Sie sind auf Seite 1von 1

Checkpoint Description Candidate No.

of Projects & Duration of each


Response Project
( Yes/No)
Controls and instrumentation skills: Close loops, Open YES 2 Projects & time 6 Yrs
loops, Drive logics, Instrumentation fundamentals
,
Honeywell TDC3000 (HPM/ AM/ APM) Closed Loop & NO
Sequence Application Development & Testing OR
Modification

Honeywell TDC System (xPM, BC, MC) migration to Worked on C- 2 Projects & time 6 Yrs
Experion C200 / C300 Design, Application, Installation 200& C300
and commissioning
Installation
resp.
Honeywell TDC System (xPM, BC, MC) migration to 3rd
Party DCS Design, Application, Installation and
commissioning

Honeywell EPKS (C200 / C300) Closed Loop & Sequence YES 2 Projects & time 6 Yrs
Application Development , Testing & Site Commissioning
Honeywell GUS / LCN / EPKS HMI Graphics Development,
Dynamic Linking , Testing & site commissioning

Non-Honeywell SCADA Graphics Design, Development, YES 2 Projects & time 6 Yrs
Dynamic Linking , testing & site commissioning , Scripting ,
shape & sub-picture design , Trend / Alarm/ Report
Configuration
Honeywell EPKS (C200/C300) Hardware Power ON , YES 2 Projects & time 6 Yrs
Testing & Site Commissioning
Non-Honeywell PLC / DCS Application Development ,
Testing & Site Commissioning
Non-Honeywell PLC / DCS Hardware Power ON , Testing & YES 2 Projects & time 6 Yrs
Site Commissioning
Configuration of Network devices (Switch, Router, Firewall, YES 2 Projects & time 6 Yrs
Client, Server, Modem, Domain Controller) &
Troubleshooting
Hands on experience on Configuration & Connectivity of YES 2 Projects & time 6 Yrs
devices (supporting HART / DNP / Profibus / FF / TCPIP /
OPC Protocols ) to PLC / DCS system
On Line Application Modification for PLC / DCS YES 2 Projects & time 6 Yrs
On Line Hardware Modification / Replacement for PLC / YES 2 Projects & time 6 Yrs
DCS
Writing Functional & Detailed Design Specifications YES 2 Projects & time 6 Yrs
documents

Das könnte Ihnen auch gefallen