Sie sind auf Seite 1von 6

S/N Date Pile No.

Pile Diame (mm)


PileCapeType AS DESIGNED
Est Penetration Toe Level Cut Of Level
BORED PILE 600.00mm
1 01/24/13 PC17/2 600 mm 2PC-K 13.525m 96.500m 110.025m
2 1/25/2013 PC18/2 600 mm 3PC-H 13.225m 96.500m 109.225m
3 1/26/2013 PC16/2 600 mm 2PC-K 13.525m 96.500m 110.025m
4 1/26/2013 PC18/1 600 mm 3PC-H 13.225m 96.000m 109.225m
5 1/28/2013 PC16/1 600 mm 2PC-K 13.525m 96.600m 110.025m
6 1/29/2013 PC28/2 600 mm 3PC-N 14.025m 95.200m 109.225m
7 1/30/2013 PC18/3 600 mm 3PC-H 13.225m 96.000m 109.225m
8 1/30/2013 PC27/2 600 mm 3PC-N 14.025m 95.200m 109.225m
9 1/30/2013 PC17/1 600 mm 2PC-K 13.525m 96.500m 110.025m
10 2/2/2013 PC26/2 600 mm 3PC-N 14.025m 95.200m 109.225m
11 2/4/2013 PC29/2 600 mm 3PC-N 14.025m 95.200m 109.225m
12 2/7/2013 PC27/3 600 mm 3PC-N 14.025m 95.200m 109.225m
13 2/15/2103 PC28/3 600 mm 3PC-N 14.025m 95.200m 109.225m
14 2/16/2013 PC27/1 600 mm 3PC-N 14.025m 95.200m 109.225m
15 2/18/2013 PC28/1 600 mm 3PC-N 14.025m 95.200m 109.225m
16 2/18/2013 PC26/3 600 mm 3PC-N 14.025m 95.200m 109.225m
17 2/22/2013 PC26/1 600 mm 3PC-N 14.025m 95.200m 109.225m
20 2/27/2013 PC14/1 600 mm 3PC-F 19.225m 90.000m 109.225m
21 2/28/2013 PC14/3 600 mm 3PC-F 19.225m 90.000m 109.225m
22 3/5/2013 PC14/2 600 mm 3PC-F 19.225m 90.000m 109.225m
23 3/9/2013 PC29/1 600 mm 3PC-N 14.025m 95.200m 109.225m
24 3/11/2013 PC12/1 600 mm 2PC-E 20.325m 89.500m 109.825m
24 3/11/2013 PC12/2 600 mm 2PC-E 20.325m 89.500m 109.825m
24 3/11/2013 PC13/1 600 mm 2PC-E 20.325m 89.500m 109.825m
24 3/11/2013 PC13/2 600 mm 2PC-E 20.325m 89.500m 109.825m
25 3/12/2013 PC11/1 600 mm 3PC-C 18.725m 90.500m 109.225m
26 3/13/2013 PC29/3 600 mm 3PC-N 14.025m 95.200m 109.225m
28 3/14/2013 PC11/3 600 mm 3PC-C 18.725m 90.500m 109.225m
29 3/15/2013 PC11/2 600 mm 3PC-C 18.725m 90.500m 109.225m
BORED PILE 800.00mm
1 1/15/2013 UTP#1 800 mm 0.00m 0.000m 0.00m
2 1/26/2013 PC22/1 800 mm 3PC-G 22.325m 86.5m 108.825m
3 1/28/2013 PC21/1 800 mm 3PC-G 22.325m 86.5m 108.825m
4 1/29/2013 PC20/2 800 mm 3PC-G 22.325m 86.5m 108.825m
5 1/29/2013 PC22/2 800 mm 3PC-G 22.325m 86.5m 108.825m
6 1/31/2013 PC22/3 800 mm 3PC-G 22.325m 86.5m 108.825m
7 1/31/2013 PC20/1 800 mm 3PC-G 22.325m 86.5m 108.825m
8 2/1/2013 PC20/3 800 mm 3PC-G 22.325m 86.5m 108.825m
9 2/4/2013 PC21/2 800 mm 3PC-G 22.325m 86.5m 108.825m
10 2/5/2013 PC25/5 800 mm 12PC-P 12.125m 96.5m 108.625m
11 2/6/2013 PC21/3 800 mm 3PC-G 22.325m 86.5m 108.825m
12 2/6/2013 PC25/9 800 mm 12PC-P 12.125m 96.5m 108.625m
13 2/7/2013 PC25/6 800 mm 12PC-P 12.125m 96.5m 108.625m
15 2/14/2013 PC25/12 800 mm 12PC-P 12.125m 96.5m 108.625m
16 2/15/2013 PC25/7 800 mm 12PC-P 12.125m 96.5m 108.625m
17 2/16/2013 PC25/11 800 mm 12PC-P 12.125m 96.5m 108.625m
18 2/16/2013 PC25/4 800 mm 12PC-P 12.125m 96.5m 108.625m
19 2/18/2013 PC25/1 800 mm 12PC-P 12.125m 96.5m 108.625m
20 2/19/2013 PC15/12 800 mm 14PC-L 16.575m 92.05m 108.625m
21 2/19/2013 PC25/10 800 mm 12PC-P 12.125m 96.5m 108.625m
22 2/20/2013 PC15/5 800 mm 14PC-L 16.575m 92.05m 108.625m
23 2/20/2013 PC25/3 800 mm 12PC-P 12.125m 96.5m 108.625m
24 2/21/2013 PC15/11 800 mm 14PC-L 16.575m 92.05m 108.625m
25 2/21/2013 PC25/8 800 mm 12PC-P 12.125m 96.5m 108.625m
26 2/22/2013 PC15/4 800 mm 14PC-L 16.575m 92.05m 108.625m
27 2/23/2013 PC15/14 800 mm 14PC-L 16.575m 92.05m 108.625m
28 2/23/2013 PC19/3 800 mm 3PC-M 16.925m 92m 108.925m
29 2/25/2013 PC15/9 800 mm 14PC-L 16.575m 92.05m 108.625m
30 2/25/2013 PC15/1 800 mm 14PC-L 16.575m 92.05m 108.625m
31 2/26/2013 PC15/10 800 mm 14PC-L 16.575m 92.05m 108.625m
32 2/27/2013 PC19/2 800 mm 3PC-M 16.925m 92.000m 108.925m
33 2/28/2013 PC19/1 800 mm 3PC-M 16.925m 92.000m 108.925m
34 3/1/2013 PC15/6 800 mm 14PC-L 16.575m 92.05m 108.625m
35 3/2/2013 PC15/3 800 mm 14PC-L 16.575m 92.05m 108.625m
36 3/4/2013 PC15/8 800 mm 14PC-L 16.575m 92.05m 108.625m
37 3/4/2013 PC15/2 800 mm 14PC-L 16.575m 92.05m 108.625m
38 3/5/2013 PC15/13 800 mm 14PC-L 16.575m 92.050m 108.625m
39 3/6/2013 PC15/7 800 mm 14PC-L 16.575m 92.050m 108.625m
40 3/7/2013 PC23/2 800 mm 3PC-D 22.325m 86.50m 108.825m
41 3/8/2013 PC24/1 800 mm 3PC-D 22.325m 86.50m 108.825m
42 3/9/2013 PC23/1 800 mm 3PC-D 22.325m 86.50m 108.825m
43 3/11/2013 PC24/2 800 mm 3PC-D 22.325m 86.50m 108.825m
44 3/12/2013 PC24/3 800 mm 3PC-D 22.325m 86.50m 108.825m
45 3/13/2013 PC23/3 800 mm 3PC-D 22.325m 86.50m 108.825m

PREPARED & CHECKED BY: CONFIRMED

NAME & SIGNATURE OF CONTRACTOR'S NAME,DESIGNATION&SIGNATURE OF


REPRESNTATIVE, DATE RTO ,DATE
As Built As Built capacity(kN)

Socket Pile L Working Load Penetration Toe Level (m) Cut Of Level
Socket Pile Length(m)

0.00 810.00 kN 15.394 95.831 111.225 0.00m


0.00 900.00kN 15.376 95.449 110.825 0.00m
0.00 810.00kN 15.225 96.000 111.225 0.00m
0.00 900.00kN 15.325 95.500 110.825 0.00m
0.00 810.00kN 15.387 95.838 111.225 0.00m
0.00 1170.00kN 16.125 94.700 110.825 0.00m
0.00 900.00kN 15.68 95.145 110.825 0.00m
0.00 1170.00kN 15.655 95.170 110.825 0.00m
0.00 810.00kN 14.86 96.365 111.225 0.00m
0.00 1170.00kN 15.84 94.985 110.825 0.00m
0.00 1170.00kN 15.63 95.195 110.825 0.00m
0.00 1170.00kN 15.745 95.080 110.825 0.00m
0.00 1170.00kN 15.775 95.050 110.825 1.40m
0.00 1170.00kN 15.755 95.070 110.825 0.00m
0.00 1170.00kN 110.825 94.880 110.825 0.00m
0.00 1170.00kN 15.76 95.065 110.825 0.00m
0.00 1170.00kN 15.765 95.060 110.825 0.00m
0.00 1770.00kN 20.785 89.940 110.725 1.10m
0.00 1770.00kN 20.985 89.740 110.725 1.30m
0.00 1770.00kN 20.965 89.760 110.725 1.10m
0.00 1170.00kN 15.63 95.195 110.825 0.00m
0.00 1830.00kN 21.625 89.300 110.925 1.20m
0.00 1830.00kN 21.625 89.300 110.925 1.30m
0.00 1830.00kN 21.625 89.300 110.925 1.40m
0.00 1830.00kN 21.69 89.235 110.925 0.00m
0.00 2810.00kN 20.53 90.195 110.725 0.00m
0.00 1170.00kN 15.79 95.035 110.825 0.00m
0.00 2810.00kN 20.525 90.200 110.725 0.00m
0.00 2810.00kN 20.575 90.150 110.725 0.00m

0.00 0.000kN 26.126 86.354 112.800 5.90m


0.00 3145.00kN 24.086 86.439 110.525 2.02m
0.00 3145.00kN 26.8 85.885 110.525 0.00m
0.00 3145.00kN 24.375 86.150 110.525 1.30m
0.00 3145.00kN 24.195 86.330 110.525 1.80m
0.00 3145.00kN 24.23 86.295 110.525 1.70m
0.00 3145.00kN 24.28 86.245 110.525 0.00m
0.00 3145.00kN 24.295 86.230 110.525 0.00m
0.00 3145.00kN 24.185 86.340 110.525 0.00m
0.00 1230.00KN 14.145 96.380 110.525 0.00m
0.00 3145.00kN 24.215 86.310 110.525 0.00m
0.00 1230.00kN 14.405 96.120 110.525 0.00m
0.00 1230.00kN 14.225 96.300 110.525 0.00m
0.00 1230.00kN 14.525 96.000 110.525 0.00m
0.00 1230.00kN 14.41 96.115 110.525 0.00m
0.00 1230.00kN 14.565 95.960 110.525 0.00m
0.00 1230.00kN 14.575 95.950 110.525 0.00m
0.00 1230.00kN 14.675 95.850 110.525 0.00m
0.00 1540.00kN 18.875 91.650 110.525 0.00m
0.00 1230.00kN 14.685 95.840 110.525 0.00m
0.00 1540.00KN 18.525 92.000 110.525 0.00m
0.00 1540.00KN 14.935 95.930 110.525 0.00m
0.00 1230.00KN 18.935 91.590 110.525 0.00m
0.00 1540.00KN 14.49 96.035 110.525 0.00m
0.00 1230.00KN 18.745 91.780 110.525 0.00m
0.00 1540.00kN 18.56 91.965 110.525 0.00m
0.00 1540.00kN 18.695 91.930 110.625 0.00m
0.00 2630.00kN 18.77 91.755 110.525 0.00m
0.00 1540.00kN 18.765 91.760 110.525 0.00m
0.00 1540.00kN 18.745 91.780 110.525 0.00m
0.00 1540.00kN 18.71 91.915 110.625 0.00m
0.00 2630.00kN 18.925 91.700 110.625 2.80m
0.00 2630.00kN 18.55 91.975 110.525 0.00m
0.00 1540.00kN 18.845 91.870 110.525 0.00m
0.00 1540.00kN 18.865 91.680 110.525 0.00m
0.00 1540.00kN 18.665 91.660 110.525 0.00m
0.00 1540.00kN 18.775 91.860 110.525 0.00m
0.00 1540.00kN 24.325 91.750 110.525 0.00m
0.00 2810.00kN 24.36 86.200 110.525 0.00m
0.00 2810.00kN 24.365 86.165 110.525 1.40m
0.00 2810.00kN 24.355 86.160 110.525 1.40m
0.00 2810.00kN 24.165 86.170 110.525 0.00m
0.00 2810.00kN 24.265 86.360 110.525 1.20m
0.00 2810.00kN 24.265 86.260 110.525 1.30m

COUNTERCHECKED&APROVED BY:

IGNATURE OF NAME,DESIGNATION&SIGNATURE OF
PROJECT OFFICER ,DATE
As Built Reinforcement Eccentricity Remarks
Main Bars Links +/-(N) +/-(E)

7T20 T13-200 39 19
7T20 T13-200 -51 10
7T20 T13-200 13 -49
7T20 T13-200 -10 -37
7T20 T13-200 -16 10
7T20 T13-200 -74 12
7T20 T13-200 -10 -42
7T20 T13-200 -50 -26
7T20 T13-200 -10 -26 wtp#1
7T20 T13-200 -63 6
7T20 T13-200 -51 25
7T20 T13-200 -30 -8
7T20 T13-200 -5 -72
7T20 T13-200 -55 -67
7T20 T13-200 25 74
7T20 T13-200 -66 -22
7T20 T13-200 27 -39
7T20 T13-200 -58 40
7T20 T13-200 -13 64
7T20 T13-200 -23 -65
7T20 T13-200 30 -13
7T20 T13-200 -15 71
7T20 T13-200 10 -46
7T20 T13-200 -72 -15
7T20 T13-200 22 -67
7T20 T13-200 33 20
7T20 T13-200 -6 -48
7T20 T13-200 -13 38
7T20 T13-200 -73 66

9T20 T13-200 -13 -25 UTP#1


9T20 T13-200 -48 11
9T20 T13-200 -48 -10
9T20 T13-200 10 73
9T20 T13-200 55 -22
9T20 T13-200 -10 10
9T20 T13-200 -73 8
9T20 T13-200 56 74
9T20 T13-200 10 69 wtp#1
9T20 T13-200 -13 -71
9T20 T13-200 -10 -67
9T20 T13-200 -59 -71
9T20 T13-200 10 -22
9T20 T13-200 -10 -7
9T20 T13-200 72 37
9T20 T13-200 70 10
9T20 T13-200 -31 24
9T20 T13-200 50 55
9T20 T13-200 28 28
9T20 T13-200 -10 -10
9T20 T13-200 10 -70 PDA#1
9T20 T13-200 -41 74
9T20 T13-200 -10 -31
9T20 T13-200 7 -33
9T20 T13-200 20 54
9T20 T13-200 52 -69
9T20 T13-200 -31 7
9T20 T13-200 10 -71
9T20 T13-200 10 -54
9T20 T13-200 53 -10
9T20 T13-200 -16 -74
9T20 T13-200 -13 -25
9T20 T13-200 74 43
9T20 T13-200 53 -16
9T20 T13-200 -10 8
9T20 T13-200 -63 -53
9T20 T13-200 62 43
9T20 T13-200 21 41
9T20 T13-200 42 -68
9T20 T13-200 60 -29
9T20 T13-200 60 30
9T20 T13-200 -36 -23
9T20 T13-200 -51 8 WTP#1
9T20 T13-200 68 61

Das könnte Ihnen auch gefallen