works, under Contractors responsibility, include works on following infrastructure:

1) SS 220/33 kV Kovacica (WF part - land plot 4949).

2) Switchyard 220 kV (TSO part - land plot 4950).

3) OHL 2x220 kV up to existing OHL 220 kV (TSO part).

The Scope of Work under Contractors responsibility, as further defined in the Section 5 of this MFS
includes the following works without limitation:
Setting out-works which includes marking of cadastral land plots, marking levelling and regulation lines in
relation to original points, lines and levels specified in the BoP Contract and pursuant to the Main Design
and approved changes within Executive Design. The setting-out works shall be done by a suitably
certified/authorized for cadastre measurement works.
The SS 33/220 kV and switchyard 220 kV works include supply (excluding supply of materials or
equipment which shall be provided by the WTG Supplier), delivery, installation (excluding installation of
WTG SCADA and WindSCADA equipment which will be done by the WTG Supplier) and commissioning of
equipment including any equipment necessary to achieve grid compliance according to TSO requirements.
Supply, installation and commissioning of the 2x220 kV OHL for connecting the switchyard 220 kV to the
existing TSO grid, including necessary works on existing OHL 220 kV Pancevo 2 Zrenjanin 2 according to
Agreement for construction between TSO and Owner, along with complete communication and
coordination with TSO.
Supply, installation, testing and commissioning of SCADA and control systems in SS 33/220 kV Kovacica
and switchyard 220 kV. The works include interfaces with the WTG SCADA, the Windfarm SCADA and
control systems which will be delivered, installed and commissioned by
FRACTAL Ltd
FRACTAL Ltd Split WF Blacksmith Minimum Functional Specification for BOP Page 16 of 169 the WTG Supplier. The Contractor shall provide all
necessary works in coordination with WTG Supplier, TSO and DSO. the WTG Supplier. The Contractor shall provide all necessary works in
coordination with WTG Supplier, TSO and DSO.
the WTG Supplier. The Contractor shall provide all necessary works in coordination with WTG Supplier, TSO
and DSO.

Supply equipment, installation, construction, testing and commissioning of two control and operating
buildings (for TSO and Owner), including all necessary related electrical and civil works.
Execute all civil works, including site preparatory works, levelling, grading and landscaping works,
earthing works, infrastructural works such as fencing and gates, roads, paving, drainage works, cable
trenches/ducts/channels, outdoor equipment foundations and steel support, transformer foundations,
underground water storage tank, sewage system, oil pits, relay protection, well building etc.

Supply, transportation, installation, testing and commissioning of suitable grounding and lightning
protection system for the SS 33/220 kV, switchyard 220 kV and OHL 2x220 kV, including all lightning rods
and all related equipment. works, under Contractors responsibility, include works on following
infrastructure:
1) SS 220/33 kV Kovacica (WF part - land plot 4949).

2) Switchyard 220 kV (TSO part - land plot 4950).

3) OHL 2x220 kV up to existing OHL 220 kV (TSO part).

The Scope of Work under Contractors responsibility, as further defined in the Section 5 of this MFS
includes the following works without limitation:
Setting out-works which includes marking of cadastral land plots, marking levelling and regulation lines in
relation to original points, lines and levels specified in the BoP Contract and pursuant to the Main Design
and approved changes within Executive Design. The setting-out works shall be done by a suitably
certified/authorized for cadastre measurement works.
The SS 33/220 kV and switchyard 220 kV works include supply (excluding supply of materials or
equipment which shall be provided by the WTG Supplier), delivery, installation (excluding installation of
WTG SCADA and WindSCADA equipment which will be done by the WTG Supplier) and commissioning of
equipment including any equipment necessary to achieve grid compliance according to TSO requirements.
Supply, installation and commissioning of the 2x220 kV OHL for connecting the switchyard 220 kV to the
existing TSO grid, including necessary works on existing OHL 220 kV Pancevo 2 Zrenjanin 2 according to
Agreement for construction between TSO and Owner, along with complete communication and
coordination with TSO.
Supply, installation, testing and commissioning of SCADA and control systems in SS 33/220 kV Kovacica
and switchyard 220 kV. The works include interfaces with the WTG SCADA, the Windfarm SCADA and
control systems which will be delivered, installed and commissioned by
FRACTAL Ltd
FRACTAL Ltd Split WF Blacksmith Minimum Functional Specification for BOP Page 16 of 169 the WTG Supplier. The Contractor shall provide all
necessary works in coordination with WTG Supplier, TSO and DSO. the WTG Supplier. The Contractor shall provide all necessary works in
coordination with WTG Supplier, TSO and DSO.
the WTG Supplier. The Contractor shall provide all necessary works in coordination with WTG Supplier, TSO
and DSO.

Supply equipment, installation, construction, testing and commissioning of two control and operating
buildings (for TSO and Owner), including all necessary related electrical and civil works.
Execute all civil works, including site preparatory works, levelling, grading and landscaping works,
earthing works, infrastructural works such as fencing and gates, roads, paving, drainage works, cable
trenches/ducts/channels, outdoor equipment foundations and steel support, transformer foundations,
underground water storage tank, sewage system, oil pits, relay protection, well building etc.
Supply, transportation, installation, testing and commissioning of suitable grounding and lightning
protection system for the SS 33/220 kV, switchyard 220 kV and OHL 2x220 kV, including all lightning rods
and all related equipment.

Supply, transportation, installation, testing and commissioning of drainage system, including oil
canalisation and oil pit for power transformer. Supply, installation, testing and commissioning of adequate
water supply, sanitation, heating and other systems.
Supply, transportation, installation, testing and commissioning of adequate external lighting system.

Supply, transportation, installation, testing and commissioning of adequate security systems (fencing and
gates, video surveillance, cyber security, antipanic and security lighting), all with accordance to the relevant
public authorities and insurance company requirements.
Providing any factory inspections and necessary testing of vital components, such as transformers,
switchgears and protection equipment.

Supply, transportation and installation of consumables for the purpose of installing and commissioning
equipment in SS.
Supply, transportation, installation, testing and commissioning of all components of firefighting system in
accordance of requirements from relevant authorities and applicable laws and regulations.

The part of the well has been already constructed. Therefore, the Contractor shall take over the well and
integrate it in complete building system which includes all works and repairs (if necessary).
The Contractor is responsible for supply, transport, installation and commissioning of two power
transformers. Details about third transformer and related equipment (transformer bay, foundations etc)
are defined in section 5.

All other equipment and works required to accomplish full functionality and quality of complete SS
33/220 kV, switchyard 220 kV and OHL2x220 kV.
The Contractor is required to verify whether any additional equipment or works are necessary for the SS
33/220 kV, switchyard 220 kV and OHL 2x220 kV in order to achieve full functionality.
1.3.6 Grid compliance testing and other services related to WF grid connection (with TSO) and self-
consumption (with DSO)
Grid compliance testing shall be performed by the Contactor in accordance with the requirements from
Grid Code, approval for grid connection issued by TSO, Agreement for construction between TSO and
Owner and other related TSO requirements. FRACTAL Ltd
FRACTAL Ltd Split WF Blacksmith Minimum Functional Specification for BOP Page 17 of 169 The Contractor is responsible, in cooperation with
TSO and WTG supplier, for organization and execution of grid compliance testing, including the preparation of test protocols, reports and other
documentation which have to be approved by TSO and obtaining final approval on test results (final report) from TSO. The Contractor is also
responsible for payment of all costs to the TSO for all TSO activities related to grid compliance testing, including works and services of third parties
hired by TSO. The Contractor is responsible, in cooperation with TSO and WTG supplier, for organization and execution of grid compliance testing,
including the preparation of test protocols, reports and other documentation which have to be approved by TSO and obtaining final approval on
test results (final report) from TSO. The Contractor is also responsible for payment of all costs to the TSO for all TSO activities related to grid
compliance testing, including works and services of third parties hired by TSO.
The Contractor is responsible, in cooperation with TSO and WTG supplier, for organization and execution of
grid compliance testing, including the preparation of test protocols, reports and other documentation
which have to be approved by TSO and obtaining final approval on test results (final report) from TSO. The
Contractor is also responsible for payment of all costs to the TSO for all TSO activities related to grid
compliance testing, including works and services of third parties hired by TSO.
Other services in responsibility of Contractor related to TSO activities, as further given in section 7, include
(without limitations):
obtaining all necessary consents, approvals, permits and agreements from TSO up to obtaining usage
permits of WF and grid connection facilities and takeover of grid connection facilities by TSO,
communication and management of all activities towards TSO needed for successful preparation and
execution of grid compliance testing and other services until commercial operation of the WF,
communication and management of all activities with TSO needed for first energization of SS and internal
technical inspection of SS and OHL 220 kV and all other activities up to the end of grid compliance testing,
technical inspection and takeover of grid connection facilities by TSO,
performing of all other works, services, communication and other needed activities with TSO in
accordance with Owners requirements and obligations from Agreement for construction between TSO and
Owner.

Other services in responsibility of Contractor related to DSO activities, as further given in section 7, includes
(without limitations):
obtaining all necessary consents, approvals, permits and agreements from DSO up to obtaining usage
permits for WF and facilities for self-consumption, and takeover of facilities for self-consumption by DSO,
communication and management of all activities with DSO needed for first energization of facilities for
self-consumption and all other activities up to the end of technical inspection and takeover of self-
consumption facilities by DSO.

Other services in responsibility of Contractor needed for first energization of SS and self-consumption,
performing all tests during temporary grid connection, and all activities needed for start of permanent
operation of WF on the grid include (without limitation):
obtaining all necessary permanent and/or temporary consents, approvals, permits and agreements from
TSO, DSO, Regulatory agency, supply company, relevant Ministry and other relevant authorities throughout
the complete process from first energizing of SS and self-consumption up to permanent operation of WF
(COD),
communication and management of all activities with TSO, DSO, Regulatory agency, supply company,
relevant Ministry and other relevant authorities throughout the complete process of construction,
commissioning, testing, technical inspection and final takeover of grid connection facilities by TSO and self
consumption facilities by DSO.

These works with requirements are defined in detail in section 7 of this MFS. FRACTAL Ltd
FRACTAL Ltd Split WF Blacksmith Minimum Functional Specification for BOP Page 18 of 169 1.3.7 Other works 1.3.7 Other works
1.3.7 Other works
Other works, under Contractor responsibility, include works on following infrastructure:
1) Measurement masts (optional),

2) Works on existing infrastructure (as needed),

3) Works and equipment on existing HV substations and OHL 220 kV in TSO ownership,

4) Works and equipment on SS 110/20 kV Debeljaca,

5) Additional works on project (as needed).

6)

These works with requirements are defined in detail in section 6 of this MFS. FRACTAL Ltd
FRACTAL Ltd Split WF Blacksmith Minimum Functional Specification for BOP Page 19 of 169 2 GENERAL REQUIREMENTS 2 GENERAL
REQUIREMENTS
2 GENERAL REQUIREMENTS
2.1 General requirements
2.1.1 Requirements defined in Plan of detail regulation and Urban plans
In accordance with relevant Laws, the Owner has prepared Plan of detail regulation (PDR) with amendment
(PDR) which includes complete infrastructure.
In accordance with requirements from PDR, the Owner has prepared Urban plans (UP) which includes SS
33/220 kV, switchyard 220 kV and OHL 2x220 kV.
Requirements from PDR and UP are referring to terrain levelling, regulation lines, dimensions of roads and
hardstands, special conditions of relevant public authorities, environmental protection etc. and shall be
fully followed by the Contractor. PDR and urban plans are given in Appendix 4.
In case of contradictions between PDR, UP, Main/Basic design and permits, the Contractor shall inform the
Owner, and also shall in coordination with the Owner conduct activities/works to fully comply with
requirements.
2.1.2 General notes for usage of existing surveys, design documentation, permits and approvals
The general overview of delivered documentation with notes for Contractor is given in following table.
Table 2-1 List of MFS Appendices MFS Appendices Explanation and notes
Appendix 1. Current design documentation is provided in
Appendix 1. The Design documentation
includes Main and Basic design, depending on
the procedure for obtaining building permits
for each part of the WF infrastructure
(switchyard 220 kV, OHL 2x220 kV, local access
roads etc.).
In some parts of existing Design, the Designers
have used old versions of the WTG Supplier
documentation. The Contractor shall be aware
that updates of WTG Supplier documentation
are provided in Appendix 7 and the Contractor
shall use only newest/updated versions of
documents.
The Main Design Books for WF part K2.S1,
K2.S2, K2.S.2.1, K2.S3 and K2.S.5 have been
provided to the Contractor as a complete set
of documentation for Main Design. However,
the works and requirements defined in those
books are not Contractors responsibility.
In existing Design there are BoQ tables which
are Incomplete and are given only for
informative purposes. The Contractor has to
be aware that those BoQ tables will not be
part of the contract and are provided by the
Owner only as part of the Design
documentation and if any quantities,
equipment, works or activity is missing, it does
not release the Contractor of obligations as
specified within MFS and BOP Contract. Also,
quantities and prices given in those BoQ tables
are not relevant for any obligation of the
Owner toward Contractor nor as a basis for
any payment, contingency, additional works
etc. In addition to aforementioned, any works,
equipment or activity listed in Main or Basic
Design Books as Owners responsibility, will be
transferred to the Contractors responsibility.
The Contractor shall be responsible for all
works, equipment and activities, whether or
not
Supply, transportation, installation, testing and commissioning of drainage system, including oil
canalisation and oil pit for power transformer. Supply, installation, testing and commissioning of
adequate water supply, sanitation, heating and other systems.
Supply, transportation, installation, testing and commissioning of adequate external lighting
system.
Supply, transportation, installation, testing and commissioning of adequate security systems
(fencing and gates, video surveillance, cyber security, antipanic and security lighting), all with
accordance to the relevant public authorities and insurance company requirements.
Providing any factory inspections and necessary testing of vital components, such as transformers,
switchgears and protection equipment.
Supply, transportation and installation of consumables for the purpose of installing and
commissioning equipment in SS.
Supply, transportation, installation, testing and commissioning of all components of firefighting
system in accordance of requirements from relevant authorities and applicable laws and regulations.
The part of the well has been already constructed. Therefore, the Contractor shall take over the
well and integrate it in complete building system which includes all works and repairs (if necessary).