Patil Rail Infrastructure Pvt. Ltd.

Railway Yard,Anara (S.E. Rly),PuruliaDist.,WB

Steam Curing Report


Chamber-5
Date: 10-06-2017 Batch: Shift: B Supervisor:

Set Temperature: 70.0

Bench no 68 564 573 132 4 529 12 136

Activity Snap Shot

Activity Start Time End Time Duration


Pre Steaming 08:46:11 10:46:24 02:00:13
Raising 10:46:24 13:21:47 02:35:23
Constant 13:21:47 17:21:58 04:00:11
Cooling 17:21:58 20:51:48 03:29:50

Time Actual
Temp.
08:46 39.4
09:16 40.2
09:46 41.1
10:16 41.9
10:46 42.5
11:17 53.5
11:47 60.3
12:17 64.0
12:47 66.6
13:18 69.4
13:48 70.8
14:18 70.4
14:48 70.0
15:19 70.1
15:49 69.6
16:19 70.1
16:50 69.8
17:20 70.3
17:50 53.3
18:20 48.0
18:51 45.1
19:21 43.7
19:51 42.4
20:21 41.6
20:51 40.6

Signature of Railway Inspector Signature of Quality Control Incharge


Name Name
Designation
Countersigned by AEN/XEN/CSP
Name
Designation