Beruflich Dokumente
Kultur Dokumente
of the structurere presented by test result shall be included in the test report. 1 sample - 4 cubes, 2 cubes
MWS pg.277 Ps.11.8.3 Testing Plan for 7 days 2 cubes for 28
(ii) For prestressed concrete,At least days
two cubes shall be tested prior to each stage of prestressing work to ensure that the minimum
(a)One set of slump test apparatus shall be provided for each concrete mixer.For reinforced
ER 288 CW2
Appratus for use at prior concrete members of below Grade 40;one sample per 20 m3 or 20 batches whichever is the 1 Set - 12 moulds, <G40 for
Pg 473 of Ps.13.38.1
to Concrete lesser volume). (b)One set of twelve moulds shall be for each concrete mixer; one sample per 20m3
1222
(c)A thermometer complying with the requirements of BS 1704.