Beruflich Dokumente
Kultur Dokumente
Calcreo
Mtodo
Sublevel Stoping
Localizao
Posio da Mina em relao ao Rio Sorocaba
Baltar Open Pit
Imagem - 1981
Mina Baltar
Acessos:
Tunel Pessoal, equipamentos, suprimentos (7,5m x 5m; 7o).
Conexo nos nveis 540, 425, 310 e 230 (projeto inicial).
Jumbo de perfurao
Simulaes para dimensionamento dos pilares e blocos de lavra
(Outokumpu OY Mining Tecnical Group 1980)
Simulaes para dimensionamento dos pilares e blocos de lavra
(Outokumpu OY Mining Tecnical Group 1980)
Simulaes para dimensionamento dos pilares e blocos de lavra
(Outokumpu OY Mining Tecnical Group 1980)
Simulaes para dimensionamento dos pilares e blocos de lavra
(Outokumpu OY Mining Tecnical Group 1980)
file:///C:/Users/JORGE/Downloads/Shimada__Doutorado%20(1).pdf
Mina subterrnea Baltar
Fonte: http://www.minerios.com.br/EdicoesInt/1542/36/Reativacao_da_mina_de_Placa__eliminou_custos_de_transporte.aspx
Desvios furos
Na mina Baltar foi observada uma tendncia de desvio dos furos tendendo para a direo
perpendicular ao plano de estratificao das rochas.
Necessidade de compensao.
20 m3/s
Galeria de acesso ao Bloco (4m x4 m)
Construo rea de Manuteno (Nvel 420)
Refeitrio Baltar rea de Refgio - Nvel 420
Reference
Mobile equipment increases productivity at Baltar of May 6th, 2013.
Available in
http://www.revistamt.com.br/index.php?option=com_content&vie
w=article&id=177. Consulting in January 21st, 2014.
Baltar Mine - Method
Conventional loaders are always more productive than the lowered Load-
Haul-Dump (LHD) models, and being able to use them is an issue that is
not only determined by productivity, but also by the size of the openings
underground.
At Baltar mine, they have the necessary conditions for opening wide
tunnels that allow the transit of non-lowered equipment, which may not
occur in other underground mines.
Even at Baltar, for the following mining panels, which will evidently be
deeper, it may not be possible to safely open galleries just as wide. This
means that lowered equipment will have to be used.
Blasting is performed at the first and second mining panels, with a total of
six rooms in activity. For future development, another two panels (the
third and fourth panels) are projected for exploration at lower levels.
Carregadeiras convencionais so mais produtivas do que os
modelos reduzido Load-Haul-Dump (LHD). A capacidade de
us-las uma questo que no determinada apenas pela
produtividade, mas tambm pelo tamanho das aberturas
subterrneas.