/ boysen (acrytex) Sash Factory
All door lock set (except CR & sliding door) lever type solid brass Yale
CR door lock set Yale
Water closet (CS4338PBDF) & wash basin with long pedestal (LF368) white HCG
w/ faucet (LF3000), soap holder (BA31) & paper holder (BA38) Pissarro Package I
Water closet (AMB 150DF) & pedestal lavatory (AMK-P03P) white Artes Myer
w/ faucet, soap holder & paper holder (AMPA-E) Emperor (AMB-150DF)
Bath tub (1.70 m) with telephone shower acrylic white Royal Tern (Penguin)
Other Finishes
Prepared by:
MMC
Office Engineer
Checked by:
Ceiling 4.5 mm thk cement board on metal furring Painted w/ boysen Flex boards
Flooring Ground flr 12 x 12 ceramic tiles (polished) Exposed tile edges w/ tile trim Tenzen/Lepanto/Euro tiles
Carport 12 x 12 ceramic tiles (unpolished)
Doors & Jambs Main door - flush door 2.1 x 0.9 m Painted w/ boysen (acrytex) sash factory
Service door - flush door 2.1 x 0.7 m w/ GI Painted w/ boysen (acrytex) sash factory
Bedroom door flush door 2.1 x 0.8 m Painted w/ boysen (QDE) sash factory
Cr door PVC door 2.1 x 0.6 m Pre painted Poly door
All door jamb steel (except CR) Painted w/ boysen Rapid forming
All door knobs Yale
Water closet & wall hung lavatory w/ soap White Royal tern
And tissue holder skylark trip lever
Wall Cladding Manufactured Stone Top with boysen acrytex clear Stone Age (ledgestones)
Prepared by:
MMC
Office Engineer
Checked by:
03/15/11
item no materials unit price
earth works
1.00 common borrow cu m 150.00
2.00 lahar cu m 250.00
concreting, masonry, plastering
1.00 cement 40 kg/s / bag bag 230.00
2.00 sand s1 cum 850.00
3.00 gravel 3/4 ( round ) cum 650.00
4.00 chb 4" non load bearing pc 14.00
5.00 chb 5" non load bearing pc 16.00
forms & ceiling
1.00 plywood 3/16 ord. pc 250.00
2.00 flex brd 3.5 mm pc 300.00
3.00 plywood 1/4 (marine) pc 310.00
4.00 plywood 1/4 ord. pc 275.00 flexboard 360
5.00 plywboards 3/4 ord. pc 710.00
6.00 coco lumber bd ft 20.00
7.00 good lumber 2" x 2" x 12' bd ft 36.00
8.00 good lumber 2" x 2" x 10' bd ft 36.00
9.00 good lumber 2" x 2" x 8' bd ft 36.00
10.00 good lumber 1" x 1" x 8' pc 36.00
11.00 cwn 2" kg 55.00
12.00 cwn 3" kg 50.00
13.00 cwn 4" kg 50.00
14.00 1" finishing nail kg 75.00
15.00 cabinet handle pc 25.00
16.00 wire mesh 1/8"x1/8"x3' l.m. 85.00
rebars price/kg
1.00 rebars 9mm dia pc 80.00 30.77
2.00 rebars 10mm dia pc 115.00 32.86
3.00 rebars 12mm dia pc 165.00 33.00
4.00 rebars 16mm dia pc 293.00 32.56
5.00 rebars 20mm dia pc 465.00 33.21 25 715
6.00 gi wire ga 16 kg 60.00
doors
1.00 pvc door 2.1 x .6 m w/ jamb pc 1,350.00
2.00 pvc door 2.1 x .6 m w/ jamb (w/ louver & colored glass) pc 2,800.00
3.00 molded door 2.1 x .8 m w/ jamb pc 3,450.00
4.00 flush door 2.1 x .6 m w/ jamb pc 1,900.00
5.00 flush door 2.1 x .7 m w/ jamb w/ GI pc 2,250.00
6.00 molded door 2.1 x .8 m w/ jamb pc 2,050.00
7.00 flush door 2.1 x .9 m w/ jamb pc 2,050.00
8.00 steel door 2.1 x .7 m w/ jamb pc 4,200.00
9.00 steel door 2.1 x .9 m w/ jamb pc 4,200.00
10.00 3" x 3" loose pin hinge pc 25.00
11.00 door knob ( yale ) pc 250.00
12.00 door knob ( amerilock ) pc 150.00
13.00 railings us pc 1,280.00
14.00 hanger stanley pc 1,000.00
15.00 door lock lock wood pc 800.00
deadbolt lock pc 240.00
barrel bolt pc 35.00
windows
1.00 glass 1/8" smoke (installed) sq ft 35.00
2.00 glass 1/8" clear (intalled) sq ft 35.00
3.00 analok 1/4" thk bronze ( installed) sq ft 300.00 bus type anodize 350
4.00 steel casement sq ft 140.00
tiles ( t & b, & kitchen counter ) `
1.00 8" x 8" glazed tiles (mariwasa) pc 12.00
2.00 8" x 8" unglazed tiles pc 12.00
3.00 abc grout / 2 kgs bag 60.00
4.00 tile trim per 8 ft pc 50.00
3 x 8 border tiles pc 18.00
8 x 12 glazed tiles pc 18.50
roof framing 03/15/10 kg/m
1.00 angle 2" x 2" x 3/16 x 20 ft pc 540.00
2.00 angle 1 1/2" x 1 1/2" x 3/16 x 20 ft pc 340.00
3.00 angle 2" x 2" x 1/4 x 20 ft pc 795.00
4.00 angle 1 1/2" x 1 1/2" x 1/4 x 20 ft pc 535.00
5.00 flat bar 2" x 3/16 x 20 ft pc 350.00
6.00 flat bar 1 1/2" x 3/16 x 20 ft pc 245.00
7.00 c purlins 2" x 3" x 20 ft (1.20 mm thk) pc 380.00 1.89
8.00 c purlins 2" x 4" x 20 ft (1.20 mm thk) pc 420.00 2.43
9.00 c purlins 2" x 5" x 20 ft (1.20 mm thk) pc 2.70
10.00 c purlins 2" x 6" x 20 ft (1.20 mm thk) pc 470.00 3.46
11.00 plain round bar 10mm dia. x 6m pc 125.00
12.00 welding rod kg 100.00
13.00 facia bd 1' x 10 " x l bd ft 65.00
14.00 facia bd lc 2" x 10" x 8 ft (0.9 mm thk) pcs 320.00
roofing
1.00 r span lm 253.00
2.00 gutter spanish ( .40 x .457 m x 0.40 mm)per 8 ft pc 340.00
3.00 ridge roll per 8 ft pc 227.00
4.00 valley gutter per 8 ft pc 255.00
5.00 end flushing per 8 ft pc 340.00
6.00 side wall flushing per 8 ft pc 170.00
7.00 tile span lm 308.00
8.00 gutter spanish per 8 ft pc 340.00
9.00 ridge roll per 8 ft pc 337.00
10.00 valley gutter per 8 ft pc 340.00
11.00 end flushing per 8 ft pc 340.00
12.00 side wall flushing per 8 ft pc 170.00
13.00 tekscrew pc 1.85
14.00 silicon pc 120.00
15.00 rivets pc 0.50
16.00 wire basket strainer pc 100.00
17.00 sleeves 3" dia pc 50.00
18.00 concrete nail 1 1/2" kg 75.00
19.00 corr gi sheet ft 33.00
20.00 fab. ridge roll per 8 ft pc 140.00
21.00 fab. gutter per 8 ft pc 130.00
22.00 fab. valley gutter per 8 ft pc 160.00
23.00 fab. end flushing per 8 ft pc 160.00
24.00 roof nails kg 90.00
25.00 Stainless gutter pc 1,200.00
362811142.xlsMATERIALSPRICELIST08/10/2017
painting ( latex, enamel, floor paint & roof paint )
1.00 masonry neutralizer gal. 275.00
2.00 paint thinner gal 190.00
3.00 panching compound kg 30.00
4.00 flat wall enamel gal 465.00
5.00 latex gal 416.00
6.00 latex semi gloss gal 485.00
7.00 qde chocolate brown gal 420.00
8.00 qde white gal 515.00
9.00 plasolux putty gal 545.00
10.00 sanding paper #120 pc 10.00
11.00 sanding paper #100 pc 15.00
12.00 lacquer thinner gal 160.00
13.00 lacquer flo gal 580.00
14.00 whether coat gal 400.00
15.00 acri color 1/4 lt latex pc 45.00
16.00 tin ting color 1/4 lt enamel. pc 95.00
17.00 glazing putty gal 545.00
18.00 true coat gal 810.00
19.00 boysen roof guard gal 540.00
20.00 acreytex primer gal 610.00
21.00 acreytex cast gal 400.00
22.00 acreytex top coat gal 765.00
acreytex reducer gal 345.00
23.00 stopa kgs 50.00
Masonry putty boysen gal 275.00
electrical
1.00 breaker box 6 holes pc 600.00
2.00 breaker box 8 holes pc 650.00
3.00 breaker box 10 holes pc 900.00
4.00 breaker switch 15 a pair 295.00
5.00 breaker switch 20 a pair 295.00
6.00 breaker switch 30 a pair 295.00
7.00 breaker switch 40 a pair 295.00
8.00 breaker switch 60 a pair 420.00
9.00 breaker switch 100 a pair 750.00
10.00 receptacles pc 28.00
11.00 t - slot outlet pc 25.00
12.00 plate co. pc 25.00
13.00 SwitcH pc 35.00
14.00 1 gang plate pc 25.00
15.00 2 gang plate pc 25.00
16.00 3 gang plate pc 25.00
17.00 awg stranded wire # 10 roll 4,455.00
18.00 awg stranded wire # 12 roll 2,910.00
19.00 awg stranded wire # 14 roll 1,635.00
20.00 awg stranded wire # 8 roll 4,645.00
21.00 flexible hose 3/4" roll 950.00
22.00 flexible hose 1/2" roll 750.00
23.00 pipe clamp 1/2 " dia. pc 2.50
24.00 junction box 4" x 4" pc 25.00
25.00 utility box 4" x 2" pc 18.00
26.00 electrical tape big pc 25.00
27.00 acu outlet national w/ plate pc 240.00
28.00 exhaust fan 12" dia ( tailee ) pc 1,350.00
29.00 exhaust fan 12" dia ( 3d ) pc 1,090.00
plumbing pipes, fitting & fixtures
1.00 bath tub ( royal tern penguin acrylic ) pc 11,050.00
2.00 lavatory ( counter type royal tern ) pc 2,250.00
3.00 lavatory (for hot & cold) pc 1,350.00
For 2-storey
4.00 water closet & lavatory pedestal type (Artes Myer AMB-150DF) set 5,500.00
For bungalow
5.00 water closet & lavatory wall hang (sf skylark trip lever package) set 4,400.00
6.00 kitchen sink 16" x 24" pc 790.00
7.00 kitchen sink double tub 2,099.75
8.00 floor drain 4" x 4" chrome plated pc 80.00
9.00 p trap 2" dia. pc 62.00
10.00 3" dia. pvc pipe (gray) pc 120.00
11.00 2" dia. pvc pipe pc 170.00
12.00 4" dia. pvc pipe pc 450.00
13.00 4" dia. coupling pc 53.00
14.00 3" dia. Coupling (gray) pc 10.00
15.00 2" dia. coupling pc 18.00
16.00 2" dia. elbow pc 26.00
17.00 3" dia. Elbow (gray) pc 25.00
18.00 4" dia. elbow pc 85.00
19.00 2" dia. tee pc 38.00
20.00 3" dia. Tee (gray) pc 30.00
21.00 4" dia. tee pc 118.00
22.00 4" x 2" dia. reducer tee pc 85.00
23.00 4" x 3" dia. reducer tee pc 95.00
24.00 4" x 45 elbow pc 74.00
25.00 2" x 45 elbow pc 24.00
26.00 3" x 45 elbow pc 10.00
27.00 clean out 4" dia w/ cover pc 65.00
28.00 clean out 2" dia w/ cover pc 40.00
29.00 wye 4" dia pc 138.00
30.00 wye reducer 4" x 2" pc 90.00
31.00 solvent cement ( 100 cc ) pc 75.00
32.00 vulcaseal lt 360.00
33.00 3/4" dia x 10' elson blue pc 100.00
34.00 1/2" dia x 10' elson blue pc 55.00
35.00 3/4" dia x gi pipe pc 450.00
36.00 1/2" dia x gi pipe pc 325.00
37.00 3/4" gi coupling pc 11.00
38.00 1/2" gi coupling pc 9.00
39.00 3/4" gi tee pc 25.00
40.00 1/2" gi tee pc 13.00
41.00 3/4" x 1/2" gi tee reducer pc 25.00
42.00 3/4" gi elbow pc 15.00
43.00 1/2" gi elbow pc 12.00
44.00 3/4" x 1/2" gi reducer pc 15.00
45.00 3" x 1/2" dia nipple pc 13.00
46.00 sho valve & head wb brand pc 520.00
47.00 shower valve (for hot & cold) pc 2,900.00
48.00 gate valve 3/4 dia pc 320.00
49.00 Faucet best tank (ks-1203) kitchen sink pc 470.00
50.00 angle valve pc 130.00
51.00 Faucet best tank (jm-9719-220) shower pc 350.00
52.00 kitchen sink faucet (JM-9814-231) pc 699.75
53.00 u. s. teflon pc 10.00
54.00 flexible hose pc 120.00
55.00 niple 3/8 x 2" pc 15.00
56.00 reducer bushing 1/2 x 3/8 pc 15.00
362811142.xlsMATERIALSPRICELIST08/10/2017
floor finish @ ground & second flr.
1.00 12" x 12" unglazed tiles tenzen pc 29.60
2.00 vinyl tiles 12" x 12" pc 14.00
3.00 vinyl bond gal 375.00
4.00 pebbles ( black ) can 40.00
5.00 pebbles ( boracay ) can 140.00
6.00 red cement kg 150.00
7.00 adobe rubble 12" x 12" pc 40.00
8.00 adobe rubble 4" x 12" pc 15.00 ashlar mariposa 4x 8 650
9.00 aslar tiles biege 2" x 6" sq m 280.00 green slate 4 x 8 350
10.00 aslar tiles biege 4" x 8" sq m 450.00 wood stone 4 x 8 650
11.00 wood parquet narra 3/8 thk top w/ polyurethane sq ft 85.00
12.00 porcelain tiles ( granite tiles ) pcs 85.00
13.00 vigan tiles pcs 15.00
stair, handrail & railings
1.00 hand rails 2" x 3" l ft 100.00
2.00 hand rails 3" x 3" l ft 130.00
3.00 steel railings sq ft 150.00
4.00 lumber 2" x 12" kd bd ft 66.00
5.00 lumber 2" x 10" kd bd ft 64.00
6.00 lumber 2" x 8" kd bd ft 61.00
7.00 t & g 1" x 4" x l bd ft 42.00
8.00 Raven anti-skid pc 1,400.00
9.00 Water proofing-frosroc Pack 360.00
10.00 Cabinet
11.00 Plywood 810.00
12.00 Piano hinges 130.00
13.00 Catches 8.00
14.00 Handle 25.00
15.00 10 mm square bar 110.00
16.00 12 mm square bar 145.00
17.00 16 mm square bar 460.00
18.00 2 x 2 tubular ga 16 735.00
19.00 2 x 3 tubular ga 16 920.00
20.00 2 x 4 tubular ga 16 1,250.00
21.00 gi pipe 1 dia sch 20 600.00
22.00 gi pipe 1 1/2 dia sch 20 910.00
23.00 gi pipe 2 dia sch 20 1,310.00
24.00 1/8 x 1/2 flat bar 50.00
25.00 1/8 x 1 flat bar 130.00
26.00 1/4 x 1/2 flat bar 105.00
27.00 1/4 x 1 flat bar 215.00
28.00 3/16 x 1/2 flat bar 70.00
29.00 3/16 x 1 flat bar 170.00
30.00 plain round bar 16mm dia 395.00
31.00 plain gi sheet ga 18 1,260.00
32.00 welding rod 110.00
33.00 concrete balluster pc 100.00
34.00 12 x 12 x 4 adobe pc 35.00
35.00 2 x 4 x 8 red bricks pc 7.00
36.00 king post 4 x 4 (steel & wood) pc 800.00
37.00 capiz on yakal frame sqft 300.00
38.00 Border 8 cm 5m/roll 420.00
39.00 assorted pebbles can 200.00
40.00 door casing 3 x 14 ft (pateco) pc 212.80
41.00 cornice CN-1-6 lft 37.50
42.00 cornice CN-1-4b lft 23.60
43.00 cornice CN-1-3b lft 17.70
44.00 cornice CN-1-2b lft 11.80
45.00 stick well kg 120.00
46.00 concealed hinges pc 36.00
47.00 stainless closet handle pc 120.00
48.00 aluminum pipe 1 x 16' pc 240.00
49.00 Flanges 1 dia pc 30.00
50.00 french type cab door pc 200.00
51.00 plain gi sheet ga 24 pc 520.00
52.00 design lace ft 25.00
53.00 epoxy primer gal 580.00
54.00 baseboard BB 1-4B lft 24.40
55.00 glass block 8 x 8 pc 90.00
56.00 screw with tox pc 2.00
polyurethane reducer lit 135.00
sanding sealer gal 470.00
polyurethane top coat gal 960.00
Artes myer dual flush push botton & pedestal type-emperor (white) set 5500
Reg. Colored set 6000
(ARTES MYER-EMPEROR AMB-150DF-two piece dual push button & pedestal type)
GRANITE-GRANITO
16X16 173.95
12X12 93.95
man power rate
362811142.xlsMATERIALSPRICELIST08/10/2017
GRADE 230(STRUCTURAL GRADE) ASTM33; 230MPa / 33000 PSI
9 0.444
10 0.616
12 0.888
16 1.578
20 2.466
25 3.853
28 4.834
32 6.313
36 7.990
9mm. kg/m 10mm. kg/m 12mm. kg/m 16mm. kg/m 20mm. kg/m 25mm. kg/m 28mm.
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
9 0.444 10 0.616 12 0.888 16 1.578 20 2.466 25 3.853 28
kg/m 32mm. kg/m 36mm. kg/m
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
4.834 32 6.313 36 7.990
estimates
foundation
isolated footing
marks qty dimension (m) main bars along l
l w d code no dia kg/m
F-1 4.00 16.00 1.58
F-2 4.00 16.00 1.58
F-3 4.00 16.00 1.58
F-4 4.00 16.00 1.58
F-5 4.00 16.00 1.58
F-6 4.00 16.00 1.58
F-7 4.00 16.00 1.58
total - -
wall footing
marks qty dimension (m) main bars along l
l w d code no dia kg/m
wf-1 - 0.40 0.25 2.00 10.00 0.62
wf-3 - 0.30 0.15 2.00 10.00 0.62
2.00 10.00 0.62
2.00 10.00 0.62
2.00 10.00 0.62
2.00 10.00 0.62
2.00 10.00 0.62
2.00 10.00 0.62
2.00 10.00 0.62
total - 0.40
F O O T I
9.00 mm - 10.00 mm - 12.00 mm - 16.00 mm -
9.00 mm - 10.00 mm - 12.00 mm - 16.00 mm -
9.00 mm - 10.00 mm - 12.00 mm - 16.00 mm -
9.00 mm - 10.00 mm - 12.00 mm - 16.00 mm -
9.00 mm - 10.00 mm - 12.00 mm - 16.00 mm -
9.00 mm - 10.00 mm - 12.00 mm - 16.00 mm -
9.00 mm - 10.00 mm - 12.00 mm - 16.00 mm -
9.00 mm - 10.00 mm - 12.00 mm - 16.00 mm -
9.00 mm - 10.00 mm - 12.00 mm - 16.00 mm -
9.00 mm - 10.00 mm - 12.00 mm - 16.00 mm -
9.00 mm - 10.00 mm - 12.00 mm - 16.00 mm -
9.00 mm - 10.00 mm - 12.00 mm - 16.00 mm -
9.00 mm - 10.00 mm - 12.00 mm - 16.00 mm -
9.00 mm - 10.00 mm - 12.00 mm - 16.00 mm -
9.00 mm - 10.00 mm - 12.00 mm - 16.00 mm -
9.00 mm - 10.00 mm - 12.00 mm - 16.00 mm -
9.00 mm - 10.00 mm - 12.00 mm - 16.00 mm -
9.00 mm - 10.00 mm - 12.00 mm - 16.00 mm -
total - - - -
along l main bars along w no of kg conc vol
Bar pcs code no dia kg/m Bar pcs main bars tie wire cum
5.000 4.00 16.00 1.58 5.000 - - -
5.000 4.00 16.00 1.58 5.000 - - -
5.000 4.00 16.00 1.58 5.000 - - -
6.000 4.00 16.00 1.58 6.000 - - -
6.000 4.00 16.00 1.58 6.000 - - -
6.000 4.00 16.00 1.58 6.000 - - -
6.000 4.00 16.00 1.58 6.000 - - -
- -
- -
- -
- -
- -
-
-
-
-
-
-
- - -
16 mm -
10 mm - - -
- - -
I N G
20.00 mm - 25.00 mm - 28.00 mm -
20.00 mm - 25.00 mm - 28.00 mm -
20.00 mm - 25.00 mm - 28.00 mm -
20.00 mm - 25.00 mm - 28.00 mm -
20.00 mm - 25.00 mm - 28.00 mm -
20.00 mm - 25.00 mm - 28.00 mm -
20.00 mm - 25.00 mm - 28.00 mm -
20.00 mm - 25.00 mm - 28.00 mm -
20.00 mm - 25.00 mm - 28.00 mm -
20.00 mm - 25.00 mm - 28.00 mm -
20.00 mm - 25.00 mm - 28.00 mm -
20.00 mm - 25.00 mm - 28.00 mm -
20.00 mm - 25.00 mm - 28.00 mm -
20.00 mm - 25.00 mm - 28.00 mm -
20.00 mm - 25.00 mm - 28.00 mm -
20.00 mm - 25.00 mm - 28.00 mm -
20.00 mm - 25.00 mm - 28.00 mm -
20.00 mm - 25.00 mm - 28.00 mm -
- - -
cement sand gravel formboard form lumber asstd nails form oil
bag cum cum pcs bdft kg li
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
conc vol cement sand gravel formboard form lumber asstd nailform oil
cum bag cum cum pcs bdft kg li
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - - -
concreting works const bid cost/cum
concreting 3000 psi #DIV/0!
unit cost qty -
equipment
one bagger mixer 1.00 500.00
bill of materials
description qty unit unit cost
Cement - bags 230.00
Sand s-1 - cum 850.00
Gravel 3/4" - cum 650.00
total
2.00
material computation:
description class a
1.0 cement 9bag/cum 9.00
2.0 sand .5cum/cum 0.50
3.0 gravel 3/4" 1cum/cum 1.00
const bid cost/cum total bid cost rebars
#DIV/0! #DIV/0! structural grade 40 psi
cum pcf #DIV/0! unit cost qty
project cost 0.08
proj.supervision 0.05 labor unit cost 9.00 -
constn facilities 0.03 equipment unit cost #DIV/0!
indirect eqpt - material unit cost #DIV/0!
miscellaneous - rebar unit cost #DIV/0! sub con
others - total cost #DIV/0!
indirect cost 0.20 duration -
bonds premiums - crew
insurance premiums - labor 1.00 400.00
escalation - steel man 1.00 500.00
cost of money 0.03
contingencies 0.05 equipment
contractor tax 0.02
profit 0.10
total 0.28
bill of materials
amount description qty unit
- 9mm - kg
- 10mm - kg
- 12mm - kg
16mm - kg
20mm - kg
25mm - kg
28mm kg
32mm kg
36mm kg
tie wire - kg
cum/day
bag/cum
cum/cum
cum/cum
const bid cost/kg total bid cost forms
#DIV/0! #DIV/0! forms
- kg pcf #DIV/0! unit cost
0.08
- proj.supervision 0.05 labor unit cost
#DIV/0! constn facilities 0.03 equipment unit cost
indirect eqpt - material unit cost
miscellaneous - formworks unit cost
others - total cost
indirect cost 0.20 duration
crew bonds premiums - crew
1.00 insurance premiums - labor
escalation - carpenter
cost of money 0.03
contingencies 0.05 equipment
contractor tax 0.02
profit 0.10
total 0.28
bill of materials
unit cost amount description
2.66 30.03 - 4 x 8 x 1/4 ord pw
3.70 31.11 - 2 x 3, 2x 4
5.33 30.97 - assorted nail
9.47 30.95 - form oil
14.80 31.43 -
23.12 35.04 -
29.00 -
37.88 -
47.94 -
60.00 -
-
100.00 kg/day
material computation:
const bid cost/kg total bid cost
coco lumber #DIV/0! #DIV/0!
qty sqm pcf #DIV/0!
project cost 0.08
112.50 - - proj.supervision 0.05
t unit cost #DIV/0! #DIV/0! constn facilities 0.03
#DIV/0! sub con indirect eqpt -
#DIV/0! miscellaneous -
#DIV/0! others -
- crew indirect cost 0.20
2.00 bonds premiums -
1.00 400.00 insurance premiums -
1.00 500.00 escalation -
cost of money 0.03
contingencies 0.05
contractor tax 0.02
profit 0.10
total 0.28
bill of materials
qty unit unit cost amount
pcs 275.00 -
bdft 20.00 -
kg 50.00 -
li 8.00 -
-
-
-
-
-
-
total -
8.00 sqm/day
8.00 sqm/day
material computation:
estimates
columns
marks qty dimension (m) main bars
d b h code no dia kg/m
C1 4 16.00 1.58
C2 4 16.00 1.58
C3 4 16.00 1.58
PC 4 16.00 1.58
C1 3 12.00 0.89
C2 4 16.00 1.58
C3 4 16.00 1.58
C4 4 16.00 1.58
C1 3 12.00 0.89
C2 4 16.00 1.58
C3 4 16.00 1.58
C4 4 16.00 1.58
C1 3 12.00 0.89
C2 4 16.00 1.58
C3 4 16.00 1.58
C4 4 16.00 1.58
C4 4 16.00 1.58
C4 4 16.00 1.58
total - -
C O L U M
9.00 mm - 10.00 mm - 12.00 mm - 16.00 mm -
9.00 mm - 10.00 mm - 12.00 mm - 16.00 mm -
9.00 mm - 10.00 mm - 12.00 mm - 16.00 mm -
9.00 mm - 10.00 mm - 12.00 mm - 16.00 mm -
9.00 mm - 10.00 mm - 12.00 mm - 16.00 mm -
9.00 mm - 10.00 mm - 12.00 mm - 16.00 mm -
9.00 mm - 10.00 mm - 12.00 mm - 16.00 mm -
9.00 mm - 10.00 mm - 12.00 mm - 16.00 mm -
9.00 mm - 10.00 mm - 12.00 mm - 16.00 mm -
9.00 mm - 10.00 mm - 12.00 mm - 16.00 mm -
9.00 mm - 10.00 mm - 12.00 mm - 16.00 mm -
9.00 mm - 10.00 mm - 12.00 mm - 16.00 mm -
9.00 mm - 10.00 mm - 12.00 mm - 16.00 mm -
9.00 mm - 10.00 mm - 12.00 mm - 16.00 mm -
9.00 mm - 10.00 mm - 12.00 mm - 16.00 mm -
9.00 mm - 10.00 mm - 12.00 mm - 16.00 mm -
9.00 mm - 10.00 mm - 12.00 mm - 16.00 mm -
9.00 mm - 10.00 mm - 12.00 mm - 16.00 mm -
0 0 0 0
main bars ties ties spacing m
no of pcs code no dia kg/m 1st no of pcs 2nd
6.00 2 10.00 0.62 0.05 2.00 0.10
6.00 2 10.00 0.62 0.05 2.00 0.10
6.00 2 10.00 0.62 0.05 2.00 0.10
6.00 2 10.00 0.62 0.05 2.00 0.10
6.00 2 10.00 0.62 0.05 2.00 0.10
6.00 2 10.00 0.62 0.05 2.00 0.10
6.00 2 10.00 0.62 0.05 2.00 0.10
6.00 2 10.00 0.62 0.05 2.00 0.10
5.00 2 10.00 0.62 0.05 2.00 0.10
6.00 2 10.00 0.62 0.05 2.00 0.10
8.00 2 10.00 0.62 0.05 2.00 0.10
6.00 2 10.00 0.62 0.05 2.00 0.10
5.00 2 10.00 0.62 0.05 2.00 0.10
6.00 2 10.00 0.62 0.05 2.00 0.10
8.00 2 10.00 0.62 0.05 2.00 0.10
6.00 2 10.00 0.62 0.05 2.00 0.10
6.00 2 10.00 0.62 0.05 2.00 0.10
6.00 2 10.00 0.62 0.05 2.00 0.10
0.90 36.00
U M N L A T E R A L T I
20.00 mm - 25.00 mm - 28.00 mm - 10.00 mm
20.00 mm - 25.00 mm - 28.00 mm - 10.00 mm
20.00 mm - 25.00 mm - 28.00 mm - 10.00 mm
20.00 mm - 25.00 mm - 28.00 mm - 10.00 mm
20.00 mm - 25.00 mm - 28.00 mm - 10.00 mm
20.00 mm - 25.00 mm - 28.00 mm - 10.00 mm
20.00 mm - 25.00 mm - 28.00 mm - 10.00 mm
20.00 mm - 25.00 mm - 28.00 mm - 10.00 mm
20.00 mm - 25.00 mm - 28.00 mm - 10.00 mm
20.00 mm - 25.00 mm - 28.00 mm - 10.00 mm
20.00 mm - 25.00 mm - 28.00 mm - 10.00 mm
20.00 mm - 25.00 mm - 28.00 mm - 10.00 mm
20.00 mm - 25.00 mm - 28.00 mm - 10.00 mm
20.00 mm - 25.00 mm - 28.00 mm - 10.00 mm
20.00 mm - 25.00 mm - 28.00 mm - 10.00 mm
20.00 mm - 25.00 mm - 28.00 mm - 10.00 mm
20.00 mm - 25.00 mm - 28.00 mm - 10.00 mm
20.00 mm - 25.00 mm - 28.00 mm - 10.00 mm
0 0 0
ties spacing m no of kg conc vol
no of pcs rest @ no of pcs main ties tie wire cum
1.00 0.10 - - - - -
1.00 0.10 - - - - -
1.00 0.10 - - - - -
1.00 0.10 - - - - -
1.00 0.10 - - - - -
1.00 0.10 - - - - -
1.00 0.10 - - - - -
1.00 0.10 - - - - -
1.00 0.10 - - - - -
1.00 0.10 - - - - -
1.00 0.10 - - - - -
1.00 0.10 - - - - -
1.00 0.10 - - - - -
1.00 0.10 - - - - -
1.00 0.10 - - - - -
1.00 0.10 - - - - -
1.00 0.10 - - - - -
1.00 0.10 - - - - -
18.00 - - - -
L A T E R A L T I E S
- 9.00 mm -
- 9.00 mm -
- 9.00 mm -
- 9.00 mm -
- 9.00 mm -
- 9.00 mm -
- 9.00 mm -
- 9.00 mm -
- 9.00 mm -
- 9.00 mm -
- 9.00 mm -
- 9.00 mm -
- 9.00 mm -
- 9.00 mm -
- 9.00 mm -
- 9.00 mm -
- 9.00 mm -
- 9.00 mm -
0 0
cement sand gravel formboard form lumber asstd nails form oil
bag cum cum pcs bdft kg li
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
concreting works const bid cost/cum
concreting 3000 psi #DIV/0!
unit cost qty 0.00
equipment
one bagger mixer 1 500
bill of materials
description qty unit unit cost
Cement 0 bags 230.00
Sand s-1 0 cum 850.00
Gravel 3/4" 0 cum 650.00
total
material computation:
description class a
1.0 cement 9bag/cum 9
2.0 sand .5cum/cum 0.5
3.0 gravel 3/4" 1cum/cum 1
const bid cost/cum total bid cost rebars
#DIV/0! #DIV/0! structural grade 40 psi
cum pcf #DIV/0! unit cost qty
project cost 8%
proj.supervision 5% labor unit cost 7.00 -
constn facilities 3% equipment unit cost #DIV/0!
indirect eqpt 0% material unit cost #DIV/0!
miscellaneous 0% rebar unit cost #DIV/0! sub con
others 0% total cost #DIV/0!
indirect cost 20% duration -
bonds premiums 0% crew
insurance premiums 0% labor 1 400.00
escalation 0% steel man 1 300.00
cost of money 3%
contingencies 5% equipment
contractor tax 2%
profit 10%
total 27.5%
s bill of materials
unit cost amount description qty unit
230.00 - 9mm 0.00 kg
850.00 - 10mm 0.00 kg
650.00 - 12mm 0.00 kg
16mm 0.00 kg
20mm 0.00 kg
25mm 0.00 kg
28mm 0.00 kg
32mm kg
36mm kg
tie wire - kg
cum/day
bag/cum
cum/cum
cum/cum
const bid cost/kg total bid cost forms
#DIV/0! #DIV/0! forms
0.00 kg pcf #DIV/0! unit cost
7.50%
- proj.supervision 5.00% labor unit cost
#DIV/0! constn facilities 2.50% equipment unit cost
indirect eqpt 0% material unit cost
miscellaneous 0% formworks unit cost
others 0% total cost
indirect cost 20% duration
crew bonds premiums 0% crew
1.0 insurance premiums 0% labor
escalation 0% carpenter
cost of money 3%
contingencies 5% equipment
contractor tax 2%
profit 10.0%
total 27.5%
bill of materials
unit cost amount description
2.66 30.03 - 4 x 8 x 1/4 ord pw
3.70 31.11 - 2 x 3, 2x 4
5.33 30.97 - assorted nail
9.47 30.95 - form oil
14.80 31.43 -
23.12 30.93 -
29.00 -
37.88 -
47.94 -
60.00 -
-
100 kg/day
material computation: ma
const bid cost/kg total bid cost
coco lumber #DIV/0! #DIV/0!
qty 0.00 sqm pcf #DIV/0!
project cost 7.5%
112.50 - - proj.supervision 5.00%
nt unit cost #DIV/0! #DIV/0! constn facilities 2.50%
#DIV/0! sub con indirect eqpt 0%
#DIV/0! miscellaneous 0%
#DIV/0! others 0%
- crew indirect cost 20%
2.0 bonds premiums 0%
1 400.00 insurance premiums 0%
1 500.00 escalation 0%
cost of money 3%
contingencies 5%
contractor tax 2%
profit 10.0%
total 27.5%
bill of materials
qty unit unit cost amount
0 pcs 275.00 -
0 bdft 20.00 -
0 kg 55.00 -
- li 8.00 -
-
-
-
-
-
-
total P-
8 sqm/day
8 sqm/day
material computation:
estimates
beams
marks qty dimension (m) col dim along beam total
d b l d1 d2 length
FB-1 0.35 0.20 0.20 0.20 0.40
FB-1 0.35 0.20 0.20 0.20 0.40
FB-1 0.35 0.20 0.20 0.20 0.40
FB-1 0.35 0.20 0.20 0.20 0.40
FB-1 0.35 0.20 0.20 0.20 0.40
FB-1 0.35 0.20 0.20 0.20 0.40
FB-1 0.35 0.20 0.20 0.20 0.40
FB-1 0.35 0.20 0.20 0.20 0.40
FB-2 0.30 0.20 0.20 0.20 0.40
FB-2 0.30 0.20 0.20 0.20 0.40
FB-2 0.30 0.20 0.20 0.20 0.40
FB-2 0.30 0.20 0.20 0.20 0.40
FB-2 0.30 0.20 0.20 0.20 0.40
FB-3 0.30 0.20 0.20 0.20 0.40
FB-3 0.30 0.20 0.20 0.20 0.40
FB-3 0.30 0.20 0.20 0.20 0.40
FB-3 0.30 0.20 0.20 0.20 0.40
FTB 0.30 0.20 0.20 0.20 0.40
GB 0.30 0.20 0.30 0.30 0.60
rb-1 0.25 0.15 0.30 0.30 0.60
rb-1 0.25 0.15 0.30 0.30 0.60
rb-1 0.25 0.15 0.20 0.20 0.40
rb-1 0.25 0.15 0.20 0.20 0.40
rb-1 0.25 0.15 0.20 0.20 0.40
rb-1 0.25 0.15 0.30 0.30 0.60
rb-1 0.25 0.15 0.30 0.30 0.60
rb-1 0.25 0.15 0.30 0.30 0.60
rb-1 0.25 0.15 0.30 0.30 0.60
rb-1 0.25 0.15 0.30 0.30 0.60
rb-1 0.25 0.15 0.30 0.30 0.60
rb-1 0.25 0.15 0.30 0.30 0.60
rb-1 0.25 0.15 0.30 0.30 0.60
-
-
-
-
-
-
-
-
-
-
-
-
-
-
lb-1 0.15 0.10 -
lb-2 0.10 0.10 -
Pasemano 0.10 0.30 -
Cb 0.30 0.13 -
-
-
-
-
total - - 15.00
B E A M M A
9.00 mm - 10.00 mm - 12.00 mm - 16.00 mm -
9.00 mm - 10.00 mm - 12.00 mm - 16.00 mm -
9.00 mm - 10.00 mm - 12.00 mm - 16.00 mm -
9.00 mm - 10.00 mm - 12.00 mm - 16.00 mm -
9.00 mm - 10.00 mm - 12.00 mm - 16.00 mm -
9.00 mm - 10.00 mm - 12.00 mm - 16.00 mm -
9.00 mm - 10.00 mm - 12.00 mm - 16.00 mm -
9.00 mm - 10.00 mm - 12.00 mm - 16.00 mm -
9.00 mm - 10.00 mm - 12.00 mm - 16.00 mm -
9.00 mm - 10.00 mm - 12.00 mm - 16.00 mm -
9.00 mm - 10.00 mm - 12.00 mm - 16.00 mm -
9.00 mm - 10.00 mm - 12.00 mm - 16.00 mm -
9.00 mm - 10.00 mm - 12.00 mm - 16.00 mm -
9.00 mm - 10.00 mm - 12.00 mm - 16.00 mm -
9.00 mm - 10.00 mm - 12.00 mm - 16.00 mm -
9.00 mm - 10.00 mm - 12.00 mm - 16.00 mm -
9.00 mm - 10.00 mm - 12.00 mm - 16.00 mm -
9.00 mm - 10.00 mm - 12.00 mm - 16.00 mm -
9.00 mm - 10.00 mm - 12.00 mm - 16.00 mm -
9.00 mm - 10.00 mm - 12.00 mm - 16.00 mm -
9.00 mm - 10.00 mm - 12.00 mm - 16.00 mm -
9.00 mm - 10.00 mm - 12.00 mm - 16.00 mm -
9.00 mm - 10.00 mm - 12.00 mm - 16.00 mm -
9.00 mm - 10.00 mm - 12.00 mm - 16.00 mm -
9.00 mm - 10.00 mm - 12.00 mm - 16.00 mm -
9.00 mm - 10.00 mm - 12.00 mm - 16.00 mm -
9.00 mm - 10.00 mm - 12.00 mm - 16.00 mm -
9.00 mm - 10.00 mm - 12.00 mm - 16.00 mm -
9.00 mm - 10.00 mm - 12.00 mm - 16.00 mm -
9.00 mm - 10.00 mm - 12.00 mm - 16.00 mm -
9.00 mm - 10.00 mm - 12.00 mm - 16.00 mm -
9.00 mm - 10.00 mm - 12.00 mm - 16.00 mm -
9.00 mm - 10.00 mm - 12.00 mm - 16.00 mm -
9.00 mm - 10.00 mm - 12.00 mm - 16.00 mm -
9.00 mm - 10.00 mm - 12.00 mm - 16.00 mm -
9.00 mm - 10.00 mm - 12.00 mm - 16.00 mm -
9.00 mm - 10.00 mm - 12.00 mm - 16.00 mm -
9.00 mm - 10.00 mm - 12.00 mm - 16.00 mm -
9.00 mm - 10.00 mm - 12.00 mm - 16.00 mm -
9.00 mm - 10.00 mm - 12.00 mm - 16.00 mm -
9.00 mm - 10.00 mm - 12.00 mm - 16.00 mm -
9.00 mm - 10.00 mm - 12.00 mm - 16.00 mm -
9.00 mm - 10.00 mm - 12.00 mm - 16.00 mm -
9.00 mm - 10.00 mm - 12.00 mm - 16.00 mm -
9.00 mm - 10.00 mm - 12.00 mm - 16.00 mm -
9.00 mm - 10.00 mm - 12.00 mm - 16.00 mm -
9.00 mm - 10.00 mm - 12.00 mm - 16.00 mm -
9.00 mm - 10.00 mm - 12.00 mm - 16.00 mm -
9.00 mm - 10.00 mm - 12.00 mm - 16.00 mm -
9.00 mm - 10.00 mm - 12.00 mm - 16.00 mm -
9.00 mm - 10.00 mm - 12.00 mm - 16.00 mm -
9.00 mm - 10.00 mm - 12.00 mm - 16.00 mm -
9.00 mm - 10.00 mm - 12.00 mm - 16.00 mm -
9.00 mm - 10.00 mm - 12.00 mm - 16.00 mm -
0 0 0 0
cont bars extra bars top
code no dia kg/m no of pcs code no dia kg/m no of pcs
4 16.000 1.578 4 4 16.000 1.578 3.00
4 16.000 1.578 4 4 16.000 1.578 3.00
4 16.000 1.578 4 4 16.000 1.578 3.00
4 16.000 1.578 4 4 16.000 1.578 3.00
4 16.000 1.578 4 4 16.000 1.578 3.00
4 16.000 1.578 4 4 16.000 1.578 3.00
4 16.000 1.578 4 4 16.000 1.578 3.00
4 16.000 1.578 4 4 16.000 1.578 3.00
4 16.000 1.578 4 4 16.000 1.578 3.00
4 16.000 1.578 4 4 16.000 1.578 3.00
4 16.000 1.578 4 4 16.000 1.578 3.00
4 16.000 1.578 4 4 16.000 1.578 3.00
4 16.000 1.578 4 4 16.000 1.578 3.00
4 16.000 1.578 4 4 16.000 1.578 3.00
4 16.000 1.578 4 4 16.000 1.578 3.00
4 16.000 1.578 4 4 16.000 1.578 3.00
4 16.000 1.578 4 4 16.000 1.578 3.00
4 16.000 1.578 6 4 16.000 1.578 -
4 16.000 1.578 6 3 12.000 0.888
3 12.000 0.888 4 3 12.000 0.888 1.00
3 12.000 0.888 4 3 12.000 0.888 1.00
3 12.000 0.888 4 3 12.000 0.888 1.00
3 12.000 0.888 4 3 12.000 0.888 1.00
3 12.000 0.888 4 3 12.000 0.888 1.00
3 12.000 0.888 4 3 12.000 0.888 1.00
3 12.000 0.888 4 3 12.000 0.888 1.00
3 12.000 0.888 4 3 12.000 0.888 1.00
3 12.000 0.888 4 3 12.000 0.888 1.00
3 12.000 0.888 4 3 12.000 0.888 1.00
3 12.000 0.888 4 3 12.000 0.888 1.00
3 12.000 0.888 4 3 12.000 0.888 1.00
3 12.000 0.888 4 3 12.000 0.888 1.00
4 16.000 1.578 4 4 16.000 1.578 1.00
4 16.000 1.578 4 4 16.000 1.578 1.00
4 16.000 1.578 4 4 16.000 1.578 1.00
4 16.000 1.578 4 4 16.000 1.578 1.00
4 16.000 1.578 4 4 16.000 1.578 1.00
4 16.000 1.578 4 4 16.000 1.578 1.00
4 16.000 1.578 4 4 16.000 1.578 1.00
4 16.000 1.578 4 4 16.000 1.578 1.00
4 16.000 1.578 4 4 16.000 1.578 1.00
4 16.000 1.578 4 4 16.000 1.578 1.00
4 16.000 1.578 4 4 16.000 1.578 1.00
4 16.000 1.578 0 4 16.000 1.578
4 16.000 1.578 0 4 16.000 1.578
4 16.000 1.578 0 4 16.000 1.578
2 10.000 0.616 2 2 10.000 0.616
2 10.000 0.616 2 2 10.000 0.616
2 10.000 0.616 3 2 10.000 0.616
3 12.000 0.888 4 3 12.000 0.888
3 12.000 0.888 4 3 12.000 0.888
3 12.000 0.888 4 3 12.000 0.888
2 10.000 0.616 2 2 10.000 0.616
2 10.000 0.616 2 10.000 0.616
197.00 75.00
M A I N S T I R
20.00 mm - 25.00 mm - 28.00 mm - 9.00 mm
20.00 mm - 25.00 mm - 28.00 mm - 9.00 mm
20.00 mm - 25.00 mm - 28.00 mm - 9.00 mm
20.00 mm - 25.00 mm - 28.00 mm - 9.00 mm
20.00 mm - 25.00 mm - 28.00 mm - 9.00 mm
20.00 mm - 25.00 mm - 28.00 mm - 9.00 mm
20.00 mm - 25.00 mm - 28.00 mm - 9.00 mm
20.00 mm - 25.00 mm - 28.00 mm - 9.00 mm
20.00 mm - 25.00 mm - 28.00 mm - 9.00 mm
20.00 mm - 25.00 mm - 28.00 mm - 9.00 mm
20.00 mm - 25.00 mm - 28.00 mm - 9.00 mm
20.00 mm - 25.00 mm - 28.00 mm - 9.00 mm
20.00 mm - 25.00 mm - 28.00 mm - 9.00 mm
20.00 mm - 25.00 mm - 28.00 mm - 9.00 mm
20.00 mm - 25.00 mm - 28.00 mm - 9.00 mm
20.00 mm - 25.00 mm - 28.00 mm - 9.00 mm
20.00 mm - 25.00 mm - 28.00 mm - 9.00 mm
20.00 mm - 25.00 mm - 28.00 mm - 9.00 mm
20.00 mm - 25.00 mm - 28.00 mm - 9.00 mm
20.00 mm - 25.00 mm - 28.00 mm - 9.00 mm
20.00 mm - 25.00 mm - 28.00 mm - 9.00 mm
20.00 mm - 25.00 mm - 28.00 mm - 9.00 mm
20.00 mm - 25.00 mm - 28.00 mm - 9.00 mm
20.00 mm - 25.00 mm - 28.00 mm - 9.00 mm
20.00 mm - 25.00 mm - 28.00 mm - 9.00 mm
20.00 mm - 25.00 mm - 28.00 mm - 9.00 mm
20.00 mm - 25.00 mm - 28.00 mm - 9.00 mm
20.00 mm - 25.00 mm - 28.00 mm - 9.00 mm
20.00 mm - 25.00 mm - 28.00 mm - 9.00 mm
20.00 mm - 25.00 mm - 28.00 mm - 9.00 mm
20.00 mm - 25.00 mm - 28.00 mm - 9.00 mm
20.00 mm - 25.00 mm - 28.00 mm - 9.00 mm
20.00 mm - 25.00 mm - 28.00 mm - 9.00 mm
20.00 mm - 25.00 mm - 28.00 mm - 9.00 mm
20.00 mm - 25.00 mm - 28.00 mm - 9.00 mm
20.00 mm - 25.00 mm - 28.00 mm - 9.00 mm
20.00 mm - 25.00 mm - 28.00 mm - 9.00 mm
20.00 mm - 25.00 mm - 28.00 mm - 9.00 mm
20.00 mm - 25.00 mm - 28.00 mm - 9.00 mm
20.00 mm - 25.00 mm - 28.00 mm - 9.00 mm
20.00 mm - 25.00 mm - 28.00 mm - 9.00 mm
20.00 mm - 25.00 mm - 28.00 mm - 9.00 mm
20.00 mm - 25.00 mm - 28.00 mm - 9.00 mm
20.00 mm - 25.00 mm - 28.00 mm - 9.00 mm
20.00 mm - 25.00 mm - 28.00 mm - 9.00 mm
20.00 mm - 25.00 mm - 28.00 mm - 9.00 mm
20.00 mm - 25.00 mm - 28.00 mm - 9.00 mm
20.00 mm - 25.00 mm - 28.00 mm - 9.00 mm
20.00 mm - 25.00 mm - 28.00 mm - 9.00 mm
20.00 mm - 25.00 mm - 28.00 mm - 9.00 mm
20.00 mm - 25.00 mm - 28.00 mm - 9.00 mm
20.00 mm - 25.00 mm - 28.00 mm - 9.00 mm
20.00 mm - 25.00 mm - 28.00 mm - 9.00 mm
20.00 mm - 25.00 mm - 28.00 mm - 9.00 mm
0 0 0
top extra bars bot
length(l/4)+24d code no dia kg/m no of pcs length(l/2)+24d
0.38 4 16.000 1.578 3.00 0.77
0.38 4 16.000 1.578 3.00 0.77
0.38 4 16.000 1.578 3.00 0.77
0.38 4 16.000 1.578 3.00 0.77
0.38 4 16.000 1.578 3.00 0.77
0.38 4 16.000 1.578 3.00 0.77
0.38 4 16.000 1.578 3.00 0.77
0.38 4 16.000 1.578 3.00 0.77
0.38 4 16.000 1.578 3.00 0.77
0.38 4 16.000 1.578 3.00 0.77
0.38 4 16.000 1.578 3.00 0.77
0.38 4 16.000 1.578 3.00 0.77
0.38 4 16.000 1.578 3.00 0.77
0.38 4 16.000 1.578 3.00 0.77
0.38 4 16.000 1.578 3.00 0.77
0.38 4 16.000 1.578 3.00 0.77
0.38 4 16.000 1.578 3.00 0.77
0.38 4 16.000 1.578 - 0.77
0.29 3 12.000 0.888 1.00 0.58
0.29 3 12.000 0.888 1.00 0.58
0.29 3 12.000 0.888 1.00 0.58
0.29 3 12.000 0.888 1.00 0.58
0.29 3 12.000 0.888 1.00 0.58
0.29 3 12.000 0.888 1.00 0.58
0.29 3 12.000 0.888 1.00 0.58
0.29 3 12.000 0.888 1.00 0.58
0.29 3 12.000 0.888 1.00 0.58
0.29 3 12.000 0.888 1.00 0.58
0.29 3 12.000 0.888 1.00 0.58
0.29 3 12.000 0.888 1.00 0.58
0.29 3 12.000 0.888 1.00 0.58
0.29 3 12.000 0.888 1.00 0.58
0.38 4 16.000 1.578 1.00 0.77
0.38 4 16.000 1.578 1.00 0.77
0.38 4 16.000 1.578 1.00 0.77
0.38 4 16.000 1.578 1.00 0.77
0.38 4 16.000 1.578 1.00 0.77
0.38 4 16.000 1.578 1.00 0.77
0.38 4 16.000 1.578 1.00 0.77
0.38 4 16.000 1.578 1.00 0.77
0.38 4 16.000 1.578 1.00 0.77
0.38 4 16.000 1.578 1.00 0.77
0.38 4 16.000 1.578 1.00 0.77
0.38 4 16.000 1.578 0.77
0.38 4 16.000 1.578 0.77
0.38 4 16.000 1.578 0.77
0.24 3 12.000 0.888 0.58
0.24 3 12.000 0.888 0.58
0.24 3 12.000 0.888 0.58
0.29 3 12.000 0.888 0.58
0.29 3 12.000 0.888 0.58
0.29 3 12.000 0.888 0.58
0.24 2 10.000 0.616 0.48
0.24 2 10.000 0.616 0.48
37.06
S T I R R U P S
- 10.00 mm -
- 10.00 mm -
- 10.00 mm -
- 10.00 mm -
- 10.00 mm -
- 10.00 mm -
- 10.00 mm -
- 10.00 mm -
- 10.00 mm -
- 10.00 mm -
- 10.00 mm -
- 10.00 mm -
- 10.00 mm -
- 10.00 mm -
- 10.00 mm -
- 10.00 mm -
- 10.00 mm -
- 10.00 mm -
- 10.00 mm -
- 10.00 mm -
- 10.00 mm -
- 10.00 mm -
- 10.00 mm -
- 10.00 mm -
- 10.00 mm -
- 10.00 mm -
- 10.00 mm -
- 10.00 mm -
- 10.00 mm -
- 10.00 mm -
- 10.00 mm -
- 10.00 mm -
- 10.00 mm -
- 10.00 mm -
- 10.00 mm -
- 10.00 mm -
- 10.00 mm -
- 10.00 mm -
- 10.00 mm -
- 10.00 mm -
- 10.00 mm -
- 10.00 mm -
- 10.00 mm -
- 10.00 mm -
- 10.00 mm -
- 10.00 mm -
- 10.00 mm -
- 10.00 mm -
- 10.00 mm -
- 10.00 mm -
- 10.00 mm -
- 10.00 mm -
- 10.00 mm -
- 10.00 mm -
0 0
ties ties spacing m
code no dia kg/m 1st no of pcs 2nd @ L/4 Rest
2 10.000 0.616 0.05 1.00 0.10 1.00 0.15
2 10.000 0.616 0.05 1.00 0.10 2.00 0.15
2 10.000 0.616 0.05 1.00 0.10 2.00 0.15
2 10.000 0.616 0.05 1.00 0.10 2.00 0.15
2 10.000 0.616 0.05 1.00 0.10 2.00 0.15
2 10.000 0.616 0.05 1.00 0.10 2.00 0.15
2 10.000 0.616 0.05 1.00 0.10 2.00 0.15
2 10.000 0.616 0.05 1.00 0.10 2.00 0.15
2 10.000 0.616 0.05 1.00 0.10 2.00 0.15
2 10.000 0.616 0.05 1.00 0.10 2.00 0.15
2 10.000 0.616 0.05 1.00 0.10 2.00 0.15
2 10.000 0.616 0.05 1.00 0.10 2.00 0.15
2 10.000 0.616 0.05 1.00 0.10 2.00 0.15
2 10.000 0.616 0.05 1.00 0.10 2.00 0.15
2 10.000 0.616 0.05 1.00 0.10 2.00 0.15
2 10.000 0.616 0.05 1.00 0.10 2.00 0.15
2 10.000 0.616 0.05 1.00 0.10 2.00 0.15
2 10.000 0.616 0.05 1.00 0.10 2.00 0.15
2 10.000 0.616 0.05 1.00 0.10 3.00 0.20
2 10.000 0.616 0.05 1.00 0.10 3.00 0.15
2 10.000 0.616 0.05 1.00 0.10 3.00 0.15
2 10.000 0.616 0.05 1.00 0.10 2.00 0.15
2 10.000 0.616 0.05 1.00 0.10 2.00 0.15
2 10.000 0.616 0.05 1.00 0.10 2.00 0.15
2 10.000 0.616 0.05 1.00 0.10 3.00 0.15
2 10.000 0.616 0.05 1.00 0.10 3.00 0.15
2 10.000 0.616 0.05 1.00 0.10 3.00 0.15
2 10.000 0.616 0.05 1.00 0.10 3.00 0.15
2 10.000 0.616 0.05 1.00 0.10 3.00 0.15
2 10.000 0.616 0.05 1.00 0.10 3.00 0.15
2 10.000 0.616 0.05 1.00 0.10 3.00 0.15
2 10.000 0.616 0.05 1.00 0.10 3.00 0.15
1 9.000 0.444 0.05 1.00 0.10 1.00 0.15
1 9.000 0.444 0.05 1.00 0.10 1.00 0.15
1 9.000 0.444 0.05 1.00 0.10 1.00 0.15
1 9.000 0.444 0.05 1.00 0.10 1.00 0.15
1 9.000 0.444 0.05 1.00 0.10 1.00 0.15
1 9.000 0.444 0.05 1.00 0.10 1.00 0.15
1 9.000 0.444 0.05 1.00 0.10 1.00 0.15
1 9.000 0.444 0.05 1.00 0.10 1.00 0.15
1 9.000 0.444 0.05 1.00 0.10 1.00 0.15
1 9.000 0.444 0.05 1.00 0.10 1.00 0.15
1 9.000 0.444 0.05 1.00 0.10 1.00 0.15
1 9.000 0.444 0.05 1.00 0.10 1.00 0.15
1 9.000 0.444 0.05 1.00 0.10 1.00 0.15
1 9.000 0.444 0.05 1.00 0.10 1.00 0.15
1 9.000 0.444 0.20 1.00 0.20 1.00 0.20
1 9.000 0.444 0.20 1.00 0.20 1.00 0.20
1 9.000 0.444 0.20 1.00 0.20 1.00 0.20
1 9.000 0.444 0.05 1.00 0.10 1.00 0.15
1 9.000 0.444 0.05 1.00 0.10 1.00 0.15
1 9.000 0.444 0.05 1.00 0.10 1.00 0.15
1 9.000 0.444 0.05 1.00 0.10 1.00 0.15
1 9.000 0.444 0.10 1.00 0.10 1.00 0.15
54.00 96.00
no of kg conc vol cement sand
@ L/2 main extra ties tie wire cum bag cum
2.00 - - - - - - -
2.00 - - - - - - -
2.00 - - - - - - -
2.00 - - - - - - -
2.00 - - - - - - -
2.00 - - - - - - -
2.00 - - - - - - -
2.00 - - - - - - -
2.00 - - - - - - -
2.00 - - - - - - -
2.00 - - - - - - -
2.00 - - - - - - -
2.00 - - - - - - -
2.00 - - - - - - -
2.00 - - - - - - -
2.00 - - - - - - -
2.00 - - - - - - -
2.00 - - - - - - -
2.00 - - - - - - -
2.00 - - - - - - -
2.00 - - - - - - -
2.00 - - - - - - -
2.00 - - - - - - -
2.00 - - - - - - -
2.00 - - - - - - -
2.00 - - - - - - -
2.00 - - - - - - -
2.00 - - - - - - -
2.00 - - - - - - -
2.00 - - - - - - -
2.00 - - - - - - -
2.00 - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - -
gravel form area. formboard form lumber asstd nails form oil
cum pcs bdft kg li
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
concreting works const bid cost/cum
concreting 3000 psi #DIV/0!
unit cost qty 0.00 cum pcf
project cost
labor unit cost 1,450.00 - - proj.supervision
equipment unit cost 250.00 #DIV/0! #DIV/0! constn facilities
material unit cost #DIV/0! indirect eqpt
concreting unit cost #DIV/0! sub con miscellaneous
total cost #DIV/0! others
duration - indirect cost
crew crew bonds premiums
labor 6 400.00 1 insurance premiums
mason 1 500.00 escalation
cost of money
equipment contingencies
one bagger mixer 1 500 contractor tax
profit
total
bill of materials
description qty unit unit cost
Cement 0 bags 230.00
Sand s-1 0 cum 850.00
Gravel 3/4" 0 cum 650.00
total
material computation:
description class a
1.0 cement 9bag/cum 9
2.0 sand .5cum/cum 0.5
3.0 gravel 3/4"1cum/cum 1
total bid cost rebars const bid cost/kg
#DIV/0! structural grade 40 psi #DIV/0!
#DIV/0! unit cost qty 0.00
8%
5% labor unit cost 9.00 - -
3% equipment unit cost #DIV/0! #DIV/0!
0% material unit cost #DIV/0!
0% rebar unit cost #DIV/0! sub con
0% total cost #DIV/0!
20% duration -
0% crew crew
0% labor 1 400.00 1.0
0% steel man 1 500.00
3%
5% equipment
2%
10%
27.5%
bill of materials
amount description qty unit
- 9mm - kg 2.66
- 10mm - kg 3.70
- 12mm - kg 5.33
16mm - kg 9.47
20mm - kg 14.80
25mm - kg 23.12
28mm kg
32mm kg
36mm kg
tie wire - kg
100
100
material computation:
bag/cum
cum/cum
cum/cum
const bid cost/kg total bid cost forms
#DIV/0! #DIV/0! forms coco lumber
kg pcf #DIV/0! unit cost
7.50%
proj.supervision 5.00% labor unit cost 112.50
constn facilities 2.50% equipment unit cost
indirect eqpt 0% material unit cost #DIV/0!
miscellaneous 0% formworks unit cost #DIV/0!
others 0% total cost #DIV/0!
indirect cost 20% duration -
bonds premiums 0% crew
insurance premiums 0% labor 1
escalation 0% carpenter 1
cost of money 3%
contingencies 5% equipment
contractor tax 2%
profit 10.0%
total 27.5%
aterials bill of materials
unit cost amount description qty
30.03 - 4 x 8 x 1/4 ord pw 0.00
31.11 - 2 x 3, 2x 4 0.00
30.97 - assorted nail 0.00
30.95 - form oil 0.00
31.43 -
30.93 -
-
-
-
60.00 -
-
kg/day install
erect
dismantel
repair
kg/day
8 sqm/day
8 sqm/day
material computation:
slab no. qty dimension Factored load
l-x l-y Deadload Liveload M Loading
Kpa Kpa l-x l-y
S-1 - - - 7.0 3.6 #DIV/0! - -
S-2 - - - 7.0 3.6 #DIV/0! - -
S-3 - - - 7.0 3.6 #DIV/0! - -
S-4 - - - 7.0 3.6 #DIV/0! - -
S-5 - - - 7.0 3.6 #DIV/0! - -
S-6 - - - 7.0 3.6 #DIV/0! - -
S-7 - - - 7.0 3.6 #DIV/0! - -
S-8 - - - 7.0 3.6 #DIV/0! - -
S-9 - -
S-10 - -
S-11
estimates
slab
marks qty dimension (clear m) beam width
s l area d sb 1 sb 2
S-1 - 0.10 0.20 0.20
S-2 - 0.10 0.20 0.20
S-3 - 0.10 0.20 0.20
S-4 - 0.10 0.20 0.20
S-5 - 0.10 0.20 0.20
S-6 - 0.10 0.20 0.20
S-7 - 0.10 0.20 0.20
S-8 - 0.10 0.20 0.20
S-9 - 0.10 0.20 0.20
S-10 - 0.10 0.20 0.20
S-11 - 0.10 0.20 0.20
S-12 - 0.10 0.20 0.20
SUBTOTAL-1 -
slab on fill
A-1 - 0.08
A-2 - 0.08
A-3 - 0.08
A-4 - 0.08
A-5 - 0.08
A-6 - 0.08
A-7 - 0.08
A-8 - 0.08
A-9 - 0.08
STEPS - 0.08
- 0.08
- 0.08
SUBTOTAL-2 -
total - -
beam width total length bot bars along short bot bars along lo
lb 1 lb 2 s l code no dia kg/m spacing code no
0.20 0.20 0.40 0.40 3 12.000 0.888 0.20 3
0.20 0.20 0.40 0.40 3 12.000 0.888 0.20 3
0.20 0.20 0.40 0.40 3 12.000 0.888 0.20 3
0.20 0.20 0.40 0.40 3 12.000 0.888 0.20 3
0.20 0.20 0.40 0.40 3 12.000 0.888 0.20 3
0.20 0.20 0.40 0.40 3 12.000 0.888 0.20 3
0.20 0.20 0.40 0.40 3 12.000 0.888 0.20 3
0.20 0.20 0.40 0.40 3 12.000 0.888 0.20 3
0.20 0.20 0.40 0.40 3 12.000 0.888 0.20 3
0.20 0.20 0.40 0.40 3 12.000 0.888 0.20 3
0.20 0.20 0.40 0.40 3 12.000 0.888 0.20 3
0.20 0.20 0.40 0.40 3 12.000 0.888 0.20 3
- - 1 9.000 0.444 1
- - 1 9.000 0.444 1
- - 1 9.000 0.444 1
- - 1 9.000 0.444 1
- - 1 9.000 0.444 1
- - 1 9.000 0.444 1
- - 1 9.000 0.444 1
- - 1 9.000 0.444 1
- - 1 9.000 0.444 1
- - 1 9.000 0.444 1
- - 1 9.000 0.444 1
- - 1 9.000 0.444 1
- - 1 9.000 0.444 1
4.80
bot bars along long top bars along short top bars along lo
dia kg/m spacing code no dia kg/m spacing code no
12.000 0.888 0.20 3 12.000 0.888 0.20 3
12.000 0.888 0.20 3 12.000 0.888 0.20 3
12.000 0.888 0.20 3 12.000 0.888 0.20 3
12.000 0.888 0.20 3 12.000 0.888 0.20 3
12.000 0.888 0.20 3 12.000 0.888 0.20 3
12.000 0.888 0.20 3 12.000 0.888 0.20 3
12.000 0.888 0.20 3 12.000 0.888 0.20 3
12.000 0.888 0.20 3 12.000 0.888 0.20 3
12.000 0.888 0.20 3 12.000 0.888 0.20 3
12.000 0.888 0.20 3 12.000 0.888 0.20 3
12.000 0.888 0.20 3 12.000 0.888 0.20 3
12.000 0.888 0.20 3 12.000 0.888 0.20 3
9.000 0.444
9.000 0.444
9.000 0.444
9.000 0.444
9.000 0.444
9.000 0.444
9.000 0.444
9.000 0.444
9.000 0.444
9.000 0.444
9.000 0.444
9.000 0.444
9.000 0.444
2.40
top bars along long conc vol cement
dia kg/m spacing no of kg tie wire cum bag
12.000 0.888 0.20 - - - -
12.000 0.888 0.20 - - - -
12.000 0.888 0.20 - - - -
12.000 0.888 0.20 - - - -
12.000 0.888 0.20 - - - -
12.000 0.888 0.20 - - - -
12.000 0.888 0.20 - - - -
12.000 0.888 0.20 - - - -
12.000 0.888 0.20 - - - -
12.000 0.888 0.20 - - - -
12.000 0.888 0.20 - - - -
12.000 0.888 0.20 - - - -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
2.40 - - - -
12 mm -
9 mm -
sand gravel form area formboard form lumber asstd nails form oil
cum cum pcs bdft kg li
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - -
- - - - - -
- -
- -
- -
- -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - - -
concreting works const bid cost/cum
concreting 3000 psi #DIV/0!
unit cost qty 0.00
equipment
one bagger mixer 1 500
bill of materials
description qty unit unit cost
Cement - bags 230.00
Sand s-1 - cum 850.00
Gravel 3/4" - cum 650.00
total
material computation:
description class a
1.0 cement 9bag/cum 9
2.0 sand .5cum/cum 0.5
3.0 gravel 3/4"1cum/cum 1
const bid cost/cum total bid cost rebars
#DIV/0! #DIV/0! structural grade 40 psi
cum pcf #DIV/0! unit cost
project cost 8%
proj.supervision 5% labor unit cost 9.00
constn facilities 3% equipment unit cost
indirect eqpt 0% material unit cost #DIV/0!
miscellaneous 0% rebar unit cost #DIV/0!
others 0% total cost #DIV/0!
indirect cost 20% duration -
bonds premiums 0% crew
insurance premiums 0% labor 1
escalation 0% steel man 1
cost of money 3%
contingencies 5% equipment
contractor tax 2%
profit 10%
total 27.5%
bill of ma
amount description qty
230.00 - 9mm
850.00 - 10mm -
650.00 - 12mm 0.00
16mm
20mm
25mm
28mm
32mm
36mm
tie wire -
cum/day
bag/cum
cum/cum
cum/cum
const bid cost/kg total bid cost
#DIV/0! #DIV/0!
qty 0.00 kg pcf #DIV/0!
project cost 7.50%
- - proj.supervision 5.00%
#DIV/0! #DIV/0! constn facilities 2.50%
indirect eqpt 0%
sub con miscellaneous 0%
others 0%
indirect cost 20%
crew bonds premiums 0%
400.00 1.0 insurance premiums 0%
500.00 escalation 0%
cost of money 3%
contingencies 5%
contractor tax 2%
profit 10.0%
total 27.5%
bill of materials
unit unit cost amount
kg 2.66 30.03 -
kg 3.70 31.11 -
kg 5.33 30.97 -
kg 9.47 30.95 -
kg 14.80 33.21 -
kg 23.12 -
kg 29.00 -
kg 37.88 -
kg 47.94 -
kg 60.00 -
-
100 kg/day
100 kg/day
material computation:
forms const bid cost/kg
forms coco lumber #DIV/0!
unit cost qty 0.00 sqm pcf
project cost
labor unit cost 112.50 - - proj.supervision
equipment unit cost #DIV/0! #DIV/0! constn facilities
material unit cost #DIV/0! sub con indirect eqpt
formworks unit cost #DIV/0! miscellaneous
total cost #DIV/0! others
duration - crew indirect cost
crew 2.0 bonds premiums
labor 1 400.00 insurance premiums
carpenter 1 500.00 escalation
cost of money
equipment contingencies
contractor tax
profit
total
bill of materials
description qty unit unit cost
4 x 8 x 1/4 ord pw 0 pcs 275.00
2 x 3, 2x 4 0 bdft 20.00
assorted nail 0 kg 55.00
form oil - li 8.00
total
install 8 sqm/day
erect
Dismantle
repair
8 sqm/day
material computation:
total bid cost
#DIV/0!
#DIV/0!
7.5%
5.00%
2.50%
0%
0%
0%
20%
0%
0%
0%
3%
5%
2%
10.0%
27.5%
amount
-
-
-
-
-
-
-
-
-
-
P-
earth works
no. of chb
variable ht. (0.80) m
description qty width m length m depth m
total volume
earth works const bid cos
excavation / manual common earth #DIV/0
unit cost qty: -
- bill of materials
1.50
material computation:
manual computation
volume = 0 cum
soil type = common earth
difficulty factor = 1
(1)(1)(400)
= (1)(1.5)
= 266.6666667 php/cum
duration volume
= x diff. factor
capacity x no. worker x crew
(0)(1)
= (1.5)(1)(6)
duration = 0 days
say= 0 days
const bid cost/unit total bid cost summary
#DIV/0! - project:
cum pcf #DIV/0!
project cost 5.0% 1.0 direct cost
proj.supervision 2.50% 1.1
constn facilities 1.50% 1.2
indirect eqpt 0.00% 1.3
miscellaneous 1.00% 1.4
others 0.00%
indirect cost 23%
bonds premiums 0.00% 2.0 project cost
insurance premiums 0.00%
escalation 0.00% 2.1
cost of money 3.00% 2.2
contingencies 7.50% 2.3
contractor tax 2.00% 2.4
profit 10.00%
total 27.5%
bill of materials 3.0 other costs
4.1
4.2
4.3
4.5
4.6
4.7
cum/day
cum/day
material computation:
amount in pesos pct wt. of total
labor 0.00 ### #DIV/0!
direct equipment 0.00 ### #DIV/0!
materials 0.00 ### #DIV/0!
subcontract 0.00 ### #DIV/0!
0.00 72.50 #DIV/0!
0 0.0% #DIV/0!
0 0.0% #DIV/0!
- #DIV/0!
earth works
earthfill / common earth/manual
fill ht. 0.5 m
description qty area (sq.m.) depth m
house area
a-1
a-2
a-3
a-4
a-5
a-6
a-7
a-8
a-9
stair
total volume
earth works
earthfill / manual lahar
unit cost qty:
material computation:
MANUAL COMPUTATION
volume = 0 cum
soil type = lahar
difficulty factor = 1
(1)(1)(400)
= (1)(2.5)
= 160 php/cum
Labor cost = - Php
(0)(1)
= (2.5)(1)(4)
Duration = 0 Days
Say= 0 Days
material computation:
volume = 0 cum
material unit cost = 250 php/cum
Material cost = material unit cost x volume
= - Php
total costMaterial
= cost + labor cost
Volume
(0+ 0)
0
total -
2.50 cum/day
2.50 cum/day
material computation:
1.3 cum/cum
summary
project:
#DIV/0!
pct wt. of total
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
earth works
earthfill / common earth/manual
fill ht. 0.5 m
description qty area (sq.m.) depth m
lot area
0.50
0.50
0.50
0.50
0.50
0.50
0.50
total volume
earth works
earthfill / manual lahar
unit cost qty:
material computation:
MANUAL COMPUTATION
volume = 0 cum
soil type = lahar
difficulty factor = 1
(1)(1)(400)
= (1)(2.5)
= 160 php/cum
Labor cost = - Php
(0)(1)
= (2.5)(1)(4)
Duration = 0 Days
Say= 0 Days
material computation:
volume = 0 cum
material unit cost = 150 php/cum
Material cost = material unit cost x volume
= - Php
total costMaterial
= cost + labor cost
Volume
(0+ 0)
0
total -
2.50 cum/day
2.50 cum/day
material computation:
1.3 cum/cum
summary
project:
#DIV/0!
pct wt. of total
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
earth works
compaction / common earth/manual
fill ht. 0.5 m
description qty width m length m depth m
house area
a-1 - - - 0.50
a-2 - - - 0.50
a-3 - - - 0.50
a-4 - - - 0.50
a-5 - - - 0.50
a-6 - - - 0.50
a-7 - - - 0.50
a-8 - - - 0.50
a-9 - - - 0.50
stair - - - 0.50
- - - 0.50
- - - 0.50
total volume
earth works
compaction / manual lahar
unit cost qty:
compactor/plate 20cum/day
material computation:
MANUAL COMPUTATION
volume = 0 cum
soil type = lahar
difficulty factor = 1
(1)(1)(400)
= (1)(15)
= 26.6666666667 php/cum
Labor cost = - Php
(0)(1)
= (15)(1)(1)
Duration = 0 Days
Say= 0 Days
Equipment computation
volume = 0 cum
plate compactor = rental per day
capcity
500
= 15
= 33.3333333333 php/cum
Equipment cost = 0 Php
total cost
equipment
= cost + labor cost
Volume
(0+ 0)
0
total -
15.00 cum/day
15.00 cum/day
cum/day
material computation:
1.3 cum/cum
summary
project:
#DIV/0!
pct wt. of total
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
NO. OF CHB masonry works const bid cost/unit total bid cost summary
masonry works below ffl chb 5" non load bearing #DIV/0! #DIV/0! project:
5"chb non bearing unit cost qty: - sqm pcf #DIV/0!
wall ht below ffl 0m project cost 7.5% 1.0 direct cost amount in pesos pct wt. of total
description qty opening sqm length m depth m area sqm labor unit cost 163.64 - - proj.supervision 5.00% 1.1 labor 0.00 ### #DIV/0!
front - - equipment unit cost #DIV/0! #DIV/0! constn facilities 2.50% 1.2 direct equipment 0.00 ### #DIV/0!
right - - material unit cost #DIV/0! indirect eqpt 0.00% 1.3 materials #DIV/0! ### #DIV/0!
left - - masonry 5"unit cost #DIV/0! sub con miscellaneous 0.00% 1.4 subcontract 0.00 ### #DIV/0!
rear - - total cost #DIV/0! others 0.00% #DIV/0! 72.50 #DIV/0!
porch - - duration - indirect cost 20%
plantbox - - crew crew bonds premiums 0.00% 2.0 project cost
partition - - labor 1 400.00 2 insurance premiums 0.00%
stair - mason 1 500.00 escalation 0.00% 2.1 project supervision #DIV/0! 5.0% #DIV/0!
steps - cost of money 3.00% 2.2 construction facilities #DIV/0! 2.5% #DIV/0!
ramp - equipment contingencies 5.00% 2.3 indirect equipment #DIV/0! 0.0% #DIV/0!
- contractor tax 2.00% 2.4 miscellaneous #DIV/0! 0.0% #DIV/0!
- profit 10.00% #DIV/0! 7.5% #DIV/0!
- total 27.5%
- bill of materials 3.0 other costs #DIV/0! 0.0% #DIV/0!
- description qty unit unit cost amount #DIV/0! 0.0% #DIV/0!
- cement - bags 230.00 -
total area - - sand - cum 850.00 - 4.0 indirect cost
5" chb - pcs 16.00 -
10 mm dia rsb - pcs 115.00 - 4.1 bonds premium #DIV/0! 0.0% #DIV/0!
#16 tie wire - kg 60.00 - 4.2 insurance premium #DIV/0! 0.0% #DIV/0!
4.3 escalation #DIV/0! 0.0% #DIV/0!
cost of money #DIV/0! 3.0% #DIV/0!
4.5 contingencies #DIV/0! 5.0% #DIV/0!
4.6 contractor's tax #DIV/0! 2.0% #DIV/0!
4.7 profit #DIV/0! 10.0% #DIV/0!
total - #DIV/0! 20.0% #DIV/0!
#DIV/0! #DIV/0!
labor cost computation:
5.50 sqm/day
material computation:
description class a
1.0 cement 1bag/1.6 sqm 1.60 sqm/bag
2.0 sand 1cum/29.5 sqm 19.51 sqm/cum
3.0 5" chb 13pcs/sqm 0.08 sqm/pc
4.0 10 mm dia rsb .5688 pcs/ sqm 1.76 sqm/pc
5.0 #16 tie wire .014kg/sqm 71.43 sqm/kg
MANUAL COMPUTATION
Area = 0 Sqm
CHB SIZE = 5 in.
(1)(400)+(1)(500)
=
(5.5)
Duration = Area
Capacity x crew
(0)
=
(5.5)(1)
Duration = 0 Days
Say= 0 Days
material computation:
Area = 0 Sqm
Cement factor: 1.6 sqm/bag
Sand factor: 19.51 sqm/cum
5 in chb factor: 0.0769 sqm/pc
1o mm rsb factor 1.762 sqm/pc
Tie wire factor : 71.428 sqm/kg
Cement: (0)/(1.6) unit cost Cost
= 0 bags 230 -
Sand: (0) / (19.51)
= 0 cum 850 -
5 in chb: (0) / (0.0769)
= 0 pcs 16 -
10 mm rsb : (0) /(1.762)
= 0 pcs 115 -
Tie wire : (0) / (71.428)
Tie wire = 0 kg 60 -
Total material cost = -
Material unit cost = #DIV/0!
Total cost: Labor cost + material cost
- Php
Total unit cost |: Labor cost + material cost
Area
#DIV/0! php/sqm
masonry works const bid cost/unit total bid cost summary
masonry works 1st ffl to 2nd ffl chb 4" non load bearing #DIV/0! #DIV/0! project:
4"chb non bearing unit cost qty: - sqm pcf #DIV/0!
wall ht1stffl-2ndffl m project cost 7.5% 1.0 direct cost amount in pesos pct wt. of total
description qty opening sqm length m depth m area sqm labor unit cost 163.64 - - proj.supervision 5.00% 1.1 labor 0.00 ### #DIV/0!
front 0 0 0 - equipment unit cost #DIV/0! #DIV/0! constn facilities 2.50% 1.2 direct equipment 0.00 ### #DIV/0!
right 0 0 0 - material unit cost #DIV/0! indirect eqpt 0.00% 1.3 materials #DIV/0! ### #DIV/0!
left 0 0 0 - masonry4"unit cost #DIV/0! sub con miscellaneous 0.00% 1.4 subcontract 0.00 ### #DIV/0!
rear 0 0 0 - total cost #DIV/0! others 0.00% #DIV/0! 72.50 #DIV/0!
porch 0 0 0 - duration - indirect cost 20%
plantbox 0 0 0 - crew crew bonds premiums 0.00% 2.0 project cost
stair on fill - labor 1 400.00 2 insurance premiums 0.00%
- mason 1 500.00 escalation 0.00% 2.1 project supervision #DIV/0! 5.0% #DIV/0!
- cost of money 3.00% 2.2 construction facilities #DIV/0! 2.5% #DIV/0!
equipment contingencies 5.00% 2.3 indirect equipment #DIV/0! 0.0% #DIV/0!
contractor tax 2.00% 2.4 miscellaneous #DIV/0! 0.0% #DIV/0!
profit 10.00% #DIV/0! 7.5% #DIV/0!
total 27.5%
bill of materials 3.0 other costs #DIV/0! 0.0% #DIV/0!
description qty unit unit cost amount #DIV/0! 0.0% #DIV/0!
cement - bags 230.00 -
total area - sand - cum 850.00 - 4.0 indirect cost
4" chb - pcs 14.00 -
10 mm dia rsb - pcs 115.00 - 4.1 bonds premium #DIV/0! 0.0% #DIV/0!
#16 tie wire - kg 60.00 - 4.2 insurance premium #DIV/0! 0.0% #DIV/0!
4.3 escalation #DIV/0! 0.0% #DIV/0!
cost of money #DIV/0! 3.0% #DIV/0!
4.5 contingencies #DIV/0! 5.0% #DIV/0!
4.6 contractor's tax #DIV/0! 2.0% #DIV/0!
4.7 profit #DIV/0! 10.0% #DIV/0!
total - #DIV/0! 20.0% #DIV/0!
#DIV/0! #DIV/0!
labor cost computation:
5.50 sqm/day
material computation:
description class a
1.0 cement 1bag/2.4 sqm 2.40 sqm/bag
2.0 sand 1cum/29.5 sqm 29.50 sqm/cum
3.0 4" chb 13pcs/sqm 0.08 sqm/pc
4.0 10 mm dia rsb .5688 pcs/ sqm 1.76 sqm/pc
5.0 #16 tie wire .014kg/sqm 71.43 sqm/kg
MANUAL COMPUTATION
Area = 0 Sqm
CHB SIZE = 4 in.
(1)(400)+(1)(500)
=
(5.5)
Duration = Area
Capacity x crew
(0)
=
(5.5)(2)
Duration = 0 Days
Say= 0 Days
material computation:
Area = 0 Sqm
Cement factor: 2.4 sqm/bag
Sand factor: 29.5 sqm/cum
4 in chb factor: 0.0769 sqm/pc
1o mm rsb factor 1.762 sqm/pc
Tie wire factor : 71.428 sqm/kg
- Php
Total unit cost |: Labor cost + material cost
Area
#DIV/0! php/sqm
masonry works
masonry works 2nd ffl to rb chb 4
4"chb non bearing unit cost
wall ht 2ndffl - 3rdffl m
description qty opening sqm length m depth m area sqm labor unit cost
front - - equipment unit cost
left - - material unit cost
right - - masonry 4"unit cost
rear - - total cost
balcony - - duration
crew
labor
mason
equipment
description
cement
total area - sand
4" chb
10 mm dia rsb
#16 tie wire
362811142.xlsMASONRY2ndffl_rb08/10/2017
description
1.0 cement
2.0 sand
3.0 4" chb
4.0 10 mm dia rsb
5.0 #16 tie wire
MANUAL COMPUTATION
Area =
CHB SIZE =
Duration =
362811142.xlsMASONRY2ndffl_rb08/10/2017
=
Duration =
Say=
material computation:
Area =
Cement factor:
Sand factor:
4 in chb factor:
1o mm rsb factor
Tie wire factor :
Cement:
=
Sand:
=
5 in chb:
=
10 mm rsb :
=
Tie wire :
Tie wire =
Total material cost =
Material unit cost =
Total cost:
362811142.xlsMASONRY2ndffl_rb08/10/2017
const bid cost/unit total bid cost summary
362811142.xlsMASONRY2ndffl_rb08/10/2017
5.50 sqm/day
material computation:
class a
1bag/1.6 sqm 2.40 sqm/bag
1cum/29.5 sqm 29.50 sqm/cum
13pcs/sqm 0.08 sqm/pc
.5688 pcs/ sqm 1.76 sqm/pc
.014kg/sqm 71.43 sqm/kg
0 Sqm
4 in.
1
1
2
400 Per day
500 Per day
5.5 sqm/day
( labor+skilled)
capacity
(1)(400)+(1)(500)
(5.5)
163.6363636364 php/sqm
- Php
Area
362811142.xlsMASONRY2ndffl_rb08/10/2017
Capacity x crew
(0)
(5.5)(2)
0 Days
0 Days
0 Sqm
2.4 sqm/bag
29.5 sqm/cum
0.0769 sqm/pc
1.762 sqm/pc
71.428 sqm/kg
- Php
Labor cost + material cost
Area
#DIV/0! php/sqm
362811142.xlsMASONRY2ndffl_rb08/10/2017
amount in pesos pct wt. of total
0.00 ### #DIV/0!
0.00 ### #DIV/0!
#DIV/0! ### #DIV/0!
0.00 ### #DIV/0!
#DIV/0! 72.50 #DIV/0!
#DIV/0! #DIV/0!
362811142.xlsMASONRY2ndffl_rb08/10/2017
masonry works
masonry works above rb
4"chb non bearing unit cost
wall ht RB -ROOF m
description qty opening sqm length m depth m area sqm labor unit cost
front - equipment unit cost
left - material unit cost
right - masonry 4"unit cost
rear - total cost
duration
crew
labor
mason
equipment
description
cement
total area - sand
4" chb
10 mm dia rsb
#16 tie wire
362811142.xlsMASONRYabove rb08/10/2017
description
1.0 cement
2.0 sand
3.0 4" chb
4.0 10 mm dia rsb
5.0 #16 tie wire
MANUAL COMPUTATION
Area =
CHB SIZE =
Duration =
362811142.xlsMASONRYabove rb08/10/2017
=
Duration =
Say=
material computation:
Area =
Cement factor:
Sand factor:
4 in chb factor:
1o mm rsb factor
Tie wire factor :
Cement:
=
Sand:
=
5 in chb:
=
10 mm rsb :
=
Tie wire :
Tie wire =
Total material cost =
Material unit cost =
Total cost:
362811142.xlsMASONRYabove rb08/10/2017
const bid cost/unit total bid cost summary
non load bearing #DIV/0! #DIV/0! project:
qty: - sqm pcf #DIV/0!
project cost 7.5% 1.0 direct cost
163.64 - - proj.supervision 5.00% 1.1 labor
#DIV/0! #DIV/0! constn facilities 2.50% 1.2 direct equipment
#DIV/0! indirect eqpt 0.00% 1.3 materials
#DIV/0! sub con miscellaneous 0.00% 1.4 subcontract
#DIV/0! others 0.00%
- indirect cost 20%
crew bonds premiums 0.00% 2.0 project cost
1 400.00 2 insurance premiums 0.00%
1 500.00 escalation 0.00% 2.1 project supervision
cost of money 3.00% 2.2 construction facilities
contingencies 5.00% 2.3 indirect equipment
contractor tax 2.00% 2.4 miscellaneous
profit 10.00%
total 27.5%
bill of materials 3.0 other costs
qty unit unit cost amount
- bags 230.00 -
- cum 850.00 - 4.0 indirect cost
- pcs 14.00 -
- pcs 115.00 - 4.1 bonds premium
- kg 60.00 - 4.2 insurance premium
4.3 escalation
cost of money
4.5 contingencies
4.6 contractor's tax
4.7 profit
total -
362811142.xlsMASONRYabove rb08/10/2017
5.50 sqm/day
material computation:
class a
1bag/1.6 sqm 2.40 sqm/bag
1cum/29.5 sqm 29.50 sqm/cum
13pcs/sqm 0.08 sqm/pc
.5688 pcs/ sqm 1.76 sqm/pc
.014kg/sqm 71.43 sqm/kg
0 Sqm
4 in.
1
1
2
400 Per day
500 Per day
5.5 sqm/day
( labor+skilled)
capacity
(1)(400)+(1)(500)
(5.5)
163.6363636364 php/sqm
- Php
Area
362811142.xlsMASONRYabove rb08/10/2017
Capacity x crew
(0)
(5.5)(2)
0 Days
0 Days
0 Sqm
2.4 sqm/bag
29.5 sqm/cum
0.0769 sqm/pc
1.762 sqm/pc
71.428 sqm/kg
- Php
Labor cost + material cost
Area
#DIV/0! php/sqm
362811142.xlsMASONRYabove rb08/10/2017
amount in pesos pct wt. of total
0.00 ### #DIV/0!
0.00 ### #DIV/0!
#DIV/0! ### #DIV/0!
0.00 ### #DIV/0!
#DIV/0! 72.50 #DIV/0!
#DIV/0! #DIV/0!
362811142.xlsMASONRYabove rb08/10/2017
masonry works
partition 4"chb (ground & 2nd flr)
1ST FFL 2ND FFL m unit cost
2ND FFL 3RD FFL m
3RD FFL RB m labor unit cost
description qty opening sqm length m depth m area sqm equipment unit cost
material unit cost
ground floor - - - partition wall 4"chb unit cost
second floor - - total cost
attic floor - - duration
crew
labor
mason
equipment
description
cement
sand
total area - 4" chb
10 mm dia rsb
#16 tie wire
362811142.xlsMASONRYpartition08/10/2017
description
1.0 cement
2.0 sand
3.0 4" chb
4.0 10 mm dia rsb
5.0 #16 tie wire
MANUAL COMPUTATION
Area =
CHB SIZE =
362811142.xlsMASONRYpartition08/10/2017
Duration =
Duration =
Say=
material computation:
Area =
Cement factor:
Sand factor:
4 in chb factor:
1o mm rsb factor
Tie wire factor :
Cement:
=
Sand:
=
5 in chb:
=
10 mm rsb :
=
Tie wire :
Tie wire =
Total material cost =
Material unit cost =
Total cost:
362811142.xlsMASONRYpartition08/10/2017
const bid cost/unit total bid cost summary
362811142.xlsMASONRYpartition08/10/2017
5.50 sqm/day
material computation:
class a
1bag/2.4 sqm 2.40 sqm/bag
1cum/29.5 sqm 29.50 sqm/cum
13pcs/sqm 0.08 sqm/pc
.5688 pcs/ sqm 1.76 sqm/pc
.014kg/sqm 71.43 sqm/kg
0 Sqm
4 in.
1
1
2
400 Per day
500 Per day
5.5 sqm/day
( labor+skilled)
capacity
(1)(400)+(1)(500)
(5.5)
163.6363636364 php/sqm
- Php
362811142.xlsMASONRYpartition08/10/2017
Area
Capacity x crew
(0)
(5.5)(2)
0 Days
0 Days
0 Sqm
2.4 sqm/bag
29.5 sqm/cum
0.0769 sqm/pc
1.762 sqm/pc
71.428 sqm/kg
- Php
Labor cost + material cost
Area
#DIV/0! php/sqm
362811142.xlsMASONRYpartition08/10/2017
amount in pesos pct wt. of total
0.00 #DIV/0! #DIV/0!
0.00 #DIV/0! #DIV/0!
#DIV/0! #DIV/0! #DIV/0!
0.00 #DIV/0! #DIV/0!
#DIV/0! 72.50 #DIV/0!
#DIV/0! #DIV/0!
362811142.xlsMASONRYpartition08/10/2017
Plastering const bid cost/unit total bid cost summary
plastering grd floor 20 mm ground floor 20 mm #DIV/0! #DIV/0! project:
unit cost class b mix qty: - sqm pcf #DIV/0!
wall ht1stffl-2ndffl m project cost 7.5% 1.0 direct cost amount in pesos pct wt. of total
description qty opening sqm length m depth m area sqm labor unit cost 75.00 - - proj.supervision 5.00% 1.1 labor 0.00 ### #DIV/0!
front - - - - - equipment unit cost #DIV/0! #DIV/0! constn facilities 2.50% 1.2 direct equipment 0.00 ### #DIV/0!
right - - - - - material unit cost #DIV/0! indirect eqpt 0.00% 1.3 materials #DIV/0! ### #DIV/0!
left - - - - - plastering unit cost #DIV/0! sub con miscellaneous 0.00% 1.4 subcontract 0.00 ### #DIV/0!
rear - - - - - total cost #DIV/0! others 0.00% #DIV/0! 72.50 #DIV/0!
porch - - - - - duration - indirect cost 20%
plantbox - - - - - crew crew bonds premiums 0.00% 2.0 project cost
stair on fill - - - - - labor 1 400.00 2 insurance premiums 0.00%
- - - - - mason 1 500.00 escalation 0.00% 2.1 project supervision #DIV/0! 5.0% #DIV/0!
- - - - - cost of money 3.00% 2.2 construction facilities #DIV/0! 2.5% #DIV/0!
- - - - - equipment contingencies 5.00% 2.3 indirect equipment #DIV/0! 0.0% #DIV/0!
- - - - - contractor tax 2.00% 2.4 miscellaneous #DIV/0! 0.0% #DIV/0!
- - - - - profit 10.00% #DIV/0! 7.5% #DIV/0!
- - - - - total 27.5%
- - - - - bill of materials 3.0 other costs #DIV/0! 0.0% #DIV/0!
- - - - - description qty unit unit cost amount #DIV/0! 0.0% #DIV/0!
- - - - - cement - bags 230.00 -
total area - sand - cum 850.00 - 4.0 indirect cost
#DIV/0! #DIV/0!
labor cost computation:
12.00 sqm/day
material computation:
description class a
1.0 cement 1bag/2.778 sqm 0.36 bag/sqm
2.0 sand 1cum/50 sqm 0.02 cum/sqm
MANUAL COMPUTATION
Area = 0 Sqm
Plastered thickness = 20 mm
(1)(400)+(1)(500)
=
(12)
Duration = Area
Capacity x crew
(0)
=
(12)(2)
Duration = 0 Days
Say= 0 Days
material computation:
Area = 0 Sqm
Cement factor: 0.36 bag/sqm
Sand factor: 0.02 cum/sqm
- Php
Total unit cost |: Labor cost + material cost
Area
#DIV/0! php/sqm
plastering
plastering 2nd floor 20 mm second floor
unit cost
wall ht 2ndffl - attic ffl m
description qty opening sqm length m depth m area sqm labor unit cost
front - - - - - equipment unit cost
left - - - - - material unit cost
right - - - - - plastering unit cost
rear - - - - - total cost
balcony - - - - - duration
- - - - - crew
- - - - - labor
- - - - - mason
- - - - -
#VALUE! equipment
-
-
-
-
- description
- cement
total #VALUE! sand
plastering interior
362811142.xlsPLASTERINGsecond08/10/2017
description
1.0 cement
2.0 sand
MANUAL COMPUTATION
Area =
Plastered thickness =
Duration =
362811142.xlsPLASTERINGsecond08/10/2017
=
Duration =
Say=
material computation:
Area =
Cement factor:
Sand factor:
Cement:
=
Sand:
=
362811142.xlsPLASTERINGsecond08/10/2017
const bid cost/unit total bid cost summary
20 mm #VALUE! #VALUE! project:
class b mix qty: #VALUE! sqm pcf #VALUE!
project cost 7.5% 1.0 direct cost
75.00 #VALUE! #VALUE! proj.supervision 5.00% 1.1 labor
#VALUE! #VALUE! constn facilities 2.50% 1.2 direct equipment
#VALUE! indirect eqpt 0.00% 1.3 materials
#VALUE! sub con miscellaneous 0.00% 1.4 subcontract
#VALUE! others 0.00%
#VALUE! indirect cost 20%
crew bonds premiums 0.00% 2.0 project cost
1 400.00 2 insurance premiums 0.00%
1 500.00 escalation 0.00% 2.1 project supervision
cost of money 3.00% 2.2 construction facilities
contingencies 5.00% 2.3 indirect equipment
contractor tax 2.00% 2.4 miscellaneous
profit 10.00%
total 27.5%
bill of materials 3.0 other costs
qty unit unit cost amount
#VALUE! bags 230.00 #VALUE!
#VALUE! cum 850.00 #VALUE! 4.0 indirect cost
362811142.xlsPLASTERINGsecond08/10/2017
12.00 sqm/day
material computation:
class a
1bag/2.778 sqm 0.36 bag/sqm
1cum/50 sqm 0.02 cum/sqm
#VALUE! Sqm
20 mm
1
1
2
400 Per day
500 Per day
12 sqm/day
( labor+skilled)
capacity
(1)(400)+(1)(500)
(12)
75 php/sqm
#VALUE! Php
Area
362811142.xlsPLASTERINGsecond08/10/2017
Capacity x crew
#VALUE!
(12)(2)
#VALUE! Days
#VALUE! Days
#VALUE! Sqm
0.36 bag/sqm
0.02 cum/sqm
#VALUE!
#VALUE!
Labor cost + material cost
#VALUE! Php
Labor cost + material cost
Area
#VALUE! php/sqm
362811142.xlsPLASTERINGsecond08/10/2017
amount in pesos pct wt. of total
#VALUE! ### #VALUE!
#VALUE! ### #VALUE!
#VALUE! ### #VALUE!
0.00 ### #VALUE!
#VALUE! 72.50 #VALUE!
#VALUE! #VALUE!
362811142.xlsPLASTERINGsecond08/10/2017
plastering
plastering partition 20 mm above rb to roof
unit cost
m
description qty opening sqm length m depth m area sqm labor unit cost
front - - - - - equipment unit cost
left - - - - - material unit cost
right - - - - - above rb to roof
rear - - - - - total cost
- - - - - duration
- - - - - crew
- - - - - labor
- - - - - mason
- - - - -
- - - - - equipment
- - - - -
- - - - -
- - - - -
- - - - -
- - - - - description
- - - - - cement
total area - sand
plastering interior
362811142.xlsPLASTERINGaboverb08/10/2017
description
1.0 cement
2.0 sand
manual computation
area =
plastered thickness =
duration =
362811142.xlsPLASTERINGaboverb08/10/2017
=
duration =
say=
material computation:
area =
cement factor:
sand factor:
cement:
=
sand:
=
362811142.xlsPLASTERINGaboverb08/10/2017
const bid cost/unit total bid cost summary
20 mm #DIV/0! #DIV/0! project:
class b mix qty: - sqm pcf #DIV/0!
project cost 7.5% 1.0 direct cost
75.00 - - proj.supervision 5.00% 1.1 labor
#DIV/0! #DIV/0! constn facilities 2.50% 1.2 direct equipment
#DIV/0! indirect eqpt 0.00% 1.3 materials
#DIV/0! sub con miscellaneous 0.00% 1.4 subcontract
#DIV/0! others 0.00%
- indirect cost 20%
crew bonds premiums 0.00% 2.0 project cost
1 400.00 2 insurance premiums 0.00%
1 500.00 escalation 0.00% 2.1 project supervision
cost of money 3.00% 2.2 construction facilities
contingencies 5.00% 2.3 indirect equipment
contractor tax 2.00% 2.4 miscellaneous
profit 10.00%
total 27.5%
bill of materials 3.0 other costs
qty unit unit cost amount
0.00 bags 230.00 -
0.00 cum 850.00 - 4.0 indirect cost
362811142.xlsPLASTERINGaboverb08/10/2017
12.00 sqm/day
material computation:
class a
1bag/2.778 sqm 0.36 bag/sqm
1cum/50 sqm 0.02 cum/sqm
0 sqm
20 mm
1
1
2
400 per day
500 per day
12 sqm/day
( labor+skilled)
capacity
(1)(400)+(1)(500)
(12)
75 php/sqm
- php
area
362811142.xlsPLASTERINGaboverb08/10/2017
capacity x crew
(0)
(12)(2)
0 days
0 days
0 sqm
0.36 bag/sqm
0.02 cum/sqm
-
#DIV/0!
labor cost + material cost
- php
labor cost + material cost
area
#DIV/0! php/sqm
362811142.xlsPLASTERINGaboverb08/10/2017
amount in pesos pct wt. of total
0.00 #DIV/0! #DIV/0!
0.00 #DIV/0! #DIV/0!
#DIV/0! #DIV/0! #DIV/0!
0.00 #DIV/0! #DIV/0!
#DIV/0! 72.50 #DIV/0!
#DIV/0! #DIV/0!
362811142.xlsPLASTERINGaboverb08/10/2017
plastering
plastering partition 20 mm partition (ground & second flr)
unit cost
grnd floor m
description qty opening sqm length m depth m area sqm labor unit cost
#VALUE! equipment unit cost
ground floor - - - - - material unit cost
second floor - - - - - partition wall 4"unit cost
attic floor - - - - - total cost
duration
crew
labor
mason
equipment
description
cement
total #VALUE! sand
plastering interior
362811142.xlsPLASTERINGpartition08/10/2017
description
1.0 cement
2.0 sand
manual computation
area =
plastered thickness =
duration =
362811142.xlsPLASTERINGpartition08/10/2017
=
duration =
say=
material computation:
area =
cement factor:
sand factor:
cement:
=
sand:
=
362811142.xlsPLASTERINGpartition08/10/2017
const bid cost/unit total bid cost summary
& second flr) 20 mm #VALUE! #VALUE! project:
class b mix qty: #VALUE! sqm pcf #VALUE!
project cost 7.5% 1.0 direct cost
77.78 #VALUE! #VALUE! proj.supervision 5.00% 1.1 labor
#VALUE! #VALUE! constn facilities 2.50% 1.2 direct equipment
#VALUE! indirect eqpt 0.00% 1.3 materials
#VALUE! sub con miscellaneous 0.00% 1.4 subcontract
#VALUE! others 0.00%
#VALUE! indirect cost 20%
crew bonds premiums 0.00% 2.0 project cost
3 400.00 2 insurance premiums 0.00%
6 500.00 escalation 0.00% 2.1 project supervision
cost of money 3.00% 2.2 construction facilities
contingencies 5.00% 2.3 indirect equipment
contractor tax 2.00% 2.4 miscellaneous
profit 10.00%
total 27.5%
bill of materials 3.0 other costs
qty unit unit cost amount
#VALUE! bags 230.00 #VALUE!
#VALUE! cum 850.00 #VALUE! 4.0 indirect cost
362811142.xlsPLASTERINGpartition08/10/2017
12.00 sqm/day
material computation:
class a
1bag/2.778 sqm 0.36 bag/sqm
1cum/50 sqm 0.02 cum/sqm
#VALUE! sqm
20 mm
3
6
2
400 per day
500 per day
12 sqm/day
( labor+skilled)
capacity
(3)(400)+(6)(500)
(12)
350 php/sqm
#VALUE! php
area
362811142.xlsPLASTERINGpartition08/10/2017
capacity x crew
#VALUE!
(12)(2)
#VALUE! days
#VALUE! days
#VALUE! sqm
0.36 bag/sqm
0.02 cum/sqm
#VALUE!
#VALUE!
labor cost + material cost
#VALUE! php
labor cost + material cost
area
#VALUE! php/sqm
362811142.xlsPLASTERINGpartition08/10/2017
amount in pesos pct wt. of total
#VALUE! ### #VALUE!
#VALUE! ### #VALUE!
#VALUE! ### #VALUE!
0.00 ### #VALUE!
#VALUE! 72.50 #VALUE!
#VALUE! #VALUE!
362811142.xlsPLASTERINGpartition08/10/2017
painting works const bid cost/unit total bid cost summary
latex interior side 3.0 coats #VALUE! #VALUE! project:
unit cost qty: #VALUE! sqm pcf #VALUE!
description area project cost 7.5% 1.0 direct cost amount in pesos pct wt. of total
ground floor - labor unit cost 30.00 #VALUE! #VALUE! proj.supervision 5.00% 1.1 labor #VALUE! ### #VALUE!
second floor #VALUE! equipment unit cost #VALUE! #VALUE! constn facilities 2.50% 1.2 direct equipment #VALUE! ### #VALUE!
stair material unit cost #VALUE! indirect eqpt 0% 1.3 materials #VALUE! ### #VALUE!
painting unit cost #VALUE! sub con miscellaneous 0% 1.4 subcontract 0.00 ### #VALUE!
partition (ground & second flr) #VALUE! total cost #VALUE! others 0% #VALUE! 72.50 #VALUE!
slab ceiling duration #VALUE! indirect cost 20%
total #VALUE! crew crew bonds premiums 0% 2.0 project cost
labor 1 400.00 2.0 insurance premiums 0%
labor 1 500.00 escalation 0% 2.1 project supervision #VALUE! 5.0% #VALUE!
cost of money 3% 2.2 construction facilities #VALUE! 2.5% #VALUE!
contingencies 5% 2.3 indirect equipment #VALUE! 0.0% #VALUE!
contractor tax 2% 2.4 miscellaneous #VALUE! 0.0% #VALUE!
profit 10.0% #VALUE! 7.5% #VALUE!
total 27.5%
bill of materials 3.0 other costs #VALUE! 0.0% #VALUE!
description qty unit unit cost amount #VALUE! 0.0% #VALUE!
latex paint flat #VALUE! gal 416.00 #VALUE!
latex paint semi gloss #VALUE! gal 485.00 #VALUE! 4.0 indirect cost
masonry neutralizer #VALUE! gal 275.00 #VALUE!
masonry putty #VALUE! gal 275.00 #VALUE! 4.1 bonds premium #VALUE! 0.0% #VALUE!
sand paper 100 #VALUE! m 15.00 #VALUE! 4.2 insurance premium #VALUE! 0.0% #VALUE!
acri color #VALUE! quart 45.00 #VALUE! 4.3 escalation #VALUE! 0.0% #VALUE!
stopa #VALUE! kgs 50.00 #VALUE! cost of money #VALUE! 3.0% #VALUE!
4.5 contingencies #VALUE! 5.0% #VALUE!
4.6 contractor's tax #VALUE! 2.0% #VALUE!
4.7 profit #VALUE! 10.0% #VALUE!
#VALUE! 20.0% #VALUE!
total #VALUE!
#VALUE! #VALUE!
30 sqm/day
material computation:
description spreading rate
masonry neutralizer .10lit/sqm 0.026 gal/sqm
latex paint 0.15 lit/sqm/coat 0.040 gal/sqm
masory putty 10sq m /gal 0.1 gal/sqm
sand paper 0.10sqm/sqm 0.100 sqm/sqm
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary miscellaneous
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
painting works CONST BID COST/unit TOTAL BID COST SUMMARY
latex exterior side 3.0 COATS #VALUE! #VALUE! PROJECT:
0 UNIT COST qty: #VALUE! SQM PCF #VALUE!
DESCRIPTION AREA Project cost 7.5% 1.0 DIRECT COST AMOUNT IN PESOS PCT WT. OF TOTAL
ground floor - labor unit cost 30.00 #VALUE! #VALUE! Proj.Supervision 5.00% 1.1 Labor #VALUE! ### #VALUE!
second floor #VALUE! equipment unit cost #VALUE! #VALUE! Constn Facilities 2.50% 1.2 Direct Equipment #VALUE! ### #VALUE!
above rb to roof - material unit cost #VALUE! Indirect Eqpt 0% 1.3 Materials #VALUE! ### #VALUE!
painting unit cost #VALUE! sub con Miscellaneous 0% 1.4 Subcontract 0.00 ### #VALUE!
firewall total cost #VALUE! Others 0% #VALUE! 72.50 #VALUE!
cladding duration #VALUE! Indirect Cost 20%
TOTAL #VALUE! crew crew Bonds Premiums 0% 2.0 PROJECT COST
labor 1 400.00 2.0 Insurance Premiums 0%
labor 1 500.00 Escalation 0% 2.1 Project Supervision #VALUE! 5.0% #VALUE!
Cost of Money 3% 2.2 Construction Facilities #VALUE! 2.5% #VALUE!
Contingencies 5% 2.3 Indirect Equipment #VALUE! 0.0% #VALUE!
Contractor Tax 2% 2.4 Miscellaneous #VALUE! 0.0% #VALUE!
Profit 10.0% #VALUE! 7.5% #VALUE!
Total 27.5%
bill of materials 3.0 OTHER COSTS #VALUE! 0.0% #VALUE!
description qty unit unit cost amount #VALUE! 0.0% #VALUE!
latex paint flat #VALUE! gal 416.00 #VALUE!
latex paint semi gloss #VALUE! gal 485.00 #VALUE! 4.0 INDIRECT COST
masonry neutralizer #VALUE! gal 275.00 #VALUE!
acrytex cast #VALUE! gal 400.00 #VALUE! 4.1 Bonds Premium #VALUE! 0.0% #VALUE!
sand paper 100 #VALUE! M 15.00 #VALUE! 4.2 Insurance Premium #VALUE! 0.0% #VALUE!
acri color #VALUE! quart 45.00 #VALUE! 4.3 Escalation #VALUE! 0.0% #VALUE!
stopa #VALUE! kgs 50.00 #VALUE! Cost of Money #VALUE! 3.0% #VALUE!
4.5 Contingencies #VALUE! 5.0% #VALUE!
4.6 Contractor's Tax #VALUE! 2.0% #VALUE!
4.7 Profit #VALUE! 10.0% #VALUE!
#VALUE! 20.0% #VALUE!
total #VALUE!
#VALUE! #VALUE!
30 SQM/DAY
material computation:
description spreading rate
masonry neutralizer .10lit/sqm 0.026 gal/sqm
latex paint 0.15 lit/sqm/coat 0.040 gal/sqm
Acrytex cast 10sq m /gal 0.1 gal/sqm
sand paper 0.10sqm/sqm 0.100 sqm/sqm
painting works const bid cost/unit
boysen acrytex (firewall) 2.0 coats #DIV/0!
unit cost qty: 0.00
description area
labor unit cost 90.00 - -
Rear - equipment unit cost #DIV/0! #DIV/0!
Right material unit cost #DIV/0!
Left painting unit cost #DIV/0! sub con
total cost #DIV/0!
duration -
total - sqm crew crew
labor 1 400.00 2.0
labor 1 500.00
bill of materials
description qty unit unit cost
acrytex primer 0 gal 610.00
acrytex cast 0.00 gal 400.00
acrytex top coat 0.00 gal 765.00
masonry neutralizer 0.00 gal 275.00
sand paper 0 sq ft 15
acri color 0 quart 45
acrytex reducer 0 gal 345
total
362811142.xlsACRYTEX_firewall08/10/2017
0.8
1.25
10
material computation:
description spreading rate
acreytex primer 30 sq m / coat / gal 0.033
acreytex cast 12 sq m / coat / gal 0.083
acreytex top coat 25 sq m / coat / gal 0.040
MANUAL COMPUTATION
Area = 0 Sqm
no. of coats = 0 coats
Paint type = Masonry latex
(4)(400)+(2)(500)
=
(10)
Duration = Area
362811142.xlsACRYTEX_firewall08/10/2017
Capacity x crew
(0)
=
(10)(1)
Duration = 0 Days
Say= 0 Days
material computation:
Area = 0 Sqm
'latex paint 0.0833333333 gal/sqm
Masonry neutralizer 0.0333333333 gal/sqm
Patching compound 0.04 gal/sqm
Sand paper 0 0
Acri color 0.0208333333 quart/coat
Stopa 0.1 kg/sqm
'latex paint
3333333333333)(0) unit cost
= 0 gal 610
Masonry neutralizer0333333333333333)
= 0 gal 400
Patching compound (0.04)(0)
= 0 kg 765
Sand paper (0)(0)
= 0 Pc 275
Acri color 333333333)(0)(0)
= 0 quart 15
Stopa (0.1)(0)
= 0 kg 45
Total material cost =
Material unit cost =
Total cost: Labor cost + material cost
- Php
Total unit cost |: Labor cost + material cost
Area
#DIV/0! php/sqm
362811142.xlsACRYTEX_firewall08/10/2017
const bid cost/unit total bid cost summary
#DIV/0! #DIV/0! project:
sqm pcf #DIV/0!
project cost 7.5% 1.0 direct cost amount in pesos
proj.supervision 5.00% 1.1 labor 0.00 ###
constn facilities 2.50% 1.2 direct equipment 0.00 ###
indirect eqpt 0% 1.3 materials #DIV/0! ###
miscellaneous 0% 1.4 subcontract 0.00 ###
others 0% #DIV/0! 72.50
indirect cost 20%
bonds premiums 0% 2.0 project cost
insurance premiums 0%
escalation 0% 2.1 project supervision #DIV/0! 5.0%
cost of money 3% 2.2 construction facilities #DIV/0! 2.5%
contingencies 5% 2.3 indirect equipment #DIV/0! 0.0%
contractor tax 2% 2.4 miscellaneous #DIV/0! 0.0%
profit 10.0% #DIV/0! 7.5%
total 27.5%
3.0 other costs #DIV/0! 0.0%
unit cost amount #DIV/0! 0.0%
610.00 -
400.00 - 4.0 indirect cost
765.00 -
275.00 - 4.1 bonds premium #DIV/0! 0.0%
15 - 4.2 insurance premium #DIV/0! 0.0%
45 - 4.3 escalation #DIV/0! 0.0%
345 - cost of money #DIV/0! 3.0%
4.5 contingencies #DIV/0! 5.0%
4.6 contractor's tax #DIV/0! 2.0%
4.7 profit #DIV/0! 10.0%
total P- #DIV/0! 20.0%
#DIV/0!
on:
mh/sqm
mh/sqm
mh/sqm
362811142.xlsACRYTEX_firewall08/10/2017
mh / sq m
sq m /hr
sqm/day
on:
gal/sqm
gal/sqm
gal/sqm
362811142.xlsACRYTEX_firewall08/10/2017
Cost
-
-
-
#DIV/0!
362811142.xlsACRYTEX_firewall08/10/2017
pct wt. of total
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
362811142.xlsACRYTEX_firewall08/10/2017
painting works const bid cost/unit total bid cost SUMMARY
boysen acrytex (door) #DIV/0! #DIV/0! PROJECT:
UNIT COST qty: 0.00 Sqm pcf #DIV/0!
Project cost 7.5% 1.0 DIRECT COST AMOUNT IN PESOS PCT WT. OF TOTAL
labor unit cost 33.33 0.00 0.00 Proj.Supervision 5.00% 1.1 Labor 0.00 #DIV/0! #DIV/0!
equipment unit cost #DIV/0! #DIV/0! Constn Facilities 2.50% 1.2 Direct Equipment 0.00 #DIV/0! #DIV/0!
material unit cost #DIV/0! Indirect Eqpt 0% 1.3 Materials #DIV/0! #DIV/0! #DIV/0!
painting unit cost #DIV/0! sub con Miscellaneous 0% 1.4 Subcontract 0.00 #DIV/0! #DIV/0!
total cost #DIV/0! Others 0% #DIV/0! 72.50 #DIV/0!
duration 0.00 Indirect Cost 20%
crew crew Bonds Premiums 0% 2.0 PROJECT COST
labor 1.0 Insurance Premiums 0%
painter 1 500.00 Escalation 0% 2.1 Project Supervision #DIV/0! 5.0% #DIV/0!
Cost of Money 3% 2.2 Construction Facilities #DIV/0! 2.5% #DIV/0!
equipment 500 Contingencies 5% 2.3 Indirect Equipment #DIV/0! 0.0% #DIV/0!
Contractor Tax 2% 2.4 Miscellaneous #DIV/0! 0.0% #DIV/0!
Profit 10.0% #DIV/0! 7.5% #DIV/0!
Total 27.5%
3.0 OTHER COSTS #DIV/0! 0.0% #DIV/0!
bill of materials #DIV/0! 0.0% #DIV/0!
description qty unit unit cost amount
acrytex primer - gal 610.00 - 4.0 INDIRECT COST
acrytex cast - gal 400.00 -
acrytex reducer - gal 345.00 - 4.1 Bonds Premium #DIV/0! 0.0% #DIV/0!
acrytex topcoat - gal 765.00 - 4.2 Insurance Premium #DIV/0! 0.0% #DIV/0!
acrytex color - quart 45.00 - 4.3 Escalation #DIV/0! 0.0% #DIV/0!
sanding paper #120 - pcs 10.00 - Cost of Money #DIV/0! 3.0% #DIV/0!
stopa - kg 50.00 - 4.5 Contingencies #DIV/0! 5.0% #DIV/0!
4.6 Contractor's Tax #DIV/0! 2.0% #DIV/0!
total - 4.7 Profit #DIV/0! 10.0% #DIV/0!
#DIV/0! 20.0% #DIV/0!
Primer 1.00 Hr
Putty 1.50 Hr
Sanding 1.50 Hr
Primer 0.50 Hr
Sanding 1.50 Hr
Top coat 1.00 Hr
LABOR total hours 7.00
material computation:
description
Acrytex primer 0.050 gal/Sqm
Acrytex cast 0.100 gal/Sqm
Acrytex reducer 0.020 gal/Sqm
Acrytex topcoat 0.040 gal/Sqm
Sanding paper #150 2.000 pc/sqm
Stopa 0.100 kgs/ sqm
Miscellaneous
doors const bid cost/unit total bid cost summary
pannel, upvc & flush dr pannel &upvc qty #DIV/0! #DIV/0! project:
unit cost 0.00 unit pcf #DIV/0!
project cost 7.5% 1.0 direct cost amount in pesos pct wt. of total
labor unit cost 900.00 - - proj.supervision 5.00% 1.1 labor 0.00 ### #DIV/0!
equipment unit cost #DIV/0! #DIV/0! constn facilities 2.50% 1.2 direct equipment 0.00 ### #DIV/0!
item description qty unit unit cost Area material unit cost #DIV/0! sub con indirect eqpt 0% 1.3 materials #DIV/0! ### #DIV/0!
1 2100 x 800 molded door sets 2,700.00 - door unit cost #DIV/0! miscellaneous 0% 1.4 subcontract 0.00 ### #DIV/0!
2 2100 x 900 steel door & jamb sets 4,200.00 - total cost #DIV/0! others 0% #DIV/0! 72.50 #DIV/0!
3 2100 x 700 steel door & jamb sets 4,200.00 - duration - crew indirect cost 20%
4 2100 x 800 molded door sets 1,300.00 - crew 1.0 bonds premiums 0% 2.0 project cost
5 2100 x 700 sld panel door sets 4,200.00 - labor 1 400.00 insurance premiums 0%
6 2100 x 600 upvc door sets 1,350.00 carpenter 1 500.00 escalation 0% 2.1 project supervision #DIV/0! 5.0% #DIV/0!
7 2100 x 900 steel door sld sets 5,000.00 - cost of money 3% 2.2 construction facilities #DIV/0! 2.5% #DIV/0!
8 2100 x 700 panel sld sets 4,200.00 - contingencies 5% 2.3 indirect equipment #DIV/0! 0.0% #DIV/0!
9 Double sliding panel door 2.10 x 0.70 sets 9,950.00 contractor tax 2% 2.4 miscellaneous #DIV/0! 0.0% #DIV/0!
steel door jamb 0 750.00 profit 10.0% #DIV/0! 7.5% #DIV/0!
10 entrance set-yale cbca5057 us5 3,899.75 total 27.5%
11 yale lever type l6267 et us5 1,099.75 bill of materials 3.0 other costs #DIV/0! 0.0% #DIV/0!
12 yale-heavy duty 899.75 description qty unit unit cost amount #DIV/0! 0.0% #DIV/0!
13 chain bolt 360.00 2100 x 800 molded door - sets 2,700.00 -
14 foot bolt 360.00 2100 x 900 steel door & jamb - sets 4,200.00 - 4.0 indirect cost
15 knobs ( faultless ) pcs 520.00 2100 x 700 steel door & jamb - sets 4,200.00 -
16 knobs ( amerilock ) pcs 150.00 2100 x 800 molded door - sets 1,300.00 - 4.1 bonds premium #DIV/0! 0.0% #DIV/0!
17 railings us 1,500.00 2100 x 700 sld panel door - sets 4,200.00 - 4.2 insurance premium #DIV/0! 0.0% #DIV/0!
18 hanger stanley 450.00 2100 x 600 upvc door - sets 1,350.00 - 4.3 escalation #DIV/0! 0.0% #DIV/0!
19 door lock lock wood 1,350.00 2100 x 900 steel door sld - sets 5,000.00 - cost of money #DIV/0! 3.0% #DIV/0!
20 FLUSH BOLT 240.00 2100 x 700 panel sld - sets 4,200.00 - 4.5 contingencies #DIV/0! 5.0% #DIV/0!
21 dead bolt 320.00 Double sliding panel door 2.10 x 0.70 - sets 9,950.00 - 4.6 contractor's tax #DIV/0! 2.0% #DIV/0!
22 hinges 0 pcs 25.00 steel door jamb - 750.00 - 4.7 profit #DIV/0! 10.0% #DIV/0!
entrance set-yale cbca5057 us5 - 3,899.75 - #DIV/0! 20.0% #DIV/0!
area 0 yale lever type l6267 et us5 - 1,099.75 -
ENAMEL 0 yale-heavy duty - 899.75 - #DIV/0! #DIV/0!
ACRYTEX 0 chain bolt - 360.00 -
foot bolt - 360.00 -
knobs ( faultless ) - pcs 520.00 -
Lb knobs ( amerilock ) - pcs 150.00 -
railings us - pcs 1,500.00 -
hanger stanley - pcs 450.00 -
entrance set-yale door lock lock wood - pcs 1,350.00 -
DH5522 US5 3800 FLUSH BOLT - pcs 240.00 -
DH5588 US5 3049 dead bolt - pcs 320.00 -
railings us hinges - pcs 25.00 -
6' 960 - pcs - -
8' 1280 - - -
10' 1600 - - -
12' 1920 - - -
pateco panel door 5500 - - -
- - -
total P-
1 unit/day
1 unit/day
material computation:
MANUAL COMPUTATION
(1)(400)+(1)(500)
=
(1)
labor unit cost = 900 php/unit
Labor cost = - Php
Duration = qty
Capacity x crew
(0)
=
(1)(1)
Duration = 0 Days
Say= 0 Days
material computation:
panel door with jamb (2.10 x 0.90) 4200
Deadbolt 240
Yale (knobs) 520
Mat'l unit cost = 4960
labor unit cost = 900
Total unit cost= 5860 /set
bi
description qty
labor
install
MANUAL COMPUTATION
Area = 0
Sub con
Area = -
Unit cost per sqft = #DIV/0!
35 sqft/day
material computation:
Sq ft
0 0.0% #DIV/0!
0 0.0% #DIV/0!
- #DIV/0!
description qty
labo
install
MANUAL COMPUTATION
Area = 0
Sub con
Area = -
Unit cost per sqft = #DIV/0!
35 sqft/day
material computation:
Sq ft
0 0.0% #DIV/0!
0 0.0% #DIV/0!
- #DIV/0!
0.00 total -
window glass const bid cost/un
window glass 1/8" smoked #DIV/0!
qty: 0.00
equipment
bill of materials
description qty unit unit cost
total
installation 85
85
material computation:
MANUAL COMPUTATION
Area = 0 Sq ft
Sub con
Area = -
Unit cost per sqft = #DIV/0!
4.1
4.2
4.3
4.5
4.6
4.7
P-
sqft/day
sqft/day
material computation:
amount in pesos pct wt. of total
labor 0.00 ### #DIV/0!
direct equipment 0.00 ### #DIV/0!
materials ### #DIV/0!
subcontract 0.00 ### #DIV/0!
0.00 72.50 #DIV/0!
0 0.0% #DIV/0!
0 0.0% #DIV/0!
- #DIV/0!
painting works const bid cost/unit total bid cost SUMMARY
roof paint 2.0 COATS #DIV/0! #DIV/0! PROJECT:
UNIT COST qty: 0.00 SQM PCF #DIV/0!
DESCRIPTION AREA Project cost 7.5% 1.0 DIRECT COST AMOUNT IN PESOS PCT WT. OF TOTAL
roof qty: labor unit cost 30.00 - - Proj.Supervision 5.00% 1.1 Labor 0.00 #DIV/0! #DIV/0!
equipment unit cost #DIV/0! #DIV/0! Constn Facilities 2.50% 1.2 Direct Equipment 0.00 #DIV/0! #DIV/0!
- material unit cost #DIV/0! Indirect Eqpt 0% 1.3 Materials #DIV/0! #DIV/0! #DIV/0!
painting unit cost #DIV/0! sub con Miscellaneuos 0% 1.4 Subcontract 0.00 #DIV/0! #DIV/0!
TOTAL - total cost #DIV/0! Others 0% #DIV/0! 72.50 #DIV/0!
duration - Indirect Cost 20%
crew crew Bonds Premiums 0% 2.0 PROJECT COST
labor 1 400.00 1.0 Insurance Premiums 0%
painter 1 500.00 Escalation 0% 2.1 Project Supervision #DIV/0! 5.0% #DIV/0!
Cost of Money 3% 2.2 Construction Facilities #DIV/0! 2.5% #DIV/0!
Contingecies 5% 2.3 Indirect Equipment #DIV/0! 0.0% #DIV/0!
Contractor Tax 2% 2.4 Miscellaneous #DIV/0! 0.0% #DIV/0!
Profit 10.0% #DIV/0! 7.5% #DIV/0!
Total 27.5%
bill of materials 3.0 OTHER COSTS #DIV/0! 0.0% #DIV/0!
description qty unit unit cost amount #DIV/0! 0.0% #DIV/0!
roof guard boysen 0 gal 540.00 -
4.0 INDIRECT COST
total P-
4.1 Bonds Premium #DIV/0! 0.0% #DIV/0!
4.2 Insurance Premium #DIV/0! 0.0% #DIV/0!
labor cost computation: 4.3 Escalation #DIV/0! 0.0% #DIV/0!
4.4 Cost of Money #DIV/0! 3.0% #DIV/0!
spreading rate 1man/30sqm/day 0.40 MH/sqm 4.5 Contigencies #DIV/0! 5.0% #DIV/0!
4.6 Contractor's Tax #DIV/0! 2.0% #DIV/0!
MH/sqm 4.7 Profit #DIV/0! 10.0% #DIV/0!
#DIV/0! 20.0% #DIV/0!
material computation:
description spreading rate
material computation:
triangular area 3 (left dk)
no. of rivets per sheet area 1 (sqm) height (m) width (m)
0.00 - -
6' 14
7' 18
8' 18 triangular area 4 (right dk)
9' 22 area 1 (sqm) height (m) width (m)
10' 22 0.00 - -
12' 26
trapezoidal 1 (left)
area 1 (sqm) height (m) width short (m) width long (m)
0.00 - -
trapezoidal 2 (right)
area 1 (sqm) height (m) width short (m) width long (m)
0.00 - -
0 0
roofing .4 mm const bid cost/unit total bid cost
s-tile roof long span #N/A #N/A
qty: 0.00 sqm pcf #N/A
project cost 7.50%
labor unit cost 180.00 - - proj.supervision 5.00%
equipment unit cost #N/A #N/A constn facilities 2.50%
material unit cost #N/A indirect eqpt 0%
roofing unit cost sub con #N/A miscellaneous 0%
total cost #N/A others 0%
duration - indirect cost 20%
crew crew bonds premiums 0%
labor 1 400.00 1.0 insurance premiums 0%
carpenter 1 500.00 escalation 0%
cost of money 3%
equipment contingencies 5%
contractor tax 2%
profit 10.0%
total 27.5%
bill of materials
description qty unit unit cost amount
total #N/A
362811142.xlsSTYLE ROOF08/10/2017
installation 5 sqm/man day 5 sqm/day
5 sqm/day
material computation:
362811142.xlsSTYLE ROOF08/10/2017
miscellaneous
362811142.xlsSTYLE ROOF08/10/2017
length of front side
length of letf side
length of right side
length of right side
09/23/98 a 6.0 spacing between pu
b 6.0 spacing between tru
c 6.0 height of truss
d 6.0 length of truss
e #VALUE! length of eaves
f #VALUE! weight of roofing
g 1.2 weight of wood
h 6.0 ll
i 0.7 p
j #VALUE! slope
k arctan
l #VALUE!angle
m #VALUE!yeild strength of ste
o #VALUE!modulus of elasticit
#VALUE!c purlins
#VALUE!
fy #VALUE! h
e #VALUE! 75
trial section
a
1.77 designation
asep c 75 x 6.9
1 w xc yc
362811142.xlsSTYLE ROOF08/10/2017
1.39
bstress computation:
123.60
design loads:
1.dead loads
wt of roofing
###
### mm 3.wind loads
design winds:
mm < #VALUE! safe
mm < #VALUE! safe
normal loads:
tangential loads:
d+l
load casse # 2
mn=wn(l)
moments:
mn=wt(l)
load case # 1
362811142.xlsSTYLE ROOF08/10/2017
load case # 2
fbx =
fby =
#VALUE!
fbx =
fy=
fby =
2.86
b/2tf =
b/2tf < 170/sqrt(fy)
170/(fy)1/2 = #VALUE!
#VALUE!
fbx=0.66fy
fby=0.60fy #VALUE!
check interaction equation
362811142.xlsSTYLE ROOF08/10/2017
load case # 1 #VALUE!
load case # 2
check deflection:
yn=5wnl4/384eix
yt=5wtl4/384eiy
362811142.xlsSTYLE ROOF08/10/2017
summary
project:
1.0 direct cost amount in pesos pct wt. of total purlin sp.= 0.30
1.1 labor #N/A #N/A
1.2 direct equipment 0.00 #N/A #N/A Purlin length Area
1.3 materials #N/A #N/A 0.00 -
1.4 subcontract #N/A #N/A #N/A
#N/A 72.50 #N/A
#N/A #N/A
0.00 -
362811142.xlsSTYLE ROOF08/10/2017
0.00 -
0.00 -
0.00 -
0.00 -
0.00 -
0.00 -
0.00 -
362811142.xlsSTYLE ROOF08/10/2017
0.00 -
0.00 -
0.00 -
0.00 -
0.00 -
0.00 -
0.00 -
362811142.xlsSTYLE ROOF08/10/2017
0.00 -
0.00 -
Purlin length = 0
362811142.xlsSTYLE ROOF08/10/2017
ngth of front side
ngth of letf side m
ngth of right side m
ngth of right side m *mid sag rods mt=wt*l2/32
acing between purlins m *third point sag rods mt=wt*l2/90
acing between truss m
ight of truss m
ngth of truss m
ngth of eaves m
eight of roofing m
eight of wood kpa
cum
< or =30sqm pa
height of roof<6 m pa
b tw tf a w xc yc
40 5.0 7.0 8.82 6.90 1.28 0.00
362811142.xlsSTYLE ROOF08/10/2017
dl #VALUE! kpa
ll #VALUE! kpa
wl #VALUE! kpa
wn
dln = #VALUE! n/m
lln = #VALUE! n/m
wln = #VALUE! n/m
wn = #VALUE! n/m
wt = #VALUE! n/m
5(d+l+w)
wn = #VALUE! n/m
wt = #VALUE! n/m
362811142.xlsSTYLE ROOF08/10/2017
mt= #VALUE! n-m
mn= #VALUE!
mt= #VALUE!
mpa
mpa
mpa
mpa
#VALUE!
362811142.xlsSTYLE ROOF08/10/2017
< 1.0 safe
54.5981500331
#VALUE! mm
81
362811142.xlsSTYLE ROOF08/10/2017
roof estimates
long span sheets
project:
rectangular area 1 (left dk) long span puyat r span. purlin spacing (m)
Qty area 1 (sqm) height (m) width (m) effective length (m) effective width (m) steel purlins
- 1.07 0.30
rectangular area 1 (left dk) long span puyat r span. purlin spacing (m)
area 1 (sqm) height (m) width (m) effective length (m) effective width (m) steel purlins
- 1.07 0.30
rectangular area 1 (left dk) long span puyat r span. purlin spacing (m)
area 1 (sqm) height (m) width (m) effective length (m) effective width (m) steel purlins
- 1.07 0.30
rectangular area 1 (left dk) long span puyat r span. purlin spacing (m)
area 1 (sqm) height (m) width (m) effective length (m) effective width (m) steel purlins
- 1.07 0.30
362811142.xlsSTYLE ROOF08/10/2017
triangular area 1(front) long span puyat r span. purlin spacing (m)
area 1 (sqm) height (m) width (m) effective length (m) effective width (m) steel purlins
- 1.07 0.30
triangular area 2 (rear) long span puyat r span. purlin spacing (m)
area 1 (sqm) height (m) width (m) effective length (m) effective width (m) steel purlins
- 1.07 0.30
triangular area 3 (left dk) long span puyat r span. purlin spacing (m)
area 1 (sqm) height (m) width (m) effective length (m) effective width (m) steel purlins
- 1.07 0.30
triangular area 4 (right dk) long span puyat r span. purlin spacing (m)
area 1 (sqm) height (m) width (m) effective length (m) effective width (m) steel purlins
- 1.07 0.30
trapezoidal 3 (front dk) long span puyat r span. purlin spacing (m)
area 1 (sqm) height (m) width short (m) width long (m) effective length (m) effective width (m) steel purlins
- 1.07 0.30
362811142.xlsSTYLE ROOF08/10/2017
trapezoidal 4 (rear dk) long span puyat r span. purlin spacing (m)
area 1 (sqm) height (m) width short (m) width long (m) effective length (m) effective width (m) steel purlins
- 1.07 0.30
triangular area 5 (front) long span puyat r span. purlin spacing (m)
area 1 (sqm) height (m) width (m) effective length (m) effective width (m) steel purlins
- 1.07 0.30
triangular area 6 (left) long span puyat r span. purlin spacing (m)
area 1 (sqm) height (m) width (m) effective length (m) effective width (m) steel purlins
- 1.07 0.30
triangular area 7 (right) long span puyat r span. purlin spacing (m)
area 1 (sqm) height (m) width (m) effective length (m) effective width (m) steel purlins
- 1.07 0.30
triangular area 8 (rear) long span puyat r span. purlin spacing (m)
area 1 (sqm) height (m) width (m) effective length (m) effective width (m) steel purlins
- 1.07 0.30
triangular area 8 (rear) long span puyat r span. purlin spacing (m)
area 1 (sqm) height (m) width (m) effective length (m) effective width (m) steel purlins
- 1.07 0.30
triangular area 8 (rear) long span puyat r span. purlin spacing (m)
area 1 (sqm) height (m) width (m) effective length (m) effective width (m) steel purlins
- 1.07 0.30
triangular area 8 (rear) long span puyat r span. purlin spacing (m)
362811142.xlsSTYLE ROOF08/10/2017
area 1 (sqm) height (m) width (m) effective length (m) effective width (m) steel purlins
- 1.07 0.30
triangular area 8 (rear) long span puyat r span. purlin spacing (m)
area 1 (sqm) height (m) width (m) effective length (m) effective width (m) steel purlins
- 1.07 0.30
Area = - sqm
362811142.xlsSTYLE ROOF08/10/2017
362811142.xlsSTYLE ROOF08/10/2017
362811142.xlsSTYLE ROOF08/10/2017
long spanpuyat steel
thickness effective purlins sheet
style mm width m spacing cost/lm
no of pcs tekscrew per total tekscrew
sheets width length (pcs) pcs
0.00 2 0.00
no of pcs tekscrew per total tekscrew tile span elite 0.4 1.077 0.30 434.65
sheets width length (pcs) pcs tile span maxi 0.4 1.077 0.35 402.45
0.00 2 0.00 0.5 1.077 0.35 461.59
0.6 1.077 0.35 536.47
r - span 1220 0.4 1.074 0.70 * 210.27
no of pcs tekscrew per total tekscrew 0.5 1.074 0.70 *
sheets width length (pcs) pcs 0.6 1.074 0.70 *
0.00 2 0.00 r - span 916 0.4 1.074 0.70 * 326
0.5 1.074 0.70 *
0.6 1.074 0.70 *
super r - span 0.4 1.05 0.70 * 332.79
no of pcs tekscrew per total tekscrew 0.5 1.05 0.70 *
sheets width length (pcs) pcs 0.6 1.05 0.70 *
0.00 2 0.00 mega r - span 0.4 0.67 0.70 * 215.62
0.5 0.67 0.70 *
0.6 0.67 0.70 *
no of pcs tekscrew per total tekscrew multi r - span 0.3 1 0.70 *
sheets width length (pcs) pcs 0.4 1 0.70 * 221.73
0.00 2 0.00 0.5 1 0.70 *
0.6 1 0.70 *
corspan 915 0.3 0.998 0.70 *
0.4 0.998 0.70 * 208.2
362811142.xlsSTYLE ROOF08/10/2017
0.5 0.998 0.70 *
0.6 0.998 0.70 *
no of pcs tekscrew per total tekscrew corspan 915 0.3 0.998 0.70 *
sheets width length (pcs) pcs 0.4 0.998 0.70 * 290.05
0.00 2 0.00 0.5 0.998 0.70 *
0.6 0.998 0.70 *
mega clad 0.4 1 0.70 *
no of pcs tekscrew per total tekscrew 0.5 1 0.70 *
sheets width length (pcs) pcs 0.6 1 0.70 *
0.00 2 0.00
madrid tile roof 0.4 0.71 0.30 355.74
0.5 0.71 0.30
no of pcs tekscrew per total tekscrew 0.6 0.71 0.30
sheets width length (pcs) pcs
0.00 2 0.00
362811142.xlsSTYLE ROOF08/10/2017
no of pcs tekscrew per total tekscrew
sheets width length (pcs) pcs
0.00 2 0.00
362811142.xlsSTYLE ROOF08/10/2017
sheets width length (pcs) pcs
0.00 2 0.00
362811142.xlsSTYLE ROOF08/10/2017
362811142.xlsSTYLE ROOF08/10/2017
362811142.xlsSTYLE ROOF08/10/2017
ix iy sx sy asep bstress
75.30 12.20 20.10 4.50 1
362811142.xlsSTYLE ROOF08/10/2017
a 6.0 length of front side m
b 6.0 length of letf side m
c 6.0 length of right side m
d 6.0 length of right side m
computation:
design loads:
1.dead loads
362811142.xlsSTYLE ROOF08/10/2017
wt of roofing dl ###
2.live loads
ll ###
3.wind loads
design winds:
wl ###
normal loads: wn
dln = ###
lln = ###
wln = ###
tangential loads:
dlt = ###
lln = ###
moments:
2
load case # 1 mn=wn(l)/8
mn= ### n-m
mn=wt(l)2/8
mt= ### n-m
362811142.xlsSTYLE ROOF08/10/2017
load case # 2
shear:
load case # 1
load casse # 2
flexural strength:
load case # 1
load case # 2
362811142.xlsSTYLE ROOF08/10/2017
shear strength
load case # 1 vn=3*vn/2bd
vt=3*vn/2bd
362811142.xlsSTYLE ROOF08/10/2017
bstress
362811142.xlsSTYLE ROOF08/10/2017
design of purlins
specifications:
properties of wood:
type w fb fv e
tanguile 3.60 13.10 1.03 8.62
result:
case# 1
dl+ll governs
362811142.xlsSTYLE ROOF08/10/2017
kpa
moment
mn= ### n-m mt= #VALUE! n-m
shear
kpa vn= ### n-m vt= #VALUE! n-m
flexural stress
fb= ### mpa < fb= #VALUE! mpa
n/m deflection
n/m y allow= l / 180
n/m y actual= ### mm < y allow= #VALUE! mm
n/m
n/m
n/m
n/m
n/m
n/m
362811142.xlsSTYLE ROOF08/10/2017
mn= ### n-m
vn= ### n
vt= ### n
vn= ### n
vt= ### n
fn = ### mpa
ft = ### mpa
fb= ### < ### ok?
fn = ### mpa
ft = ### mpa
fb= ### < ### ok?
.:load case #2 is more critical
362811142.xlsSTYLE ROOF08/10/2017
vn= ### mpa
362811142.xlsSTYLE ROOF08/10/2017
### desig h b tw tf a w xc yc ix
w 175 x 40.2 175 175 7.5 11.0 51.21 40.20 0.00 0.00 2880.00
w 150 x 31.5 150 150 7.0 10.0 40.14 31.50 0.00 0.00 1640.00
w 150 x 21.1 150 100 6.0 9.0 26.84 21.10 0.00 0.00 1020.00
w 150 x 14.0 150 75 5.0 7.0 17.85 14.00 0.00 0.00 666.00
w 125 x 23.8 125 125 6.5 9.0 30.31 23.80 0.00 0.00 847.00
w 125 x 13.2 125 60 6.0 8.0 16.84 13.20 0.00 0.00 413.00
w 100 x 17.2 100 100 6.0 8.0 21.90 17.20 0.00 0.00 383.00
w 100 x 9.3 100 50 5.0 7.0 11.85 9.30 0.00 0.00 187.00
i 200 x 50.4 200 150 9.0 16.0 64.16 50.40 0.00 0.00 4460.00
i 200 x 26.0 200 100 7.0 10.0 33.06 26.00 0.00 0.00 2170.00
i 180 x 23.6 180 100 6.0 10.0 30.06 23.60 0.00 0.00 1670.00
i 150 x 36.2 150 125 8.5 14.0 46.15 36.20 0.00 0.00 1760.00
i 150 x 17.1 150 75 5.5 9.5 21.83 17.10 0.00 0.00 819.00
i 100 x 16.1 125 75 5.5 9.5 20.45 16.10 0.00 0.00 538.00
i 100 x 12.9 100 75 5.0 8.0 16.43 12.90 0.00 0.00 281.00
c 180 x 21.4 180 75 7.0 10.5 27.20 21.40 2.13 0.00 1380.00
c 150 x 24.0 150 75 9.0 12.5 30.59 24.00 2.31 0.00 1050.00
c 150 x 18.6 150 75 6.5 10.0 23.71 18.60 2.28 0.00 861.00
c 125 x 13.4 125 65 6.0 8.0 17.11 13.40 1.90 0.00 424.00
c 100 x 9.4 100 50 5.0 7.5 11.92 9.40 1.54 0.00 188.00
c 75 x 6.9 75 40 5.0 7.0 8.82 6.90 1.28 0.00 75.30
lz 255x90x25x4.7 255 90 4.7 4.7 21.34 16.75 2055.90
lz 255x90x25x4.5 255 90 4.5 4.5 20.49 16.09 1979.60
lz 255x90x25x4.3 255 90 4.3 4.3 19.64 15.42 1902.40
lz 255x90x25x4.0 255 90 4.0 4.0 18.35 14.40 1784.60
362811142.xlsSTYLE ROOF08/10/2017
lz 255x90x25x3.2 255 90 3.2 3.2 14.85 11.65 1459.90
lz 255x90x25x2.9 255 90 2.9 2.9 13.51 10.61 1334.00
lz 220x75x25x4.7 220 75 4.7 4.7 18.29 14.36 1287.70
lz 220x75x25x4.5 220 75 4.5 4.5 17.57 13.79 1241.10
lz 220x75x25x4.3 220 75 4.3 4.3 16.84 13.22 1193.90
lz 220x75x25x4.0 220 75 4.0 4.0 15.75 12.36 1121.60
lz 220x75x25x3.2 220 75 3.2 3.2 12.77 10.02 920.90
lz 220x75x25x2.9 220 75 2.9 2.9 11.63 9.13 842.70
safe lz 220x75x25x2.6 220 75 2.6 2.6 10.48 8.22 762.80
lz 220x75x25x2.3 220 75 2.3 2.3 9.31 7.31 681.20
lz 200x75x25x4.0 200 75 4.0 4.0 14.95 11.73 894.50
safe lz 200x75x25x3.2 200 75 3.2 3.2 12.13 9.52 735.50
lz 200x75x20x4.0 200 75 4.0 4.0 14.55 11.42 870.50
lz 200x75x20x3.2 200 75 3.2 3.2 11.81 9.27 716.20
lz 200x70x20x4.7 200 70 4.7 4.7 16.41 12.88 952.80
safe lz 200x70x20x4.5 200 70 4.5 4.5 15.77 12.38 919.00
lz 200x70x20x4.3 200 70 4.3 4.3 15.12 11.87 884.70
lz 200x70x20x4.0 200 70 4.0 4.0 14.15 11.11 832.10
lz 200x70x20x3.2 200 70 3.2 3.2 11.49 9.02 685.30
lz 200x70x20x2.9 200 70 2.9 2.9 10.47 8.22 627.70
lz 200x70x20x2.6 200 70 2.6 2.6 9.44 7.41 568.80
lz 200x70x20x2.3 200 70 2.3 2.3 8.39 6.59 508.50
lz 200x70x20x2.0 200 70 2.0 2.0 7.34 5.76 446.90
lz 200x70x20x1.8 200 70 1.8 1.8 6.63 5.20 405.00
lz 200x70x20x1.6 200 70 1.6 1.6 5.91 4.64 362.50
lz 185x50x20x3.2 185 50 3.2 3.2 9.73 7.64 464.50
lz 185x50x20x2.3 185 50 2.3 2.3 7.13 5.60 346.90
lz 185x50x20x2.0 185 50 2.0 2.0 6.24 4.90 305.50
lz 175x50x20x4.3 175 50 4.3 4.3 12.33 9.68 519.00
lz 175x50x20x4.0 175 50 4.0 4.0 11.55 9.07 489.50
lz 175x50x20x3.2 175 50 3.2 3.2 9.41 7.38 406.00
lz 175x50x20x2.9 175 50 2.9 2.9 8.58 6.74 372.90
lz 175x50x20x2.6 175 50 2.6 2.6 7.75 6.08 338.70
lz 175x50x20x2.3 175 50 2.3 2.3 6.90 5.41 303.60
lz 175x50x20x2.0 175 50 2.0 2.0 6.04 4.74 267.40
lz 175x50x20x1.8 175 50 1.8 1.8 5.46 4.28 242.80
lz 175x50x20x1.6 175 50 1.6 1.6 4.87 3.82 217.60
lz 150x75x25x4.0 150 75 4.0 4.0 12.95 10.16 454.30
362811142.xlsSTYLE ROOF08/10/2017
lz 150x75x25x3.2 150 75 3.2 3.2 10.53 8.26
lz 150x75x20x4.0 150 75 4.0 4.0 12.55 9.85
lz 150x75x20x3.2 150 75 3.2 3.2 10.21 8.01
lz 150x65x20x4.0 150 65 4.0 4.0 11.75 9.22
lz 150x65x20x3.2 150 65 3.2 3.2 9.57 7.51
lz 150x65x20x2.3 150 65 2.3 2.3 7.01 5.50
lz 150x50x20x3.2 150 50 3.2 3.2 8.61 6.76
lz 150x50x20x2.3 150 50 2.3 2.3 6.32 4.96
lz 150x50x18x4.3 150 50 4.3 4.3 11.08 8.70
lz 150x50x18x4.0 150 50 4.0 4.0 10.39 8.15
lz 150x50x18x3.2 150 50 3.2 3.2 8.48 6.66
lz 150x50x18x2.9 150 50 2.9 2.9 7.74 6.08
lz 150x50x18x2.6 150 50 2.6 2.6 6.99 5.49
lz 150x50x18x2.3 150 50 2.3 2.3 6.23 4.89
lz 150x50x18x2.0 150 50 2.0 2.0 5.46 4.28
lz 150x50x18x1.8 150 50 1.8 1.8 4.94 3.87
lz 150x50x18x1.6 150 50 1.6 1.6 4.41 3.46
lz 125x50x20x4.0 125 50 4.0 4.0 9.55 7.50
lz 125x50x20x3.2 125 50 3.2 3.2 7.81 6.13
lz 125x50x20x2.3 125 50 2.3 2.3 5.78 4.51
lz 125x50x15x4.3 125 50 4.3 4.3 9.75 7.65
lz 125x50x15x4.0 125 50 4.0 4.0 9.15 7.18
lz 125x50x15x3.2 125 50 3.2 3.2 7.49 5.88
lz 125x50x15x2.9 125 50 2.9 2.9 6.84 5.37
lz 125x50x15x2.6 125 50 2.6 2.6 6.19 4.86
lz 125x50x15x2.3 125 50 2.3 2.3 5.52 4.33
lz 125x50x15x2.0 125 50 2.0 2.0 4.84 3.80
lz 125x50x15x1.8 125 50 1.8 1.8 4.38 3.44
lz 125x50x15x1.6 125 50 1.6 1.6 3.91 3.07
362811142.xlsSTYLE ROOF08/10/2017
lz 125x50x15x1.4 125 50 1.4 1.4 3.44 2.70
lz 125x50x15x1.2 125 50 1.2 1.2 2.97 2.33
lz 120x60x20x3.2 120 60 3.2 3.2 8.29 6.51
lz 120x60x20x2.3 120 60 2.3 2.3 6.09 4.78
lz 120x40x20x3.2 120 40 3.2 3.2 7.01 5.50
lz 100x50x15x3.2 100 50 3.2 3.2 6.69 5.25
362811142.xlsSTYLE ROOF08/10/2017
lc 200x75x20x3.2 200 75 3.2 3.2 11.81 9.27
lc 200x70x20x4.7 200 70 4.7 4.7 16.41 12.88
lc 200x70x20x4.5 200 70 4.5 4.5 15.77 12.38
lc 200x70x20x4.3 200 70 4.3 4.3 15.12 11.87
lc 200x70x20x4.0 200 70 4.0 4.0 14.15 11.11
lc 200x70x20x3.2 200 70 3.2 3.2 11.49 9.02
lc 200x70x20x2.9 200 70 2.9 2.9 10.47 8.22
lc 200x70x20x2.6 200 70 2.6 2.6 9.44 7.41
lc 200x70x20x2.3 200 70 2.3 2.3 8.39 6.59
lc 200x70x20x2.0 200 70 2.0 2.0 7.34 5.76
lc 200x70x20x1.8 200 70 1.8 1.8 6.63 5.20
lc 200x70x20x1.6 200 70 1.6 1.6 5.91 4.64
lc 185x50x20x3.2 185 50 3.2 3.2 9.73 7.64
lc 185x50x20x2.3 185 50 2.3 2.3 7.13 5.60
362811142.xlsSTYLE ROOF08/10/2017
lc 185x50x20x2.0 185 50 2.0 2.0 6.24 4.90
lc 175x50x20x4.3 175 50 4.3 4.3 12.33 9.68
lc 175x50x20x4.0 175 50 4.0 4.0 11.55 9.07
lc 175x50x20x3.2 175 50 3.2 3.2 9.41 7.38
lc 175x50x20x2.9 175 50 2.9 2.9 8.58 6.74
lc 175x50x20x2.6 175 50 2.6 2.6 7.75 6.08
lc 175x50x20x2.3 175 50 2.3 2.3 6.90 5.41
lc 175x50x20x2.0 175 50 2.0 2.0 6.04 4.74
lc 175x50x20x1.8 175 50 1.8 1.8 5.46 4.28
lc 175x50x20x1.6 175 50 1.6 1.6 4.87 3.82
lc 150x75x25x4.0 150 75 4.0 4.0 12.95 10.16
lc 150x75x25x3.2 150 75 3.2 3.2 10.53 8.26
lc 150x75x20x4.0 150 75 4.0 4.0 12.55 9.85
lc 150x75x20x3.2 150 75 3.2 3.2 10.21 8.01
lc 150x65x20x4.0 150 65 4.0 4.0 11.75 9.22
lc 150x65x20x3.2 150 65 3.2 3.2 9.57 7.51
lc 150x65x20x2.3 150 65 2.3 2.3 7.01 5.50
lc 150x50x20x3.2 150 50 3.2 3.2 8.61 6.76
lc 150x50x20x2.3 150 50 2.3 2.3 6.32 4.96
lc 150x50x18x4.3 150 50 4.3 4.3 11.08 8.70
lc 150x50x18x4.0 150 50 4.0 4.0 10.39 8.15
lc 150x50x18x3.2 150 50 3.2 3.2 8.48 6.66
lc 150x50x18x2.9 150 50 2.9 2.9 7.74 6.08
lc 150x50x18x2.6 150 50 2.6 2.6 6.99 5.49
lc 150x50x18x2.3 150 50 2.3 2.3 6.23 4.89
lc 150x50x18x2.0 150 50 2.0 2.0 5.46 4.28
lc 150x50x18x1.8 150 50 1.8 1.8 4.94 3.87
lc 150x50x18x1.6 150 50 1.6 1.6 4.41 3.46
lc 125x50x20x4.0 125 50 4.0 4.0 9.55 7.50
lc 125x50x20x3.2 125 50 3.2 3.2 7.81 6.13
lc 125x50x20x2.3 125 50 2.3 2.3 5.75 4.51
lc 125x50x15x4.3 125 50 4.3 4.3 9.75 7.65
lc 125x50x15x4.0 125 50 4.0 4.0 9.15 7.18
lc 125x50x15x3.2 125 50 3.2 3.2 7.49 5.88
lc 125x50x15x2.9 125 50 2.9 2.9 6.84 5.37
lc 125x50x15x2.6 125 50 2.6 2.6 6.19 4.86
lc 125x50x15x2.3 125 50 2.3 2.3 5.52 4.33
lc 125x50x15x2.0 125 50 2.0 2.0 4.84 3.80
362811142.xlsSTYLE ROOF08/10/2017
lc 125x50x15x1.8 125 50 1.8 1.8 4.38 3.44
lc 125x50x15x1.6 125 50 1.6 1.6 3.91 3.07
lc 125x50x15x1.4 125 50 1.4 1.4 3.44 2.70
lc 125x50x15x1.2 125 50 1.2 1.2 2.97 2.33
lc 120x60x20x3.2 120 60 3.2 3.2 8.29 6.51
lc 120x60x20x2.3 120 60 2.3 2.3 6.09 4.78
lc 120x40x20x3.2 120 40 3.2 3.2 7.01 5.50
lc 100x50x15x3.2 100 50 3.2 3.2 6.69 5.25
lc 100x50x15x2.9 100 50 2.9 2.9 6.12 4.80
lc 100x50x15x2.6 100 50 2.6 2.6 5.54 4.35
lc 100x50x15x2.3 100 50 2.3 2.3 4.94 3.88
lc 100x50x15x2.0 100 50 2.0 2.0 4.34 3.40
lc 100x50x15x1.8 100 50 1.8 1.8 3.93 3.08
lc 100x50x15x1.6 100 50 1.6 1.6 3.51 2.76
lc 100x50x15x1.4 100 50 1.4 1.4 3.09 2.43
lc 100x50x15x1.2 100 50 1.2 1.2 2.67 2.09
lc 90x45x15x3.2 90 45 3.2 3.2 6.05 4.75
lc 90x45x15x2.9 90 45 2.9 2.9 5.54 4.35
lc 90x45x15x2.6 90 45 2.6 2.6 5.02 3.94
lc 90x45x15x2.3 90 45 2.3 2.3 4.48 3.52
lc 90x45x15x2.0 90 45 2.0 2.0 3.94 3.09
lc 90x45x15x1.8 90 45 1.8 1.8 3.57 2.80
lc 90x45x15x1.6 90 45 1.6 1.6 3.19 2.51
lc 90x45x15x1.4 90 45 1.4 1.4 2.81 2.21
lc 90x45x15x1.2 90 45 1.2 1.2 2.43 1.90
lc 75x38x15x2.6 75 38 2.6 2.6 4.26 3.35
lc 75x38x15x2.3 75 38 2.3 2.3 3.82 3.00
lc 75x38x15x2.0 75 38 2.0 2.0 3.36 2.64
lc 75x38x15x1.8 75 38 1.8 1.8 3.05 2.39
lc 75x38x15x1.6 75 38 1.6 1.6 2.73 2.14
lc 75x38x15x1.4 75 38 1.4 1.4 2.41 1.89
lc 75x38x15x1.2 75 38 1.2 1.2 2.08 1.63
lc 65x30x15x2.6 65 30 2.6 2.6 3.59 2.81
lc 65x30x15x2.3 65 30 2.3 2.3 3.22 2.53
lc 65x30x15x2.0 65 30 2.0 2.0 2.84 2.23
lc 65x30x15x1.8 65 30 1.8 1.8 2.58 2.02
lc 65x30x15x1.6 65 30 1.6 1.6 2.31 1.82
lc 65x30x15x1.4 65 30 1.4 1.4 2.04 1.60
362811142.xlsSTYLE ROOF08/10/2017
lc 65x30x15x1.2 65 30 1.2 1.2 1.77 1.39
type w fb fv e
apitong 5.40 13.00 1.36 5.76
guijo 6.40 17.10 1.89 6.67
mahogany 5.30 13.00 2.13 3.67
mayapis 3.40 11.00 0.73 8.14
molave 6.50 18.90 2.27 5.15
narra 4.90 14.20 1.51 4.68
lauan 3.50 10.90 1.17 4.59
tanguile 3.60 13.10 1.03 8.62
w.lauan 3.50 11.00 1.03 7.72
yakal 7.30 19.30 1.96 7.70
362811142.xlsSTYLE ROOF08/10/2017
iy sx sy asep bstress
984.00 330.00 112.00 1
563.00 219.00 75.10 1
151.00 138.00 30.10 1
362811142.xlsSTYLE ROOF08/10/2017
242.20 114.50 27.40 1 147.00
223.00 104.63 25.19 1 147.00
199.60 117.06 27.47 1 147.00
193.50 112.83 26.60 1 147.00
187.30 108.53 25.71 1 147.00
177.50 101.96 24.32 1 147.00
149.20 83.72 20.33 1 147.00
137.70 76.61 18.73 1 147.00
125.70 69.34 17.06 1 123.60
113.20 61.93 15.33 1 123.60
177.50 89.46 24.32 1 147.00
149.20 73.55 20.33 1 147.00
157.40 87.05 21.56 1 147.00
132.70 71.62 18.08 1 147.00
145.40 95.28 21.50 1 147.00
141.30 91.91 20.85 1 147.00
136.90 88.47 20.18 1 147.00
130.10 83.21 19.14 1 147.00
110.10 68.53 16.10 1 147.00
101.90 62.77 14.85 1 147.00
93.20 56.88 13.57 1 123.60
84.10 50.85 12.22 1 123.60
47.60 44.69 10.82 1 123.60
68.10 40.50 9.85 1 123.60
61.30 36.25 8.86 1 123.60
44.70 50.21 9.23 1 147.00
34.80 37.50 7.12 1 123.60
31.00 33.03 6.34 1 123.60
54.20 59.32 11.33 1 147.00
51.90 55.94 10.81 1 147.00
44.70 46.40 9.23 1 147.00
41.60 42.61 8.57 1 147.00
38.30 38.71 7.86 1 123.60
34.80 34.70 7.12 1 123.60
31.00 30.56 6.34 1 123.60
28.40 27.75 5.79 1 123.60
25.70 24.87 5.22 1 123.60
177.50 60.57 24.32 1 147.00
362811142.xlsSTYLE ROOF08/10/2017
375.10 149.20 50.01 20.33 1 147.00
443.20 157.40 59.10 21.56 1 147.00
366.30 132.70 48.84 18.08 1 147.00
400.60 106.20 53.41 16.86 1 147.00
331.80 90.20 44.24 14.22 1 147.00
247.70 69.20 33.03 10.83 1 123.60
280.10 44.70 37.34 9.23 1 147.00
210.10 34.80 28.02 7.12 1 123.60
351.10 50.60 46.82 10.58 1 147.00
331.60 48.50 44.22 10.10 1 147.00
276.10 41.90 36.81 8.65 1 147.00
253.90 39.00 33.85 8.04 1 147.00
230.90 36.00 30.79 7.38 1 123.60
207.20 32.70 27.63 6.69 1 123.60
182.80 29.20 24.37 5.96 1 123.60
166.10 26.80 22.14 5.45 1 123.60
149.00 24.20 19.87 4.92 1 123.60
216.70 51.90 34.68 10.81 1 147.00
181.00 44.70 28.97 9.23 1 147.00
136.40 34.80 21.82 7.12 1 123.60
220.50 45.20 35.28 9.46 1 147.00
208.60 43.40 33.38 9.05 1 147.00
174.50 37.70 27.93 7.78 1 147.00
160.80 35.20 25.73 7.24 1 147.00
146.50 32.50 23.45 6.66 1 123.60
131.70 29.50 21.08 6.05 1 123.60
116.40 26.40 18.62 5.40 1 123.60
105.90 24.20 16.94 4.94 1 123.60
95.10 22.00 15.22 4.46 1 123.60
362811142.xlsSTYLE ROOF08/10/2017
84.10 19.60 13.45 3.97 1 123.60
72.80 17.10 11.65 3.46 1 123.60
186.10 72.70 31.01 12.45 1 147.00
139.80 56.00 23.30 9.52 1 123.60
142.40 24.70 23.73 6.44 1 147.00
103.00 37.70 20.60 7.78 1 147.00
362811142.xlsSTYLE ROOF08/10/2017
716.20 83.90 71.62 15.81 1 147.00
952.80 94.10 95.28 18.84 1 147.00
919.00 91.30 91.91 18.28 1 147.00
884.70 88.50 88.47 17.71 1 147.00
832.10 83.90 83.21 16.81 1 147.00
685.30 70.70 68.53 14.18 1 147.00
627.70 65.40 62.77 13.10 1 147.00
568.80 59.70 56.88 11.98 1 123.60
508.50 53.80 50.85 10.80 1 123.60
446.90 47.70 44.69 9.57 1 123.60
405.00 43.40 40.50 8.72 1 123.60
362.50 39.10 36.25 7.85 1 123.60
464.50 30.10 50.21 8.33 1 147.00
346.90 23.30 37.50 6.45 1 123.60
362811142.xlsSTYLE ROOF08/10/2017
305.50 20.80 33.03 5.74 1 123.60
519.00 36.20 59.32 10.12 1 147.00
489.50 34.60 55.94 9.67 1 147.00
406.00 29.60 46.40 8.28 1 147.00
372.90 27.50 42.61 7.70 1 147.00
338.70 25.30 38.71 7.08 1 123.60
303.60 22.90 34.70 6.41 1 123.60
267.40 20.40 30.56 5.71 1 123.60
242.80 18.70 27.75 5.23 1 123.60
217.60 16.90 24.87 4.72 1 123.60
454.30 99.60 60.57 20.55 1 147.00
375.10 83.50 50.01 17.25 1 147.00
443.20 90.70 59.10 18.16 1 147.00
366.30 76.30 48.84 15.29 1 147.00
400.60 63.40 53.41 14.44 1 147.00
331.80 53.70 44.24 12.23 1 147.00
247.70 41.00 33.03 9.36 1 123.60
280.10 28.20 37.34 8.16 1 147.00
210.10 21.80 28.02 6.32 1 123.60
351.10 32.60 46.82 9.30 1 147.00
331.60 31.20 44.22 8.89 1 147.00
276.10 26.80 36.81 7.64 1 147.00
253.90 24.90 33.85 7.11 1 147.00
230.90 22.90 30.79 6.54 1 123.60
207.20 20.80 27.63 5.94 1 123.60
182.80 18.50 24.37 5.30 1 123.60
166.10 17.00 22.14 4.85 1 123.60
149.00 15.30 19.87 4.38 1 123.60
216.70 30.90 34.68 9.32 1 147.00
181.00 26.50 28.97 8.00 1 147.00
136.40 20.60 21.82 6.21 1 123.60
220.50 28.10 35.28 8.12 1 147.00
208.60 26.90 33.38 7.78 1 147.00
174.50 23.20 27.93 6.73 1 147.00
160.80 21.60 25.73 6.27 1 147.00
146.50 19.90 23.45 5.78 1 123.60
131.70 18.10 21.08 5.26 1 123.60
116.40 16.20 18.62 4.70 1 123.60
362811142.xlsSTYLE ROOF08/10/2017
105.90 14.80 16.94 4.30 1 123.60
95.10 13.40 15.22 3.89 1 123.60
84.10 11.90 13.45 3.47 1 123.60
72.80 10.40 11.65 3.02 1 123.60
186.10 40.80 31.01 10.52 1 147.00
139.80 31.30 23.30 8.09 1 123.60
142.40 15.20 23.73 5.68 1 147.00
103.00 21.50 20.60 6.54 1 147.00
95.10 20.00 19.02 6.10 1 147.00
86.80 18.40 17.37 5.63 1 123.60
78.20 16.80 15.64 5.12 1 123.60
69.20 15.00 13.85 4.57 1 123.60
63.00 13.70 12.61 4.19 1 123.60
56.70 12.40 11.34 3.79 1 123.60
50.20 11.10 10.04 3.38 1 123.60
43.50 9.60 8.71 2.95 1 123.60
74.40 15.90 16.52 5.45 1 147.00
68.80 14.80 15.29 5.10 1 147.00
62.90 13.70 13.98 4.71 1 123.60
56.80 12.50 12.62 4.30 1 123.60
50.40 11.20 11.19 3.85 1 123.60
45.90 10.30 10.21 3.53 1 123.60
41.40 9.30 9.19 3.20 1 123.60
36.70 8.30 8.15 2.86 1 123.60
31.80 7.20 7.07 2.50 1 123.60
36.20 8.50 9.66 3.55 1 123.60
32.80 7.70 8.75 3.25 1 123.60
29.20 7.00 7.79 2.92 1 123.60
26.70 6.40 7.12 2.69 1 123.60
24.10 5.80 6.43 2.45 1 123.60
21.40 5.20 5.71 2.19 1 123.60
18.60 4.60 4.97 1.92 1 123.60
21.70 4.50 6.68 2.43 1 123.60
19.80 4.10 6.08 2.24 1 123.60
17.70 3.70 5.44 2.03 1 123.60
16.20 3.50 4.99 1.88 1 123.60
14.70 3.20 4.52 1.71 1 123.60
13.10 2.80 4.02 1.54 1 123.60
362811142.xlsSTYLE ROOF08/10/2017
11.40 2.50 3.51 1.35 1 123.60
362811142.xlsSTYLE ROOF08/10/2017
roofing .4 mm const bid cost/unit total bid cost summary roof estimates
r-span
r-span roof
roof long span #VALUE! #VALUE! project: long span sheets long spanp uyat st eel
qty: 0.00 sqm pcf #VALUE! project: thickness effective purlins sheet
project cost 7.50% 1.0 direct cost amount in pesos pct wt. of total purlin sp.= 0.60 style mm width m spacing cost/lm
labor unit cost 180.00 - - proj.supervision 5.00% 1.1 labor #VALUE! #VALUE! rectangular area 1 (left dk) long span puyat r span. purlin spacing (m) no of pcs tekscrew per total tekscrew
equipment unit cost #VALUE! #VALUE! constn facilities 2.50% 1.2 direct equipment 0.00 #VALUE! #VALUE! Purlin length Area Qty area 1 (sqm) height (m) width (m) effective length (m) effective width (m) steel purlins sheets width length (pcs) pcs
material unit cost #VALUE! indirect eqpt 0% 1.3 materials #VALUE! #VALUE! 0.00 - 1.00 - 1.07 0.60 0.00 2 0.00 0
roofing unit cost sub con #VALUE! miscellaneous 0% 1.4 subcontract #VALUE! #VALUE! #VALUE! 0
total cost #VALUE! others 0% #VALUE! 72.50 #VALUE! rectangular area 1 (left dk) long span puyat r span. purlin spacing (m) no of pcs tekscrew per total tekscrew ###
duration - indirect cost 20% area 1 (sqm) height (m) width (m) effective length (m) effective width (m) steel purlins sheets width length (pcs) pcs ###
crew crew bonds premiums 0% 2.0 project cost 0.00 - 1.00 - 1.07 0.60 0.00 2 0.00 0
labor 1 400.00 1.0 insurance premiums 0% 0
carpenter 1 500.00 escalation 0% 2.1 project supervision #VALUE! 5.0% #VALUE! rectangular area 1 (left dk) long span puyat r span. purlin spacing (m) no of pcs tekscrew per total tekscrew ###
cost of money 3% 2.2 construction facilities #VALUE! 2.5% #VALUE! area 1 (sqm) height (m) width (m) effective length (m) effective width (m) steel purlins sheets width length (pcs) pcs ###
equipment contingencies 5% 2.3 indirect equipment #VALUE! 0.0% #VALUE! 0.00 - - 1.07 0.60 0.00 2 0.00 0
contractor tax 2% 2.4 miscellaneous #VALUE! 0.0% #VALUE! 0
profit 10.0% #VALUE! 7.5% #VALUE! rectangular area 1 (left dk) long span puyat r span. purlin spacing (m) no of pcs tekscrew per total tekscrew ### tile span elite 0.4 1.077 0.30 434.65
total 27.5% area 1 (sqm) height (m) width (m) effective length (m) effective width (m) steel purlins sheets width length (pcs) pcs ### tile span maxi 0.4 1.077 0.35 402.45
bill of materials 3.0 other costs #VALUE! 0.0% #VALUE! 0.00 - - 1.07 0.60 0.00 2 0.00 0 0.5 1.077 0.35 461.59
description qty unit unit cost amount #VALUE! 0.0% #VALUE! 0 0.6 1.077 0.35 536.47
0 r - span 1220 0.4 1.074 0.70 * 210.27
r-span roof - sqm 253.00 - 4.0 indirect cost rectangular area 2 long span puyat r span. purlin spacing (m) no of pcs tekscrew per total tekscrew ### 0.5 1.074 0.70 *
tekscrew #VALUE! pcs 1.85 #VALUE! area 1 (sqm) height (m) width (m) effective length (m) effective width (m) steel purlins sheets width length (pcs) pcs ### 0.6 1.074 0.70 *
gutter spanish fab .4mm x .457 m x 8 ft #N/A pcs 340.00 #N/A 4.1 bonds premium #VALUE! 0.0% #VALUE! 0.00 - - 1.07 0.60 0.00 2 0.00 0 r - span 916 0.4 1.074 0.70 * 326
ridge roll .4mm x .6 m x 8 ft #N/A pcs 227.00 #N/A 4.2 insurance premium #VALUE! 0.0% #VALUE! 0 0.5 1.074 0.70 *
valley gutter fab .4mm x .457 m x 8 ft #N/A pcs 255.00 #N/A 4.3 escalation #VALUE! 0.0% #VALUE! 0 0.6 1.074 0.70 *
end flashing fab 4mm x .305 m x 8 ft #N/A pcs 340.00 #N/A 4.4 cost of money #VALUE! 3.0% #VALUE! 0 super r - span 0.4 1.05 0.70 * 332.79
side wall flashing fab 4mm x .305 m x 8 #N/A pcs 170.00 #N/A 4.5 contingencies #VALUE! 5.0% #VALUE! rectangular area 3 long span puyat r span. purlin spacing (m) no of pcs tekscrew per total tekscrew ### 0.5 1.05 0.70 *
stainless gutter #N/A pcs 1,200.00 #N/A 4.6 contractor's tax #VALUE! 2.0% #VALUE! area 1 (sqm) height (m) width (m) effective length (m) effective width (m) steel purlins sheets width length (pcs) pcs ### 0.6 1.05 0.70 *
sleeves 3" dia pcs 50.00 - 4.7 profit #VALUE! 10.0% #VALUE! 0.00 - - 1.07 0.60 0.00 2 0.00 0 mega r - span 0.4 0.67 0.70 * 215.62
concrete nail 1" kg 75.00 - #VALUE! 20.0% #VALUE! 0 0.5 0.67 0.70 *
touch up paint - gal 515.00 - 0 0.6 0.67 0.70 *
silicon #VALUE! tube 120.00 #VALUE! #VALUE! #VALUE! rectangular area 4 long span puyat r span. purlin spacing (m) no of pcs tekscrew per total tekscrew ### multi r - span 0.3 1 0.70 *
rivets #VALUE! pcs 0.50 #VALUE! area 1 (sqm) height (m) width (m) effective length (m) effective width (m) steel purlins sheets width length (pcs) pcs ### 0.4 1 0.70 * 221.73
0.00 - - 1.07 0.60 0.00 2 0.00 0 0.5 1 0.70 *
total #VALUE! 0 0.6 1 0.70 *
0 corspan 915 0.3 0.998 0.70 *
labor cost computation: 0 0.4 0.998 0.70 * 208.2
0 0.5 0.998 0.70 *
0 0.6 0.998 0.70 *
installation 5 sqm/man day 5 sqm/day triangular area 1(front) long span puyat r span. purlin spacing (m) no of pcs tekscrew per total tekscrew ### corspan 915 0.3 0.998 0.70 *
area 1 (sqm) height (m) width (m) effective length (m) effective width (m) steel purlins sheets width length (pcs) pcs ### 0.4 0.998 0.70 * 290.05
0.00 - 1.00 - 1.07 0.60 0.00 2 0.00 0 0.5 0.998 0.70 *
0 0.6 0.998 0.70 *
0 mega clad 0.4 1 0.70 *
5 sqm/day triangular area 2 (rear) long span puyat r span. purlin spacing (m) no of pcs tekscrew per total tekscrew ### 0.5 1 0.70 *
area 1 (sqm) height (m) width (m) effective length (m) effective width (m) steel purlins sheets width length (pcs) pcs ### 0.6 1 0.70 *
0.00 - 1.00 - 1.07 0.60 0.00 2 0.00 0
material computation: 0 madrid tile roof 0.4 0.71 0.30 355.74
0 0.5 0.71 0.30
see roofing sheet triangular area 3 (left dk) long span puyat r span. purlin spacing (m) no of pcs tekscrew per total tekscrew ### 0.6 0.71 0.30
area 1 (sqm) height (m) width (m) effective length (m) effective width (m) steel purlins sheets width length (pcs) pcs ###
0.00 - - 1.07 0.60 0.00 2 0.00 0
0
0
triangular area 4 (right dk) long span puyat r span. purlin spacing (m) no of pcs tekscrew per total tekscrew ###
area 1 (sqm) height (m) width (m) effective length (m) effective width (m) steel purlins sheets width length (pcs) pcs ###
0.00 - - 1.07 0.60 0.00 2 0.00 0
0
0
0
0
0
trapezoidal 1 (left) long span puyat r span. purlin spacing (m) no of pcs tekscrew per total tekscrew ###
area 1 (sqm) height (m) width short (m) width long (m) effective length (m) effective width (m) steel purlins sheets width length (pcs) pcs ###
0.00 - - 1.07 0.60 0.00 2 0.00 0
0
0
trapezoidal 2 (right) long span puyat r span. purlin spacing (m) no of pcs tekscrew per total tekscrew ###
area 1 (sqm) height (m) width short (m) width long (m) effective length (m) effective width (m) steel purlins sheets width length (pcs) pcs ###
0.00 - - 1.07 0.60 0.00 2 0.00 0
0
0
trapezoidal 3 (front dk) long span puyat r span. purlin spacing (m) no of pcs tekscrew per total tekscrew ###
area 1 (sqm) height (m) width short (m) width long (m) effective length (m) effective width (m) steel purlins sheets width length (pcs) pcs ###
0.00 - - 1.07 0.60 0.00 2 0.00 0
0
0
trapezoidal 4 (rear dk) long span puyat r span. purlin spacing (m) no of pcs tekscrew per total tekscrew ###
area 1 (sqm) height (m) width short (m) width long (m) effective length (m) effective width (m) steel purlins sheets width length (pcs) pcs ###
0.00 - - 1.07 0.60 0.00 2 0.00 0
0
0
0
0
triangular area 5 (front) long span puyat r span. purlin spacing (m) no of pcs tekscrew per total tekscrew ###
area 1 (sqm) height (m) width (m) effective length (m) effective width (m) steel purlins sheets width length (pcs) pcs ###
0.00 - - 1.07 0.60 0.00 2 0.00 0
0
0
triangular area 6 (left) long span puyat r span. purlin spacing (m) no of pcs tekscrew per total tekscrew ###
area 1 (sqm) height (m) width (m) effective length (m) effective width (m) steel purlins sheets width length (pcs) pcs ###
0.00 - - 1.07 0.60 0.00 2 0.00 0
0
0
triangular area 7 (right) long span puyat r span. purlin spacing (m) no of pcs tekscrew per total tekscrew ###
area 1 (sqm) height (m) width (m) effective length (m) effective width (m) steel purlins sheets width length (pcs) pcs ###
0.00 - - 1.07 0.60 0.00 2 0.00 0
0
0
triangular area 8 (rear) long span puyat r span. purlin spacing (m) no of pcs tekscrew per total tekscrew ###
area 1 (sqm) height (m) width (m) effective length (m) effective width (m) steel purlins sheets width length (pcs) pcs ###
0.00 - - 1.07 0.60 0.00 2 0.00 0
0
0
triangular area 8 (rear) long span puyat r span. purlin spacing (m) no of pcs tekscrew per total tekscrew ###
area 1 (sqm) height (m) width (m) effective length (m) effective width (m) steel purlins sheets width length (pcs) pcs ###
0.00 - - 1.07 0.60 0.00 2 0.00 0
0
triangular area 8 (rear) long span puyat r span. purlin spacing (m) no of pcs tekscrew per total tekscrew ###
area 1 (sqm) height (m) width (m) effective length (m) effective width (m) steel purlins sheets width length (pcs) pcs ###
0.00 - - 1.07 0.60 0.00 2 0.00 0
0
triangular area 8 (rear) long span puyat r span. purlin spacing (m) no of pcs tekscrew per total tekscrew ###
area 1 (sqm) height (m) width (m) effective length (m) effective width (m) steel purlins sheets width length (pcs) pcs ###
0.00 - - 1.07 0.60 0.00 2 0.00 0
0
triangular area 8 (rear) long span puyat r span. purlin spacing (m) no of pcs tekscrew per total tekscrew ###
area 1 (sqm) height (m) width (m) effective length (m) effective width (m) steel purlins sheets width length (pcs) pcs ###
0.00 - - 1.07 0.60 0.00 2 0.00 0
wn = #VALUE! n/m
wt = #VALUE! n/m
load case # 1 .75(d+l+w)
wn = #VALUE! n/m
wt = #VALUE! n/m
load casse # 2
mn=wn(
2
mn= #VALUE!
fby =
###
mpa
load case # 2 ###
mpa
fbx =
fy=
fby = #VALUE!
2.86
b/2tf =
b/2tf < 170/sqrt(fy)
170/(fy)1/2 = ### compact!!!
### mpa
mpa
fbx=0.66fy
fby=0.60fy ###
check interaction equation < 1.0 safe
load case # 2
load case #1 critical
54.5981500331
#VALUE! mm
check deflection:
yt=5wtl4/384eiy 81
a 6.0 length of front side m design of purlins ### desig h b tw tf a w xc yc ix iy sx sy asep bstress
b 6.0 length of letf side m w 175 x 40.2 175 175 7.5 11.0 51.21 40.20 0.00 0.00 2880.00 984.00 330.00 112.00 1
c 6.0 length of right side m name of building : sample w 150 x 31.5 150 150 7.0 10.0 40.14 31.50 0.00 0.00 1640.00 563.00 219.00 75.10 1
d 6.0 length of right side m purlin designation : p-1 w 150 x 21.1 150 100 6.0 9.0 26.84 21.10 0.00 0.00 1020.00 151.00 138.00 30.10 1
e #VALUE! spacing between purlins m w 150 x 14.0 150 75 5.0 7.0 17.85 14.00 0.00 0.00 666.00 49.50 88.80 13.20 1
f #VALUE! spacing between truss m specifications: w 125 x 23.8 125 125 6.5 9.0 30.31 23.80 0.00 0.00 847.00 293.00 136.00 47.00 1
g 1.2 height of truss m w 125 x 13.2 125 60 6.0 8.0 16.84 13.20 0.00 0.00 413.00 29.20 66.10 9.70 1
h 6.0 length of truss m w 100 x 17.2 100 100 6.0 8.0 21.90 17.20 0.00 0.00 383.00 134.00 76.50 26.70 1
i 0.65 length of eaves m slope of roofing : 0.40 w 100 x 9.3 100 50 5.0 7.0 11.85 9.30 0.00 0.00 187.00 14.80 37.50 5.90 1
j #VALUE! weight of roofing kpa spacing of truss : 1.20 m i 200 x 50.4 200 150 9.0 16.0 64.16 50.40 0.00 0.00 4460.00 753.00 446.00 10.00 1
k #VALUE! weight of wood cum spacing of purlins : 0.60 m i 200 x 26.0 200 100 7.0 10.0 33.06 26.00 0.00 0.00 2170.00 138.00 217.00 27.70 1
l #VALUE! ll < or =30sqm pa weight of roofing : 77.00 pa i 180 x 23.6 180 100 6.0 10.0 30.06 23.60 0.00 0.00 1670.00 138.00 186.00 27.50 1
m #VALUE! p height of roof<6 m pa other vertical loads : 800.00 pa i 150 x 36.2 150 125 8.5 14.0 46.15 36.20 0.00 0.00 1760.00 385.00 235.00 61.60 1
o #VALUE! slope wind load (normal projection) : 603.00 pa i 150 x 17.1 150 75 5.5 9.5 21.83 17.10 0.00 0.00 819.00 57.50 109.00 15.30 1
#VALUE! arctan i 100 x 16.1 125 75 5.5 9.5 20.45 16.10 0.00 0.00 538.00 57.50 86.00 15.30 1
#VALUE! angle properties of wood: i 100 x 12.9 100 75 5.0 8.0 16.43 12.90 0.00 0.00 281.00 47.30 56.20 12.60 1
yeild strength of steel mpa c 180 x 21.4 180 75 7.0 10.5 27.20 21.40 2.13 0.00 1380.00 131.00 153.00 24.30 1
e #VALUE! modulus of elasticity gpa type w fb fv e c 150 x 24.0 150 75 9.0 12.5 30.59 24.00 2.31 0.00 1050.00 147.00 140.00 28.30 1
trial section tanguile 3.60 13.10 1.03 8.62 c 150 x 18.6 150 75 6.5 10.0 23.71 18.60 2.28 0.00 861.00 117.00 115.00 22.40 1
b (mm) d (mm) c 125 x 13.4 125 65 6.0 8.0 17.11 13.40 1.90 0.00 424.00 61.80 67.80 13.40 1
#VALUE! #VALUE! suggested section: b (mm) d (mm) c 100 x 9.4 100 50 5.0 7.5 11.92 9.40 1.54 0.00 188.00 26.00 37.60 7.50 1
50.00 50.00 c 75 x 6.9 75 40 5.0 7.0 8.82 6.90 1.28 0.00 75.30 12.20 20.10 4.50 1
computation: lz 255x90x25x4.7 255 90 4.7 4.7 21.34 16.75 2055.90 328.10 161.25 37.43 1 147.00
result: lz 255x90x25x4.5 255 90 4.5 4.5 20.49 16.09 1979.60 317.60 155.27 36.20 1 147.00
design loads: case# 1 lz 255x90x25x4.3 255 90 4.3 4.3 19.64 15.42 1902.40 306.80 149.21 34.93 1 147.00
1.dead loads dl+ll governs lz 255x90x25x4.0 255 90 4.0 4.0 18.35 14.40 1784.60 290.10 139.97 32.97 1 147.00
wt of roofing dl ### kpa lz 255x90x25x3.2 255 90 3.2 3.2 14.85 11.65 1459.90 242.20 114.50 27.40 1 147.00
moment lz 255x90x25x2.9 255 90 2.9 2.9 13.51 10.61 1334.00 223.00 104.63 25.19 1 147.00
mn= ### n-m mt= #VALUE! n-m lz 220x75x25x4.7 220 75 4.7 4.7 18.29 14.36 1287.70 199.60 117.06 27.47 1 147.00
lz 220x75x25x4.5 220 75 4.5 4.5 17.57 13.79 1241.10 193.50 112.83 26.60 1 147.00
2.live loads shear lz 220x75x25x4.3 220 75 4.3 4.3 16.84 13.22 1193.90 187.30 108.53 25.71 1 147.00
ll ### kpa vn= ### n-m vt= #VALUE! n-m lz 220x75x25x4.0 220 75 4.0 4.0 15.75 12.36 1121.60 177.50 101.96 24.32 1 147.00
lz 220x75x25x3.2 220 75 3.2 3.2 12.77 10.02 920.90 149.20 83.72 20.33 1 147.00
flexural stress lz 220x75x25x2.9 220 75 2.9 2.9 11.63 9.13 842.70 137.70 76.61 18.73 1 147.00
3.wind loads fb= ### mpa < fb= #VALUE! mpa safe lz 220x75x25x2.6 220 75 2.6 2.6 10.48 8.22 762.80 125.70 69.34 17.06 1 123.60
design winds: lz 220x75x25x2.3 220 75 2.3 2.3 9.31 7.31 681.20 113.20 61.93 15.33 1 123.60
wl ### kpa shear stress lz 200x75x25x4.0 200 75 4.0 4.0 14.95 11.73 894.50 177.50 89.46 24.32 1 147.00
fv= ### mpa < fv= 1.03 mpa safe lz 200x75x25x3.2 200 75 3.2 3.2 12.13 9.52 735.50 149.20 73.55 20.33 1 147.00
normal loads: wn lz 200x75x20x4.0 200 75 4.0 4.0 14.55 11.42 870.50 157.40 87.05 21.56 1 147.00
dln = ### n/m deflection lz 200x75x20x3.2 200 75 3.2 3.2 11.81 9.27 716.20 132.70 71.62 18.08 1 147.00
lln = ### n/m y allow= l / 180 lz 200x70x20x4.7 200 70 4.7 4.7 16.41 12.88 952.80 145.40 95.28 21.50 1 147.00
wln = ### n/m y actual= ### mm < y allow= #VALUE! mm safe lz 200x70x20x4.5 200 70 4.5 4.5 15.77 12.38 919.00 141.30 91.91 20.85 1 147.00
lz 200x70x20x4.3 200 70 4.3 4.3 15.12 11.87 884.70 136.90 88.47 20.18 1 147.00
tangential loads: lz 200x70x20x4.0 200 70 4.0 4.0 14.15 11.11 832.10 130.10 83.21 19.14 1 147.00
dlt = ### n/m lz 200x70x20x3.2 200 70 3.2 3.2 11.49 9.02 685.30 110.10 68.53 16.10 1 147.00
lln = ### n/m lz 200x70x20x2.9 200 70 2.9 2.9 10.47 8.22 627.70 101.90 62.77 14.85 1 147.00
lz 200x70x20x2.6 200 70 2.6 2.6 9.44 7.41 568.80 93.20 56.88 13.57 1 123.60
lz 200x70x20x2.3 200 70 2.3 2.3 8.39 6.59 508.50 84.10 50.85 12.22 1 123.60
load case # 1 d+l lz 200x70x20x2.0 200 70 2.0 2.0 7.34 5.76 446.90 47.60 44.69 10.82 1 123.60
wn = ### n/m lz 200x70x20x1.8 200 70 1.8 1.8 6.63 5.20 405.00 68.10 40.50 9.85 1 123.60
wt = ### n/m lz 200x70x20x1.6 200 70 1.6 1.6 5.91 4.64 362.50 61.30 36.25 8.86 1 123.60
lz 185x50x20x3.2 185 50 3.2 3.2 9.73 7.64 464.50 44.70 50.21 9.23 1 147.00
load casse # 2 .75(d+l+w) lz 185x50x20x2.3 185 50 2.3 2.3 7.13 5.60 346.90 34.80 37.50 7.12 1 123.60
wn = ### n/m lz 185x50x20x2.0 185 50 2.0 2.0 6.24 4.90 305.50 31.00 33.03 6.34 1 123.60
wt = ### n/m lz 175x50x20x4.3 175 50 4.3 4.3 12.33 9.68 519.00 54.20 59.32 11.33 1 147.00
lz 175x50x20x4.0 175 50 4.0 4.0 11.55 9.07 489.50 51.90 55.94 10.81 1 147.00
moments: lz 175x50x20x3.2 175 50 3.2 3.2 9.41 7.38 406.00 44.70 46.40 9.23 1 147.00
2 lz 175x50x20x2.9 175 50 2.9 2.9 8.58 6.74 372.90 41.60 42.61 8.57 1 147.00
load case # 1 mn=wn(l)/8 lz 175x50x20x2.6 175 50 2.6 2.6 7.75 6.08 338.70 38.30 38.71 7.86 1 123.60
mn= ### n-m lz 175x50x20x2.3 175 50 2.3 2.3 6.90 5.41 303.60 34.80 34.70 7.12 1 123.60
lz 175x50x20x2.0 175 50 2.0 2.0 6.04 4.74 267.40 31.00 30.56 6.34 1 123.60
mn=wt(l)2/8 lz 175x50x20x1.8 175 50 1.8 1.8 5.46 4.28 242.80 28.40 27.75 5.79 1 123.60
mt= ### n-m lz 175x50x20x1.6 175 50 1.6 1.6 4.87 3.82 217.60 25.70 24.87 5.22 1 123.60
lz 150x75x25x4.0 150 75 4.0 4.0 12.95 10.16 454.30 177.50 60.57 24.32 1 147.00
load case # 2 lz 150x75x25x3.2 150 75 3.2 3.2 10.53 8.26 375.10 149.20 50.01 20.33 1 147.00
mn= ### n-m lz 150x75x20x4.0 150 75 4.0 4.0 12.55 9.85 443.20 157.40 59.10 21.56 1 147.00
lz 150x75x20x3.2 150 75 3.2 3.2 10.21 8.01 366.30 132.70 48.84 18.08 1 147.00
mt= ### n-m lz 150x65x20x4.0 150 65 4.0 4.0 11.75 9.22 400.60 106.20 53.41 16.86 1 147.00
lz 150x65x20x3.2 150 65 3.2 3.2 9.57 7.51 331.80 90.20 44.24 14.22 1 147.00
shear: lz 150x65x20x2.3 150 65 2.3 2.3 7.01 5.50 247.70 69.20 33.03 10.83 1 123.60
load case # 1 vn= ### n lz 150x50x20x3.2 150 50 3.2 3.2 8.61 6.76 280.10 44.70 37.34 9.23 1 147.00
lz 150x50x20x2.3 150 50 2.3 2.3 6.32 4.96 210.10 34.80 28.02 7.12 1 123.60
vt= ### n lz 150x50x18x4.3 150 50 4.3 4.3 11.08 8.70 351.10 50.60 46.82 10.58 1 147.00
lz 150x50x18x4.0 150 50 4.0 4.0 10.39 8.15 331.60 48.50 44.22 10.10 1 147.00
load casse # 2 vn= ### n lz 150x50x18x3.2 150 50 3.2 3.2 8.48 6.66 276.10 41.90 36.81 8.65 1 147.00
lz 150x50x18x2.9 150 50 2.9 2.9 7.74 6.08 253.90 39.00 33.85 8.04 1 147.00
vt= ### n lz 150x50x18x2.6 150 50 2.6 2.6 6.99 5.49 230.90 36.00 30.79 7.38 1 123.60
flexural strength: lz 150x50x18x2.3 150 50 2.3 2.3 6.23 4.89 207.20 32.70 27.63 6.69 1 123.60
lz 150x50x18x2.0 150 50 2.0 2.0 5.46 4.28 182.80 29.20 24.37 5.96 1 123.60
load case # 1 lz 150x50x18x1.8 150 50 1.8 1.8 4.94 3.87 166.10 26.80 22.14 5.45 1 123.60
lz 150x50x18x1.6 150 50 1.6 1.6 4.41 3.46 149.00 24.20 19.87 4.92 1 123.60
fn = ### mpa lz 125x50x20x4.0 125 50 4.0 4.0 9.55 7.50 216.70 51.90 34.68 10.81 1 147.00
lz 125x50x20x3.2 125 50 3.2 3.2 7.81 6.13 181.00 44.70 28.97 9.23 1 147.00
ft = ### mpa lz 125x50x20x2.3 125 50 2.3 2.3 5.78 4.51 136.40 34.80 21.82 7.12 1 123.60
fb= ### < ### ok? lz 125x50x15x4.3 125 50 4.3 4.3 9.75 7.65 220.50 45.20 35.28 9.46 1 147.00
lz 125x50x15x4.0 125 50 4.0 4.0 9.15 7.18 208.60 43.40 33.38 9.05 1 147.00
load case # 2 lz 125x50x15x3.2 125 50 3.2 3.2 7.49 5.88 174.50 37.70 27.93 7.78 1 147.00
lz 125x50x15x2.9 125 50 2.9 2.9 6.84 5.37 160.80 35.20 25.73 7.24 1 147.00
fn = ### mpa lz 125x50x15x2.6 125 50 2.6 2.6 6.19 4.86 146.50 32.50 23.45 6.66 1 123.60
lz 125x50x15x2.3 125 50 2.3 2.3 5.52 4.33 131.70 29.50 21.08 6.05 1 123.60
ft = ### mpa lz 125x50x15x2.0 125 50 2.0 2.0 4.84 3.80 116.40 26.40 18.62 5.40 1 123.60
fb= ### < ### ok? lz 125x50x15x1.8 125 50 1.8 1.8 4.38 3.44 105.90 24.20 16.94 4.94 1 123.60
.: load c ase #2 is more c ritic al lz 125x50x15x1.6 125 50 1.6 1.6 3.91 3.07 95.10 22.00 15.22 4.46 1 123.60
lz 125x50x15x1.4 125 50 1.4 1.4 3.44 2.70 84.10 19.60 13.45 3.97 1 123.60
lz 125x50x15x1.2 125 50 1.2 1.2 2.97 2.33 72.80 17.10 11.65 3.46 1 123.60
shear strength lz 120x60x20x3.2 120 60 3.2 3.2 8.29 6.51 186.10 72.70 31.01 12.45 1 147.00
load case # 1 vn=3*vn/2bd lz 120x60x20x2.3 120 60 2.3 2.3 6.09 4.78 139.80 56.00 23.30 9.52 1 123.60
vn= ### mpa lz 120x40x20x3.2 120 40 3.2 3.2 7.01 5.50 142.40 24.70 23.73 6.44 1 147.00
vt=3*vn/2bd lz 100x50x15x3.2 100 50 3.2 3.2 6.69 5.25 103.00 37.70 20.60 7.78 1 147.00
lc 200x75x20x3.2 200 75 3.2 3.2 11.81 9.27 716.20 83.90 71.62 15.81 1 147.00
lc 200x70x20x4.7 200 70 4.7 4.7 16.41 12.88 952.80 94.10 95.28 18.84 1 147.00
lc 200x70x20x4.5 200 70 4.5 4.5 15.77 12.38 919.00 91.30 91.91 18.28 1 147.00
lc 200x70x20x4.3 200 70 4.3 4.3 15.12 11.87 884.70 88.50 88.47 17.71 1 147.00
lc 200x70x20x4.0 200 70 4.0 4.0 14.15 11.11 832.10 83.90 83.21 16.81 1 147.00
lc 200x70x20x3.2 200 70 3.2 3.2 11.49 9.02 685.30 70.70 68.53 14.18 1 147.00
lc 200x70x20x2.9 200 70 2.9 2.9 10.47 8.22 627.70 65.40 62.77 13.10 1 147.00
lc 200x70x20x2.6 200 70 2.6 2.6 9.44 7.41 568.80 59.70 56.88 11.98 1 123.60
lc 200x70x20x2.3 200 70 2.3 2.3 8.39 6.59 508.50 53.80 50.85 10.80 1 123.60
lc 200x70x20x2.0 200 70 2.0 2.0 7.34 5.76 446.90 47.70 44.69 9.57 1 123.60
lc 200x70x20x1.8 200 70 1.8 1.8 6.63 5.20 405.00 43.40 40.50 8.72 1 123.60
lc 200x70x20x1.6 200 70 1.6 1.6 5.91 4.64 362.50 39.10 36.25 7.85 1 123.60
lc 185x50x20x3.2 185 50 3.2 3.2 9.73 7.64 464.50 30.10 50.21 8.33 1 147.00
lc 185x50x20x2.3 185 50 2.3 2.3 7.13 5.60 346.90 23.30 37.50 6.45 1 123.60
lc 185x50x20x2.0 185 50 2.0 2.0 6.24 4.90 305.50 20.80 33.03 5.74 1 123.60
lc 175x50x20x4.3 175 50 4.3 4.3 12.33 9.68 519.00 36.20 59.32 10.12 1 147.00
lc 175x50x20x4.0 175 50 4.0 4.0 11.55 9.07 489.50 34.60 55.94 9.67 1 147.00
lc 175x50x20x3.2 175 50 3.2 3.2 9.41 7.38 406.00 29.60 46.40 8.28 1 147.00
lc 175x50x20x2.9 175 50 2.9 2.9 8.58 6.74 372.90 27.50 42.61 7.70 1 147.00
lc 175x50x20x2.6 175 50 2.6 2.6 7.75 6.08 338.70 25.30 38.71 7.08 1 123.60
lc 175x50x20x2.3 175 50 2.3 2.3 6.90 5.41 303.60 22.90 34.70 6.41 1 123.60
lc 175x50x20x2.0 175 50 2.0 2.0 6.04 4.74 267.40 20.40 30.56 5.71 1 123.60
lc 175x50x20x1.8 175 50 1.8 1.8 5.46 4.28 242.80 18.70 27.75 5.23 1 123.60
lc 175x50x20x1.6 175 50 1.6 1.6 4.87 3.82 217.60 16.90 24.87 4.72 1 123.60
lc 150x75x25x4.0 150 75 4.0 4.0 12.95 10.16 454.30 99.60 60.57 20.55 1 147.00
lc 150x75x25x3.2 150 75 3.2 3.2 10.53 8.26 375.10 83.50 50.01 17.25 1 147.00
lc 150x75x20x4.0 150 75 4.0 4.0 12.55 9.85 443.20 90.70 59.10 18.16 1 147.00
lc 150x75x20x3.2 150 75 3.2 3.2 10.21 8.01 366.30 76.30 48.84 15.29 1 147.00
lc 150x65x20x4.0 150 65 4.0 4.0 11.75 9.22 400.60 63.40 53.41 14.44 1 147.00
lc 150x65x20x3.2 150 65 3.2 3.2 9.57 7.51 331.80 53.70 44.24 12.23 1 147.00
lc 150x65x20x2.3 150 65 2.3 2.3 7.01 5.50 247.70 41.00 33.03 9.36 1 123.60
lc 150x50x20x3.2 150 50 3.2 3.2 8.61 6.76 280.10 28.20 37.34 8.16 1 147.00
lc 150x50x20x2.3 150 50 2.3 2.3 6.32 4.96 210.10 21.80 28.02 6.32 1 123.60
lc 150x50x18x4.3 150 50 4.3 4.3 11.08 8.70 351.10 32.60 46.82 9.30 1 147.00
lc 150x50x18x4.0 150 50 4.0 4.0 10.39 8.15 331.60 31.20 44.22 8.89 1 147.00
lc 150x50x18x3.2 150 50 3.2 3.2 8.48 6.66 276.10 26.80 36.81 7.64 1 147.00
lc 150x50x18x2.9 150 50 2.9 2.9 7.74 6.08 253.90 24.90 33.85 7.11 1 147.00
lc 150x50x18x2.6 150 50 2.6 2.6 6.99 5.49 230.90 22.90 30.79 6.54 1 123.60
lc 150x50x18x2.3 150 50 2.3 2.3 6.23 4.89 207.20 20.80 27.63 5.94 1 123.60
lc 150x50x18x2.0 150 50 2.0 2.0 5.46 4.28 182.80 18.50 24.37 5.30 1 123.60
lc 150x50x18x1.8 150 50 1.8 1.8 4.94 3.87 166.10 17.00 22.14 4.85 1 123.60
lc 150x50x18x1.6 150 50 1.6 1.6 4.41 3.46 149.00 15.30 19.87 4.38 1 123.60
lc 125x50x20x4.0 125 50 4.0 4.0 9.55 7.50 216.70 30.90 34.68 9.32 1 147.00
lc 125x50x20x3.2 125 50 3.2 3.2 7.81 6.13 181.00 26.50 28.97 8.00 1 147.00
lc 125x50x20x2.3 125 50 2.3 2.3 5.75 4.51 136.40 20.60 21.82 6.21 1 123.60
lc 125x50x15x4.3 125 50 4.3 4.3 9.75 7.65 220.50 28.10 35.28 8.12 1 147.00
lc 125x50x15x4.0 125 50 4.0 4.0 9.15 7.18 208.60 26.90 33.38 7.78 1 147.00
lc 125x50x15x3.2 125 50 3.2 3.2 7.49 5.88 174.50 23.20 27.93 6.73 1 147.00
lc 125x50x15x2.9 125 50 2.9 2.9 6.84 5.37 160.80 21.60 25.73 6.27 1 147.00
lc 125x50x15x2.6 125 50 2.6 2.6 6.19 4.86 146.50 19.90 23.45 5.78 1 123.60
lc 125x50x15x2.3 125 50 2.3 2.3 5.52 4.33 131.70 18.10 21.08 5.26 1 123.60
lc 125x50x15x2.0 125 50 2.0 2.0 4.84 3.80 116.40 16.20 18.62 4.70 1 123.60
lc 125x50x15x1.8 125 50 1.8 1.8 4.38 3.44 105.90 14.80 16.94 4.30 1 123.60
lc 125x50x15x1.6 125 50 1.6 1.6 3.91 3.07 95.10 13.40 15.22 3.89 1 123.60
lc 125x50x15x1.4 125 50 1.4 1.4 3.44 2.70 84.10 11.90 13.45 3.47 1 123.60
lc 125x50x15x1.2 125 50 1.2 1.2 2.97 2.33 72.80 10.40 11.65 3.02 1 123.60
lc 120x60x20x3.2 120 60 3.2 3.2 8.29 6.51 186.10 40.80 31.01 10.52 1 147.00
lc 120x60x20x2.3 120 60 2.3 2.3 6.09 4.78 139.80 31.30 23.30 8.09 1 123.60
lc 120x40x20x3.2 120 40 3.2 3.2 7.01 5.50 142.40 15.20 23.73 5.68 1 147.00
lc 100x50x15x3.2 100 50 3.2 3.2 6.69 5.25 103.00 21.50 20.60 6.54 1 147.00
lc 100x50x15x2.9 100 50 2.9 2.9 6.12 4.80 95.10 20.00 19.02 6.10 1 147.00
lc 100x50x15x2.6 100 50 2.6 2.6 5.54 4.35 86.80 18.40 17.37 5.63 1 123.60
lc 100x50x15x2.3 100 50 2.3 2.3 4.94 3.88 78.20 16.80 15.64 5.12 1 123.60
lc 100x50x15x2.0 100 50 2.0 2.0 4.34 3.40 69.20 15.00 13.85 4.57 1 123.60
lc 100x50x15x1.8 100 50 1.8 1.8 3.93 3.08 63.00 13.70 12.61 4.19 1 123.60
lc 100x50x15x1.6 100 50 1.6 1.6 3.51 2.76 56.70 12.40 11.34 3.79 1 123.60
lc 100x50x15x1.4 100 50 1.4 1.4 3.09 2.43 50.20 11.10 10.04 3.38 1 123.60
lc 100x50x15x1.2 100 50 1.2 1.2 2.67 2.09 43.50 9.60 8.71 2.95 1 123.60
lc 90x45x15x3.2 90 45 3.2 3.2 6.05 4.75 74.40 15.90 16.52 5.45 1 147.00
lc 90x45x15x2.9 90 45 2.9 2.9 5.54 4.35 68.80 14.80 15.29 5.10 1 147.00
lc 90x45x15x2.6 90 45 2.6 2.6 5.02 3.94 62.90 13.70 13.98 4.71 1 123.60
lc 90x45x15x2.3 90 45 2.3 2.3 4.48 3.52 56.80 12.50 12.62 4.30 1 123.60
lc 90x45x15x2.0 90 45 2.0 2.0 3.94 3.09 50.40 11.20 11.19 3.85 1 123.60
lc 90x45x15x1.8 90 45 1.8 1.8 3.57 2.80 45.90 10.30 10.21 3.53 1 123.60
lc 90x45x15x1.6 90 45 1.6 1.6 3.19 2.51 41.40 9.30 9.19 3.20 1 123.60
lc 90x45x15x1.4 90 45 1.4 1.4 2.81 2.21 36.70 8.30 8.15 2.86 1 123.60
lc 90x45x15x1.2 90 45 1.2 1.2 2.43 1.90 31.80 7.20 7.07 2.50 1 123.60
lc 75x38x15x2.6 75 38 2.6 2.6 4.26 3.35 36.20 8.50 9.66 3.55 1 123.60
lc 75x38x15x2.3 75 38 2.3 2.3 3.82 3.00 32.80 7.70 8.75 3.25 1 123.60
lc 75x38x15x2.0 75 38 2.0 2.0 3.36 2.64 29.20 7.00 7.79 2.92 1 123.60
lc 75x38x15x1.8 75 38 1.8 1.8 3.05 2.39 26.70 6.40 7.12 2.69 1 123.60
lc 75x38x15x1.6 75 38 1.6 1.6 2.73 2.14 24.10 5.80 6.43 2.45 1 123.60
lc 75x38x15x1.4 75 38 1.4 1.4 2.41 1.89 21.40 5.20 5.71 2.19 1 123.60
lc 75x38x15x1.2 75 38 1.2 1.2 2.08 1.63 18.60 4.60 4.97 1.92 1 123.60
lc 65x30x15x2.6 65 30 2.6 2.6 3.59 2.81 21.70 4.50 6.68 2.43 1 123.60
lc 65x30x15x2.3 65 30 2.3 2.3 3.22 2.53 19.80 4.10 6.08 2.24 1 123.60
lc 65x30x15x2.0 65 30 2.0 2.0 2.84 2.23 17.70 3.70 5.44 2.03 1 123.60
lc 65x30x15x1.8 65 30 1.8 1.8 2.58 2.02 16.20 3.50 4.99 1.88 1 123.60
lc 65x30x15x1.6 65 30 1.6 1.6 2.31 1.82 14.70 3.20 4.52 1.71 1 123.60
lc 65x30x15x1.4 65 30 1.4 1.4 2.04 1.60 13.10 2.80 4.02 1.54 1 123.60
lc 65x30x15x1.2 65 30 1.2 1.2 1.77 1.39 11.40 2.50 3.51 1.35 1 123.60
type w fb fv e
apitong 5.40 13.00 1.36 5.76
guijo 6.40 17.10 1.89 6.67
mahogany 5.30 13.00 2.13 3.67
mayapis 3.40 11.00 0.73 8.14
molave 6.50 18.90 2.27 5.15
narra 4.90 14.20 1.51 4.68
lauan 3.50 10.90 1.17 4.59
tanguile 3.60 13.10 1.03 8.62
w.lauan 3.50 11.00 1.03 7.72
yakal 7.30 19.30 1.96 7.70
I
N
P
U
T
V
A
L
U
E
S B
length wt per m no of pcs by 6m
H - 4.47 -
E - 3.64 -
R 0.00 3.49 -
E 0.00 2.68 -
0 -
3.46 -
2.43 -
1.89 -
0
362811142.xlsTRUSSES08/10/2017
#N/A
362811142.xlsTRUSSES08/10/2017
SIZE L 2" x 2" x 3/16" 0
MEMBER
VERT QTY V LENGTH DIA LENGTH TOTAL
T-1 0.00 0.000 0 0
T-2 0.00 0.000 0 0
T-3 0.00 0.000 0 0
T-4 0.00 0.000 0 0
T-5 0.00 0.000 0 0
T-6 0.00 0.000 0 0
HT-1 0.00 0.000 0 0
HT-2 0.00 0.000 0 0
HT-3 0.00 0.000 0 0
HT-4 0.00 0.000 0 0
HT-5 0.00 0.000 0 0
HT-6 0.00 0.000 0 0
HT-7 0.00 0.000 0 0
HT-8 0.00 0.000 0 0
SIZE L 1 1/2" x 1 1/2" x 3/16 0
362811142.xlsTRUSSES08/10/2017
steel trusses & c purlins const bid cost/unit total bid cost
angular & lc purlins #DIV/0! #DIV/0!
unit cost qty 0.00 kg pcf #DIV/0!
project cost 7.5%
labor unit cost 19.26 - - proj.supervision 5.00%
equipment unit cost #DIV/0! #N/A #N/A constn facilities 2.50%
material unit cost #N/A #DIV/0! indirect eqpt 0%
steel truss unit cost #DIV/0! sub con #DIV/0! miscellaneous 0%
total cost #DIV/0! others 0%
duration - indirect cost 20%
crew crew bonds premiums 0%
labor 2 400.00 4.0 insurance premiums 0%
welder 1 500.00 escalation 0%
cost of money 3%
equipment contingencies 5%
welding machine 2 650.00 contractor tax 2%
profit 10.0%
total 27.5%
BILL OF MATERIALS
description qty unit unit cost amount
L 2" x 2" x " - kg 29.64 -
L 2" x 2" x 3/16" - kg 24.73 -
L 1 1/2" x 1 1/2" x 1/4 - kg 25.55 -
L 1 1/2" x 1 1/2" x 3/16 - kg 21.14 -
welding rod - kg 100.00 -
c purlins 2"x 6" ga 16 - kg 22.64 -
c purlins 2"x 4" ga 16 - kg 28.81 -
c purlins 2"x 3" ga 16 - kg 33.51 -
flat bar 11/2" x 3/16" - pcs 245.00 -
Red oxide - gal 305.00 -
Paint thinner - gal 190.00 -
362811142.xlsTRUSSES08/10/2017
10 mm dia - pcs 125.00 -
fascia board lc 2" x 10" #N/A pcs 320.00 #N/A
-
total wt - kg
total #N/A
fabricate/install 45 pcs/day
45 pcs/day
material computation:
362811142.xlsTRUSSES08/10/2017
miscellaneous
362811142.xlsTRUSSES08/10/2017
summary
project:
362811142.xlsTRUSSES08/10/2017
4.5 contingencies #DIV/0! 5.0% #DIV/0!
4.6 contractor's tax #DIV/0! 2.0% #DIV/0!
4.7 profit #DIV/0! 10.0% #DIV/0!
#DIV/0! 20.0% #DIV/0!
#DIV/0! #DIV/0!
362811142.xlsTRUSSES08/10/2017
362811142.xlsTRUSSES08/10/2017
INPUT C.R. DIMENSION ( in m)
area 0.00 -
tile works const bid cost/unit
tiles @ grnd flr t & b #DIV/0!
unit cost qty: 0.00
equipment
bill of materials
description qty unit unit cost
total
install 2.5
2.5
material computation:
MANUAL COMPUTATION
Area = 0 Sqm
Ceramic tiles size 8 x 8
labor cost computation:
Labor = 1
Skilled = 1
Crew = 1
Wage per labor = 400 Per day
Wage per skilled = 500 Per day
capacity per crew = 2.5 sqm/day
labor unit cost = ( labor+skilled)
capacity
(1)(400)+(1)(500)
= (2.5)
labor unit cost = 360 php/sqm
Labor cost = - Php
Duration = Area
Capacity x crew
(0)
= (2.5)(1)
Duration = 0 Days
Say= 0 Days
material computation:
l w/ border tiles = #N/A m grout factor:
area = 0 Sqm unglazed factor:
cement factor: 0.24 bag/sqm glazed factor:
sand factor: 0.02 cum/sqm border tiles factor:
cement: (0) x(0.24) unit cost
= 0 bags 230
sand: (0) x (0.02)
= 0 cum 850
grout: (0) x (0.2)
= 0 bags 60
unglazed tiles: (25) x (0)
= 0 pc 18.5
glazed tiles: (25) x (0)
= 0 pc 12
border tiles : 0 pc #N/A
Total material cost =
Material unit cost =
Total cost: Labor cost + material cost
- Php
Total unit Labor
cost |:cost + material cost
Area
#DIV/0! php/sqm
const bid cost/unit total bid cost summary
#DIV/0! #DIV/0! project:
sqm pcf #DIV/0!
project cost 7.5% 1.0 direct cost
proj.supervision 5.00% 1.1 labor
constn facilities 2.50% 1.2 direct equipment
indirect eqpt 0% 1.3 materials
miscellaneous 0% 1.4 subcontract
others 0%
indirect cost 20%
bonds premiums 0% 2.0 project cost
insurance premiums 0%
escalation 0% 2.1 project supervision
cost of money 3% 2.2 construction facilities
contingencies 5% 2.3 indirect equipment
contractor tax 2% 2.4 miscellaneous
profit 10.0%
total 27.5%
total 5.0% 3.0 other costs
terials
unit cost amount
4.0 indirect cost
sqm/day
sqm/day
mputation:
0.2 bag/sqm
25 pc/sqm
25 pc/sqm
5 pc/lm
Cost
-
-
#N/A
-
#DIV/0!
amount in pesos pct wt. of total
0.00 ### #DIV/0!
0.00 ### #DIV/0!
#DIV/0! ### #DIV/0!
0.00 ### #DIV/0!
#DIV/0! 72.50 #DIV/0!
#DIV/0! #DIV/0!
#DIV/0! #DIV/0!
INPUT C.R. DIMENSION ( in m)
area 0.00 -
tile works const bid cost/unit
tiles @ 2 flr t & b
nd
#DIV/0!
unit cost qty: 0.00
equipment
bill of materials
description qty unit unit cost
total
install 2.5
2.5
material computation:
MANUAL COMPUTATION
Area = 0 Sqm
Ceramic tiles size 8 x 8
labor cost computation:
Labor = 1
Skilled = 1
Crew = 1
Wage per labor = 400 Per day
Wage per skilled = 500 Per day
capacity per crew = 2.5 sqm/day
labor unit cost = ( labor+skilled)
capacity
(1)(400)+(1)(500)
= (2.5)
labor unit cost = 360 php/sqm
Labor cost = - Php
Duration = Area
Capacity x crew
(0)
= (2.5)(1)
Duration = 0 Days
Say= 0 Days
material computation:
l w/ border tiles = #N/A m grout factor:
area = 0 Sqm unglazed factor:
cement factor: 0.24 bag/sqm glazed factor:
sand factor: 0.02 cum/sqm border tiles factor:
cement: (0) x(0.24) unit cost
= 0 bags 230
sand: (0) x (0.02)
= 0 cum 850
grout: (0) x (0.2)
= 0 bags 60
unglazed tiles: (25) x (0)
= 0 pc 18.5
glazed tiles: (25) x (0)
= 0 pc 12
border tiles : 0 pc #N/A
Total material cost =
Material unit cost =
Total cost: Labor cost + material cost
- Php
Total unit Labor
cost |:cost + material cost
Area
#DIV/0! php/sqm
const bid cost/unit total bid cost summary
sqm/day
sqm/day
mputation:
0.2 bag/sqm
25 pc/sqm
25 pc/sqm
5 pc/lm
Cost
-
-
#N/A
-
#DIV/0!
amount in pesos pct wt. of total
0.00 ### #DIV/0!
0.00 ### #DIV/0!
#DIV/0! ### #DIV/0!
0.00 ### #DIV/0!
#DIV/0! 72.50 #DIV/0!
#DIV/0! #DIV/0!
#DIV/0! #DIV/0!
INPUT C.R. DIMENSION ( in m)
equipment
bill of materials
description qty unit unit cost
total
install 2.5
2.5
material computation:
MANUAL COMPUTATION
Area = 0 Sqm
Ceramic tiles size 8 x 8
labor cost computation:
Labor = 1
Skilled = 1
Crew = 1
Wage per labor = 400 Per day
Wage per skilled = 500 Per day
capacity per crew = 2.5 sqm/day
labor unit cost = ( labor+skilled)
capacity
(1)(400)+(1)(500)
= (2.5)
labor unit cost = 360 php/sqm
Labor cost = - Php
Duration = Area
Capacity x crew
(0)
= (2.5)(1)
Duration = 0 Days
Say= 0 Days
material computation:
l w/ border tiles = #N/A m grout factor:
area = 0 Sqm unglazed factor:
cement factor: 0.24 bag/sqm glazed factor:
sand factor: 0.02 cum/sqm border tiles factor:
cement: (0) x(0.24) unit cost
= 0 bags 230
sand: (0) x (0.02)
= 0 cum 850
grout: (0) x (0.2)
= 0 bags 60
unglazed tiles: (25) x (0)
= 0 pc 18.5
glazed tiles: (25) x (0)
= 0 pc 12
border tiles : 0 pc #N/A
Total material cost =
Material unit cost =
Total cost: Labor cost + material cost
- Php
Total unit Labor
cost |:cost + material cost
Area
#DIV/0! php/sqm
const bid cost/unit total bid cost summary
#DIV/0! #DIV/0! project:
sqm pcf #DIV/0!
project cost 7.5% 1.0 direct cost
proj.supervision 5.00% 1.1 labor
constn facilities 2.50% 1.2 direct equipment
indirect eqpt 0% 1.3 materials
miscellaneous 0% 1.4 subcontract
others 0%
indirect cost 20%
bonds premiums 0% 2.0 project cost
insurance premiums 0%
escalation 0% 2.1 project supervision
cost of money 3% 2.2 construction facilities
contingencies 5% 2.3 indirect equipment
contractor tax 2% 2.4 miscellaneous
profit 10.0%
total 27.5%
total 5.0% 3.0 other costs
rials
unit cost amount
4.0 indirect cost
sqm/day
sqm/day
utation:
0.2 bag/sqm
25 pc/sqm
25 pc/sqm
5 pc/lm
Cost
-
-
#N/A
-
#DIV/0!
amount in pesos pct wt. of total
0.00 ### #DIV/0!
0.00 ### #DIV/0!
#DIV/0! ### #DIV/0!
0.00 ### #DIV/0!
#DIV/0! 72.50 #DIV/0!
#DIV/0! #DIV/0!
#DIV/0! #DIV/0!
tile works
tiles @ kitchen counter
unit cost
description area qty unit unit cost amount
ceramic 8 x 8 0.000 pcs 12.00 - labor unit cost 360.00
border 3 x 8 0.000 pcs 18.00 - equipment unit cost
tile trim 0.000 pcs 60.00 - material unit cost #DIV/0!
cement scratch coat 3/4" 0.00 0.000 bags 230.00 - tilework unit cost #DIV/0!
sand 0.00 0.000 cum 850.00 - total cost #DIV/0!
grout 0 0 bags 60.00 0 duration -
area 0.00 - crew
labor 1
tilesetter 1
equipment
bill
description qty
labor co
install
362811142.xlsTILES AT KIT08/10/2017
materi
MANUAL COMPUTATION
Area = 0
Ceramic tiles size 8 x 8
labor cost computation:
Labor = 1
Skilled = 1
Crew = 1
Wage per labor = 400
Wage per skilled = 500
capacity per crew = 2.5
labor unit cost = ( labor+skilled)
capacity
(1)(400)+(1)(500)
= (2.5)
labor unit cost = 360
Labor cost = -
Duration = Area
Capacity x crew
(0)
= (2.5)(1)
Duration = 0
Say= 0
material computation:
l w/ border tiles = #N/A
area = 0
cement factor: 0.24
sand factor: 0.02
362811142.xlsTILES AT KIT08/10/2017
cement: (0) x(0.24)
= 0
sand: (0) x (0.02)
= 0
grout: (0) x (0.2)
= 0
unglazed tiles: (25) x (0)
= 0
glazed tiles: (25) x (0)
= 0
border tiles : 0
Total material cost =
Material unit cost =
Total cost: Labor cost + material co
#N/A
Total unit cost
Labor
|: cost + material cost
Area
#N/A
362811142.xlsTILES AT KIT08/10/2017
const bid cost/unit total bid cost summary
#DIV/0! #DIV/0! project:
qty: 0.00 sqm pcf #DIV/0!
project cost 7.5% 1.0 direct cost amount in pesos
- - proj.supervision 5.00% 1.1 labor 0.00
#DIV/0! #DIV/0! constn facilities 2.50% 1.2 direct equipment 0.00
indirect eqpt 0% 1.3 materials #DIV/0!
sub con miscellaneous 0% 1.4 subcontract 0.00
others 0% #DIV/0!
indirect cost 20%
crew bonds premiums 0% 2.0 project cost
400.00 1.0 insurance premiums 0%
500.00 escalation 0% 2.1 project supervision #DIV/0!
cost of money 3% 2.2 construction facilities #DIV/0!
contingencies 5% 2.3 indirect equipment #DIV/0!
contractor tax 2% 2.4 miscellaneous #DIV/0!
profit 10.0% #DIV/0!
total 27.5%
total 5.0% 3.0 other costs #DIV/0!
bill of materials #DIV/0!
unit unit cost amount
4.0 indirect cost
#DIV/0!
sqm/day
2.5 sqm/day
362811142.xlsTILES AT KIT08/10/2017
material computation:
Sqm
Per day
Per day
sqm/day
+skilled)
1)(500)
php/sqm
Php
x crew
Days
Days
362811142.xlsTILES AT KIT08/10/2017
unit cost Cost
bags 850 -
cum 60 -
pc 60 -
pc 230 -
pc #N/A #N/A
#N/A
#N/A
st + material cost
Php
material cost
Area
php/sqm
362811142.xlsTILES AT KIT08/10/2017
pct wt. of total
### #DIV/0!
### #DIV/0!
### #DIV/0!
### #DIV/0!
72.50 #DIV/0!
5.0% #DIV/0!
2.5% #DIV/0!
0.0% #DIV/0!
0.0% #DIV/0!
7.5% #DIV/0!
0.0% #DIV/0!
0.0% #DIV/0!
0.0% #DIV/0!
0.0% #DIV/0!
0.0% #DIV/0!
3.0% #DIV/0!
5.0% #DIV/0!
2.0% #DIV/0!
10.0% #DIV/0!
20.0% #DIV/0!
#DIV/0!
362811142.xlsTILES AT KIT08/10/2017
kitchen counter
unit cost
description area qty unit unit cost amount
PATECO CABINET DOOR 0.000 pcs 275.00 - labor unit cost 1,800.00
CONCEALED HINGES 0.00 0.000 pcs 36.00 - equipment unit cost
HANDLE 0.00 0.000 pcs 25.00 - material unit cost #N/A
CATCHES 0.00 0.000 pcs 5.00 - tilework unit cost #N/A
cement slab 100 mm thick 0.00 0.000 bags 230.00 - total cost #N/A
sand 0.00 0.000 cum 850.00 - duration -
gravel 0.00 0.000 cum 650.00 - crew
chb 5" 1.26 16.380 pcs 16.00 262.08 labor 1
10mmrsb 3.23 0.538 pcs 115.00 61.81 tilesetter 1
slab
WIDTH 0.6
LENGTH bill
HEIGHT 1.05 description qty
labor co
install
362811142.xlsKIT COUNTER08/10/2017
materi
MANUAL COMPUTATION
Area = 0
Ceramic tiles size 8 x 8
labor cost computation:
Labor = 1
Skilled = 1
Crew = 1
Wage per labor = 400
Wage per skilled = 500
capacity per crew = 0.5
labor unit cost = ( labor+skilled)
capacity
(1)(400)+(1)(500)
= (0.5)
labor unit cost = 1800
Labor cost = -
Duration = Area
Capacity x crew
(0)
= (0.5)(1)
Duration = 0
Say= 0
material computation:
l w/ border tiles = 3.225
area = 0
cement factor: 0.24
sand factor: 0.02
362811142.xlsKIT COUNTER08/10/2017
cement: (0) x(0.24)
= 0
sand: (0) x (0.02)
= 0
grout: (0) x (0.2)
= 0
unglazed tiles: (25) x (0)
= 0
glazed tiles: (25) x (0)
= 0
border tiles : 0
Total material cost =
Material unit cost =
Total cost: Labor cost + material co
#N/A
Total unit cost
Labor
|: cost + material cost
Area
#N/A
362811142.xlsKIT COUNTER08/10/2017
const bid cost/unit total bid cost summary
#N/A #N/A project:
qty: lot pcf #N/A
project cost 7.5% 1.0 direct cost amount in pesos
- - proj.supervision 5.00% 1.1 labor 0.00
#N/A #N/A constn facilities 2.50% 1.2 direct equipment 0.00
indirect eqpt 0% 1.3 materials #N/A
sub con miscellaneous 0% 1.4 subcontract 0.00
others 0% #N/A
indirect cost 20%
crew bonds premiums 0% 2.0 project cost
400.00 1.0 insurance premiums 0%
500.00 escalation 0% 2.1 project supervision #N/A
cost of money 3% 2.2 construction facilities #N/A
contingencies 5% 2.3 indirect equipment #N/A
contractor tax 2% 2.4 miscellaneous #N/A
profit 10.0% #N/A
total 27.5%
total 5.0% 3.0 other costs #N/A
bill of materials #N/A
unit unit cost amount
4.0 indirect cost
#N/A
cum/day
0.5 cumday
362811142.xlsKIT COUNTER08/10/2017
material computation:
Sqm
Per day
Per day
sqm/day
+skilled)
1)(500)
php/sqm
Php
x crew
Days
Days
362811142.xlsKIT COUNTER08/10/2017
unit cost Cost
bags #N/A #N/A
cum 230 -
bags 850 -
pc 25 -
pc 5 -
pc 115 -
#N/A
#N/A
st + material cost
Php
material cost
Area
php/sqm
362811142.xlsKIT COUNTER08/10/2017
pct wt. of total
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
72.50 #N/A
5.0% #N/A
2.5% #N/A
0.0% #N/A
0.0% #N/A
7.5% #N/A
0.0% #N/A
0.0% #N/A
0.0% #N/A
0.0% #N/A
0.0% #N/A
3.0% #N/A
5.0% #N/A
2.0% #N/A
10.0% #N/A
20.0% #N/A
#N/A
362811142.xlsKIT COUNTER08/10/2017
nook counter
unit cost
description area qty unit unit cost amount
PATECO CABINET DOOR 0.000 pcs 275.00 - labor unit cost 1,800.00
CONCEALED HINGES 0.00 0.000 pcs 36.00 - equipment unit cost
HANDLE 0.00 0.000 pcs 25.00 - material unit cost #N/A
CATCHES 0.00 0.000 pcs 5.00 - tilework unit cost #N/A
cement slab 100 mm thick 0.00 0.000 bags 230.00 - total cost #N/A
sand 0.00 0.000 cum 850.00 - duration -
gravel 0.00 0.000 cum 650.00 - crew
chb 5" 1.26 16.380 pcs 16.00 262.08 labor 1
10mmrsb 3.23 0.538 pcs 115.00 61.81 tilesetter 1
cabinet jamb #N/A bdft 36.00 #N/A
volume 0.00 #N/A equipment
slab
WIDTH 0.6
LENGTH
HEIGHT 1.05 bill
description qty
labor co
install
362811142.xlsnook counter08/10/2017
materi
MANUAL COMPUTATION
Area = 0
Ceramic tiles size 8 x 8
labor cost computation:
Labor = 1
Skilled = 1
Crew = 1
Wage per labor = 400
Wage per skilled = 500
capacity per crew = 0.5
labor unit cost = ( labor+skilled)
capacity
(1)(400)+(1)(500)
= (0.5)
labor unit cost = 1800
Labor cost = -
Duration = Area
Capacity x crew
(0)
= (0.5)(1)
Duration = 0
Say= 0
material computation:
l w/ border tiles = 3.225
area = 0
cement factor: 0.24
sand factor: 0.02
362811142.xlsnook counter08/10/2017
cement: (0) x(0.24)
= 0
sand: (0) x (0.02)
= 0
grout: (0) x (0.2)
= 0
unglazed tiles: (25) x (0)
= 0
glazed tiles: (25) x (0)
= 0
border tiles : 0
Total material cost =
Material unit cost =
Total cost: Labor cost + material co
#N/A
Total unit cost
Labor
|: cost + material cost
Area
#N/A
362811142.xlsnook counter08/10/2017
const bid cost/unit total bid cost summary
#N/A #N/A project:
qty: lot pcf #N/A
project cost 7.5% 1.0 direct cost amount in pesos
- - proj.supervision 5.00% 1.1 labor 0.00
#N/A #N/A constn facilities 2.50% 1.2 direct equipment 0.00
indirect eqpt 0% 1.3 materials #N/A
sub con miscellaneous 0% 1.4 subcontract 0.00
others 0% #N/A
indirect cost 20%
crew bonds premiums 0% 2.0 project cost
400.00 1.0 insurance premiums 0%
500.00 escalation 0% 2.1 project supervision #N/A
cost of money 3% 2.2 construction facilities #N/A
contingencies 5% 2.3 indirect equipment #N/A
contractor tax 2% 2.4 miscellaneous #N/A
profit 10.0% #N/A
total 27.5%
total 5.0% 3.0 other costs #N/A
bill of materials #N/A
unit unit cost amount
4.0 indirect cost
#N/A
cum/day
0.5 cumday
362811142.xlsnook counter08/10/2017
material computation:
Sqm
Per day
Per day
sqm/day
+skilled)
1)(500)
php/sqm
Php
x crew
Days
Days
362811142.xlsnook counter08/10/2017
unit cost Cost
bags #N/A #N/A
cum 230 -
bags 850 -
pc 25 -
pc 5 -
pc 115 -
#N/A
#N/A
st + material cost
Php
material cost
Area
php/sqm
362811142.xlsnook counter08/10/2017
pct wt. of total
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
72.50 #N/A
5.0% #N/A
2.5% #N/A
0.0% #N/A
0.0% #N/A
7.5% #N/A
0.0% #N/A
0.0% #N/A
0.0% #N/A
0.0% #N/A
0.0% #N/A
3.0% #N/A
5.0% #N/A
2.0% #N/A
10.0% #N/A
20.0% #N/A
#N/A
362811142.xlsnook counter08/10/2017
tile works
nook (granite slab)
unit cost
description area qty unit unit cost amount
Granite slab 0.000 pcs 6,500.00 - labor unit cost 360.00
cement scratch coat 3/4" 0.00 0.000 bags 230.00 - equipment unit cost
sand 0.00 0.000 cum 850.00 - material unit cost #DIV/0!
area 0.00 - tilework unit cost #DIV/0!
total cost #DIV/0!
duration -
crew
labor 1
tilesetter 1
equipment
bill
description qty
labor co
install
362811142.xlsTILEKS NOOK08/10/2017
materi
362811142.xlsTILEKS NOOK08/10/2017
miscellaneous
362811142.xlsTILEKS NOOK08/10/2017
const bid cost/unit total bid cost summary
#DIV/0! #DIV/0! project:
qty: 0.00 sqm pcf #DIV/0!
project cost 7.5% 1.0 direct cost amount in pesos
- - proj.supervision 5.00% 1.1 labor 0.00
#DIV/0! #DIV/0! constn facilities 2.50% 1.2 direct equipment 0.00
indirect eqpt 0% 1.3 materials #DIV/0!
sub con miscellaneous 0% 1.4 subcontract 0.00
others 0% #DIV/0!
indirect cost 20%
crew bonds premiums 0% 2.0 project cost
400.00 1.0 insurance premiums 0%
500.00 escalation 0% 2.1 project supervision #DIV/0!
cost of money 3% 2.2 construction facilities #DIV/0!
contingencies 5% 2.3 indirect equipment #DIV/0!
contractor tax 2% 2.4 miscellaneous #DIV/0!
profit 10.0% #DIV/0!
total 27.5%
total 5.0% 3.0 other costs #DIV/0!
bill of materials #DIV/0!
unit unit cost amount
4.0 indirect cost
#DIV/0!
sqm/day
2.5 sqm/day
362811142.xlsTILEKS NOOK08/10/2017
material computation:
362811142.xlsTILEKS NOOK08/10/2017
pct wt. of total
### #DIV/0!
### #DIV/0!
### #DIV/0!
### #DIV/0!
72.50 #DIV/0!
5.0% #DIV/0!
2.5% #DIV/0!
0.0% #DIV/0!
0.0% #DIV/0!
7.5% #DIV/0!
0.0% #DIV/0!
0.0% #DIV/0!
0.0% #DIV/0!
0.0% #DIV/0!
0.0% #DIV/0!
3.0% #DIV/0!
5.0% #DIV/0!
2.0% #DIV/0!
10.0% #DIV/0!
20.0% #DIV/0!
#DIV/0!
362811142.xlsTILEKS NOOK08/10/2017
ceiling const bid
interior ceiling #D
unit cost qty: 0.00
to
362811142.xlsCEILING INT08/10/2017
5.00
material computation:
362811142.xlsCEILING INT08/10/2017
miscellaneous
362811142.xlsCEILING INT08/10/2017
const bid cost/unit total bid cost summary
#DIV/0! #DIV/0! project:
sqm pcf #DIV/0!
project cost 7.5% 1.0 direct cost amount in pesos
proj.supervision 5.00% 1.1 labor 0.00 ###
constn facilities 2.50% 1.2 direct equipment 0.00 ###
indirect eqpt 0% 1.3 materials 0.00 ###
miscellaneous 0% 1.4 subcontract #DIV/0! ###
others 0% #DIV/0! 72.50
indirect cost 20%
bonds premiums 0% 2.0 project cost
insurance premiums 0%
escalation 0% 2.1 project supervision #DIV/0! 5.0%
cost of money 3% 2.2 construction facilities #DIV/0! 2.5%
contingencies 5% 2.3 indirect equipment #DIV/0! 0.0%
contractor tax 2% 2.4 miscellaneous #DIV/0! 0.0%
profit 10.0% #DIV/0! 7.5%
total 27.5%
3.0 other costs #DIV/0! 0.0%
unitcost amount #DIV/0! 0.0%
450.00 0.00
0.00 4.0 indirect cost
0.00
4.1 bonds premium #DIV/0! 0.0%
4.2 insurance premium #DIV/0! 0.0%
4.3 escalation #DIV/0! 0.0%
4.4 cost of money #DIV/0! 3.0%
4.5 contingencies #DIV/0! 5.0%
4.6 contractor's tax #DIV/0! 2.0%
4.7 profit #DIV/0! 10.0%
total P- #DIV/0! 20.0%
#DIV/0!
ion:
362811142.xlsCEILING INT08/10/2017
sqm/day
on:
362811142.xlsCEILING INT08/10/2017
pct wt. of total
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
362811142.xlsCEILING INT08/10/2017
ceiling const bid c
exterior ceiling #DIV
unit cost qty: 0.00
tota
362811142.xlsCEILING EXT08/10/2017
5.00
material computation:
362811142.xlsCEILING EXT08/10/2017
miscellaneous
362811142.xlsCEILING EXT08/10/2017
const bid cost/unit total bid cost summary
#DIV/0! #DIV/0! project:
sqm pcf #DIV/0!
project cost 7.5% 1.0 direct cost amount in pesos
proj.supervision 5.00% 1.1 labor 0.00 ###
constn facilities 2.50% 1.2 direct equipment 0.00 ###
indirect eqpt 0% 1.3 materials 0.00 ###
miscellaneous 0% 1.4 subcontract #DIV/0! ###
others 0% #DIV/0! 72.50
indirect cost 20%
bonds premiums 0% 2.0 project cost
insurance premiums 0%
escalation 0% 2.1 project supervision #DIV/0! 5.0%
cost of money 3% 2.2 construction facilities #DIV/0! 2.5%
contingencies 5% 2.3 indirect equipment #DIV/0! 0.0%
contractor tax 2% 2.4 miscellaneous #DIV/0! 0.0%
profit 10.0% #DIV/0! 7.5%
total 27.5%
ls 3.0 other costs #DIV/0! 0.0%
unitcost amount #DIV/0! 0.0%
550.00 0.00
4.0 indirect cost
#DIV/0!
ation:
362811142.xlsCEILING EXT08/10/2017
sqm/day
ation:
362811142.xlsCEILING EXT08/10/2017
pct wt. of total
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
362811142.xlsCEILING EXT08/10/2017
painting works CONST BID COST/unit TOTAL BID COST SUMMARY
enamel 3.0 COATS P182.66 135.74 PROJECT:
UNIT COST qty: 0.74 SQM PCF 1.38
DESCRIPTION AREA (sqm) Project cost 7.5% 1.0 DIRECT COST AMOUNT IN PESOS PCT WT. OF TOTAL
cornice - labor unit cost 36.00 26.75 26.75 Proj.Supervision 5.00% 1.1 Labor 26.75 19.71 19.71
interior ceiling - equipment unit cost 37.33 37.33 Constn Facilities 2.50% 1.2 Direct Equipment 0.00 0.00 0.00
windows 1 - material unit cost 96.43 Indirect Eqpt 0% 1.3 Materials 71.66 52.79 52.79
stair railings - painting unit cost 132.43 sub con Miscellaneous 0% 1.4 Subcontract 0.00 0.00 0.00
doors - total cost 98.41 Others 0% 98.41 72.50 72.50
counter cabinet duration 0.03 Indirect Cost 20%
bedroom closet crew crew Bonds Premiums 0% 2.0 PROJECT COST
acu grills 0.74 labor 1 400.00 1.0 Insurance Premiums 0%
grilles - painter 1 500.00 Escalation 0% 2.1 Project Supervision 6.79 5.0% 5.00
exterior ceiling - Cost of Money 3% 2.2 Construction Facilities 3.39 2.5% 2.50
trellis Contingencies 5% 2.3 Indirect Equipment 0.00 0.0% 0.00
hand rail - Contractor Tax 2% 2.4 Miscellaneous 0.00 0.0% 0.00
TOTAL 0.74 Profit 10.0% 10.18 7.5% 7.50
Total 27.5%
3.0 OTHER COSTS 0 0.0% 0.00
bill of materials 0 0.0% 0.00
description qty unit unit cost amount
enamel paint flat 0.03 gal 465.00 13.82 4.0 INDIRECT COST
quick dry enamel 0.06 gal 515.00 30.62
paint thinner 0.02 gal 190.00 3.74 4.1 Bonds Premium 0.00 0.0% 0.00
glazing putty 0.03 gal 545.00 16.20 4.2 Insurance Premium 0.00 0.0% 0.00
sand paper 0.07 pcs 10.00 0.74 4.3 Escalation 0.00 0.0% 0.00
tin tin color 0.03 1/4 quart 95.00 2.82 4.4 Cost of Money 4.07 3.0% 3.00
stopa 0.0743151787 kgs 50.00 3.72 4.5 Contingencies 6.79 5.0% 5.00
4.6 Contractor's Tax 2.71 2.0% 2.00
4.7 Profit 13.57 10.0% 10.00
27.15 20.0% 20.00
25.00
.
material computation:
description spreading rate
paint thinner .10lit/sqm 0.03 gal/sqm
enamel paint 0.15 lit/sqm/coat 0.04 gal/sqm
glazing putty 0.05lit/sqm 0.04 gal/sqm
sand paper 0.10pc/sqm 0.10 ps/sqm
Miscellaneous
plumbing works
plumbing wares & fixtures
unit cost qty:
description qty unit unit cost amount labor unit cost 900.00 -
water closet & lavatory package (emperor) set 5,500.00 - equipment unit cost #DIV/0!
water closet & lavatory package (skylark) set 4,400.00 - material unit cost #DIV/0!
kitchen sink double tub set 2,099.75 - plumbing unit cost #DIV/0! sub con
kitchen sink single tub set 790.00 - total cost #DIV/0!
duration -
total 0.00 - crew
no of item 0.00 labor 1 400.00
tile setter 1 500.00
bill of materials
total
362811142.xlsPLUMBINGWARE FIXTURES08/10/2017
material computati
362811142.xlsPLUMBINGWARE FIXTURES08/10/2017
miscellaneous
362811142.xlsPLUMBINGWARE FIXTURES08/10/2017
const bid cost/unit total bid cost summary
#DIV/0! #DIV/0! project:
0.00 wc pcf #DIV/0!
project cost 7.5% 1.0 direct cost amount in pesos
- proj.supervision 5.00% 1.1 labor 0.00
#DIV/0! constn facilities 2.50% 1.2 direct equipment 0.00
indirect eqpt 0% 1.3 materials #DIV/0!
miscellaneous 0% 1.4 subcontract 0.00
others 0% #DIV/0!
indirect cost 20%
crew bonds premiums 0% 2.0 project cost
1.0 insurance premiums 0%
escalation 0% 2.1 project supervision #DIV/0!
cost of money 3% 2.2 construction facilities #DIV/0!
contingencies 5% 2.3 indirect equipment #DIV/0!
contractor tax 2% 2.4 miscellaneous #DIV/0!
profit 10.0% #DIV/0!
total 27.5%
f materials 3.0 other costs #DIV/0!
#DIV/0!
#DIV/0!
1
362811142.xlsPLUMBINGWARE FIXTURES08/10/2017
computation:
362811142.xlsPLUMBINGWARE FIXTURES08/10/2017
pct wt. of total
### #DIV/0!
### #DIV/0!
### #DIV/0!
### #DIV/0!
72.50 #DIV/0!
5.0% #DIV/0!
2.5% #DIV/0!
0.0% #DIV/0!
0.0% #DIV/0!
7.5% #DIV/0!
0.0% #DIV/0!
0.0% #DIV/0!
0.0% #DIV/0!
0.0% #DIV/0!
0.0% #DIV/0!
3.0% #DIV/0!
5.0% #DIV/0!
2.0% #DIV/0!
10.0% #DIV/0!
20.0% #DIV/0!
#DIV/0!
362811142.xlsPLUMBINGWARE FIXTURES08/10/2017
plumbing works
rough-in ground flr
unit cost
item no. description qty unit unit cost amount labor unit cost
equipment unit cost
fresh water line 3/4" dia blue pipe pc/s 100.00 - material unit cost
1/2" dia blue pipe pc/s 55.00 - plumbing unit cost
1/2" dia gi tee pc/s 13.00 - total cost
3/4 x 1/2" dia gi tee reducer pc/s 25.00 - duration
1/2" dia gi elbow 90 pc/s 15.00 - crew
kitchen sink faucet pc/s 699.75 - labor
shower faucet pc/s 350.00 - plumber
shower head /valve pc/s 520.00 -
teflon tape pc/s 10.00 -
gate valve 3/4" pc/s 320.00 -
1/2" x 3/8" gi reducer pc/s 15.00 -
3" x 1/2" dia nipple pc/s 13.00 -
3/4" x 1/2dia gi elbow reducer pc/s 15.00 -
3/4"dia coupling pc/s 11.00 -
3/4"dia tee pc/s 25.00 - description
3/4"dia elbow pc/s 15.00 -
Sewer line
2"dia upvcpipe pc/s 170.00 -
4"dia upvc pipe pc/s 450.00 -
p- trap 2" dia pc/s 62.00 -
wye reducer 4" x 2" dia pc/s 90.00 -
wye 4" dia pc/s 138.00 -
elbow 45 - 4" dia pc/s 74.00 -
elbow 45 - 2" dia pc/s 24.00 -
elbow 90 - 4" dia pc/s 85.00 -
elbow 90 - 2" dia pc/s 26.00 -
tee reducer 4" x 2" dia pc/s 85.00 -
c. o. adoptor & plug 4" dia pc/s 65.00 -
tee 4" dia pc/s 118.00 -
solvent cement 100 cc can 75.00 -
362811142.xlsPLUMBING108/10/2017
coupling 4" pvc pc/s 53.00 -
floor drain stainer pc/s 80.00 -
coupling 2" pvc pc/s 18.00 -
-
summary
project:
1.1
1.2
1.3
1.4
2.1
362811142.xlsPLUMBING108/10/2017
2.2
2.3
2.4
4.1
4.2
4.3
4.4
4.5
4.6
4.7
362811142.xlsPLUMBING108/10/2017
const bid cost/unit total bid cost summary
#DIV/0! #DIV/0! project:
qty: wc pcf #DIV/0!
project cost 7.5% 1.0 direct cost
3,600.00 - - proj.supervision 5.00% 1.1
#DIV/0! #DIV/0! constn facilities 2.50% 1.2
#DIV/0! indirect eqpt 0% 1.3
#DIV/0! sub con miscellaneous 0% 1.4
#DIV/0! others 0%
- indirect cost 20%
crew bonds premiums 0% 2.0 project cost
1 400.00 1.0 insurance premiums 0%
1 500.00 escalation 0% 2.1
cost of money 3% 2.2
contingencies 5% 2.3
contractor tax 2% 2.4
profit 10.0%
total 27.5%
bill of materials 3.0 other costs
qty unit unit cost amount
total P- 4.1
4.2
4.3
labor cost computation: 4.4
4.5
4.6
4.7
0.25
362811142.xlsPLUMBING108/10/2017
material computation:
362811142.xlsPLUMBING108/10/2017
construction facilities #DIV/0! 2.5% #DIV/0!
indirect equipment #DIV/0! 0.0% #DIV/0!
miscellaneous #DIV/0! 0.0% #DIV/0!
#DIV/0! 7.5% #DIV/0!
#DIV/0! #DIV/0!
362811142.xlsPLUMBING108/10/2017
amount in pesos pct wt. of total
labor 0.00 ### #DIV/0!
direct equipment 0.00 ### #DIV/0!
materials #DIV/0! ### #DIV/0!
subcontract 0.00 ### #DIV/0!
#DIV/0! 72.50 #DIV/0!
#DIV/0! #DIV/0!
362811142.xlsPLUMBING108/10/2017
plumbing works
rough-in second flr
unit cost
item no. description qty unit unit cost amount labor unit cost
equipment unit cost
fresh water line 3/4" dia blue pipe pc/s 100.00 - material unit cost
1/2" dia blue pipe pc/s 55.00 - plumbing unit cost
1/2" dia gi tee pc/s 13.00 - total cost
3/4 gi tee pc/s 25.00 - duration
1/2" dia gi elbow 90 pc/s 15.00 - crew
kitchen sink faucet pc/s 470.00 - labor
shower faucet pc/s 350.00 - plumber
shower head /valve pc/s 520.00 -
teflon tape pc/s 10.00 -
3/4" x 1/2" gi tee reducer pc/s 25.00 -
1/2" x 3/8 gi reducer pc/s 15.00 -
2" x 1/2" dia nipple pc/s 13.00 -
3/4" x 1/2dia gi elbow reducer pc/s 15.00 -
3/4"dia coupling pc/s 11.00 -
3/4"dia tee pc/s 25.00 - description
3/4"dia elbow pc/s 15.00 -
Sewer line
2"dia upvcpipe pc/s 170.00 -
4"dia upvc pipe pc/s 450.00 -
p- trap 2" dia pc/s 62.00 -
wye reducer 4" x 2" dia pc/s 90.00 -
wye 4" dia pc/s 138.00 -
elbow 45 - 4" dia pc/s 74.00 -
elbow 45 - 2" dia pc/s 24.00 -
elbow 90 - 4" dia pc/s 85.00 -
elbow 90 - 2" dia pc/s 26.00 -
tee reducer 4" x 2" dia pc/s 85.00 -
c. o. adoptor & plug 4" dia pc/s 65.00 -
tee 4" dia pc/s 118.00 -
solvent cement 100 cc can 75.00 -
362811142.xlsPLUMBING208/10/2017
floor drain stainer pc/s 80.00 -
coupling 4" pvc pc/s 53.00 -
coupling 2" pvc pc/s 18.00 -
-
summary
project:
1.1
1.2
1.3
1.4
362811142.xlsPLUMBING208/10/2017
2.1
2.2
2.3
2.4
4.1
4.2
4.3
4.4
4.5
4.6
4.7
362811142.xlsPLUMBING208/10/2017
const bid cost/unit total bid cost summary
#DIV/0! #DIV/0! project:
qty: wc pcf #DIV/0!
project cost 7.5% 1.0 direct cost
3,600.00 - - proj.supervision 5.00% 1.1
#DIV/0! #DIV/0! constn facilities 2.50% 1.2
#DIV/0! indirect eqpt 0% 1.3
#DIV/0! sub con miscellaneous 0% 1.4
#DIV/0! others 0%
- indirect cost 20%
crew bonds premiums 0% 2.0 project cost
1 400.00 1.0 insurance premiums 0%
1 500.00 escalation 0% 2.1
cost of money 3% 2.2
contingencies 5% 2.3
contractor tax 2% 2.4
profit 10.0%
total 27.5%
bill of materials 3.0 other costs
qty unit unit cost amount
4.1
total P- 4.2
4.3
4.4
labor cost computation: 4.5
4.6
4.7
0.25
362811142.xlsPLUMBING208/10/2017
material computation:
362811142.xlsPLUMBING208/10/2017
project supervision #DIV/0! 5.0% #DIV/0!
construction facilities #DIV/0! 2.5% #DIV/0!
indirect equipment #DIV/0! 0.0% #DIV/0!
miscellaneous #DIV/0! 0.0% #DIV/0!
#DIV/0! 7.5% #DIV/0!
#DIV/0! #DIV/0!
362811142.xlsPLUMBING208/10/2017
amount in pesos pct wt. of total
labor 0.00 ### #DIV/0!
direct equipment 0.00 ### #DIV/0!
materials #DIV/0! ### #DIV/0!
subcontract 0.00 ### #DIV/0!
#DIV/0! 72.50 #DIV/0!
#DIV/0! #DIV/0!
362811142.xlsPLUMBING208/10/2017
plumbing works
rough-in attic
unit cost
item no. description qty unit unit cost amount labor unit cost
equipment unit cost
fresh water line 3/4" dia blue pipe pc/s 100.00 - material unit cost
1/2" dia blue pipe pc/s 55.00 - plumbing unit cost
1/2" dia gi tee pc/s 13.00 - total cost
3/4 gi tee pc/s 25.00 - duration
1/2" dia gi elbow 90 pc/s 15.00 - crew
kitchen sink faucet pc/s 470.00 - labor
shower faucet pc/s 350.00 - plumber
shower head / valve pc/s 520.00 -
teflon tape pc/s 10.00 -
3/4" x 1/2" gi tee reducer pc/s 25.00 -
1/2" x 3/8 gi reducer pc/s 15.00 -
2" x 1/2" dia nipple pc/s 13.00 -
3/4" x dia gi elbow reducer pc/s 15.00 -
3/4"dia coupling pc/s 11.00 -
3/4"dia tee pc/s 25.00 - description
3/4"dia elbow pc/s 15.00 -
Sewer line
2"dia upvcpipe pc/s 170.00 -
4"dia upvc pipe pc/s 450.00 -
p- trap 2" dia pc/s 62.00 -
wye reducer 4" x 2" dia pc/s 90.00 -
wye 4" dia pc/s 138.00 -
elbow 45 - 4" dia pc/s 74.00 -
elbow 45 - 2" dia pc/s 24.00 -
elbow 90 - 4" dia pc/s 85.00 -
elbow 90 - 2" dia pc/s 26.00 -
tee reducer 4" x 2" dia pc/s 85.00 -
c. o. adoptor & plug 4" dia pc/s 65.00 -
tee 4" dia pc/s 118.00 -
solvent cement 100 cc can 75.00 -
362811142.xlsPLUMBING308/10/2017
floor drain stainer pc/s 80.00 -
coupling 4" pvc pc/s 53.00 -
coupling 2" pvc pc/s 18.00 -
-
1.1
1.2
1.3
1.4
2.1
362811142.xlsPLUMBING308/10/2017
2.2
2.3
2.4
4.1
4.2
4.3
4.4
4.5
4.6
4.7
362811142.xlsPLUMBING308/10/2017
const bid cost/unit total bid cost summary
#DIV/0! #DIV/0! project:
qty: wc pcf #DIV/0!
project cost 7.5% 1.0 direct cost
3,600.00 - - proj.supervision 5.00% 1.1
#DIV/0! #DIV/0! constn facilities 2.50% 1.2
#DIV/0! indirect eqpt 0% 1.3
#DIV/0! sub con miscellaneous 0% 1.4
#DIV/0! others 0%
- indirect cost 20%
crew bonds premiums 0% 2.0 project cost
1 400.00 1.0 insurance premiums 0%
1 500.00 escalation 0% 2.1
cost of money 3% 2.2
contingencies 5% 2.3
contractor tax 2% 2.4
profit 10.0%
total 27.5%
bill of materials 3.0 other costs
qty unit unit cost amount
total P- 4.1
4.2
4.3
labor cost computation: 4.4
4.5
4.6
4.7
0.25
362811142.xlsPLUMBING308/10/2017
material computation:
362811142.xlsPLUMBING308/10/2017
construction facilities #DIV/0! 2.5% #DIV/0!
indirect equipment #DIV/0! 0.0% #DIV/0!
miscellaneous #DIV/0! 0.0% #DIV/0!
#DIV/0! 7.5% #DIV/0!
#DIV/0! #DIV/0!
362811142.xlsPLUMBING308/10/2017
amount in pesos pct wt. of total
labor 0.00 ### #DIV/0!
direct equipment 0.00 ### #DIV/0!
materials #DIV/0! ### #DIV/0!
subcontract 0.00 ### #DIV/0!
#DIV/0! 72.50 #DIV/0!
#DIV/0! #DIV/0!
362811142.xlsPLUMBING308/10/2017
const bid cost/unit total bid cost summary
septic tank installation & pipes #DIV/0! #DIV/0! project:
septic tank set 10,400.00 - unit cost qty: 0.00 bt pcf #DIV/0!
project cost 7.5% 1.0 direct cost amount in pesos pct wt. of total
description qty unit unit cost amount labor unit cost 900.00 - - proj.supervision 5.00% 1.1 labor 0.00 #DIV/0! #DIV/0!
septic tank 0.00 set - - equipment unit cost #DIV/0! #DIV/0! constn facilities 2.50% 1.2 direct equipment 0.00 #DIV/0! #DIV/0!
- material unit cost #DIV/0! indirect eqpt 0% 1.3 materials #DIV/0! #DIV/0! #DIV/0!
4" dia upvc pipes pcs 450.00 - bath tub unit cost #DIV/0! sub con miscellaneous 0% 1.4 subcontract 0.00 #DIV/0! #DIV/0!
4" dia upvc tee pcs 118.00 - total cost #DIV/0! others 0% #DIV/0! 72.50 #DIV/0!
4" dia upvc co/cover pcs 65.00 - duration - indirect cost 20%
4" dia upvc coupling pcs 53.00 - crew crew bonds premiums 0% 2.0 project cost
4" dia upvc elbow pcs 85.00 - labor 1 400.00 1.0 insurance premiums 0%
solvent cement 100cc can 75.00 - tile setter 1 500.00 escalation 0% 2.1 project supervision #DIV/0! 5.0% #DIV/0!
cost of money 3% 2.2 construction facilities #DIV/0! 2.5% #DIV/0!
total - contingencies 5% 2.3 indirect equipment #DIV/0! 0.0% #DIV/0!
contractor tax 2% 2.4 miscellaneous #DIV/0! 0.0% #DIV/0!
profit 10.0% #DIV/0! 7.5% #DIV/0!
volume total 27.5%
quantity width length depth bill of materials 3.0 other costs #DIV/0! 0.0% #DIV/0!
0 1.2 2.4 1.5 description qty unit unit cost amount #DIV/0! 0.0% #DIV/0!
1 #DIV/0! #DIV/0!
material computation:
miscellaneous
const bid cost/unit total bid cost
catch basin & downspout #DIV/0! #DIV/0!
unit cost qty: 0.00 cum pcf #DIV/0!
project cost 7.5%
labor unit cost 450.00 - - proj.supervision 5.00%
equipment unit cost #DIV/0! #DIV/0! constn facilities 2.50%
material unit cost #DIV/0! indirect eqpt 0%
septic tank #DIV/0! sub con miscellaneous 0%
total cost #DIV/0! others 0%
duration - indirect cost 20%
crew crew bonds premiums 0%
labor 1 400.00 1.0 insurance premiums 0%
mason 1 500.00 escalation 0%
cost of money 3%
contingencies 5%
contractor tax 2%
profit 10.0%
total 27.5%
bill of materials
total #DIV/0!
2 0
#DIV/0!
material computation:
#DIV/0! #DIV/0!
billof materials
item description qty unit unitcost amount
1 4"chb 0 pcs 14.00 -
2 4"chb 0 pcs 14.00 -
3 4" dia upvc pipes 0 pcs 450.00 -
4 4" dia upvc tee 1 pcs 118.00 141.60
5 4" dia upvc co/cover 0 pcs 65.00 -
6 4" dia upvc coupling 0 pcs 53.00 -
7 4" dia upvc elbow 0 pcs 85.00 -
8 3" dia upvc pipe 0 pcs 120.00 -
9 3" dia upvc elbow 0 pcs 25.00 -
10 3" dia upvc coupling 0 pcs 10.00 -
11 solvent cement 100cc 0 can 75.00 -
12 form lumber 0 bd ft 20.00 -
13 9mmrsb 0.0000 pcs 80.00 -
14 tie wire 0 kg 60.00 1.13
15 cement 0 bags 230.00 -
16 sand 0 cum 850.00 -
17 assorted nails 0.00 kg 50.00 -
18 plywood 1/4 ord 0.00 pcs 275.00 -
19 10 mm dia #DIV/0! pcs 115.00 #DIV/0!
volume material cost: #DIV/0!
0.00
cement sand
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.00 0.000
cement sand
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.00 0.000
total : 92.50
total 0.0
362811142.xlselectrical108/10/2017
upvc 68.25 pc/3m
upvc 104.75 pc/3m
elbow 9 pc/s
elbow 15 pc/s
Socket / coupling 3 pc/s
Socket / coupling 5 pc/s
male threaded adaptor 4.75 pc/s
male threaded adaptor 6.5 pc/s
362811142.xlselectrical108/10/2017
const bid cost/co total bid cost summary
#DIV/0! #DIV/0! project:
qty: lot pcf #DIV/0!
project cost 7.5% 1.0 direct cost
450.00 - - proj.supervision 5.00% 1.1 labor
#DIV/0! 0.00 constn facilities 2.50% 1.2 direct equipment
#DIV/0! indirect eqpt 0% 1.3 materials
t cost sub con #DIV/0! miscellaneous 0% 1.4 subcontract
#DIV/0! others 0%
- indirect cost 20%
crew bonds premiums 0% 2.0 project cost
1 400.00 1.0 insurance premiums 0%
1 500.00 escalation 0% 2.1 project supervision
cost of money 3% 2.2 construction facilities
contingencies 5% 2.3 indirect equipment
contractor tax 2% 2.4 miscellaneous
profit 10.0%
total 27.5%
bill of materials 3.0 other costs
material computation:
362811142.xlselectrical108/10/2017
362811142.xlselectrical108/10/2017
miscellaneous
362811142.xlselectrical108/10/2017
amount in pesos pct wt. of total
### #DIV/0!
0.00 ### #DIV/0!
### #DIV/0!
#DIV/0! ### #DIV/0!
#DIV/0! 72.50 #DIV/0!
#DIV/0! #DIV/0!
362811142.xlselectrical108/10/2017
electrical works
second floor
unit cost
362811142.xlselectrical208/10/2017
total 0.0
miscellaneous
362811142.xlselectrical208/10/2017
const bid cost/co total bid cost summary
#DIV/0! #DIV/0! project:
qty: co pcf #DIV/0!
project cost 7.5% 1.0 direct cost amount in pesos
- - proj.supervision 5.00% 1.1 labor
#DIV/0! 0.00 constn facilities 2.50% 1.2 direct equipment 0.00
indirect eqpt 0% 1.3 materials
sub con #DIV/0! miscellaneous 0% 1.4 subcontract #DIV/0!
others 0% #DIV/0!
indirect cost 20%
crew bonds premiums 0% 2.0 project cost
400.00 1.0 insurance premiums 0%
500.00 escalation 0% 2.1 project supervision #DIV/0!
cost of money 3% 2.2 construction facilities #DIV/0!
contingencies 5% 2.3 indirect equipment #DIV/0!
contractor tax 2% 2.4 miscellaneous #DIV/0!
profit 10.0% #DIV/0!
total 27.5%
bill of materials 3.0 other costs #DIV/0!
#DIV/0!
material computation:
362811142.xlselectrical208/10/2017
362811142.xlselectrical208/10/2017
pct wt. of total
### #DIV/0!
### #DIV/0!
### #DIV/0!
### #DIV/0!
72.50 #DIV/0!
5.0% #DIV/0!
2.5% #DIV/0!
0.0% #DIV/0!
0.0% #DIV/0!
7.5% #DIV/0!
0.0% #DIV/0!
0.0% #DIV/0!
0.0% #DIV/0!
0.0% #DIV/0!
0.0% #DIV/0!
3.0% #DIV/0!
5.0% #DIV/0!
2.0% #DIV/0!
10.0% #DIV/0!
20.0% #DIV/0!
#DIV/0!
362811142.xlselectrical208/10/2017
electrical works
attic
unit cost
total 0.0
362811142.xlselectrical308/10/2017
mat
362811142.xlselectrical308/10/2017
miscellaneous
362811142.xlselectrical308/10/2017
const bid cost/co total bid cost summary
#DIV/0! #DIV/0! project:
qty: 1.00 co pcf #DIV/0!
project cost 7.5% 1.0 direct cost amount in pesos
450.00 450.00 proj.supervision 5.00% 1.1 labor
#DIV/0! 720.00 constn facilities 2.50% 1.2 direct equipment 0.00
indirect eqpt 0% 1.3 materials
sub con #DIV/0! miscellaneous 0% 1.4 subcontract #DIV/0!
others 0% #DIV/0!
indirect cost 20%
crew bonds premiums 0% 2.0 project cost
400.00 1.0 insurance premiums 0%
500.00 escalation 0% 2.1 project supervision #DIV/0!
cost of money 3% 2.2 construction facilities #DIV/0!
contingencies 5% 2.3 indirect equipment #DIV/0!
contractor tax 2% 2.4 miscellaneous #DIV/0!
profit 10.0% #DIV/0!
total 27.5%
bill of materials 3.0 other costs #DIV/0!
#DIV/0!
#DIV/0!
2
362811142.xlselectrical308/10/2017
material computation:
362811142.xlselectrical308/10/2017
pct wt. of total
### #DIV/0!
### #DIV/0!
### #DIV/0!
### #DIV/0!
72.50 #DIV/0!
5.0% #DIV/0!
2.5% #DIV/0!
0.0% #DIV/0!
0.0% #DIV/0!
7.5% #DIV/0!
0.0% #DIV/0!
0.0% #DIV/0!
0.0% #DIV/0!
0.0% #DIV/0!
0.0% #DIV/0!
3.0% #DIV/0!
5.0% #DIV/0!
2.0% #DIV/0!
10.0% #DIV/0!
20.0% #DIV/0!
#DIV/0!
362811142.xlselectrical308/10/2017
floor finishes const bid cost/unit total bid cost summary
wood parquet ( narra ) 3/8" classb #N/A #N/A project:
description qty width m length m area sqm unit cost qty: 0.00 sqm pcf #N/A
0.00 project cost 0.08 1.0 direct cost amount in pesos pct wt. of total
0.00 labor unit cost 0.00 0.00 proj.supervision 0.05 1.10 labor 0.00 #N/A #N/A
0.00 equipment unit cost #DIV/0! #N/A constn facilities 0.03 1.20 direct equipment 0.00 #N/A #N/A
0.00 material unit cost indirect eqpt 0.00 1.30 materials 0.00 #N/A #N/A
0.00 tile works unit cost #N/A sub con #N/A miscellaneous 0.00 1.40 subcontract #N/A #N/A #N/A
0.00 total cost others 0.00 #N/A 72.50 #N/A
0.00 duration 0.00 indirect cost 0.20
0.00 crew crew bonds premiums 0.00 2.0 project cost
0.00 labor 1.00 1.00 insurance premiums 0.00
0.00 tilesetter 2.00 500.00 escalation 0.00 2.10 project supervision #N/A 0.05 #N/A
0.00 cost of money 0.03 2.20 construction facilities #N/A 0.03 #N/A
0.00 contingencies 0.05 2.30 indirect equipment #N/A 0.00 #N/A
0.00 500.00 contractor tax 0.02 2.40 miscellaneous #N/A 0.00 #N/A
0.00 profit 0.10 #N/A 0.08 #N/A
0.00 total 0.28
bill of materials 3.0 other costs #N/A 0.00 #N/A
total volume 0.00 description qty unit unit cost amount #N/A 0.00 #N/A
wood parquet ( narra ) 3/8" 0.00 sqft 85.00 0.00
0.00 4.0 indirect cost
narra strip #N/A pc/s 200.00 #N/A
4.10 bonds premium #N/A 0.00 #N/A
4.20 insurance premium #N/A 0.00 #N/A
total #N/A 4.30 escalation #N/A 0.00 #N/A
4.40 cost of money #N/A 0.03 #N/A
4.50 contingencies #N/A 0.05 #N/A
labor cost computation: 4.60 contractor's tax #N/A 0.02 #N/A
4.70 profit #N/A 0.10 #N/A
scratch coat 1 man/6 sqm/ day mh / sq m #N/A 0.20 #N/A
tile installation 1 man/4 sqm/ day 2.00 mh / sq m
cleaning 1 man/16 sqm/ day mh / sq m #N/A #N/A
2.00 mh / sq m
4.00 sq m /day
32.00 sq m /day
material computation:
miscellaneous
floor finishes
ceramic tiles 16 x 16
description qty width m length m area sqm unit cost
-
- labor unit cost
- equipment unit cost
- material unit cost
- tile works unit cost
- total cost
- duration
- crew
- labor
- tilesetter
-
grout
cement
sand
scratch coat
tile installation
cleaning
scratch coat
cement
sand
adhesives
cement for grout of tiles joint
tiles
muriatic acid
const bid cost/unit total bid cost
classb #DIV/0! #DIV/0!
qty: 0.00 sqm pcf #DIV/0!
project cost 7.5%
300.00 - - proj.supervision 5.00%
#DIV/0! #DIV/0! constn facilities 2.50%
#DIV/0! indirect eqpt 0%
#DIV/0! sub con miscellaneous 0%
#DIV/0! others 0%
- indirect cost 20%
crew bonds premiums 0%
1 400.00 1.0 insurance premiums 0%
1 500.00 escalation 0%
cost of money 3%
contingencies 5%
contractor tax 2%
profit 10.0%
total 27.5%
bill of materials
qty unit unit cost amount
- pcs 55.00 -
- gal 60.00 -
- bag 230.00 -
- cum 850.00 -
total P-
3.00 mh / sqm
material computation:
20 1:2
0.36 bag/sqm
0.02 cum/sqm
0.07 gal/sqm
0.10 bag/sqm
6.25 pcs/sqm
0.01 gal/sqm
miscellaneous
summary
project:
#DIV/0! #DIV/0!
floor finishes
granite 16 x 16
description qty width m length m area sqm unit cost
-
- labor unit cost
- equipment unit cost
- material unit cost
- tile works unit cost
- total cost
- duration
- crew
- labor
- tilesetter
-
grout
cement
sand
scratch coat
tile installation
cleaning
scratch coat
cement
sand
adhesives
cement for grout of tiles joint
tiles
muriatic acid
const bid cost/unit total bid cost
classb #DIV/0! #DIV/0!
qty: 0.00 sqm pcf #DIV/0!
project cost 7.5%
300.00 - - proj.supervision 5.00%
#DIV/0! #DIV/0! constn facilities 2.50%
#DIV/0! indirect eqpt 0%
#DIV/0! sub con miscellaneous 0%
#DIV/0! others 0%
- indirect cost 20%
crew bonds premiums 0%
1 400.00 1.0 insurance premiums 0%
1 500.00 escalation 0%
cost of money 3%
contingencies 5%
contractor tax 2%
profit 10.0%
total 27.5%
bill of materials
qty unit unit cost amount
- pcs 174.00 -
- gal 60.00 -
- bag 230.00 -
- cum 850.00 -
total P-
3.00 mh / sqm
material computation:
20 1:2
0.36 bag/sqm
0.02 cum/sqm
0.07 gal/sqm
0.10 bag/sqm
6.25 pcs/sqm
0.01 gal/sqm
miscellaneous
summary
project:
#DIV/0! #DIV/0!
floor finishes
ceramic tiles 12 x 12" (balcony, carport
description qty width m length m area sqm unit cost
carport -
porch - labor unit cost
lanai - equipment unit cost
balcony - material unit cost
pasemano - tile works unit cost
total cost
total volume - duration
crew
labor
tilesetter
description
ceramic tiles
tile trim
grout
cement
sand
scratch coat
tile installation
cleaning
scratch coat
cement
sand
adhesives
cement for grout of tiles joint
tiles
muriatic acid
const bid cost/unit total bid cost
balcony, carport & lanai) #DIV/0! #DIV/0!
qty: 0.00 sqm pcf #DIV/0!
project cost 7.5%
300.00 - - proj.supervision 5.00%
#DIV/0! #DIV/0! constn facilities 2.50%
#DIV/0! indirect eqpt 0%
#DIV/0! sub con miscellaneous 0%
#DIV/0! others 0%
- indirect cost 20%
crew bonds premiums 0%
1 400.00 1.0 insurance premiums 0%
1 500.00 escalation 0%
cost of money 3%
contingencies 5%
contractor tax 2%
profit 10.0%
total 27.5%
bill of materials
qty unit unit cost amount
- pcs 29.60 -
pcs 50.00 -
- gal 60.00 -
- bag 230.00 -
- cum 850.00 -
total P-
3.00 mh / sqm
material computation:
20 1:2
0.36 bag/sqm
0.02 cum/sqm
0.07 gal/sqm
0.10 bag/sqm
11.11 pcs/sqm
0.01 gal/sqm
miscellaneous
summary
project:
#DIV/0! #DIV/0!
water proofing const bid cost/unit total bid cost summary
water proofing (balcony & CR) classb #DIV/0! #DIV/0! project:
description qty width m length m vol. cu.m. area sqm unit cost qty: 0.00 sqm pcf #DIV/0!
Balcony 0.00 0.00 project cost 7.5% 1.0 direct cost amount in pesos pct wt. of total
Cr-2 0.00 0.00 labor unit cost 36.00 - - proj.supervision 0.05 1.1 labor 0.00 #DIV/0! #DIV/0!
Cr-master bedroom 0.00 0.00 equipment unit cost #DIV/0! #DIV/0! constn facilities 0.03 1.2 direct equipment 0.00 #DIV/0! #DIV/0!
material unit cost #DIV/0! indirect eqpt - 1.3 materials #DIV/0! #DIV/0! #DIV/0!
total volume 0.00 0.00 water proofing unit cost #DIV/0! sub con miscellaneous - 1.4 subcontract 0.00 #DIV/0! #DIV/0!
total cost #DIV/0! others - #DIV/0! 72.50 #DIV/0!
duration - indirect cost 0.20
crew crew bonds premiums - 2.0 project cost
labor 1.00 400.00 1.00 insurance premiums -
tilesetter 1.00 500.00 escalation - 2.1 project supervision #DIV/0! 5.0% #DIV/0!
cost of money 0.03 2.2 construction facilities #DIV/0! 2.5% #DIV/0!
contingencies 0.05 2.3 indirect equipment #DIV/0! 0.0% #DIV/0!
contractor tax 0.02 2.4 miscellaneous #DIV/0! 0.0% #DIV/0!
profit 0.10 #DIV/0! 7.5% #DIV/0!
total 0.28
bill of materials 3.0 other costs #DIV/0! 0.0% #DIV/0!
description qty unit unit cost amount #DIV/0! 0.0% #DIV/0!
BRUSH BOND 0.00 Pack 360.00 0.00 4.1 bonds premium #DIV/0! 0.0% #DIV/0!
4.2 insurance premium #DIV/0! 0.0% #DIV/0!
total P- 4.3 escalation #DIV/0! 0.0% #DIV/0!
4.4 cost of money #DIV/0! 3.0% #DIV/0!
4.5 contingencies #DIV/0! 5.0% #DIV/0!
labor cost computation: 4.6 contractor's tax #DIV/0! 2.0% #DIV/0!
4.7 profit #DIV/0! 10.0% #DIV/0!
mh / sqm #DIV/0! 20.0% #DIV/0!
frosroc application by brush 25.00 mh / sqm
mh / sqm #DIV/0! #DIV/0!
25.00 sq m / day
material computation:
miscellaneous
description qty width m length m area sqm
-
-
-
-
Total -
floor finishes const bid cost/unit
red cement finish classb #DIV/0!
unit cost qty: 0.00
bill of materials
description qty unit unit cost
red cement 0 bags 150.00
total
0.38
21.33
material computation:
mh / sqm
kg/sqm
cum/sqm
gal/sqm
bag/sqm
pcs/sqm
gal/sqm
amount in pesos pct wt. of total
0.00 ### #DIV/0!
0.00 ### #DIV/0!
#DIV/0! ### #DIV/0!
0.00 ### #DIV/0!
#DIV/0! 72.50 #DIV/0!
#DIV/0! #DIV/0!
floor finishes
cement topping (2nd flr) classb
description qty width m length m area sqm unit cost qty:
- - - -
- - - - labor unit cost 112.50 -
- - - - equipment unit cost #DIV/0! #DIV/0!
- - - - material unit cost #DIV/0! #DIV/0!
- - - - tile works unit cost #DIV/0! sub con
- - - - total cost #DIV/0!
- - - - duration -
- - - - crew
- - - - labor 1 400.00
- - - - tilesetter 1 500.00
- - - -
- - -
- - -
- - - equipment 1
- - -
- - - bill of materials
total volume - description qty unit
cement - bag
sand - cum
cement
sand
adhesives
cement for grout of tiles joint
tiles
muriatic acid
miscellaneous
const bid cost/unit total bid cost summary
#DIV/0!
omputation:
mh / sqm
mh / sqm
mh / sqm
8.00 mh / sqm
mputation:
0.36 bag/sqm
0.02 cum/sqm
0.07 gal/sqm
0.10 bag/sqm
11.11 pcs/sqm
0.01 gal/sqm
pct wt. of total
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
description qty unit
cement 6.54 bag/s
sand 0.36 cu.m.
gravel 0.73 cu.m.
9mm. dia. rebar 0.98 kg/s.
10mm. dia. rebar 15.40 kg/s.
12mm. dia. rebar 64.67 kg/s.
16mm. dia. rebar 25.20 kg/s.
ga 16 tiewire 1.18 kg/s.
formboard 2.74 pc/s.
formlumber 60.35 bd.ft.
assted nail 1.34 kg./s
formoil 1.26 lit
total volume
weight computation:
diameter weight ( 1 ) weight ( 2 ) total (kg)
9.00 0.00 0.98 0.98
10.00 1.93 13.48 15.40
12.00 35.83 28.83 64.67
16.00 25.20 0.00 25.20
20.00 0.00 0.00 0.00
25.00 0.00 0.00 0.00
28.00 0.00 0.00 0.00
32.00 0.00 0.00 0.00
36.00 0.00 0.00 0.00
tie wire 1.18
stairs
concrete steps & landing
unit cost
area
0.00
area material comp
0.00
area
2.48
area
3.89
area
1.54
total 7,892.66
15,135.83
length of cutbars(/step) total kg(cont.bars) total kg(cut bars) tie wire(kg)
4.20 0.00 0.00 0.00
length of bottom bars total kg(top bars) total kg(bot. bars) tie wire(kg)
1.10 0.92 0.92 0.07
length of bottom bars total kg(top bars) total kg(bot. bars) tie wire(kg)
25.20 21.00 21.00 0.16
length of ties total kg(cont. bars) total kg(ties) tie wire(kg)
23.10 25.20 13.48 0.75
length of 12 mm total kg(cont. bars)
8.40 7.00
length of rear bars total kg(front bars) total kg(rear bars) tie wire(kg)
8.30 6.92 6.92 0.09
length of cut bars total kg (cont) total kg (cut bars) tie wire(kg)
2.25 1.93 0.98 0.11
concreting works
concreting
unit cost
pct wt. of total
19.15 19.15 labor unit cost
1.20 1.20 equipment unit cost
52.15 52.15 material unit cost
0.00 0.00 concreting unit cost
72.50 72.50 total cost
duration
crew
labor
5.0% 5.00 mason
2.5% 2.50
0.0% 0.00 equipment
0.0% 0.00 one bagger mixer
7.5% 7.50
10.0% 10.00
20.0% 20.00 labor cost
100.00
material
const bid cost/cum total bid cost
3000 psi P6,682.76 P4,858.37
qty 0.73 cum pcf 1.38
project cost 8%
1,450 1,054.15 301.19 proj.supervision 5%
250.00 46.10 46.10 constn facilities 3%
3,145.00 indirect eqpt 0%
4,845.00 sub con miscellaneous 0%
3,522.32 others 0%
0.10 indirect cost 20%
crew bonds premiums 0%
6 400.00 1 insurance premiums 0%
1 500.00 escalation 0%
cost of money 3%
contingencies 5%
1 500 contractor tax 2%
profit 10%
total 27.5%
bill of materials
qty unit unit cost amount
6.54 bags 230.00 1,504.89
0.36 cum 850.00 308.98
0.73 cum 650.00 472.55
total 2,286.42
2cum/day 2 cum/day
material computation:
descriptionclass a
1.0 cement9 bag/cum 9 bag/cum
2.0 sand .5cum/cum 0.5 cum/cum
3.0 gravel 1 cum/cum 1 cum/cum
rebars const bid cost/kg
structural grade 40 psi P58.65
unit cost qty 106.24 kg pcf
100 kg/day
100 kg/day
material computation:
total bid cost forms const bid cost/kg
P6,230.64 forms coco lumber P512.26
1.38 unit cost qty 7.90
7.50%
5.00% labor unit cost 112.50 888.75 888.75
2.50% equipment unit cost 43.46 43.46
0% material unit cost 258.89 sub con
0% formworks unit cost 371.39
0% total cost 2,933.95
20% duration 0.49 crew
0% crew 2.0
0% labor 1 400.00
0% carpenter 1 500.00
3%
5% equipment
2%
10.0%
27.5%
bill of materials
amount description qty unit unit cost
30.00 4 x 8 x 1/4 ord pw 3 pcs 275.00
506.00 2 x 3, 2x 4 60 bdft 20.00
2,134.00 assorted nail 1 kg 55.00
820.40 form oil 1 li 8.00
-
-
-
-
-
70.64
3,561.04 total
install 8
erect
dismantel
repair
material computation:
const bid cost/kg total bid cost
P512.26 P4,046.83
sqm pcf 1.38
project cost 7.5%
proj.supervision 5.00%
constn facilities 2.50%
indirect eqpt 0%
miscellaneous 0%
others 0%
indirect cost 20%
bonds premiums 0%
insurance premiums 0%
escalation 0%
cost of money 3%
contingencies 5%
contractor tax 2%
profit 10.0%
total 27.5%
materials
unit cost amount
275.00 754.34
1,206.94
73.87
10.05
-
-
-
-
-
-
P2,045.20
computation:
sqm/day
sqm/day
omputation:
wooden handrails
wooden handrails ( 3"x 3" )
equipment
bill of
description qty
wooden handrails 0.00
labor cost
install
material
362811142.xlsWOODHANDRAILS08/10/2017
summary
project:
1.1 materials
1.2 labor
1.3 direct equipment
1.4 subcontract
362811142.xlsWOODHANDRAILS08/10/2017
2.4 miscellaneous
362811142.xlsWOODHANDRAILS08/10/2017
const bid cost/unit total bid cost summary
#DIV/0! - project:
qty: 0.00 lft pcf #DIV/0!
project cost 7.5% 1.0 direct cost
- - proj.supervision 5.00% 1.1 labor
#DIV/0! #DIV/0! constn facilities 2.50% 1.2 direct equipment
#DIV/0! indirect eqpt 0% 1.3 materials
sub con P- miscellaneous 0% 1.4 subcontract
others 0%
indirect cost 20%
crew bonds premiums 0% 2.0 project cost
400.00 1.0 insurance premiums 0%
500.00 escalation 0% 2.1 project supervision
cost of money 3% 2.2 construction facilities
contingencies 5% 2.3 indirect equipment
contractor tax 2% 2.4 miscellaneous
profit 10.0%
total 27.5%
bill of materials 3.0 other costs
unit unit cost amount
l.ft 130.00 -
4.0 indirect cost
45 ft/day
material computation:
362811142.xlsWOODHANDRAILS08/10/2017
amount in pesos pct wt. of total
362811142.xlsWOODHANDRAILS08/10/2017
#DIV/0! 0.0% #DIV/0!
#DIV/0! 7.5% #DIV/0!
#DIV/0! #DIV/0!
362811142.xlsWOODHANDRAILS08/10/2017
amount in pesos pct wt. of total
0.00 ### #DIV/0!
0.00 ### #DIV/0!
### #DIV/0!
0.00 ### #DIV/0!
0.00 72.50 #DIV/0!
0 0.0% #DIV/0!
0 0.0% #DIV/0!
- #DIV/0!
362811142.xlsWOODHANDRAILS08/10/2017
stair railings
steel stair railings
equipment
bill of
description qty
stair railings 0.00
labor cost
install
material
362811142.xlsSTAIRRAILINGS08/10/2017
summary
project:
1.1 materials
1.2 labor
1.3 direct equipment
1.4 subcontract
362811142.xlsSTAIRRAILINGS08/10/2017
2.4 miscellaneous
362811142.xlsSTAIRRAILINGS08/10/2017
const bid cost/unit total bid cost summary
#DIV/0! - project:
qty: 0.00 sqft pcf #DIV/0!
project cost 7.5% 1.0 direct cost
- - proj.supervision 5.00% 1.1 labor
#DIV/0! #DIV/0! constn facilities 2.50% 1.2 direct equipment
#DIV/0! indirect eqpt 0% 1.3 materials
sub con #DIV/0! miscellaneous 0% 1.4 subcontract
others 0%
indirect cost 20%
crew bonds premiums 0% 2.0 project cost
400.00 1.0 insurance premiums 0%
500.00 escalation 0% 2.1 project supervision
cost of money 3% 2.2 construction facilities
contingencies 5% 2.3 indirect equipment
contractor tax 2% 2.4 miscellaneous
profit 10.0%
total 27.5%
bill of materials 3.0 other costs
unit unit cost amount
sqft 150.00 -
4.0 indirect cost
35 sqft/day
material computation:
362811142.xlsSTAIRRAILINGS08/10/2017
amount in pesos pct wt. of total
362811142.xlsSTAIRRAILINGS08/10/2017
#DIV/0! 0.0% #DIV/0!
#DIV/0! 7.5% #DIV/0!
#DIV/0! #DIV/0!
362811142.xlsSTAIRRAILINGS08/10/2017
amount in pesos pct wt. of total
0.00 ### #DIV/0!
0.00 ### #DIV/0!
### #DIV/0!
0.00 ### #DIV/0!
0.00 72.50 #DIV/0!
0 0.0% #DIV/0!
0 0.0% #DIV/0!
- #DIV/0!
362811142.xlsSTAIRRAILINGS08/10/2017
mouldings cast in place const bid cost/lm total bid cost summary
concrete mouldings #DIV/0! #DIV/0! project:
unit cost qty: 0.00 lm pcf #DIV/0!
project cost 7.5% 1.0 direct cost amount in pesos pct wt. of total
description qty thick m width m length m area sqm vol cum labor unit cost 250.00 - - proj.supervision 5.00% 1.1 labor 0.00 ### #DIV/0!
equipment unit cost #DIV/0! #DIV/0! constn facilities 2.50% 1.2 direct equipment 0.00 ### #DIV/0!
- - material unit cost #DIV/0! indirect eqpt 0% 1.3 materials #DIV/0! ### #DIV/0!
- - concrete moulding unit cost #DIV/0! sub con miscellaneous 0% 1.4 subcontract 0.00 ### #DIV/0!
- - total cost #DIV/0! others 0% #DIV/0! 72.50 #DIV/0!
- - duration - indirect cost 20%
- - crew crew bonds premiums 0% 2.0 project cost
- - labor 0 400.00 2.0 insurance premiums 0%
- - mason 1 500.00 escalation 0% 2.1 project supervision #DIV/0! 5.0% #DIV/0!
- - cost of money 3% 2.2 construction facilities #DIV/0! 2.5% #DIV/0!
- - contingencies 5% 2.3 indirect equipment #DIV/0! 0.0% #DIV/0!
contractor tax 2% 2.4 miscellaneous #DIV/0! 0.0% #DIV/0!
total volume - - - equipment profit 10.0% #DIV/0! 7.5% #DIV/0!
total 27.5%
bill of materials 3.0 other costs #DIV/0! 0.0% #DIV/0!
description qty unit unit cost amount #DIV/0! 0.0% #DIV/0!
1.0 cement - bags 230.00 -
2.0 sand - cum 850.00 - 4.0 indirect cost
balluster( 0.80 x 2.50) - PCS 950.00 -
4.1 bonds premium #DIV/0! 0.0% #DIV/0!
4.2 insurance premium #DIV/0! 0.0% #DIV/0!
total - 4.3 escalation #DIV/0! 0.0% #DIV/0!
4.4 cost of money #DIV/0! 3.0% #DIV/0!
4.5 contingencies #DIV/0! 5.0% #DIV/0!
labor cost computation: 4.6 contractor's tax #DIV/0! 2.0% #DIV/0!
4.7 profit #DIV/0! 10.0% #DIV/0!
1 man/2 lm/ day 4.00 mh / lm #DIV/0! 20.0% #DIV/0!
mh / lm
4.00 #DIV/0! #DIV/0!
material computation:
miscellaneous
const bid cost/unit total bid cost summary
pebble ( black with vigan tiles) classb #DIV/0! #DIV/0! project:
description qty width m length m area sqm unit cost qty: 0.00 sqm pcf #DIV/0!
- project cost 7.5% 1.0 direct cost amount in pesos pct wt. of total
- labor unit cost 225.00 - - proj.supervision 5.00% 1.1 labor 0.00 ### #DIV/0!
- equipment unit cost #DIV/0! #DIV/0! constn facilities 2.50% 1.2 direct equipment 0.00 ### #DIV/0!
- material unit cost #DIV/0! indirect eqpt 0% 1.3 materials #DIV/0! ### #DIV/0!
pebble unit cost #DIV/0! sub con miscellaneous 0% 1.4 subcontract 0.00 ### #DIV/0!
total volume - total cost #DIV/0! others 0% #DIV/0! 72.50 #DIV/0!
duration - indirect cost 20%
crew crew bonds premiums 0% 2.0 project cost
labor 1 400.00 1.0 insurance premiums 0%
tilesetter 1 500.00 escalation 0% 2.1 project supervision #DIV/0! 5.0% #DIV/0!
cost of money 3% 2.2 construction facilities #DIV/0! 2.5% #DIV/0!
contingencies 5% 2.3 indirect equipment #DIV/0! 0.0% #DIV/0!
contractor tax 2% 2.4 miscellaneous #DIV/0! 0.0% #DIV/0!
profit 10.0% #DIV/0! 7.5% #DIV/0!
total 27.5%
bill of materials 3.0 other costs #DIV/0! 0.0% #DIV/0!
description qty unit unit cost amount #DIV/0! 0.0% #DIV/0!
pebbles ( boracay ) - can 40.00 -
cement - bag 230.00 - 4.0 indirect cost
sand - cum 850.00 -
4.1 bonds premium #DIV/0! 0.0% #DIV/0!
vigan tiles 0 pcs 15.00 - 4.2 insurance premium #DIV/0! 0.0% #DIV/0!
4.3 escalation #DIV/0! 0.0% #DIV/0!
total P- 4.4 cost of money #DIV/0! 3.0% #DIV/0!
4.5 contingencies #DIV/0! 5.0% #DIV/0!
4.6 contractor's tax #DIV/0! 2.0% #DIV/0!
labor cost computation: 4.7 profit #DIV/0! 10.0% #DIV/0!
#DIV/0! 20.0% #DIV/0!
#DIV/0! #DIV/0!
4.00 mh / sqm
material computation:
miscellaneous
STEEL BARS PRICE LIST
#DIV/0! #DIV/0!
4.00 mh / sqm
material computation:
miscellaneous
const bid cost/unit total bid cost summary
vinyl tiles 12" x 12" classb #DIV/0! #DIV/0! project:
description qty width m length m area sqm unit cost qty: - sqm pcf #DIV/0!
- project cost 0.08 1.0 direct cost amount in pesos pct wt. of total
- labor unit cost 81.82 - - proj.supervision 0.05 1.10 labor - ### #DIV/0!
- equipment unit cost #DIV/0! #DIV/0! constn facilities 0.03 1.20 direct equipment - ### #DIV/0!
- material unit cost #DIV/0! indirect eqpt - 1.30 materials #DIV/0! ### #DIV/0!
- tile works unit cost #DIV/0! sub con miscellaneous - 1.40 subcontract - ### #DIV/0!
- total cost #DIV/0! #DIV/0! others - #DIV/0! 72.50 #DIV/0!
- duration - #DIV/0! indirect cost 0.20
- crew crew bonds premiums - 2.0 project cost
- labor 1.00 400.00 1.00 insurance premiums -
- tilesetter 1.00 500.00 escalation - 2.10 project supervision #DIV/0! 0.05 #DIV/0!
- cost of money 0.03 2.20 construction facilities #DIV/0! 0.03 #DIV/0!
- contingencies 0.05 2.30 indirect equipment #DIV/0! - #DIV/0!
- contractor tax 0.02 2.40 miscellaneous #DIV/0! - #DIV/0!
- profit 0.10 #DIV/0! 0.08 #DIV/0!
- total 0.28
- bill of materials 3.0 other costs #DIV/0! - #DIV/0!
total volume - description qty unit unit cost amount #DIV/0! - #DIV/0!
vinly 12" x 12" - pcs 14.00 -
4.0 indirect cost
tile adhesives - gal 375.00 -
4.10 bonds premium #DIV/0! - #DIV/0!
4.20 insurance premium #DIV/0! - #DIV/0!
total - 4.30 escalation #DIV/0! - #DIV/0!
cost of money #DIV/0! 0.03 #DIV/0!
4.50 contingencies #DIV/0! 0.05 #DIV/0!
labor cost computation: 4.60 contractor's tax #DIV/0! 0.02 #DIV/0!
4.70 profit #DIV/0! 0.10 #DIV/0!
scratch coat sq m / day #DIV/0! 0.20 #DIV/0!
tile installation sq m / day
#DIV/0! #DIV/0!
11.00 sq m/ day
material computation:
miscellaneous
const bid cost/unit total bid cost SUMMARY
cement topping classb #DIV/0! #DIV/0! PROJECT:
description qty width m length m area sqm unit cost qty: - sqm pcf #DIV/0!
- - - - project cost 0.08 1.0 DIRECT COST AMOUNT IN PESOS PCT WT. OF TOTAL
- - - - labor unit cost 112.50 - - proj.supervision 0.05 1.10 Labor - ### #DIV/0!
- - - - equipment unit cost #DIV/0! #DIV/0! constn facilities 0.03 1.20 Direct Equipment - ### #DIV/0!
- - - - material unit cost #DIV/0! indirect eqpt - 1.30 Materials #DIV/0! ### #DIV/0!
- - - - cement topping unit cost #DIV/0! sub con miscellaneous - 1.40 Subcontract - ### #DIV/0!
- - - - total cost #DIV/0! #DIV/0! others - #DIV/0! 72.50 #DIV/0!
- - - - duration - #DIV/0! indirect cost 0.20
- - - - crew crew bonds premiums - 2.0 PROJECT COST
- - - - labor 1.00 400.00 1.00 insurance premiums -
- - - - tilesetter 1.00 500.00 escalation - 2.10 Project Supervision #DIV/0! 0.05 #DIV/0!
- - - - cost of money 0.03 2.20 Construction Facilities #DIV/0! 0.03 #DIV/0!
- - - - contingencies 0.05 2.30 Indirect Equipment #DIV/0! - #DIV/0!
- - - contractor tax 0.02 2.40 Miscellaneous #DIV/0! - #DIV/0!
- - - profit 0.10 #DIV/0! 0.08 #DIV/0!
- - - total 0.28
- - - bill of materials 3.0 OTHER COSTS #DIV/0! - #DIV/0!
TOTAL VOLUME - description qty unit unit cost amount #DIV/0! - #DIV/0!
vinly 12" x 12" pcs 11.00 -
4.0 INDIRECT COST
tile adhesives gal 280.00 -
cement - bag 230.00 - 4.10 Bonds Premium #DIV/0! - #DIV/0!
sand - cum 850.00 - 4.20 Insurance Premium #DIV/0! - #DIV/0!
4.30 Escalation #DIV/0! - #DIV/0!
Cost of Money #DIV/0! 0.03 #DIV/0!
total - 4.50 Contingencies #DIV/0! 0.05 #DIV/0!
4.60 Contractor's Tax #DIV/0! 0.02 #DIV/0!
4.70 Profit #DIV/0! 0.10 #DIV/0!
labor cost computation: #DIV/0! 0.20 #DIV/0!
8.00 sq m/ day
material computation:
Miscellaneous
stainless handrail 2 pipe
bi
description qty
stainless pipe 0.00
stainless pipe 2 0.00
welding rod 2.00
labor
362811142.xlsSTAINLESS HANDRAIL08/10/2017
mate
summary
project:
1.1 materials
1.2 labor
1.3 direct equipment
1.4 subcontract
362811142.xlsSTAINLESS HANDRAIL08/10/2017
2.0 project cost
362811142.xlsSTAINLESS HANDRAIL08/10/2017
const bid cost/unit total bid cost summary
#DIV/0! #DIV/0! project:
qty: 0.00 lft pcf #DIV/0!
project cost 7.5% 1.0 direct cost
- - proj.supervision 5.00% 1.1 labor
#DIV/0! 0.00 constn facilities 2.50% 1.2 direct equipment
#DIV/0! indirect eqpt 0% 1.3 materials
sub con P- miscellaneous 0% 1.4 subcontract
others 0%
indirect cost 20%
crew bonds premiums 0% 2.0 project cost
1.0 insurance premiums 0%
500.00 escalation 0% 2.1 project supervision
cost of money 3% 2.2 construction facilities
600.00 contingencies 5% 2.3 indirect equipment
contractor tax 2% 2.4 miscellaneous
profit 10.0%
total 27.5%
bill of materials 3.0 other costs
unit unit cost amount
l.ft 0.00 -
pcs 2500 0.00 4.0 indirect cost
kg 120 240.00
4.1 bonds premium
4.2 insurance premium
4.3 escalation
cost of money
total P240.00 4.5 contingencies
4.6 contractor's tax
4.7 profit
labor cost computation:
5 ft/day
5 ft/day
362811142.xlsSTAINLESS HANDRAIL08/10/2017
10 ft/day
material computation:
362811142.xlsSTAINLESS HANDRAIL08/10/2017
#DIV/0! 5.0% #DIV/0!
#DIV/0! 2.5% #DIV/0!
#DIV/0! 0.0% #DIV/0!
#DIV/0! 0.0% #DIV/0!
#DIV/0! 7.5% #DIV/0!
#DIV/0! #DIV/0!
362811142.xlsSTAINLESS HANDRAIL08/10/2017
amount in pesos pct wt. of total
0.00 ### #DIV/0!
0.00 ### #DIV/0!
#DIV/0! ### #DIV/0!
0.00 ### #DIV/0!
#DIV/0! 72.50 #DIV/0!
#DIV/0! #DIV/0!
362811142.xlsSTAINLESS HANDRAIL08/10/2017
stainless railings
bill of
description qty
stair railings 0.00
tubing x 1.20 mm thk per 20 ft 4.00
1/2 tubing x 1.20 mm thk per 20 ft 5.00
1/2 x 3/16' flat bar stainless per 8 ft 9.00
welding rod 1
labor cost
fabrication/install
material
summary
project:
1.1 materials
1.2 labor
1.3 direct equipment
1.4 subcontract
7.5 sqft/day
10 sqft/day
material computation:
#DIV/0! #DIV/0!
#DIV/0! #DIV/0!
1 #DIV/0! #DIV/0!
material computation:
miscellaneous
painting works const bid cost/unit total bid cost summary
boysen multi-fleck super dense 1.0 coats #DIV/0! #DIV/0! project:
unit cost qty: 0.00 sqm pcf #DIV/0!
description l ht open area project cost 7.5% 1.0 direct cost amount in pesos pct wt. of total
- labor unit cost 20.00 - - proj.supervision 5.00% 1.1 labor 0.00 #DIV/0! #DIV/0!
- equipment unit cost #DIV/0! #DIV/0! #DIV/0! constn facilities 2.50% 1.2 direct equipment #DIV/0! #DIV/0! #DIV/0!
- material unit cost #DIV/0! indirect eqpt 0% 1.3 materials #DIV/0! #DIV/0! #DIV/0!
- painting unit cost #DIV/0! sub con miscellaneous 0% 1.4 subcontract 0.00 #DIV/0! #DIV/0!
- total cost #DIV/0! others 0% #DIV/0! 72.50 #DIV/0!
- duration - indirect cost 20%
crew crew bonds premiums 0% 2.0 project cost
- labor 400.00 1.00 insurance premiums 0%
- labor 1.00 500.00 escalation 0% 2.1 project supervision #DIV/0! 5.0% #DIV/0!
- cost of money 3% 2.2 construction facilities #DIV/0! 2.5% #DIV/0!
- equipment 500 contingencies 5% 2.3 indirect equipment #DIV/0! 0.0% #DIV/0!
- contractor tax 2% 2.4 miscellaneous #DIV/0! 0.0% #DIV/0!
- profit 10.0% #DIV/0! 7.5% #DIV/0!
- total 27.5%
- bill of materials 3.0 other costs #DIV/0! 0.0% #DIV/0!
- description qty unit unit cost amount #DIV/0! 0.0% #DIV/0!
- boysen multi-fleck 0 lt 480 0
4.0 indirect cost
total - sqm
4.1 bonds premium #DIV/0! 0.0% #DIV/0!
total P- 4.2 insurance premium #DIV/0! 0.0% #DIV/0!
4.3 escalation #DIV/0! 0.0% #DIV/0!
cost of money #DIV/0! 3.0% #DIV/0!
labor cost computation: 4.5 contingencies #DIV/0! 5.0% #DIV/0!
4.6 contractor's tax #DIV/0! 2.0% #DIV/0!
boysen multifleck /spreading rate 3.125 sq / mh 25 sqm/day 4.7 profit #DIV/0! 10.0% #DIV/0!
#DIV/0! 20.0% #DIV/0!
#DIV/0! #DIV/0!
25 sqm/day
equipment 50 sqm/day
material computation:
description spreading rate
25.00 sqm/day
equipment 25.00 sqm/day
material computation:
description spreading rate
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary miscellaneous
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
painting works const bid cost/unit total bid cost summary
boysen acrytex paint 2.0 coats #DIV/0! #DIV/0! project:
unit cost qty: 0.00 sqm pcf #DIV/0!
description l ht open area project cost 7.5% 1.0 direct cost amount in pesos pct wt. of total
- labor unit cost 30.00 - - proj.supervision 5.00% 1.1 labor 0.00 #DIV/0! #DIV/0!
grd - - - equipment unit cost #DIV/0! #DIV/0! constn facilities 2.50% 1.2 direct equipment 0.00 #DIV/0! #DIV/0!
2nd - - - material unit cost #DIV/0! indirect eqpt 0% 1.3 materials #DIV/0! #DIV/0! #DIV/0!
partition - - - painting unit cost #DIV/0! sub con miscellaneous 0% 1.4 subcontract 0.00 #DIV/0! #DIV/0!
- - - total cost #DIV/0! others 0% #DIV/0! 72.50 #DIV/0!
- - - duration - indirect cost 20%
- - - crew crew bonds premiums 0% 2.0 project cost
- labor 1 400.00 1.0 insurance premiums 0%
skilled 1 500.00 escalation 0% 2.1 project supervision #DIV/0! 5.0% #DIV/0!
cost of money 3% 2.2 construction facilities #DIV/0! 2.5% #DIV/0!
contingencies 5% 2.3 indirect equipment #DIV/0! 0.0% #DIV/0!
contractor tax 2% 2.4 miscellaneous #DIV/0! 0.0% #DIV/0!
total sqm - profit 10.0% #DIV/0! 7.5% #DIV/0!
total 27.5%
bill of materials 3.0 other costs #DIV/0! 0.0% #DIV/0!
description qty unit unit cost amount #DIV/0! 0.0% #DIV/0!
1.0 acrytex top coat - gal 765.00 -
2.0 acrytex cast - gal 400.00 - 4.0 indirect cost
3.0 acrytex reducer - gal 345.00 -
- 4.1 bonds premium #DIV/0! 0.0% #DIV/0!
- 4.2 insurance premium #DIV/0! 0.0% #DIV/0!
- 4.3 escalation #DIV/0! 0.0% #DIV/0!
7.0 acri color - quarts 45.00 - cost of money #DIV/0! 3.0% #DIV/0!
4.5 contingencies #DIV/0! 5.0% #DIV/0!
4.6 contractor's tax #DIV/0! 2.0% #DIV/0!
4.7 profit #DIV/0! 10.0% #DIV/0!
#DIV/0! 20.0% #DIV/0!
total P-
#DIV/0! #DIV/0!
30 sqm/day
material computation:
description spreading rate
masonry neutralizer .10lit/sqm 0.026 gal/sqm
topcoat 0.050 gal/sqm
acrytex cast 0.200 gal/sqm
patching compound 0.05lit/sqm 0.026 kg/sqm
sand paper 0.10sqm/sqm 0.100 sqm/sqm
acri color 0.25
rags 0.1 kgs/ sq m
const bid cost/unit total bid cost summary
steel grilles #DIV/0! #DIV/0! project:
unit cost qty: - sq ft pcf #DIV/0!
project cost 7.5% 1.0 direct cost amount in pesos pct wt. of total
description qty h length m sq ft labor unit cost #DIV/0! #DIV/0! #DIV/0! proj.supervision 5.00% 1.1 labor #DIV/0! ### #DIV/0!
- equipment unit cost #DIV/0! #DIV/0! constn facilities 2.50% 1.2 direct equipment #DIV/0! ### #DIV/0!
- material unit cost #DIV/0! indirect eqpt 0.00% 1.3 materials #DIV/0! ### #DIV/0!
- grills unit cost #DIV/0! sub con miscellaneous 0.00% 1.4 subcontract 0.00 ### #DIV/0!
- total cost #DIV/0! others 0.00% #DIV/0! 72.50 #DIV/0!
- duration #DIV/0! indirect cost 20%
- crew crew bonds premiums 0.00% 2.0 project cost
- labor 1 400.00 1 insurance premiums 0.00%
- 1 500.00 escalation 0.00% 2.1 project supervision #DIV/0! 5.0% #DIV/0!
- cost of money 3.00% 2.2 construction facilities #DIV/0! 2.5% #DIV/0!
- equipment contingencies 5.00% 2.3 indirect equipment #DIV/0! 0.0% #DIV/0!
- contractor tax 2.00% 2.4 miscellaneous #DIV/0! 0.0% #DIV/0!
- profit 10.00% #DIV/0! 7.5% #DIV/0!
- total 27.5%
- bill of materials 3.0 other costs #DIV/0! 0.0% #DIV/0!
- description qty unit unit cost amount #DIV/0! 0.0% #DIV/0!
- 10 mm sq bar - pc 110.00 -
area - sq ft 12 mm sq bar - pc 145.00 - 4.0 indirect cost
2 x 4 tubular ga 16 - pc 1,250.00 -
materials qty unit unit wt total wt 2 x 3 tubular ga 16 - pc 920.00 - 4.1 bonds premium #DIV/0! 0.0% #DIV/0!
10 mm sq bar pcs 4.71 0 2 x 2 tubular ga 16 - pc 735.00 - 4.2 insurance premium #DIV/0! 0.0% #DIV/0!
12 mm sq bar pcs 6.7824 0 gi pipe 1 1/2 dia s 20 - pc 910.00 - 4.3 escalation #DIV/0! 0.0% #DIV/0!
2 x 4 tubular ga 16 - pcs 16.956 0 1/8 x flat bar - pc 50.00 -
2 x 3 tubular ga 16 pcs 14.13 0 1/8 x 1 flat bar - pc 130.00 - cost of money #DIV/0! 3.0% #DIV/0!
2 x 2 tubular ga 16 - pcs 11.304 0 1/4 x 1/2 flat bar - pc 105.00 - 4.5 contingencies #DIV/0! 5.0% #DIV/0!
gi pipe 1 1/2 dia s 20 pcs 16.89948 0 1/4 x 1 flat bar - pc 215.00 - 4.6 contractor's tax #DIV/0! 2.0% #DIV/0!
1/8 x flat bar pcs 1.9134375 0 3/16 x 1 flat bar - pc 170.00 - 4.7 profit #DIV/0! 10.0% #DIV/0!
1/8 x 1 flat bar pcs 3.826875 0 l 1 x 1 x 1/8 - pc 235.00 -
1/4 x 1/2 flat bar pcs 3.6796875 0 plain gi sheet ga 18 - pc 1,260.00 - #DIV/0! 20.0% #DIV/0!
1/4 x 1 flat bar 0 pcs 7.359375 0 plain round bar 16 mm dia - pc 395.00 -
3/16 x 1 flat bar pcs 5.4165 0 CYLINDRICAL HINGE - pc 50.00 -
l 1 x 1 x 1/8 pcs 7.359375 0 cast mouldings - pc 65.00 -
plain gi sheet ga 18 0 pcs welding rod - kg 110.00 - #DIV/0! #DIV/0!
cyclone wire 4' x 10' 0 roll
miscellaneous
wall cladding const bid cost/unit total bid cost summary
wall cladding classb #DIV/0! #DIV/0! project:
description qty width m length m area sqm unit cost qty: 0.00 sqm pcf #DIV/0!
- project cost 7.5% 1.0 direct cost amount in pesos pct wt. of total
- labor unit cost 300.00 - - proj.supervision 5.00% 1.1 labor 0.00 ### #DIV/0!
- equipment unit cost #DIV/0! #DIV/0! constn facilities 2.50% 1.2 direct equipment 0.00 ### #DIV/0!
- material unit cost #DIV/0! indirect eqpt 0% 1.3 materials #DIV/0! ### #DIV/0!
- wall cladding unit cost #DIV/0! sub con miscellaneous 0% 1.4 subcontract 0.00 ### #DIV/0!
- total cost #DIV/0! others 0% #DIV/0! 72.50 #DIV/0!
- duration - indirect cost 20%
- crew crew bonds premiums 0% 2.0 project cost
- labor 1 400.00 1.0 insurance premiums 0%
- tilesetter 1 500.00 escalation 0% 2.1 project supervision #DIV/0! 5.0% #DIV/0!
- cost of money 3% 2.2 construction facilities #DIV/0! 2.5% #DIV/0!
contingencies 5% 2.3 indirect equipment #DIV/0! 0.0% #DIV/0!
contractor tax 2% 2.4 miscellaneous #DIV/0! 0.0% #DIV/0!
profit 10.0% #DIV/0! 7.5% #DIV/0!
total 27.5%
bill of materials 3.0 other costs #DIV/0! 0.0% #DIV/0!
total volume - description qty unit unit cost amount #DIV/0! 0.0% #DIV/0!
wall cladding 0 sqm 350.00 -
4 x 8 green slate - 4.0 indirect cost
-
cement 0 bags 230.00 - 4.1 bonds premium #DIV/0! 0.0% #DIV/0!
5.0 sand 0.000 cum 850.00 - 4.2 insurance premium #DIV/0! 0.0% #DIV/0!
- 4.3 escalation #DIV/0! 0.0% #DIV/0!
acrytex clear 0 gal 500 - cost of money #DIV/0! 3.0% #DIV/0!
- 4.5 contingencies #DIV/0! 5.0% #DIV/0!
4.6 contractor's tax #DIV/0! 2.0% #DIV/0!
4.7 profit #DIV/0! 10.0% #DIV/0!
total P- #DIV/0! 20.0% #DIV/0!
#DIV/0! #DIV/0!
labor cost computation:
3.00 mh / sqm
material computation:
miscellaneous
floor finishes const bid cost/unit total bid cost summary
ceramic tiles 12 x 12" classb #DIV/0! #DIV/0! project:
description qty width m length m area sqm unit cost qty: 0.00 sqm pcf #DIV/0!
- project cost 7.5% 1.0 direct cost amount in pesos pct wt. of total
- labor unit cost 300.00 - - proj.supervision 5.00% 1.1 labor 0.00 ### #DIV/0!
- equipment unit cost #DIV/0! #DIV/0! constn facilities 2.50% 1.2 direct equipment 0.00 ### #DIV/0!
- material unit cost #DIV/0! indirect eqpt 0% 1.3 materials #DIV/0! ### #DIV/0!
- tile works unit cost #DIV/0! sub con miscellaneous 0% 1.4 subcontract 0.00 ### #DIV/0!
- total cost #DIV/0! others 0% #DIV/0! 72.50 #DIV/0!
- duration - indirect cost 20%
- crew crew bonds premiums 0% 2.0 project cost
- labor 1 400.00 1.0 insurance premiums 0%
- tilesetter 1 500.00 escalation 0% 2.1 project supervision #DIV/0! 5.0% #DIV/0!
- cost of money 3% 2.2 construction facilities #DIV/0! 2.5% #DIV/0!
- contingencies 5% 2.3 indirect equipment #DIV/0! 0.0% #DIV/0!
- contractor tax 2% 2.4 miscellaneous #DIV/0! 0.0% #DIV/0!
- profit 10.0% #DIV/0! 7.5% #DIV/0!
- total 27.5%
total volume - bill of materials 3.0 other costs #DIV/0! 0.0% #DIV/0!
description qty unit unit cost amount #DIV/0! 0.0% #DIV/0!
ceramic tiles - pcs 29.60 -
4.0 indirect cost
grout - gal 60.00 -
cement - bag 230.00 - 4.1 bonds premium #DIV/0! 0.0% #DIV/0!
sand - cum 850.00 - 4.2 insurance premium #DIV/0! 0.0% #DIV/0!
4.3 escalation #DIV/0! 0.0% #DIV/0!
tile trim pcs 50 - cost of money #DIV/0! 3.0% #DIV/0!
4.5 contingencies #DIV/0! 5.0% #DIV/0!
4.6 contractor's tax #DIV/0! 2.0% #DIV/0!
4.7 profit #DIV/0! 10.0% #DIV/0!
total P- #DIV/0! 20.0% #DIV/0!
#DIV/0! #DIV/0!
labor cost computation:
3.00 mh / sqm
material computation:
miscellaneous
floor finishes const bid cost/unit total bid cost SUMMARY
anti-skid at stair steps classb #DIV/0! #DIV/0! PROJECT:
description qty width m length m area no of tiles unit cost qty: 0.00 steps pcf #DIV/0!
project cost 7.5% 1.0 DIRECT COST AMOUNT IN PESOS PCT WT. OF TOTAL
Steps - labor unit cost 35.71 - - proj.supervision 5.00% 1.1 Labor 0.00 ### #DIV/0!
- equipment unit cost #DIV/0! #DIV/0! constn facilities 2.50% 1.2 Direct Equipment 0.00 ### #DIV/0!
- material unit cost #DIV/0! indirect eqpt 0% 1.3 Materials #DIV/0! ### #DIV/0!
- anti skid unit cost #DIV/0! sub con miscellaneous 0% 1.4 Subcontract 0.00 ### #DIV/0!
TOTAL - - total cost #DIV/0! others 0% #DIV/0! 72.50 #DIV/0!
duration - indirect cost 20%
crew crew bonds premiums 0% 2.0 PROJECT COST
labor 0 400 0.0 insurance premiums 0%
tilesetter 1 500 escalation 0% 2.1 Project Supervision #DIV/0! 5.0% #DIV/0!
cost of money 3% 2.2 Construction Facilities #DIV/0! 2.5% #DIV/0!
contingencies 5% 2.3 Indirect Equipment #DIV/0! 0.0% #DIV/0!
contractor tax 2% 2.4 Miscellaneous #DIV/0! 0.0% #DIV/0!
profit 10.0% #DIV/0! 7.5% #DIV/0!
total 27.5%
bill of materials 3.0 OTHER COSTS #DIV/0! 0.0% #DIV/0!
description qty unit unit cost amount #DIV/0! 0.0% #DIV/0!
14.00 step/day
material computation:
Miscellaneous
floor finishes const bid cost/unit total bid cost summary
ceramic tiles 12 x 12" (stair) classb #DIV/0! #DIV/0! project:
description qty width m length m area no of tiles unit cost qty: 0.00 sqm pcf #DIV/0!
steps 0.30 1.00 - - project cost 7.5% 1.0 direct cost amount in pesos pct wt. of total
rise 0.20 1.00 - - labor unit cost 300.00 - - proj.supervision 5.00% 1.1 labor 0.00 ### #DIV/0!
landing 1.00 2.00 - - equipment unit cost #DIV/0! #DIV/0! constn facilities 2.50% 1.2 direct equipment 0.00 ### #DIV/0!
landing 1.00 1.00 - - material unit cost #DIV/0! indirect eqpt 0% 1.3 materials #DIV/0! ### #DIV/0!
landing rise 0.20 1.40 - - tile works unit cost #DIV/0! sub con miscellaneous 0% 1.4 subcontract 0.00 ### #DIV/0!
total - - total cost #DIV/0! others 0% #DIV/0! 72.50 #DIV/0!
duration - indirect cost 20%
crew crew bonds premiums 0% 2.0 project cost
labor 1 400.00 1.0 insurance premiums 0%
tilesetter 1 500.00 escalation 0% 2.1 project supervision #DIV/0! 5.0% #DIV/0!
cost of money 3% 2.2 construction facilities #DIV/0! 2.5% #DIV/0!
contingencies 5% 2.3 indirect equipment #DIV/0! 0.0% #DIV/0!
contractor tax 2% 2.4 miscellaneous #DIV/0! 0.0% #DIV/0!
profit 10.0% #DIV/0! 7.5% #DIV/0!
total 27.5%
bill of materials 3.0 other costs #DIV/0! 0.0% #DIV/0!
description qty unit unit cost amount #DIV/0! 0.0% #DIV/0!
ceramic tiles - pcs 29.60 -
4.0 indirect cost
grout - gal 60.00 -
cement - bag 230.00 - 4.1 bonds premium #DIV/0! 0.0% #DIV/0!
sand - cum 850.00 - 4.2 insurance premium #DIV/0! 0.0% #DIV/0!
- 4.3 escalation #DIV/0! 0.0% #DIV/0!
cost of money #DIV/0! 3.0% #DIV/0!
4.5 contingencies #DIV/0! 5.0% #DIV/0!
4.6 contractor's tax #DIV/0! 2.0% #DIV/0!
4.7 profit #DIV/0! 10.0% #DIV/0!
total P- #DIV/0! 20.0% #DIV/0!
#DIV/0! #DIV/0!
labor cost computation:
3.00 mh / sqm
material computation:
miscellaneous
const bid cost/unit total bid cost summary
ceiling joist treatment (solignum) 1.0 coats #DIV/0! #DIV/0! project:
unit cost qty: 0.00 sqm pcf #DIV/0!
description area( sq.m) project cost 7.5% 1.0 direct cost amount in pesos pct wt. of total
labor unit cost 23.68 0.00 0.00 proj.supervision 5.00% 1.1 labor 0.00 #DIV/0! #DIV/0!
interior ceiling - equipment unit cost #DIV/0! #DIV/0! constn facilities 2.50% 1.2 direct equipment 0.00 #DIV/0! #DIV/0!
exterior ceiling - material unit cost #DIV/0! indirect eqpt 0% 1.3 materials #DIV/0! #DIV/0! #DIV/0!
solignum unit cost #DIV/0! sub con miscellaneous 0% 1.4 subcontract 0.00 #DIV/0! #DIV/0!
total - total cost #DIV/0! others 0% #DIV/0! 72.50 #DIV/0!
duration 0.00 indirect cost 20%
crew crew bonds premiums 0% 2.0 project cost
labor 1.00 400.00 1.00 insurance premiums 0%
painter 1.00 500.00 escalation 0% 2.1 project supervision #DIV/0! 5.0% #DIV/0!
cost of money 3% 2.2 construction facilities #DIV/0! 2.5% #DIV/0!
contingencies 5% 2.3 indirect equipment #DIV/0! 0.0% #DIV/0!
contractor tax 2% 2.4 miscellaneous #DIV/0! 0.0% #DIV/0!
profit 10.0% #DIV/0! 7.5% #DIV/0!
total 27.5%
3.0 other costs #DIV/0! 0.0% #DIV/0!
bill of materials #DIV/0! 0.0% #DIV/0!
description qty unit unit cost amount
solignum 0.000 gal 820.00 - 4.0 indirect cost
-
- 4.1 bonds premium #DIV/0! 0.0% #DIV/0!
- 4.2 insurance premium #DIV/0! 0.0% #DIV/0!
- 4.3 escalation #DIV/0! 0.0% #DIV/0!
total - cost of money #DIV/0! 3.0% #DIV/0!
4.5 contingencies #DIV/0! 5.0% #DIV/0!
labor cost computation: 4.6 contractor's tax #DIV/0! 2.0% #DIV/0!
4.7 profit #DIV/0! 10.0% #DIV/0!
enamel/spreading rate 1man/20sqm/day 0.40 mh/sqm #DIV/0! 20.0% #DIV/0!
preparation 1 man/ 2 sqm/day 4.00 mh/sqm
mh/sqm #DIV/0! #DIV/0!
38.00
.
material computation:
description spreading rate
solignum 0.0400 gal/sqm
water proofing const bid cost/unit total bid cost summary
water proofing & topping (roof deck) classb #DIV/0! #DIV/0! project:
description qty width m length m vol. cu.m. area sqm unit cost qty: - sqm pcf #DIV/0!
- 0.00 project cost 7.5% 1.0 direct cost amount in pesos pct wt. of total
- 0.00 labor unit cost 180.00 - - proj.supervision 5.00% 1.1 labor 0.00 #DIV/0! #DIV/0!
- 0.00 equipment unit cost #DIV/0! #DIV/0! constn facilities 2.50% 1.2 direct equipment 0.00 #DIV/0! #DIV/0!
- 0.00 material unit cost #DIV/0! indirect eqpt 0% 1.3 materials #DIV/0! #DIV/0! #DIV/0!
water proofing unit cost #DIV/0! sub con miscellaneous 0% 1.4 subcontract 0.00 #DIV/0! #DIV/0!
total volume 0.00 0.00 total cost #DIV/0! others 0% #DIV/0! 72.50 #DIV/0!
duration - indirect cost 20%
crew crew bonds premiums 0% 2.0 project cost
labor 1.00 400.00 1.00 insurance premiums 0%
tilesetter 1.00 500.00 escalation 0% 2.1 project supervision #DIV/0! 5.0% #DIV/0!
cost of money 3% 2.2 construction facilities #DIV/0! 2.5% #DIV/0!
contingencies 5% 2.3 indirect equipment #DIV/0! 0.0% #DIV/0!
contractor tax 2% 2.4 miscellaneous #DIV/0! 0.0% #DIV/0!
profit 10.0% #DIV/0! 7.5% #DIV/0!
total 27.5%
bill of materials 3.0 other costs #DIV/0! 0.0% #DIV/0!
description qty unit unit cost amount #DIV/0! 0.0% #DIV/0!
cement 0.00 bags 230.00 0.00
sand 0.00 cu m 850.00 0.00 4.0 indirect cost
sahara 0.00 bags 25.00 0.00
fosroc 0.00 gal 360.00 0.00 4.1 bonds premium #DIV/0! 0.0% #DIV/0!
4.2 insurance premium #DIV/0! 0.0% #DIV/0!
sahara for slab 0.00 bags 25.00 0.00 4.3 escalation #DIV/0! 0.0% #DIV/0!
cost of money #DIV/0! 3.0% #DIV/0!
4.5 contingencies #DIV/0! 5.0% #DIV/0!
4.6 contractor's tax #DIV/0! 2.0% #DIV/0!
4.7 profit #DIV/0! 10.0% #DIV/0!
total P- #DIV/0! 20.0% #DIV/0!
#DIV/0! #DIV/0!
labor cost computation:
5.00 sq m / day
material computation:
miscellaneous
const bid cost/co total bid cost summary
tv antena outlet #DIV/0! #DIV/0! project:
item no. description qty unit unit cost amount unit cost qty: 0.00 co pcf #DIV/0!
project cost 7.5% 1.0 direct cost amount in pesos pct wt. of total
labor unit cost 450.00 - - proj.supervision 5.00% 1.1 labor 0.00 #DIV/0! #DIV/0!
tv cable equipment unit cost #DIV/0! #DIV/0! constn facilities 2.50% 1.2 direct equipment 0.00 #DIV/0! #DIV/0!
material unit cost #DIV/0! indirect eqpt 0% 1.3 materials #DIV/0! #DIV/0! #DIV/0!
1 coax cable m 15.00 - outlet unit cost #DIV/0! sub con miscellaneous 0% 1.4 subcontract 0.00 #DIV/0! #DIV/0!
2 tv antena splitter pcs 60.00 - total cost #DIV/0! others 0% #DIV/0! 72.50 #DIV/0!
3 flexible hose 0.0 m 6.10 - duration - indirect cost 20%
4 1-gang tv terminal set pcs 90.00 - crew crew bonds premiums 0% 2.0 project cost
5 utility box 0.0 pcs 25.00 - labor 1 400.00 1.0 insurance premiums 0%
electrician 1 500.00 escalation 0% 2.1 project supervision #DIV/0! 5.0% #DIV/0!
cost of money 3% 2.2 construction facilities #DIV/0! 2.5% #DIV/0!
total : - contingencies 5% 2.3 indirect equipment #DIV/0! 0.0% #DIV/0!
0.0 contractor tax 2% 2.4 miscellaneous #DIV/0! 0.0% #DIV/0!
profit 10.0% #DIV/0! 7.5% #DIV/0!
total 27.5%
bill of materials 3.0 other costs #DIV/0! 0.0% #DIV/0!
#DIV/0! 0.0% #DIV/0!
2 #DIV/0! #DIV/0!
material computation:
miscellaneous
const bid cost/unit total bid cost summary
acu grills (1-unit) P3,293.16 26,345.27 project:
unit cost qty: 8.00 sq ft pcf 1.38
project cost 7.5% 1.0 direct cost amount in pesos pct wt. of total
NO. OF UNIT labor unit cost 1,203.93 9,631.44 9,631.44 proj.supervision 5.00% 1.1 labor 9631.44 36.56 36.56
equipment unit cost 481.57 171.49 constn facilities 2.50% 1.2 direct equipment 3852.58 14.62 14.62
material unit cost 702.04 indirect eqpt 0.00% 1.3 materials 5616.31 21.32 21.32
acu grills unit cost 2,387.54 sub con miscellaneous 0.00% 1.4 subcontract 0.00 0.00 0.00
description qty h l sq ft total cost 19,100.32 others 0.00% 19100.32 72.50 72.50
1.00 0.50 1.44 8.00 duration 10.70 indirect cost 20%
- 0.50 1.04 - crew crew bonds premiums 0.00% 2.0 project cost
- 0.52 0.72 - labor 1 400.00 1 insurance premiums 0.00%
- 1 500.00 escalation 0.00% 2.1 project supervision 1317.26 5.0% 5.00
AREA 8.00 cost of money 3.00% 2.2 construction facilities 658.63 2.5% 2.50
equipment contingencies 5.00% 2.3 indirect equipment 0.00 0.0% 0.00
materials qty unit unit wt total wt contractor tax 2.00% 2.4 miscellaneous 0.00 0.0% 0.00
10 mm sq bar 0.00 pcs 4.71 0 profit 10.00% 1975.90 7.5% 7.50
1 1/2 x 1 1/2 x3/16 14 pcs 21.84 305.76 total 27.5%
welding rod 7.644 kgs bill of materials 3.0 other costs 0 0.0% 0.00
epoxy primer 0.0266666667 gal description qty unit unit cost amount 0 0.0% 0.00
lacquer thinner gal 10 mm sq bar - pc 110.00 -
total wt 305.76 1 1/2 x 1 1/2 x3/16 14.00 pc 340.00 4,760.00 4.0 indirect cost
welding rod 7.64 kg 110.00 840.84
labor epoxy primer 0.03 gal 580.00 15.47 4.1 bonds premium 0.00 0.0% 0.00
fabrication 0.22 mh/kg lacquer thinner - gal 160.00 - 4.2 insurance premium 0.00 0.0% 0.00
delivery 0.04 mh/kg total 5,616.31 4.3 escalation 0.00 0.0% 0.00
painting 0.02 mh/kg
0.28 mh/kg cost of money 790.36 3.0% 3.00
labor cost computation: 4.5 contingencies 1317.26 5.0% 5.00
labor 28.57143 kg / day 4.6 contractor's tax 526.91 2.0% 2.00
= total area / no of days 0.75 sq ft /day 4.7 profit 2634.53 10.0% 10.00
no of days 10.7016
5269.05 20.0% 20.00
material computation:
miscellaneous
CONST BID COST/CO TOTAL BID COST SUMMARY
telephone outlet #DIV/0! #DIV/0! PROJECT:
UNIT COST qty: 0.00 CO PCF #DIV/0!
Project cost 7.5% 1.0 DIRECT COST AMOUNT IN PESOS PCT WT. OF TOTAL
labor unit cost 450.00 - - Proj.Supervision 5.00% 1.1 Labor 0.00 #DIV/0! #DIV/0!
equipment unit cost #DIV/0! #DIV/0! Constn Facilities 2.50% 1.2 Direct Equipment 0.00 #DIV/0! #DIV/0!
item no. description qty unit unit cost amount material unit cost #DIV/0! Indirect Eqpt 0% 1.3 Materials #DIV/0! #DIV/0! #DIV/0!
- outlet unit cost #DIV/0! sub con Miscellaneous 0% 1.4 Subcontract 0.00 #DIV/0! #DIV/0!
TELEPHONE - total cost #DIV/0! Others 0% #DIV/0! 72.50 #DIV/0!
- duration - Indirect Cost 20%
1 WIRE 0.0 M 8.00 - crew crew Bonds Premiums 0% 2.0 PROJECT COST
2 1-GANG TELEPHONE MODULAR JACK pcs 90.00 - labor 1 400.00 1.0 Insurance Premium 0%
3 UTILITY BOX 0.0 pcs 25.00 - electrician 1 500.00 Escalation 0% 2.1 Project Supervision #DIV/0! 5.0% #DIV/0!
4 FLEXIBLE HOSE 1/2" DIA 0.0 M 6.10 - Cost of Money 3% 2.2 Construction Facilities #DIV/0! 2.5% #DIV/0!
Contingencies 5% 2.3 Indirect Equipment #DIV/0! 0.0% #DIV/0!
total : - Contractor Tax 2% 2.4 Miscellaneous #DIV/0! 0.0% #DIV/0!
0.0 Profit 10.0% #DIV/0! 7.5% #DIV/0!
Total 27.5%
bill of materials 3.0 OTHER COSTS #DIV/0! 0.0% #DIV/0!
#DIV/0! 0.0% #DIV/0!
2 #DIV/0! #DIV/0!
material computation:
Miscellaneous
basis 200 kgs CONST BID COST/unit TOTAL BID COST SUMMARY
wood trellis sundry #DIV/0! #DIV/0! PROJECT:
UNIT COST QTY 0.00 bd ft #DIV/0!
Project cost 7.5% 1.0 DIRECT COST AMOUNT IN PESOS PCT WT. OF TOTAL
labor unit cost 18.00 - - Proj.Supervision 5.00% 1.1 Labor 0.00 ### #DIV/0!
equipment unit cost #DIV/0! #DIV/0! #DIV/0! Constn Facilities 2.50% 1.2 Direct Equipment #DIV/0! ### #DIV/0!
material unit cost #DIV/0! - Indirect Eqpt 0% 1.3 Materials #DIV/0! ### #DIV/0!
trellis unit cost #DIV/0! sub con P- Miscellaneuos 0% 1.4 Subcontract 0.00 ### #DIV/0!
total cost #DIV/0! Others 0% #DIV/0! 72.50 #DIV/0!
duration - Indirect Cost 20%
crew crew Bonds Premiums 0% 2.0 PROJECT COST
labor 1 400.00 1.0 Insurance Premiums 0%
CARPENTER 1 500.00 Escalation 0% 2.1 Project Supervision #DIV/0! 5.0% #DIV/0!
Cost of Money 3% 2.2 Construction Facilities #DIV/0! 2.5% #DIV/0!
equipment Contingecies 5% 2.3 Indirect Equipment #DIV/0! 0.0% #DIV/0!
Contractor Tax 2% 2.4 Miscellaneous #DIV/0! 0.0% #DIV/0!
Profit 10.0% #DIV/0! 7.5% #DIV/0!
Total 26.5%
bill of materials 3.0 OTHER COSTS #DIV/0! 0.0% #DIV/0!
NO. OF PCS WIDTH THICK LENGTH description qty unit unit cost amount #DIV/0! 0.0% #DIV/0!
3 6 16 BEAM - bdft 36.00 -
BEAM - bdft 36.00 -
2 5 12 TRELLIS - bdft 36.00 -
-
assrtd cwn - kg 55.00 -
-
-
- -
total P-
fabricate/install 50 bdft/day
0
const bid cost/unit total bid cost summary
polycarbonate sheet #DIV/0! #DIV/0! project:
qty: 0.00 sqm pcf #DIV/0!
project cost 7.5% 1.0 direct cost amount in pesos pct wt. of total
labor unit cost 600.00 - - proj.supervision 5.00% 1.1 labor 0.00 ### #DIV/0!
description qty area unit unitcost amount equipment unit cost #DIV/0! 0.00 constn facilities 2.50% 1.2 direct equipment 0.00 ### #DIV/0!
(sq ft) material unit cost #DIV/0! #DIV/0! indirect eqpt 0% 1.3 materials #DIV/0! ### #DIV/0!
stair railings unit cost #DIV/0! sub con #DIV/0! miscellaneous 0% 1.4 subcontract ### #DIV/0!
sqm - total cost #DIV/0! others 0% #DIV/0! 72.50 #DIV/0!
area 0.00 - duration - indirect cost 20%
crew crew bonds premiums 0% 2.0 project cost
labor 1 400.00 1.0 insurance premiums 0%
tinsmith 1 500.00 escalation 0% 2.1 project supervision #DIV/0! 5.0% #DIV/0!
cost of money 3% 2.2 construction facilities #DIV/0! 2.5% #DIV/0!
contingencies 5% 2.3 indirect equipment #DIV/0! 0.0% #DIV/0!
contractor tax 2% 2.4 miscellaneous #DIV/0! 0.0% #DIV/0!
profit 10.0% #DIV/0! 7.5% #DIV/0!
total 27.5%
bill of materials 3.0 other costs #DIV/0! 0.0% #DIV/0!
description qty unit unit cost amount #DIV/0! 0.0% #DIV/0!
7x19
polycarbonate sheet pc 8000 - 4.0 indirect cost
screw 60.00 pc 1.5 90.00
polycarbonate sheet (4x16) 3.00 pc 4900 14,700.00 4.1 bonds premium #DIV/0! 0.0% #DIV/0!
4.2 insurance premium #DIV/0! 0.0% #DIV/0!
- 4.3 escalation #DIV/0! 0.0% #DIV/0!
- cost of money #DIV/0! 3.0% #DIV/0!
- 4.5 contingencies #DIV/0! 5.0% #DIV/0!
total P14,790.00 4.6 contractor's tax #DIV/0! 2.0% #DIV/0!
4.7 profit #DIV/0! 10.0% #DIV/0!
#DIV/0! 20.0% #DIV/0!
labor cost computation:
#DIV/0! #DIV/0!
fabrication/install 1.5 sqm/day
1.5 sqm/day
material computation:
summary
project:
#DIV/0! #DIV/0!
glass block 8"x8" const bid cost/unit total bid cost summary
glass block 8"x8" glass blocks 8" x 8" #DIV/0! #DIV/0! project:
unit cost qty: 0.00 sqm pcf #DIV/0!
project cost 7.5% 1.0 direct cost amount in pesos pct wt. of total
description area qty unit unit cost amount labor unit cost 333 0 0 proj.supervision 5.00% 1.1 labor 0.00 ### #DIV/0!
glass block 0.00 pcs 90 0 equipment unit cost #DIV/0! #DIV/0! constn facilities 2.50% 1.2 direct equipment 0.00 ### #DIV/0!
area 0.00 0 material unit cost #DIV/0! indirect eqpt 0% 1.3 materials #DIV/0! ### #DIV/0!
glass blocks unit cost #DIV/0! sub con miscellaneous 0% 1.4 subcontract 0.00 ### #DIV/0!
total cost #DIV/0! others 0% #DIV/0! 72.50 #DIV/0!
duration - indirect cost 20%
crew crew bonds premiums 0% 2.0 project cost
labor 1.0 insurance premiums 0%
tilesetter 1 500 escalation 0% 2.1 project supervision #DIV/0! 5.0% #DIV/0!
cost of money 3% 2.2 construction facilities #DIV/0! 2.5% #DIV/0!
equipment contingencies 5% 2.3 indirect equipment #DIV/0! 0.0% #DIV/0!
contractor tax 2% 2.4 miscellaneous #DIV/0! 0.0% #DIV/0!
profit 10.0% #DIV/0! 7.5% #DIV/0!
total 27.5%
total 5.0% 3.0 other costs #DIV/0! 0.0% #DIV/0!
bill of materials #DIV/0! 0.0% #DIV/0!
description qty unit unit cost amount
4.0 indirect cost
#DIV/0! #DIV/0!
3 sqm/day #DIV/0! #DIV/0!
material computation:
cabinets const bid cost/unit total bid cost summary
bedroom closet #DIV/0! #DIV/0! project:
unit cost qty: lot pcf #DIV/0!
project cost 7.5% 1.0 direct cost amount in pesos pct wt. of total
labor unit cost 2,571.43 - - proj.supervision 5.00% 1.1 labor 0.00 ### #DIV/0!
equipment unit cost #DIV/0! #DIV/0! constn facilities 2.50% 1.2 direct equipment 0.00 ### #DIV/0!
material unit cost #DIV/0! indirect eqpt 0% 1.3 materials #DIV/0! ### #DIV/0!
cabinet unit cost #DIV/0! sub con miscellaneous 0% 1.4 subcontract 0.00 ### #DIV/0!
total cost #DIV/0! others 0% #DIV/0! 72.50 #DIV/0!
duration - indirect cost 20%
crew crew bonds premiums 0% 2.0 project cost
1 400.00 1.0 insurance premiums 0%
1 500.00 escalation 0% 2.1 project supervision #DIV/0! 5.0% #DIV/0!
cost of money 3% 2.2 construction facilities #DIV/0! 2.5% #DIV/0!
equipment contingencies 5% 2.3 indirect equipment #DIV/0! 0.0% #DIV/0!
contractor tax 2% 2.4 miscellaneous #DIV/0! 0.0% #DIV/0!
profit 10.0% #DIV/0! 7.5% #DIV/0!
total 27.5%
total 5.0% 3.0 other costs #DIV/0! 0.0% #DIV/0!
bill of materials #DIV/0! 0.0% #DIV/0!
description qty unit unit cost amount
4.0 indirect cost
3/16 ordinary plywood pcs 250.00 0.00 4.1 bonds premium #DIV/0! 0.0% #DIV/0!
gd lumber 2 x 3 x 10ft pcs 180.00 0.00 4.2 insurance premium #DIV/0! 0.0% #DIV/0!
gd lumber 2 x 3 x 12ft pcs 216.00 0.00 4.3 escalation #DIV/0! 0.0% #DIV/0!
gd lumber 1 1/2 x 2 x 8ft pcs 72.00 0.00 cost of money #DIV/0! 3.0% #DIV/0!
gd lumber x 2 x 8ft pcs 44.00 0.00 4.5 contingencies #DIV/0! 5.0% #DIV/0!
gd lumber x 2 x 10ft pcs 55.00 0.00 4.6 contractor's tax #DIV/0! 2.0% #DIV/0!
plyboard ord pcs 710.00 0.00 4.7 profit #DIV/0! 10.0% #DIV/0!
finishing nail pcs 75.00 0.00 #DIV/0! 20.0% #DIV/0!
stick well kg 120.00 0.00
concealed hinges pcs 25.00 0.00 0 #DIV/0! #DIV/0!
closet handle pcs 25.00 0.00
aluminum pipe 1 dia 16 ft pcs 240.00 0.00
flanges 1 dia pcs 30.00 0.00
lockset pcs 75.00 0.00
half c moulding x x 10' pcs 55.00 0.00
total P-
sqm/day
0.35 sqm/day
material computation:
const bid cost/unit total bid cost summary
cornice #DIV/0! #DIV/0! project:
unit cost qty: 0.00 lft pcf #DIV/0!
project cost 7.5% 1.0 direct cost amount in pesos pct wt. of total
description perimeter l ft qty unit unit cost amount labor unit cost 12.00 - - proj.supervision 5.00% 1.1 labor 0.00 #DIV/0! #DIV/0!
cornice 4 (cn 1 4b) x 14 ft 0.00 0.00 pcs 330.40 - equipment unit cost #DIV/0! 0.00 constn facilities 2.50% 1.2 direct equipment 0.00 #DIV/0! #DIV/0!
cornice 3 (cn 1 3b) x 14 ft 0.00 0.00 pcs 247.80 - material unit cost #DIV/0! indirect eqpt 0% 1.3 materials #DIV/0! #DIV/0! #DIV/0!
cornice 2 (cn 1 2b) x 14 ft 0.00 0.00 pcs 165.20 - base board 4 #DIV/0! sub con miscellaneous 0% 1.4 subcontract 0.00 #DIV/0! #DIV/0!
0.00 0.00 pcs - total cost #DIV/0! others 0% #DIV/0! 72.50 #DIV/0!
length 0.00 0.00 0.00 - duration - indirect cost 20%
crew crew bonds premiums 0% 2.0 project cost
labor 1 400.00 1.0 insurance premiums 0%
w/ 10 per cent allowance carpenter 1 500.00 escalation 0% 2.1 project supervision #DIV/0! 5.0% #DIV/0!
cost of money 3% 2.2 construction facilities #DIV/0! 2.5% #DIV/0!
equipment contingencies 5% 2.3 indirect equipment #DIV/0! 0.0% #DIV/0!
contractor tax 2% 2.4 miscellaneous #DIV/0! 0.0% #DIV/0!
profit 10.0% #DIV/0! 7.5% #DIV/0!
total 27.5%
total 5.0% 3.0 other costs #DIV/0! 0.0% #DIV/0!
bill of materials #DIV/0! 0.0% #DIV/0!
description qty unit unit cost amount
cornice 0.00 pcs 0.00 0.00 4.0 indirect cost
finshing nail 0.01 kg 70.00 0.37
stikwell 0.00 can 120.00 0.00 4.1 bonds premium #DIV/0! 0.0% #DIV/0!
screw with tox 0.00 pcs 2.00 0.00 4.2 insurance premium #DIV/0! 0.0% #DIV/0!
4.3 escalation #DIV/0! 0.0% #DIV/0!
cost of money #DIV/0! 3.0% #DIV/0!
4.5 contingencies #DIV/0! 5.0% #DIV/0!
4.6 contractor's tax #DIV/0! 2.0% #DIV/0!
4.7 profit #DIV/0! 10.0% #DIV/0!
#DIV/0! 20.0% #DIV/0!
total P0.37
#DIV/0! #DIV/0!
#DIV/0! #DIV/0!
labor cost computation:
install 75 lf/day
pcs/ day
75 pcs/ day
material computation:
miscellaneous miscellaneous
mouldings cast in place const bid cost/lm total bid cost summary
concrete moldings 4 #DIV/0! #DIV/0! project:
unit cost qty: 0.00 lm pcf #DIV/0!
project cost 7.5% 1.0 direct cost amount in pesos pct wt. of total
length m labor unit cost 100.00 - - proj.supervision 5.00% 1.1 labor 0.00 ### #DIV/0!
equipment unit cost #DIV/0! #DIV/0! constn facilities 2.50% 1.2 direct equipment 0.00 ### #DIV/0!
material unit cost #DIV/0! indirect eqpt 0% 1.3 materials #DIV/0! ### #DIV/0!
concrete molding unit cost #DIV/0! sub con miscellaneous 0% 1.4 subcontract 0.00 ### #DIV/0!
total cost #DIV/0! others 0% #DIV/0! 72.50 #DIV/0!
duration - indirect cost 20%
crew crew bonds premiums 0% 2.0 project cost
labor 0 400.00 2.0 insurance premiums 0%
mason 1 500.00 escalation 0% 2.1 project supervision #DIV/0! 5.0% #DIV/0!
cost of money 3% 2.2 construction facilities #DIV/0! 2.5% #DIV/0!
contingencies 5% 2.3 indirect equipment #DIV/0! 0.0% #DIV/0!
contractor tax 2% 2.4 miscellaneous #DIV/0! 0.0% #DIV/0!
equipment profit 10.0% #DIV/0! 7.5% #DIV/0!
total 27.5%
bill of materials 3.0 other costs #DIV/0! 0.0% #DIV/0!
description qty unit unit cost amount #DIV/0! 0.0% #DIV/0!
-
- Welding rod - Kgs 100.00 - 4.0 indirect cost
concrete moldings 4 - Lm 85.00 -
Concrete moulding canvass @ lolong bruzon - 4.1 bonds premium #DIV/0! 0.0% #DIV/0!
Cel no 0918-534-9586 - 4.2 insurance premium #DIV/0! 0.0% #DIV/0!
Cement 0 Bags 230.00 - 4.3 escalation #DIV/0! 0.0% #DIV/0!
Sand 0 Cu m 850.00 - cost of money #DIV/0! 3.0% #DIV/0!
4.5 contingencies #DIV/0! 5.0% #DIV/0!
4.6 contractor's tax #DIV/0! 2.0% #DIV/0!
4.7 profit #DIV/0! 10.0% #DIV/0!
total - #DIV/0! 20.0% #DIV/0!
#DIV/0! #DIV/0!
labor cost computation:
material computation:
miscellaneous
mouldings cast in place const bid cost/lm total bid cost summary
concrete moldings 5 #DIV/0! #DIV/0! project:
unit cost qty: 0.00 lm pcf #DIV/0!
project cost 7.5% 1.0 direct cost amount in pesos pct wt. of total
length m labor unit cost 100.00 - - proj.supervision 5.00% 1.1 labor 0.00 ### #DIV/0!
equipment unit cost #DIV/0! #DIV/0! constn facilities 2.50% 1.2 direct equipment 0.00 ### #DIV/0!
material unit cost #DIV/0! indirect eqpt 0% 1.3 materials #DIV/0! ### #DIV/0!
concrete molding unit cost #DIV/0! sub con miscellaneous 0% 1.4 subcontract 0.00 ### #DIV/0!
total cost #DIV/0! others 0% #DIV/0! 72.50 #DIV/0!
duration - indirect cost 20%
crew crew bonds premiums 0% 2.0 project cost
labor 0 400.00 2.0 insurance premiums 0%
mason 1 500.00 escalation 0% 2.1 project supervision #DIV/0! 5.0% #DIV/0!
cost of money 3% 2.2 construction facilities #DIV/0! 2.5% #DIV/0!
contingencies 5% 2.3 indirect equipment #DIV/0! 0.0% #DIV/0!
contractor tax 2% 2.4 miscellaneous #DIV/0! 0.0% #DIV/0!
equipment profit 10.0% #DIV/0! 7.5% #DIV/0!
total 27.5%
bill of materials 3.0 other costs #DIV/0! 0.0% #DIV/0!
description qty unit unit cost amount #DIV/0! 0.0% #DIV/0!
-
- Welding rod - Kgs 100.00 - 4.0 indirect cost
concrete moldings 5 - Lm 120.00 -
Concrete moulding canvass @ lolong bruzon - 4.1 bonds premium #DIV/0! 0.0% #DIV/0!
Cel no 0918-534-9586 - 4.2 insurance premium #DIV/0! 0.0% #DIV/0!
Cement 0 Bags 230.00 - 4.3 escalation #DIV/0! 0.0% #DIV/0!
Sand 0 Cu m 850.00 - cost of money #DIV/0! 3.0% #DIV/0!
4.5 contingencies #DIV/0! 5.0% #DIV/0!
4.6 contractor's tax #DIV/0! 2.0% #DIV/0!
4.7 profit #DIV/0! 10.0% #DIV/0!
total - #DIV/0! 20.0% #DIV/0!
#DIV/0! #DIV/0!
labor cost computation:
material computation:
miscellaneous
const bid cost/unit total bid cost summary item no.27 painting works const bid cost/unit total bid cost summary
base board 4 (bb 1- 4b) x 14 ft #DIV/0! #DIV/0! project: enamel 1.0 coats #DIV/0! - project:
unit cost qty: 0.00 l ft pcf #DIV/0!
project cost 7.5% 1.0 direct cost amount in pesos pct wt. of total pct wt. of total
description Perimeter L ft qty unit labor unit cost 12.00 - - proj.supervision 5.00% 1.1 labor 0.00 #DIV/0! #DIV/0! #DIV/0! #DIV/0!
Grnd & 2nd floor 0.00 0.00 Pcs equipment unit cost #DIV/0! 0.00 constn facilities 2.50% 1.2 direct equipment 0.00 #DIV/0! #DIV/0! #DIV/0! #DIV/0!
material unit cost #DIV/0! indirect eqpt 0% 1.3 materials #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
Base board 4 #DIV/0! sub con miscellaneous 0% 1.4 subcontract 0.00 #DIV/0! #DIV/0! #DIV/0! #DIV/0!
total cost #DIV/0! others 0% #DIV/0! 72.50 #DIV/0! 100.00 #DIV/0!
duration - indirect cost 20%
crew crew bonds premiums 0% 2.0 project cost
labor 1 400.00 1.0 insurance premiums 0%
Carpenter 1 500.00 escalation 0% 2.1 project supervision #DIV/0! 5.0% #DIV/0! 0.0% #DIV/0!
cost of money 3% 2.2 construction facilities #DIV/0! 2.5% #DIV/0! 0.0% #DIV/0!
equipment contingencies 5% 2.3 indirect equipment #DIV/0! 0.0% #DIV/0! 0.0% #DIV/0!
contractor tax 2% 2.4 miscellaneous #DIV/0! 0.0% #DIV/0! 0.0% #DIV/0!
profit 10.0% #DIV/0! 7.5% #DIV/0! 0.0% #DIV/0!
total 27.5%
total 5.0% 3.0 other costs #DIV/0! 0.0% #DIV/0! 0.0% #DIV/0!
bill of materials #DIV/0! 0.0% #DIV/0! 0.0% #DIV/0!
description qty unit unit cost amount
Base board 4 (BB 1- 4b) x 14 ft 0.00 PCS 341.60 0.00 4.0 indirect cost
Finshing nail 0.01 Kg 75.00 0.39
Stikwell 0.00 Can 120.00 0.00 4.1 bonds premium #DIV/0! 0.0% #DIV/0! 0.0% #DIV/0!
Screw with tox 0.00 PCS 2.00 0.00 4.2 insurance premium #DIV/0! 0.0% #DIV/0! 0.0% #DIV/0!
4.3 escalation #DIV/0! 0.0% #DIV/0! 0.0% #DIV/0!
cost of money #DIV/0! 3.0% #DIV/0! 0.0% #DIV/0!
4.5 contingencies #DIV/0! 5.0% #DIV/0! 0.0% #DIV/0!
4.6 contractor's tax #DIV/0! 2.0% #DIV/0! 0.0% #DIV/0!
Length 0 lft 4.7 profit #DIV/0! 10.0% #DIV/0! 0.0% #DIV/0!
#DIV/0! 20.0% #DIV/0! 0.0% #DIV/0!
total P0.39
W/ 10 per cent allowance #DIV/0! #DIV/0! #DIV/0!
#DIV/0! #DIV/0!
labor cost computation:
install 75 lf/day
PCS/ DAY
75 PCS/ DAY
material computation:
miscellaneous miscellaneous
PAINTING WORKS CONST BID COST/unit TOTAL BID COST SUMMARY
varnish 2.0 COATS #DIV/0! #DIV/0! PROJECT:
UNIT COST qty: 0.00 SQM PCF #DIV/0!
DESCRIPTION AREA Project cost 7.5% 1.0 DIRECT COST AMOUNT IN PESOS PCT WT. OF TOTAL
labor unit cost 150.00 0.00 0.00 Proj.Supervision 5.00% 1.1 Labor 0.00 #DIV/0! #DIV/0!
HANDRAIL 0.00 equipment unit cost #DIV/0! 0.00 Constn Facilities 2.50% 1.2 Direct Equipment 0.00 #DIV/0! #DIV/0!
KING POST 0.00 material unit cost #DIV/0! Indirect Eqpt 0% 1.3 Materials #DIV/0! #DIV/0! #DIV/0!
BASEBOARD 0.00 painting unit cost #DIV/0! sub con Miscellaneous 0% 1.4 Subcontract 0.00 #DIV/0! #DIV/0!
CORNICE 0.00 total cost #DIV/0! Others 0% #DIV/0! 72.50 #DIV/0!
CABINET duration 0.00 Indirect Cost 20%
CAPIZ 0.00 crew crew Bonds Premiums 0% 2.0 PROJECT COST
DOOR labor 1.00 400.00 1.00 Insurance Premiums 0%
DOOR CASING 0.00 painter 1.00 500.00 Escalation 0% 2.1 Project Supervision #DIV/0! 5.0% #DIV/0!
TOTAL 0.00 Cost of Money 3% 2.2 Construction Facilities #DIV/0! 2.5% #DIV/0!
Contingencies 5% 2.3 Indirect Equipment #DIV/0! 0.0% #DIV/0!
Contractor Tax 2% 2.4 Miscellaneous #DIV/0! 0.0% #DIV/0!
Profit 10.0% #DIV/0! 7.5% #DIV/0!
Total 27.5%
3.0 OTHER COSTS #DIV/0! 0.0% #DIV/0!
bill of materials #DIV/0! 0.0% #DIV/0!
description qty unit unit cost amount
lacquer thinner 0.000 gal 160.00 - 4.0 INDIRECT COST
Polyurethane reducer 0.000 Lit 135.00 -
sanding sealer 0.000 gal 470.00 - 4.1 Bonds Premium #DIV/0! 0.0% #DIV/0!
sanding paper 0.000 Pcs 10.00 - 4.2 Insurance Premium #DIV/0! 0.0% #DIV/0!
stopa 0.000 kgs 50.00 - 4.3 Escalation #DIV/0! 0.0% #DIV/0!
paint brush 1.000 Pcs 75.00 75.00 Cost of Money #DIV/0! 3.0% #DIV/0!
polyurethane(top coat) 0.000 gal 960.00 - 4.5 Contingencies #DIV/0! 5.0% #DIV/0!
- 4.6 Contractor's Tax #DIV/0! 2.0% #DIV/0!
- 4.7 Profit #DIV/0! 10.0% #DIV/0!
- #DIV/0! 20.0% #DIV/0!
total 75.00
#DIV/0! #DIV/0!
labor cost computation:
6.00
.
material computation:
description spreading rate
LACQUER THINNER 0.04 GAL/SQM 0.0400 gal/sqm
CLEAR GLOSS 0.09 GAL/SQM/COAT 0.0882 gal/sqm
SANDING SEALER 0.16QRT/SQM 0.16000 gal/sqm
LACQUER FLO 0.26QRT/SQM 0.26 ps/sqm
SANDING PAPER 1.50PC/SQM 1.5
STOPA 1 KG/SQM 0.52910053
Polyurethane(top coat) 0.04 0.04 gal/sqm/coat
const bid cost/unit total bid cost summary
gi canopy #DIV/0! #DIV/0! project:
unit cost qty: - sq ft pcf #DIV/0!
project cost 7.5% 1.0 direct cost amount in pesos pct wt. of total
description qty h length m sq ft labor unit cost #DIV/0! #DIV/0! #DIV/0! proj.supervision 5.00% 1.1 labor #DIV/0! ### #DIV/0!
0.70 3.00 - equipment unit cost #DIV/0! #DIV/0! constn facilities 2.50% 1.2 direct equipment #DIV/0! ### #DIV/0!
- material unit cost #DIV/0! indirect eqpt 0.00% 1.3 materials #DIV/0! ### #DIV/0!
- unit cost #DIV/0! sub con miscellaneous 0.00% 1.4 subcontract 0.00 ### #DIV/0!
- total cost #DIV/0! others 0.00% #DIV/0! 72.50 #DIV/0!
- duration #DIV/0! indirect cost 20%
- crew crew bonds premiums 0.00% 2.0 project cost
- labor 1 400.00 1 insurance premiums 0.00%
- 1 500.00 escalation 0.00% 2.1 project supervision #DIV/0! 5.0% #DIV/0!
- cost of money 3.00% 2.2 construction facilities #DIV/0! 2.5% #DIV/0!
- equipment contingencies 5.00% 2.3 indirect equipment #DIV/0! 0.0% #DIV/0!
- contractor tax 2.00% 2.4 miscellaneous #DIV/0! 0.0% #DIV/0!
- profit 10.00% #DIV/0! 7.5% #DIV/0!
- total 27.5%
- bill of materials 3.0 other costs #DIV/0! 0.0% #DIV/0!
- description qty unit unit cost amount #DIV/0! 0.0% #DIV/0!
- 3/16 x 1 flat bar 3.00 pc 170.00 510.00
area - sq ft L 1 1/2 x 1 1/2 x 3/16 3.00 pc 340.00 1,020.00 4.0 indirect cost
plain gi sheet ga 24 2.00 pc 520.00 1,040.00
materials qty unit unit wt total wt Design (lace) x 8' 2.00 PCS 200.00 400.00 4.1 bonds premium #DIV/0! 0.0% #DIV/0!
3/16 x 1 flat bar 3 pcs 5.4165 16.2495 welding rod 2.04 kg 100.00 204.42 4.2 insurance premium #DIV/0! 0.0% #DIV/0!
L 1 1/2 x 1 1/2 x 3/16 3 pcs 21.84 65.52 Epoxy primer - gal 580.00 - 4.3 escalation #DIV/0! 0.0% #DIV/0!
plain gi sheet ga 24 2 pcs Lacquer thinner - gal 160.00 -
Design (lace) x 8' 2 pcs total 3,174.42 cost of money #DIV/0! 3.0% #DIV/0!
welding rod 2.0442375 kgs 4.5 contingencies #DIV/0! 5.0% #DIV/0!
Epoxy primer 0 gal 4.6 contractor's tax #DIV/0! 2.0% #DIV/0!
Lacquer thinner 0 gal labor cost computation: 4.7 profit #DIV/0! 10.0% #DIV/0!
total wt 81.7695
= total area / no of days 0.00 sq ft /day #DIV/0! 20.0% #DIV/0!
labor
fabrication 0.22 mh/kg
delivery 0.04 mh/kg
painting 0.02 mh/kg #DIV/0! #DIV/0!
0.28 mh/kg 0.00 sq ft /day
miscellaneous
CONST BID COST/unit TOTAL BID COST SUMMARY
cabinetry (kit hanging cabinet & bedroom closets) #DIV/0! #DIV/0! PROJECT:
UNIT COST qty: lot PCF #DIV/0!
Project cost 7.5% 1.0 DIRECT COST AMOUNT IN PESOS PCT WT. OF TOTAL
labor unit cost 2,571.43 - - Proj.Supervision 5.00% 1.1 Labor 0.00 ### #DIV/0!
equipment unit cost #DIV/0! #DIV/0! Constn Facilities 2.50% 1.2 Direct Equipment 0.00 ### #DIV/0!
material unit cost #DIV/0! Indirect Eqpt 0% 1.3 Materials #DIV/0! ### #DIV/0!
tilework unit cost #DIV/0! Miscellaneous 0% 1.4 Subcontract 0.00 ### #DIV/0!
total cost #DIV/0! Others 0% #DIV/0! 72.50 #DIV/0!
duration - Indirect Cost 20%
crew crew Bonds Premiums 0% 2.0 PROJECT COST
1 400.00 1.0 Insurance Premiums 0%
1 500.00 Escalation 0% 2.1 Project Supervision #DIV/0! 5.0% #DIV/0!
Cost of Money 3% 2.2 Construction Facilities #DIV/0! 2.5% #DIV/0!
equipment Contingencies 5% 2.3 Indirect Equipment #DIV/0! 0.0% #DIV/0!
Contractor Tax 2% 2.4 Miscellaneous #DIV/0! 0.0% #DIV/0!
Profit 10.0% #DIV/0! 7.5% #DIV/0!
Total 27.5%
Total 5.0% 3.0 OTHER COSTS #DIV/0! 0.0% #DIV/0!
bill of materials #DIV/0! 0.0% #DIV/0!
description qty unit unit cost amount
4.0 INDIRECT COST
Bedroom cabinets
Gd lumber 2 x 3 x 10ft Pcs 180.00 0.00 4.1 Bonds Premium #DIV/0! 0.0% #DIV/0!
Gd lumber 2 x 3 x 12ft Pcs 216.00 0.00 4.2 Insurance Premium #DIV/0! 0.0% #DIV/0!
Gd lumber 2 x 3 x 8ft Pcs 144.00 0.00 4.3 Escalation #DIV/0! 0.0% #DIV/0!
cornice CN 1-4B 8FT Pcs 188.80 0.00 Cost of Money #DIV/0! 3.0% #DIV/0!
Gd lumber x 2 x 10ft Pcs 30.00 0.00 4.5 Contingencies #DIV/0! 5.0% #DIV/0!
Plyboard ord Pcs 710.00 0.00 4.6 Contractor's Tax #DIV/0! 2.0% #DIV/0!
Finishing nail Pcs 75.00 0.00 4.7 Profit #DIV/0! 10.0% #DIV/0!
Stick well Kg 120.00 0.00 #DIV/0! 20.0% #DIV/0!
Concealed hinges Pcs 36.00 0.00
Closet handle stainless Pcs 120.00 0.00 0 #DIV/0! #DIV/0!
Aluminum pipe 1 dia 16 ft Pcs 240.00 0.00
Flanges 1 dia Pcs 30.00 0.00
0.00
hanging cabinet 0.00
Plyboard ord Pcs 710.00 0.00
Gd lumber 2 x 3 x 8ft Pcs 144.00 0.00 #N/A
Concealed hinges Pcs 36.00 0.00
Handle Pcs 120.00 0.00
French type cabinet door Pcs 200.00 0.00
cornice CN 1-4B 8FT Pcs 188.80 0.00
Glass 1/8 thk Sq ft 35.00 0.00
Stick well Kg 120.00 0.00
Finishing nail Kg 75.00 0.00
total P-
sqm/day
0.35 sqm/day
material computation:
Miscellaneous
const bid cost/unit total bid cost summary
door casing 3 x 14 ft #DIV/0! #DIV/0! project:
unit cost qty: 0.00 lft pcf #DIV/0!
project cost 7.5% 1.0 direct cost amount in pesos pct wt. of total
description Perimeter L ft qty unit labor unit cost 12.00 - - proj.supervision 5.00% 1.1 labor 0.00 #DIV/0! #DIV/0!
Grd 0.00 0.00 Pcs equipment unit cost #DIV/0! 0.00 constn facilities 2.50% 1.2 direct equipment 0.00 #DIV/0! #DIV/0!
material unit cost #DIV/0! indirect eqpt 0% 1.3 materials #DIV/0! #DIV/0! #DIV/0!
Base board 4 #DIV/0! sub con miscellaneous 0% 1.4 subcontract 0.00 #DIV/0! #DIV/0!
Second 0.00 0.00 Pcs total cost #DIV/0! others 0% #DIV/0! 72.50 #DIV/0!
duration - indirect cost 20%
Length 0 lft crew crew bonds premiums 0% 2.0 project cost
labor 1 400.00 1.0 insurance premiums 0%
Carpenter 1 500.00 escalation 0% 2.1 project supervision #DIV/0! 5.0% #DIV/0!
W/ 10 per cent allowance cost of money 3% 2.2 construction facilities #DIV/0! 2.5% #DIV/0!
equipment contingencies 5% 2.3 indirect equipment #DIV/0! 0.0% #DIV/0!
contractor tax 2% 2.4 miscellaneous #DIV/0! 0.0% #DIV/0!
profit 10.0% #DIV/0! 7.5% #DIV/0!
total 27.5%
total 5.0% 3.0 other costs #DIV/0! 0.0% #DIV/0!
bill of materials #DIV/0! 0.0% #DIV/0!
description qty unit unit cost amount
Door casing 3 x 14 ft 0.00 PCS 212.80 0.00 4.0 indirect cost
Finshing nail 0.01 Kg 70.00 0.37
Stikwell 0.00 Can 120.00 0.00 4.1 bonds premium #DIV/0! 0.0% #DIV/0!
Screw with tox 0.00 PCS 2.00 0.00 4.2 insurance premium #DIV/0! 0.0% #DIV/0!
4.3 escalation #DIV/0! 0.0% #DIV/0!
cost of money #DIV/0! 3.0% #DIV/0!
4.5 contingencies #DIV/0! 5.0% #DIV/0!
4.6 contractor's tax #DIV/0! 2.0% #DIV/0!
4.7 profit #DIV/0! 10.0% #DIV/0!
#DIV/0! 20.0% #DIV/0!
total P0.37
#DIV/0! #DIV/0!
#DIV/0! #DIV/0!
labor cost computation:
install 75 lf/day
PCS/ DAY
75 PCS/ DAY
material computation:
miscellaneous miscellaneous
CONST BID COST/unit TOTAL BID COST SUMMARY
king post 4 x 4 #DIV/0! - PROJECT:
qty: 0.00 pc PCF #DIV/0!
Project cost 7.5% 1.0 DIRECT COST AMOUNT IN PESOS PCT WT. OF TOTAL
labor unit cost 450.00 - - Proj.Supervision 5.00% 1.1 Labor 0.00 ### #DIV/0!
equipment unit cost #DIV/0! #DIV/0! Constn Facilities 2.50% 1.2 Direct Equipment 0.00 ### #DIV/0!
material unit cost #DIV/0! #DIV/0! Indirect Eqpt 0% 1.3 Materials ### #DIV/0!
unit cost #DIV/0! sub con P- Miscellaneous 0% 1.4 Subcontract 0.00 ### #DIV/0!
total cost #DIV/0! Others 0% 0.00 72.50 #DIV/0!
duration - Indirect Cost 20%
crew crew Bonds Premiums 0% 2.0 PROJECT COST
labor 1 400.00 1.0 Insurance Premiums 0%
carpenter 1 500.00 Escalation 0% 2.1 Project Supervision 0.00 5.0% #DIV/0!
Cost of Money 3% 2.2 Construction Facilities 0.00 2.5% #DIV/0!
equipment Contingencies 5% 2.3 Indirect Equipment 0.00 0.0% #DIV/0!
Contractor Tax 2% 2.4 Miscellaneous 0.00 0.0% #DIV/0!
Profit 10.0% 0.00 7.5% #DIV/0!
Total 27.5%
bill of materials 3.0 OTHER COSTS 0 0.0% #DIV/0!
description qty unit unit cost amount 0 0.0% #DIV/0!
-
4.0 INDIRECT COST
king post 4 x 4 pc 800 -
4.1 Bonds Premium 0.00 0.0% #DIV/0!
4.2 Insurance Premium 0.00 0.0% #DIV/0!
4.3 Escalation 0.00 0.0% #DIV/0!
Cost of Money 0.00 3.0% #DIV/0!
4.5 Contingencies 0.00 5.0% #DIV/0!
4.6 Contractor's Tax 0.00 2.0% #DIV/0!
4.7 Profit 0.00 10.0% #DIV/0!
total P- 0.00 20.0% #DIV/0!
- #DIV/0!
labor cost computation:
install 2 ft/day
2 ft/day
material computation:
SUMMARY
PROJECT:
#DIV/0! #DIV/0!
moldings cast in place const bid cost/lm total bid cost summary
concrete balluster #DIV/0! #DIV/0! project:
unit cost qty: 0.00 lm pcf #DIV/0!
project cost 7.5% 1.0 direct cost amount in pesos pct wt. of total
labor unit cost 90.00 - - proj.supervision 5.00% 1.1 labor 0.00 ### #DIV/0!
equipment unit cost #DIV/0! 0.00 constn facilities 2.50% 1.2 direct equipment 0.00 ### #DIV/0!
material unit cost #DIV/0! indirect eqpt 0% 1.3 materials #DIV/0! ### #DIV/0!
concrete molding unit cost #DIV/0! sub con miscellaneous 0% 1.4 subcontract 0.00 ### #DIV/0!
total cost #DIV/0! others 0% #DIV/0! 72.50 #DIV/0!
duration - indirect cost 20%
crew crew bonds premiums 0% 2.0 project cost
labor 1 400.00 1.0 insurance premiums 0%
mason 1 500.00 escalation 0% 2.1 project supervision #DIV/0! 5.0% #DIV/0!
cost of money 3% 2.2 construction facilities #DIV/0! 2.5% #DIV/0!
contingencies 5% 2.3 indirect equipment #DIV/0! 0.0% #DIV/0!
contractor tax 2% 2.4 miscellaneous #DIV/0! 0.0% #DIV/0!
equipment profit 10.0% #DIV/0! 7.5% #DIV/0!
total 27.5%
bill of materials 3.0 other costs #DIV/0! 0.0% #DIV/0!
description qty unit unit cost amount #DIV/0! 0.0% #DIV/0!
1.0 cement 2.00 bags 230.00 460.00
2.0 sand 0.50 cum 850.00 425.00 4.0 indirect cost
Welding rod 1.00 Kgs 110.00 110.00
Baluster (concrete) Pcs 100.00 - 4.1 bonds premium #DIV/0! 0.0% #DIV/0!
- 4.2 insurance premium #DIV/0! 0.0% #DIV/0!
4.3 escalation #DIV/0! 0.0% #DIV/0!
cost of money #DIV/0! 3.0% #DIV/0!
4.5 contingencies #DIV/0! 5.0% #DIV/0!
4.6 contractor's tax #DIV/0! 2.0% #DIV/0!
4.7 profit #DIV/0! 10.0% #DIV/0!
total 995.00 #DIV/0! 20.0% #DIV/0!
#DIV/0! #DIV/0!
labor cost computation:
material computation:
miscellaneous
CONST BID COST/unit TOTAL BID COST SUMMARY
decorative fixed capiz #DIV/0! - PROJECT:
qty: 0.00 SQFT PCF #DIV/0!
Project cost 7.5% 1.0 DIRECT COST AMOUNT IN PESOS PCT WT. OF TOTAL
labor unit cost 25.71 - - Proj.Supervision 5.00% 1.1 Labor 0.00 ### #DIV/0!
DESCRIPTION QTY AREA UNIT UNITCOST AMOUNT equipment unit cost #DIV/0! #DIV/0! Constn Facilities 2.50% 1.2 Direct Equipment 0.00 ### #DIV/0!
W Ht sqft material unit cost #DIV/0! Indirect Eqpt 0% 1.3 Materials ### #DIV/0!
Capiz #DIV/0! sub con #DIV/0! Miscellaneous 0% 1.4 Subcontract 0.00 ### #DIV/0!
0.3 1.2 0.00 set/s 300.00 - total cost #DIV/0! Others 0% 0.00 72.50 #DIV/0!
duration - Indirect Cost 20%
AREA 0.00 - crew crew Bonds Premiums 0% 2.0 PROJECT COST
labor 1 400.00 1.0 Insurance Premiums 0%
1 500.00
- #DIV/0!
labor cost computation:
install 35 sqft/day
35 sqft/day
material computation:
SUMMARY
PROJECT:
#DIV/0! #DIV/0!
floor finishes const bid cost/unit total bid cost summary
assorted pebbles classb #DIV/0! #DIV/0! project:
description qty width m length m area sqm unit cost qty: 0.00 sqm pcf #DIV/0!
- project cost 7.5% 1.0 direct cost amount in pesos pct wt. of total
- labor unit cost 225.00 - - proj.supervision 5.00% 1.1 labor 0.00 ### #DIV/0!
- equipment unit cost #DIV/0! #DIV/0! constn facilities 2.50% 1.2 direct equipment 0.00 ### #DIV/0!
- material unit cost #DIV/0! indirect eqpt 0% 1.3 materials #DIV/0! ### #DIV/0!
- Pebble unit cost #DIV/0! sub con miscellaneous 0% 1.4 subcontract 0.00 ### #DIV/0!
- total cost #DIV/0! others 0% #DIV/0! 72.50 #DIV/0!
total volume - duration - indirect cost 20%
crew crew bonds premiums 0% 2.0 project cost
labor 1 400.00 1.0 insurance premiums 0%
Tile setter 1 500.00 escalation 0% 2.1 project supervision #DIV/0! 5.0% #DIV/0!
cost of money 3% 2.2 construction facilities #DIV/0! 2.5% #DIV/0!
contingencies 5% 2.3 indirect equipment #DIV/0! 0.0% #DIV/0!
contractor tax 2% 2.4 miscellaneous #DIV/0! 0.0% #DIV/0!
profit 10.0% #DIV/0! 7.5% #DIV/0!
total 27.5%
bill of materials 3.0 other costs #DIV/0! 0.0% #DIV/0!
description qty unit unit cost amount #DIV/0! 0.0% #DIV/0!
pebbles - can 200.00 -
cement - bag 230.00 - 4.0 indirect cost
sand - cum 850.00 -
4.1 bonds premium #DIV/0! 0.0% #DIV/0!
4.2 insurance premium #DIV/0! 0.0% #DIV/0!
4.3 escalation #DIV/0! 0.0% #DIV/0!
total P- cost of money #DIV/0! 3.0% #DIV/0!
4.5 contingencies #DIV/0! 5.0% #DIV/0!
4.6 contractor's tax #DIV/0! 2.0% #DIV/0!
labor cost computation: 4.7 profit #DIV/0! 10.0% #DIV/0!
#DIV/0! 20.0% #DIV/0!
#DIV/0! #DIV/0!
4.00 mh / sqm
material computation:
miscellaneous
wall cladding const bid cost/unit total bid cost summary
adobe 12 x 12 x 4 classb #DIV/0! #DIV/0! project:
description qty width m length m area sqm unit cost qty: 0.00 sqm pcf #DIV/0!
- project cost 7.5% 1.0 direct cost amount in pesos pct wt. of total
- labor unit cost 300.00 - - proj.supervision 5.00% 1.1 labor 0.00 ### #DIV/0!
- equipment unit cost #DIV/0! #DIV/0! constn facilities 2.50% 1.2 direct equipment 0.00 ### #DIV/0!
- material unit cost #DIV/0! indirect eqpt 0% 1.3 materials #DIV/0! ### #DIV/0!
- wall cladding unit cost #DIV/0! sub con miscellaneous 0% 1.4 subcontract 0.00 ### #DIV/0!
- total cost #DIV/0! others 0% #DIV/0! 72.50 #DIV/0!
- duration - indirect cost 20%
- crew crew bonds premiums 0% 2.0 project cost
- labor 1 400.00 1.0 insurance premiums 0%
- Tile setter 1 500.00 escalation 0% 2.1 project supervision #DIV/0! 5.0% #DIV/0!
- cost of money 3% 2.2 construction facilities #DIV/0! 2.5% #DIV/0!
- contingencies 5% 2.3 indirect equipment #DIV/0! 0.0% #DIV/0!
- contractor tax 2% 2.4 miscellaneous #DIV/0! 0.0% #DIV/0!
- profit 10.0% #DIV/0! 7.5% #DIV/0!
- total 27.5%
- bill of materials 3.0 other costs #DIV/0! 0.0% #DIV/0!
total volume - description qty unit unit cost amount #DIV/0! 0.0% #DIV/0!
adobe 12 x 12 x 4 - pcs 35.00 -
- 4.0 indirect cost
-
cement 0 bags 230.00 - 4.1 bonds premium #DIV/0! 0.0% #DIV/0!
sand 0.000 cum 850.00 - 4.2 insurance premium #DIV/0! 0.0% #DIV/0!
- 4.3 escalation #DIV/0! 0.0% #DIV/0!
cost of money #DIV/0! 3.0% #DIV/0!
4.5 contingencies #DIV/0! 5.0% #DIV/0!
4.6 contractor's tax #DIV/0! 2.0% #DIV/0!
4.7 profit #DIV/0! 10.0% #DIV/0!
total P- #DIV/0! 20.0% #DIV/0!
#DIV/0! #DIV/0!
labor cost computation:
3.00 mh / sqm
material computation:
miscellaneous
wall cladding const bid cost/unit total bid cost summary
brick red 2 x 4 x 8 classb #DIV/0! #DIV/0! project:
description qty width m length m area sqm unit cost qty: 0.00 sqm pcf #DIV/0!
- project cost 7.5% 1.0 direct cost amount in pesos pct wt. of total
- labor unit cost 300.00 - - proj.supervision 5.00% 1.1 labor 0.00 ### #DIV/0!
- equipment unit cost #DIV/0! #DIV/0! constn facilities 2.50% 1.2 direct equipment 0.00 ### #DIV/0!
- material unit cost #DIV/0! indirect eqpt 0% 1.3 materials #DIV/0! ### #DIV/0!
- wall cladding unit cost #DIV/0! sub con miscellaneous 0% 1.4 subcontract 0.00 ### #DIV/0!
- total cost #DIV/0! others 0% #DIV/0! 72.50 #DIV/0!
- duration - indirect cost 20%
- crew crew bonds premiums 0% 2.0 project cost
- labor 1 400.00 1 insurance premiums 0%
- Tile setter 1 500.00 escalation 0% 2.1 project supervision #DIV/0! 5.0% #DIV/0!
- cost of money 3% 2.2 construction facilities #DIV/0! 2.5% #DIV/0!
- contingencies 5% 2.3 indirect equipment #DIV/0! 0.0% #DIV/0!
- contractor tax 2% 2.4 miscellaneous #DIV/0! 0.0% #DIV/0!
- profit 10.0% #DIV/0! 7.5% #DIV/0!
- total 27.5%
- bill of materials 3.0 other costs #DIV/0! 0.0% #DIV/0!
total volume - description qty unit unit cost amount #DIV/0! 0.0% #DIV/0!
brick red 2 x 4 x 8 - pcs 7.00 -
- 4.0 indirect cost
-
cement 0 bags 230.00 - 4.1 bonds premium #DIV/0! 0.0% #DIV/0!
sand 0.000 cum 850.00 - 4.2 insurance premium #DIV/0! 0.0% #DIV/0!
- 4.3 escalation #DIV/0! 0.0% #DIV/0!
cost of money #DIV/0! 3.0% #DIV/0!
4.5 contingencies #DIV/0! 5.0% #DIV/0!
4.6 contractor's tax #DIV/0! 2.0% #DIV/0!
4.7 profit #DIV/0! 10.0% #DIV/0!
total P- #DIV/0! 20.0% #DIV/0!
#DIV/0! #DIV/0!
labor cost computation:
3.00 mh / sqm
material computation:
miscellaneous
const bid cost/unit total bid cost summary
border coats #DIV/0! #DIV/0! project:
unit cost qty: 0.00 sqm pcf #DIV/0!
description l ht open length project cost 0.08 1.0 direct cost amount in pesos pct wt. of total
labor unit cost 36.00 0.00 0.00 proj.supervision 0.05 1.10 labor 0.00 #DIV/0! #DIV/0!
0.00 equipment unit cost #DIV/0! #DIV/0! constn facilities 0.03 1.20 direct equipment 0.00 #DIV/0! #DIV/0!
material unit cost #DIV/0! indirect eqpt 0.00 1.30 materials #DIV/0! #DIV/0! #DIV/0!
painting unit cost #DIV/0! sub con miscellaneous 0.00 1.40 subcontract 0.00 #DIV/0! #DIV/0!
total total cost #DIV/0! others 0.00 #DIV/0! 72.50 #DIV/0!
duration 0.00 indirect cost 0.20
crew crew bonds premiums 0.00 2.0 project cost
labor 1.00 400.00 2.00 insurance premiums 0.00
labor 1.00 500.00 escalation 0.00 2.10 project supervision #DIV/0! 0.05 #DIV/0!
cost of money 0.03 2.20 construction facilities #DIV/0! 0.03 #DIV/0!
equipment 500.00 contingencies 0.05 2.30 indirect equipment #DIV/0! 0.00 #DIV/0!
contractor tax 0.02 2.40 miscellaneous #DIV/0! 0.00 #DIV/0!
profit 0.10 #DIV/0! 0.08 #DIV/0!
total 0.28
bill of materials 3.0 other costs #DIV/0! 0.00 #DIV/0!
description qty unit unit cost amount #DIV/0! 0.00 #DIV/0!
border 8cm 0.00 roll/5m 420.00 0.00
4.0 indirect cost
#DIV/0! #DIV/0!
25.00 m/day
25.00 m/day
material computation:
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary miscellaneous
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
summary
floor finishes const bid cost/unit total bid cost summary
concrete trellis classb P1,153.84 12,692.19 project:
description qty width m length m area sqm unit cost qty: 11.00 pcs pcf 1.38
project cost 7.5% 1.0 direct cost amount in pesos pct wt. of total
labor unit cost 95.45 1,050.00 1,050.00 proj.supervision 5.00% 1.1 labor 1050.00 8.27 8.27
- equipment unit cost 12.88 12.88 constn facilities 2.50% 1.2 direct equipment 0.00 0.00 0.00
- material unit cost 741.08 indirect eqpt 0% 1.3 materials 8151.84 64.23 64.23
- cer tile works unit cost 836.53 sub con miscellaneous 0% 1.4 subcontract 0.00 0.00 0.00
- total cost 9,201.84 others 0% 9201.84 72.50 72.50
- duration 1.50 indirect cost 20%
- crew crew bonds premiums 0% 2.0 project cost
- labor 2 200.00 1.0 insurance premiums 0%
- tilesetter 1 300.00 escalation 0% 2.1 project supervision 634.61 5.0% 5.00
- cost of money 3% 2.2 construction facilities 317.30 2.5% 2.50
contingencies 5% 2.3 indirect equipment 0.00 0.0% 0.00
contractor tax 2% 2.4 miscellaneous 0.00 0.0% 0.00
profit 10.0% 951.91 7.5% 7.50
total 27.5%
bill of materials 3.0 other costs 0 0.0% 0.00
total volume - sqm description qty unit unit cost amount 0 0.0% 0.00
concrete trellis 3 x 6 x 2.2 11.00 pcs 580.00 6,380.00
4.0 indirect cost
7.33 trellis/day
material computation:
miscellaneous